ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross Length Net Length Prepared By: 163 NA 395 H845501C 163-A-(201)T 31312 NAVAJO NORTHEAST 0.6 David Do Highway Termini Location Work Description KAYENTA-UTAH STATE LINE HWY (US 163) LAGUNA CREEK BRIDGE STR #20088 BRIDGE REPLACEMENT

Printed: 1/23/2019 Page 1 of 18 BID RESULTS FOR 2016138 Bid Opening Date : 12/14/2018, Prequalification Required, Engineer Specialist : David Do Completion Date: 250 Working Days The proposed project is located in Navajo County, on US 163 within the Town of Kayenta on the Navajo Nation Reservation, beginning at Milepost 395.83 and extending north along US 163 to Milepost 396.45. The proposed work consists of removing the existing bridge and constructing a new concrete girder bridge, removing the existing pavement and replacing it with asphaltic concrete (miscellaneous structural) pavement, constructing guardrail, striping and other related work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $7,051,397.67 DEPARTMENT ESTIMATE $7,051,397.67 1 +34.8% $9,508,303.62 2 +38.8% $9,787,346.44 3 +46.9% $10,359,114.00 FNF CONSTRUCTION, INC. 115 S. 48TH STREET TEMPE, AZ 85281 VASTCO, INC. 425 INDUSTRIAL DRIVE CHINO VALLEY, AZ 86323 GRANITE CONSTRUCTION COMPANY 4115 E ILLINOIS ST TUCSON, AZ 85714 $9,508,303.62 $9,787,346.44 $10,359,114.00 Winning Bidder is 34.8% Over Department Estimate (Difference = $2,456,905.95)

Printed: 1/23/2019 Page 2 of 18 Measure Description Quantity Unit Price Extended Amount 2010011 ACRE CLEARING AND GRUBBING Bid Rank Department Estimate 5.000 $1,500.000 $7,500.00 1 FNF CONSTRUCTION, INC. $4,000.000 $20,000.00 +166.7% 2 VASTCO, INC. $1,347.620 $6,738.10-10.2% 3 GRANITE CONSTRUCTION COMPANY $6,000.000 $30,000.00 +300.0% 2020009 CU.YD. REMOVAL OF STRUCTURAL CONCRETE Bid Rank Department Estimate 9.000 $500.000 $4,500.00 1 FNF CONSTRUCTION, INC. $1,000.000 $9,000.00 +100.0% 2 VASTCO, INC. $1,727.240 $15,545.16 +245.4% 3 GRANITE CONSTRUCTION COMPANY $1,300.000 $11,700.00 +160.0% 2020037 EACH REMOVE AND SALVAGE CATTLE GUARDS Bid Rank Department Estimate 1.000 $2,000.000 $2,000.00 1 FNF CONSTRUCTION, INC. $7,500.000 $7,500.00 +275.0% 2 VASTCO, INC. $13,847.760 $13,847.76 +592.4% 3 GRANITE CONSTRUCTION COMPANY $4,000.000 $4,000.00 +100.0% 2020041 L.FT. REMOVAL OF PIPE Bid Rank Department Estimate 315.000 $20.000 $6,300.00 1 FNF CONSTRUCTION, INC. $70.000 $22,050.00 +250.0% 2 VASTCO, INC. $35.220 $11,094.30 +76.1% 3 GRANITE CONSTRUCTION COMPANY $21.000 $6,615.00 +5.0% 2020053 EACH REMOVE (SIGNS) Bid Rank Department Estimate 11.000 $200.000 $2,200.00 1 FNF CONSTRUCTION, INC. $500.000 $5,500.00 +150.0% 2 VASTCO, INC. $189.810 $2,087.91-5.1% 3 GRANITE CONSTRUCTION COMPANY $275.000 $3,025.00 +37.5% 2020057 EACH REMOVE AND SALVAGE (GUARDRAIL END TREATMENT) Bid Rank Department Estimate 4.000 $750.000 $3,000.00 1 FNF CONSTRUCTION, INC. $900.000 $3,600.00 +20.0% 2 VASTCO, INC. $752.900 $3,011.60 +0.4% 3 GRANITE CONSTRUCTION COMPANY $750.000 $3,000.00 +0.0% 2020072 L.FT. REMOVE AND SALVAGE GUARD RAIL Bid Rank Department Estimate 875.000 $4.000 $3,500.00 1 FNF CONSTRUCTION, INC. $4.500 $3,937.50 +12.5% 2 VASTCO, INC. $3.800 $3,325.00-5.0% 3 GRANITE CONSTRUCTION COMPANY $8.000 $7,000.00 +100.0% 2020101 L.FT. REMOVE FENCE Bid Rank Department Estimate 2,657.000 $1.000 $2,657.00 1 FNF CONSTRUCTION, INC. $3.000 $7,971.00 +200.0%

Printed: 1/23/2019 Page 3 of 18 Measure Description Quantity Unit Price Extended Amount 2020101 L.FT. REMOVE FENCE Bid Rank Department Estimate 2,657.000 $1.000 $2,657.00 2 VASTCO, INC. $2.530 $6,722.21 +153.0% 3 GRANITE CONSTRUCTION COMPANY $2.600 $6,908.20 +160.0% 2020115 EACH REMOVE (CATCH BASIN) Bid Rank Department Estimate 2.000 $1,000.000 $2,000.00 1 FNF CONSTRUCTION, INC. $2,500.000 $5,000.00 +150.0% 2 VASTCO, INC. $2,164.050 $4,328.10 +116.4% 3 GRANITE CONSTRUCTION COMPANY $1,750.000 $3,500.00 +75.0% 2020156 EACH REMOVE (HEADWALL) Bid Rank Department Estimate 2.000 $1,000.000 $2,000.00 1 FNF CONSTRUCTION, INC. $2,500.000 $5,000.00 +150.0% 2 VASTCO, INC. $2,164.050 $4,328.10 +116.4% 3 GRANITE CONSTRUCTION COMPANY $1,750.000 $3,500.00 +75.0% 2020365 L.FT. REMOVE LEAD-BASED STRIPING Bid Rank Department Estimate 3,200.000 $5.000 $16,000.00 1 FNF CONSTRUCTION, INC. $4.000 $12,800.00-20.0% 2 VASTCO, INC. $9.870 $31,584.00 +97.4% 3 GRANITE CONSTRUCTION COMPANY $9.100 $29,120.00 +82.0% 2020366 L.SUM REMOVE LEAD-BASED PAINT MATERIALS Bid Rank Department Estimate 1.000 $10,000.000 $10,000.00 1 FNF CONSTRUCTION, INC. $150,000.000 $150,000.00 +1400.0% 2 VASTCO, INC. $23,852.320 $23,852.32 +138.5% 3 GRANITE CONSTRUCTION COMPANY $25,000.000 $25,000.00 +150.0% 2020370 L.SUM DISPOSE OF LEAD-BASED PAINT MATERIALS (FORCE ACCOUNT) Bid Rank Department Estimate 1.000 $5,000.000 $5,000.00 1 FNF CONSTRUCTION, INC. $5,000.000 $5,000.00 +0.0% 2 VASTCO, INC. $5,000.000 $5,000.00 +0.0% 3 GRANITE CONSTRUCTION COMPANY $5,000.000 $5,000.00 +0.0% 2030301 CU.YD. ROADWAY EXCAVATION Bid Rank Department Estimate 12,278.000 $15.000 $184,170.00 1 FNF CONSTRUCTION, INC. $20.000 $245,560.00 +33.3% 2 VASTCO, INC. $25.730 $315,912.94 +71.5% 3 GRANITE CONSTRUCTION COMPANY $38.000 $466,564.00 +153.3% 2030401 CU.YD. DRAINAGE EXCAVATION Bid Rank Department Estimate 245.000 $25.000 $6,125.00 1 FNF CONSTRUCTION, INC. $25.000 $6,125.00 +0.0% 2 VASTCO, INC. $39.280 $9,623.60 +57.1%

Printed: 1/23/2019 Page 4 of 18 Measure Description Quantity Unit Price Extended Amount 2030401 CU.YD. DRAINAGE EXCAVATION Bid Rank Department Estimate 245.000 $25.000 $6,125.00 3 GRANITE CONSTRUCTION COMPANY $650.000 $159,250.00 +2500.0% 2030501 CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate 1,455.000 $40.000 $58,200.00 1 FNF CONSTRUCTION, INC. $22.000 $32,010.00-45.0% 2 VASTCO, INC. $26.450 $38,484.75-33.9% 3 GRANITE CONSTRUCTION COMPANY $50.000 $72,750.00 +25.0% 2050003 SQ.YD. GRADING ROADWAY FOR PAVEMENT (TURNOUTS) Bid Rank Department Estimate 1,055.000 $10.000 $10,550.00 1 FNF CONSTRUCTION, INC. $6.000 $6,330.00-40.0% 2 VASTCO, INC. $39.020 $41,166.10 +290.2% 3 GRANITE CONSTRUCTION COMPANY $8.000 $8,440.00-20.0% 3030022 CU.YD. AGGREGATE BASE, CLASS 2 Bid Rank Department Estimate 3,033.000 $75.000 $227,475.00 1 FNF CONSTRUCTION, INC. $126.000 $382,158.00 +68.0% 2 VASTCO, INC. $114.400 $346,975.20 +52.5% 3 GRANITE CONSTRUCTION COMPANY $150.000 $454,950.00 +100.0% 4040125 TON FOG COAT Bid Rank Department Estimate 1.000 $1,500.000 $1,500.00 1 FNF CONSTRUCTION, INC. $1,000.000 $1,000.00-33.3% 2 VASTCO, INC. $1,898.060 $1,898.06 +26.5% 3 GRANITE CONSTRUCTION COMPANY $1,500.000 $1,500.00 +0.0% 4040163 TON BLOTTER MATERIAL Bid Rank Department Estimate 1.000 $100.000 $100.00 1 FNF CONSTRUCTION, INC. $500.000 $500.00 +400.0% 2 VASTCO, INC. $44.290 $44.29-55.7% 3 GRANITE CONSTRUCTION COMPANY $235.000 $235.00 +135.0% 4090003 TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) Bid Rank Department Estimate 1,926.000 $150.000 $288,900.00 1 FNF CONSTRUCTION, INC. $205.000 $394,830.00 +36.7% 2 VASTCO, INC. $162.600 $313,167.60 +8.4% 3 GRANITE CONSTRUCTION COMPANY $260.000 $500,760.00 +73.3% 4110001 TON ASPHALTIC CONCRETE FRICTION COURSE (MISC.) Bid Rank Department Estimate 153.000 $250.000 $38,250.00 1 FNF CONSTRUCTION, INC. $300.000 $45,900.00 +20.0% 2 VASTCO, INC. $284.710 $43,560.63 +13.9% 3 GRANITE CONSTRUCTION COMPANY $325.000 $49,725.00 +30.0%

Printed: 1/23/2019 Page 5 of 18 Measure Description Quantity Unit Price Extended Amount 5010204 L.FT. PIPE, CORRUGATED METAL, 28" X 20" Bid Rank Department Estimate 398.000 $100.000 $39,800.00 1 FNF CONSTRUCTION, INC. $150.000 $59,700.00 +50.0% 2 VASTCO, INC. $148.650 $59,162.70 +48.7% 3 GRANITE CONSTRUCTION COMPANY $192.000 $76,416.00 +92.0% 5011022 L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 24" Bid Rank Department Estimate 136.000 $100.000 $13,600.00 1 FNF CONSTRUCTION, INC. $250.000 $34,000.00 +150.0% 2 VASTCO, INC. $216.020 $29,378.72 +116.0% 3 GRANITE CONSTRUCTION COMPANY $225.000 $30,600.00 +125.0% 5011023 L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 24" Bid Rank Department Estimate 32.000 $120.000 $3,840.00 1 FNF CONSTRUCTION, INC. $250.000 $8,000.00 +108.3% 2 VASTCO, INC. $443.610 $14,195.52 +269.7% 3 GRANITE CONSTRUCTION COMPANY $225.000 $7,200.00 +87.5% 5011024 L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 24" Bid Rank Department Estimate 46.000 $130.000 $5,980.00 1 FNF CONSTRUCTION, INC. $250.000 $11,500.00 +92.3% 2 VASTCO, INC. $218.010 $10,028.46 +67.7% 3 GRANITE CONSTRUCTION COMPANY $250.000 $11,500.00 +92.3% 5014048 EACH FLARED END SECTION, 48" (C-13.25) Bid Rank Department Estimate 4.000 $2,000.000 $8,000.00 1 FNF CONSTRUCTION, INC. $6,000.000 $24,000.00 +200.0% 2 VASTCO, INC. $2,325.620 $9,302.48 +16.3% 3 GRANITE CONSTRUCTION COMPANY $3,000.000 $12,000.00 +50.0% 5014672 EACH METAL SAFETY END SECTION (28" X 20") Bid Rank Department Estimate 14.000 $1,500.000 $21,000.00 1 FNF CONSTRUCTION, INC. $1,000.000 $14,000.00-33.3% 2 VASTCO, INC. $2,966.740 $41,534.36 +97.8% 3 GRANITE CONSTRUCTION COMPANY $4,000.000 $56,000.00 +166.7% 5019007 L.FT. PIPE (LINER) (EXISTING 48" CMP) Bid Rank Department Estimate 132.000 $140.000 $18,480.00 1 FNF CONSTRUCTION, INC. $480.000 $63,360.00 +242.9% 2 VASTCO, INC. $515.800 $68,085.60 +268.4% 3 GRANITE CONSTRUCTION COMPANY $545.000 $71,940.00 +289.3% 5030142 EACH CONCRETE CATCH BASIN (MEDIAN) (C-15.80) Bid Rank Department Estimate 3.000 $4,500.000 $13,500.00 1 FNF CONSTRUCTION, INC. $8,000.000 $24,000.00 +77.8%

Printed: 1/23/2019 Page 6 of 18 Measure Description Quantity Unit Price Extended Amount 5030142 EACH CONCRETE CATCH BASIN (MEDIAN) (C-15.80) Bid Rank Department Estimate 3.000 $4,500.000 $13,500.00 2 VASTCO, INC. $8,767.820 $26,303.46 +94.8% 3 GRANITE CONSTRUCTION COMPANY $12,000.000 $36,000.00 +166.7% 6010002 CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) Bid Rank Department Estimate 138.000 $500.000 $69,000.00 1 FNF CONSTRUCTION, INC. $700.000 $96,600.00 +40.0% 2 VASTCO, INC. $1,121.410 $154,754.58 +124.3% 3 GRANITE CONSTRUCTION COMPANY $725.000 $100,050.00 +45.0% 6010731 SQ.YD. CONCRETE SLAB (PROTECTIVE) Bid Rank Department Estimate 28.000 $250.000 $7,000.00 1 FNF CONSTRUCTION, INC. $400.000 $11,200.00 +60.0% 2 VASTCO, INC. $416.490 $11,661.72 +66.6% 3 GRANITE CONSTRUCTION COMPANY $475.000 $13,300.00 +90.0% 6050002 LB. REINFORCING STEEL Bid Rank Department Estimate 12,360.000 $1.500 $18,540.00 1 FNF CONSTRUCTION, INC. $3.000 $37,080.00 +100.0% 2 VASTCO, INC. $1.950 $24,102.00 +30.0% 3 GRANITE CONSTRUCTION COMPANY $2.250 $27,810.00 +50.0% 6050012 LB. REINFORCING STEEL (EPOXY COATED) Bid Rank Department Estimate 55.000 $10.000 $550.00 1 FNF CONSTRUCTION, INC. $4.000 $220.00-60.0% 2 VASTCO, INC. $1.270 $69.85-87.3% 3 GRANITE CONSTRUCTION COMPANY $3.000 $165.00-70.0% 6050101 EACH PLACE DOWELS Bid Rank Department Estimate 76.000 $30.000 $2,280.00 1 FNF CONSTRUCTION, INC. $25.000 $1,900.00-16.7% 2 VASTCO, INC. $46.880 $3,562.88 +56.3% 3 GRANITE CONSTRUCTION COMPANY $25.000 $1,900.00-16.7% 6070038 EACH SLIP BASE (P2) Bid Rank Department Estimate 12.000 $250.000 $3,000.00 1 FNF CONSTRUCTION, INC. $250.000 $3,000.00 +0.0% 2 VASTCO, INC. $18.980 $227.76-92.4% 3 GRANITE CONSTRUCTION COMPANY $265.000 $3,180.00 +6.0% 6070054 L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate 60.000 $10.000 $600.00 1 FNF CONSTRUCTION, INC. $20.000 $1,200.00 +100.0% 2 VASTCO, INC. $18.980 $1,138.80 +89.8%

Printed: 1/23/2019 Page 7 of 18 Measure Description Quantity Unit Price Extended Amount 6070054 L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate 60.000 $10.000 $600.00 3 GRANITE CONSTRUCTION COMPANY $22.000 $1,320.00 +120.0% 6070055 L.FT. SIGN POST (PERFORATED) (2 1/2 S) Bid Rank Department Estimate 78.000 $13.000 $1,014.00 1 FNF CONSTRUCTION, INC. $22.000 $1,716.00 +69.2% 2 VASTCO, INC. $25.310 $1,974.18 +94.7% 3 GRANITE CONSTRUCTION COMPANY $24.000 $1,872.00 +84.6% 6070060 EACH FOUNDATION FOR SIGN POST (CONCRETE) Bid Rank Department Estimate 12.000 $250.000 $3,000.00 1 FNF CONSTRUCTION, INC. $250.000 $3,000.00 +0.0% 2 VASTCO, INC. $253.070 $3,036.84 +1.2% 3 GRANITE CONSTRUCTION COMPANY $264.000 $3,168.00 +5.6% 6080005 SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL Bid Rank Department Estimate 45.000 $22.000 $990.00 1 FNF CONSTRUCTION, INC. $40.000 $1,800.00 +81.8% 2 VASTCO, INC. $31.630 $1,423.35 +43.8% 3 GRANITE CONSTRUCTION COMPANY $41.000 $1,845.00 +86.4% 6080025 SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL Bid Rank Department Estimate 1.000 $25.000 $25.00 1 FNF CONSTRUCTION, INC. $60.000 $60.00 +140.0% 2 VASTCO, INC. $31.630 $31.63 +26.5% 3 GRANITE CONSTRUCTION COMPANY $65.000 $65.00 +160.0% 7015032 L.FT. TEMPORARY PREFORMED MARKING (TYPE II, TAPE LINE) Bid Rank Department Estimate 6,596.000 $3.000 $19,788.00 1 FNF CONSTRUCTION, INC. $2.000 $13,192.00-33.3% 2 VASTCO, INC. $3.500 $23,086.00 +16.7% 3 GRANITE CONSTRUCTION COMPANY $1.850 $12,202.60-38.3% 7015042 L.FT. TEMPORARY PAINTED MARKING (STRIPE) Bid Rank Department Estimate 12,783.000 $0.200 $2,556.60 1 FNF CONSTRUCTION, INC. $0.200 $2,556.60 +0.0% 2 VASTCO, INC. $0.340 $4,346.22 +70.0% 3 GRANITE CONSTRUCTION COMPANY $0.200 $2,556.60 +0.0% 7016030 EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 9,720.000 $0.300 $2,916.00 1 FNF CONSTRUCTION, INC. $0.300 $2,916.00 +0.0% 2 VASTCO, INC. $0.420 $4,082.40 +40.0% 3 GRANITE CONSTRUCTION COMPANY $0.260 $2,527.20-13.3%

Printed: 1/23/2019 Page 8 of 18 Measure Description Quantity Unit Price Extended Amount 7016031 EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate 60.000 $0.700 $42.00 1 FNF CONSTRUCTION, INC. $1.000 $60.00 +42.9% 2 VASTCO, INC. $1.050 $63.00 +50.0% 3 GRANITE CONSTRUCTION COMPANY $0.630 $37.80-10.0% 7016033 EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate 603.000 $0.800 $482.40 1 FNF CONSTRUCTION, INC. $1.000 $603.00 +25.0% 2 VASTCO, INC. $1.150 $693.45 +43.7% 3 GRANITE CONSTRUCTION COMPANY $0.700 $422.10-12.5% 7016035 EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 4,187.000 $0.250 $1,046.75 1 FNF CONSTRUCTION, INC. $0.500 $2,093.50 +100.0% 2 VASTCO, INC. $0.310 $1,297.97 +24.0% 3 GRANITE CONSTRUCTION COMPANY $0.200 $837.40-20.0% 7016037 EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 9,720.000 $0.300 $2,916.00 1 FNF CONSTRUCTION, INC. $0.500 $4,860.00 +66.7% 2 VASTCO, INC. $0.310 $3,013.20 +3.3% 3 GRANITE CONSTRUCTION COMPANY $0.200 $1,944.00-33.3% 7016039 EACH-DAY EMBEDDED SIGN POST Bid Rank Department Estimate 8,400.000 $0.200 $1,680.00 1 FNF CONSTRUCTION, INC. $0.500 $4,200.00 +150.0% 2 VASTCO, INC. $0.520 $4,368.00 +160.0% 3 GRANITE CONSTRUCTION COMPANY $0.350 $2,940.00 +75.0% 7016051 EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate 332.000 $0.600 $199.20 1 FNF CONSTRUCTION, INC. $1.000 $332.00 +66.7% 2 VASTCO, INC. $0.730 $242.36 +21.7% 3 GRANITE CONSTRUCTION COMPANY $0.450 $149.40-25.0% 7016052 EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate 4,516.000 $0.700 $3,161.20 1 FNF CONSTRUCTION, INC. $1.000 $4,516.00 +42.9% 2 VASTCO, INC. $0.940 $4,245.04 +34.3% 3 GRANITE CONSTRUCTION COMPANY $0.600 $2,709.60-14.3% 7016061 EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate 4.000 $25.000 $100.00 1 FNF CONSTRUCTION, INC. $50.000 $200.00 +100.0%

Printed: 1/23/2019 Page 9 of 18 Measure Description Quantity Unit Price Extended Amount 7016061 EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate 4.000 $25.000 $100.00 2 VASTCO, INC. $41.990 $167.96 +68.0% 3 GRANITE CONSTRUCTION COMPANY $26.000 $104.00 +4.0% 7016067 EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate 160.000 $35.000 $5,600.00 1 FNF CONSTRUCTION, INC. $60.000 $9,600.00 +71.4% 2 VASTCO, INC. $83.970 $13,435.20 +139.9% 3 GRANITE CONSTRUCTION COMPANY $51.000 $8,160.00 +45.7% 7016075 HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate 4,440.000 $35.000 $155,400.00 1 FNF CONSTRUCTION, INC. $30.000 $133,200.00-14.3% 2 VASTCO, INC. $35.980 $159,751.20 +2.8% 3 GRANITE CONSTRUCTION COMPANY $17.250 $76,590.00-50.7% 7016080 HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate 1,752.000 $65.260 $114,335.52 1 FNF CONSTRUCTION, INC. $65.260 $114,335.52 +0.0% 2 VASTCO, INC. $65.260 $114,335.52 +0.0% 3 GRANITE CONSTRUCTION COMPANY $65.260 $114,335.52 +0.0% 7030053 EACH RESET MILEPOST MARKER Bid Rank Department Estimate 2.000 $300.000 $600.00 1 FNF CONSTRUCTION, INC. $500.000 $1,000.00 +66.7% 2 VASTCO, INC. $63.270 $126.54-78.9% 3 GRANITE CONSTRUCTION COMPANY $700.000 $1,400.00 +133.3% 7030080 EACH OBJECT MARKER (M-23) (TYPE 3(1)) Bid Rank Department Estimate 4.000 $300.000 $1,200.00 1 FNF CONSTRUCTION, INC. $350.000 $1,400.00 +16.7% 2 VASTCO, INC. $432.750 $1,731.00 +44.3% 3 GRANITE CONSTRUCTION COMPANY $500.000 $2,000.00 +66.7% 7060101 EACH PAVEMENT MARKER, RECESSED, TYPE D Bid Rank Department Estimate 83.000 $10.000 $830.00 1 FNF CONSTRUCTION, INC. $20.000 $1,660.00 +100.0% 2 VASTCO, INC. $33.890 $2,812.87 +238.9% 3 GRANITE CONSTRUCTION COMPANY $18.000 $1,494.00 +80.0% 7080001 L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 6,570.000 $0.300 $1,971.00 1 FNF CONSTRUCTION, INC. $0.200 $1,314.00-33.3% 2 VASTCO, INC. $0.340 $2,233.80 +13.3%

Printed: 1/23/2019 Page 10 of 18 Measure Description Quantity Unit Price Extended Amount 7080001 L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 6,570.000 $0.300 $1,971.00 3 GRANITE CONSTRUCTION COMPANY $0.200 $1,314.00-33.3% 7080011 L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW) Bid Rank Department Estimate 6,600.000 $0.300 $1,980.00 1 FNF CONSTRUCTION, INC. $0.200 $1,320.00-33.3% 2 VASTCO, INC. $0.340 $2,244.00 +13.3% 3 GRANITE CONSTRUCTION COMPANY $0.200 $1,320.00-33.3% 7090001 L.FT. DUAL COMPONENT PAVEMENT MARKING (WHITE EPOXY) Bid Rank Department Estimate 9,855.000 $0.500 $4,927.50 1 FNF CONSTRUCTION, INC. $0.400 $3,942.00-20.0% 2 VASTCO, INC. $0.790 $7,785.45 +58.0% 3 GRANITE CONSTRUCTION COMPANY $0.450 $4,434.75-10.0% 7090002 L.FT. DUAL COMPONENT PAVEMENT MARKING (YELLOW EPOXY) Bid Rank Department Estimate 9,900.000 $0.500 $4,950.00 1 FNF CONSTRUCTION, INC. $0.400 $3,960.00-20.0% 2 VASTCO, INC. $0.790 $7,821.00 +58.0% 3 GRANITE CONSTRUCTION COMPANY $0.450 $4,455.00-10.0% 8050003 ACRE SEEDING (CLASS II) Bid Rank Department Estimate 10.000 $3,500.000 $35,000.00 1 FNF CONSTRUCTION, INC. $5,000.000 $50,000.00 +42.9% 2 VASTCO, INC. $5,013.480 $50,134.80 +43.2% 3 GRANITE CONSTRUCTION COMPANY $3,500.000 $35,000.00 +0.0% 8101008 CU.YD. EROSION CONTROL (RIPRAP) (GRADATION A) Bid Rank Department Estimate 114.000 $100.000 $11,400.00 1 FNF CONSTRUCTION, INC. $150.000 $17,100.00 +50.0% 2 VASTCO, INC. $171.220 $19,519.08 +71.2% 3 GRANITE CONSTRUCTION COMPANY $72.000 $8,208.00-28.0% 8101012 L.FT. EROSION CONTROL (SILT FENCE ) Bid Rank Department Estimate 1,143.000 $8.000 $9,144.00 1 FNF CONSTRUCTION, INC. $5.000 $5,715.00-37.5% 2 VASTCO, INC. $4.870 $5,566.41-39.1% 3 GRANITE CONSTRUCTION COMPANY $7.000 $8,001.00-12.5% 8101014 L.FT. EROSION CONTROL (WATTLES) (20") Bid Rank Department Estimate 374.000 $8.000 $2,992.00 1 FNF CONSTRUCTION, INC. $6.000 $2,244.00-25.0% 2 VASTCO, INC. $4.110 $1,537.14-48.6% 3 GRANITE CONSTRUCTION COMPANY $4.750 $1,776.50-40.6%

Printed: 1/23/2019 Page 11 of 18 Measure Description Quantity Unit Price Extended Amount 8101018 SQ.YD. EROSION CONTROL (STABILIZED CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD) Bid Rank Department Estimate 1,000.000 $25.000 $25,000.00 1 FNF CONSTRUCTION, INC. $10.000 $10,000.00-60.0% 2 VASTCO, INC. $42.420 $42,420.00 +69.7% 3 GRANITE CONSTRUCTION COMPANY $30.000 $30,000.00 +20.0% 8101021 L.FT. EROSION CONTROL (WATTLES) (9") Bid Rank Department Estimate 4,076.000 $4.000 $16,304.00 1 FNF CONSTRUCTION, INC. $2.500 $10,190.00-37.5% 2 VASTCO, INC. $2.230 $9,089.48-44.3% 3 GRANITE CONSTRUCTION COMPANY $1.800 $7,336.80-55.0% 8101023 L.FT. EROSION CONTROL (WATTLES) (12") Bid Rank Department Estimate 132.000 $6.000 $792.00 1 FNF CONSTRUCTION, INC. $5.000 $660.00-16.7% 2 VASTCO, INC. $3.160 $417.12-47.3% 3 GRANITE CONSTRUCTION COMPANY $3.500 $462.00-41.7% 8101029 CU.YD. EROSION CONTROL (ROCK MULCH) (GRADATION C) Bid Rank Department Estimate 62.000 $100.000 $6,200.00 1 FNF CONSTRUCTION, INC. $150.000 $9,300.00 +50.0% 2 VASTCO, INC. $171.220 $10,615.64 +71.2% 3 GRANITE CONSTRUCTION COMPANY $100.000 $6,200.00 +0.0% 9010001 L.SUM MOBILIZATION Bid Rank Department Estimate 1.000 $700,000.000 $700,000.00 1 FNF CONSTRUCTION, INC. $947,000.000 $947,000.00 +35.3% 2 VASTCO, INC. $950,000.000 $950,000.00 +35.7% 3 GRANITE CONSTRUCTION COMPANY $1,005,616.530 $1,005,616.53 +43.7% 9020003 L.FT. CHAIN LINK FENCE, TYPE 1 (60") Bid Rank Department Estimate 124.000 $20.000 $2,480.00 1 FNF CONSTRUCTION, INC. $22.000 $2,728.00 +10.0% 2 VASTCO, INC. $23.470 $2,910.28 +17.3% 3 GRANITE CONSTRUCTION COMPANY $22.000 $2,728.00 +10.0% 9020030 L.FT. CHAIN LINK FENCE (FOR STRUCTURE) Bid Rank Department Estimate 159.000 $50.000 $7,950.00 1 FNF CONSTRUCTION, INC. $45.000 $7,155.00-10.0% 2 VASTCO, INC. $49.610 $7,887.99-0.8% 3 GRANITE CONSTRUCTION COMPANY $46.000 $7,314.00-8.0% 9030012 L.FT. BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate 3,377.000 $15.000 $50,655.00 1 FNF CONSTRUCTION, INC. $2.500 $8,442.50-83.3%

Printed: 1/23/2019 Page 12 of 18 Measure Description Quantity Unit Price Extended Amount 9030012 L.FT. BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate 3,377.000 $15.000 $50,655.00 2 VASTCO, INC. $2.400 $8,104.80-84.0% 3 GRANITE CONSTRUCTION COMPANY $2.250 $7,598.25-85.0% 9030100 EACH FENCE GATE, TYPE 1, SINGLE Bid Rank Department Estimate 1.000 $1,500.000 $1,500.00 1 FNF CONSTRUCTION, INC. $400.000 $400.00-73.3% 2 VASTCO, INC. $379.610 $379.61-74.7% 3 GRANITE CONSTRUCTION COMPANY $500.000 $500.00-66.7% 9030212 L.FT. RECONSTRUCT BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate 320.000 $5.000 $1,600.00 1 FNF CONSTRUCTION, INC. $2.200 $704.00-56.0% 2 VASTCO, INC. $2.150 $688.00-57.0% 3 GRANITE CONSTRUCTION COMPANY $2.000 $640.00-60.0% 9050003 L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH) Bid Rank Department Estimate 1,138.000 $25.000 $28,450.00 1 FNF CONSTRUCTION, INC. $22.000 $25,036.00-12.0% 2 VASTCO, INC. $24.670 $28,074.46-1.3% 3 GRANITE CONSTRUCTION COMPANY $23.000 $26,174.00-8.0% 9050025 EACH GUARD RAIL TERMINAL (MASH) Bid Rank Department Estimate 4.000 $3,500.000 $14,000.00 1 FNF CONSTRUCTION, INC. $4,500.000 $18,000.00 +28.6% 2 VASTCO, INC. $4,871.690 $19,486.76 +39.2% 3 GRANITE CONSTRUCTION COMPANY $4,600.000 $18,400.00 +31.4% 9050419 EACH GUARD RAIL TRANSITION (C-10.30) Bid Rank Department Estimate 2.000 $2,500.000 $5,000.00 1 FNF CONSTRUCTION, INC. $4,500.000 $9,000.00 +80.0% 2 VASTCO, INC. $4,492.080 $8,984.16 +79.7% 3 GRANITE CONSTRUCTION COMPANY $4,200.000 $8,400.00 +68.0% 9050420 EACH GUARD RAIL TRANSITION (C-10.31) Bid Rank Department Estimate 2.000 $2,500.000 $5,000.00 1 FNF CONSTRUCTION, INC. $5,000.000 $10,000.00 +100.0% 2 VASTCO, INC. $5,434.790 $10,869.58 +117.4% 3 GRANITE CONSTRUCTION COMPANY $5,100.000 $10,200.00 +104.0% 9060021 EACH CATTLE GUARD (2 UNIT) Bid Rank Department Estimate 1.000 $12,000.000 $12,000.00 1 FNF CONSTRUCTION, INC. $17,000.000 $17,000.00 +41.7% 2 VASTCO, INC. $34,705.260 $34,705.26 +189.2%

Printed: 1/23/2019 Page 13 of 18 Measure Description Quantity Unit Price Extended Amount 9060021 EACH CATTLE GUARD (2 UNIT) Bid Rank Department Estimate 1.000 $12,000.000 $12,000.00 3 GRANITE CONSTRUCTION COMPANY $17,000.000 $17,000.00 +41.7% 9060031 EACH CATTLE GUARD (3 UNIT) Bid Rank Department Estimate 1.000 $18,000.000 $18,000.00 1 FNF CONSTRUCTION, INC. $25,000.000 $25,000.00 +38.9% 2 VASTCO, INC. $44,357.340 $44,357.34 +146.4% 3 GRANITE CONSTRUCTION COMPANY $21,000.000 $21,000.00 +16.7% 9060041 EACH CATTLE GUARD (4 UNIT) Bid Rank Department Estimate 1.000 $24,000.000 $24,000.00 1 FNF CONSTRUCTION, INC. $30,000.000 $30,000.00 +25.0% 2 VASTCO, INC. $54,009.430 $54,009.43 +125.0% 3 GRANITE CONSTRUCTION COMPANY $31,000.000 $31,000.00 +29.2% 9060051 EACH CATTLE GUARD (5 UNIT) Bid Rank Department Estimate 1.000 $30,000.000 $30,000.00 1 FNF CONSTRUCTION, INC. $36,000.000 $36,000.00 +20.0% 2 VASTCO, INC. $63,661.520 $63,661.52 +112.2% 3 GRANITE CONSTRUCTION COMPANY $40,000.000 $40,000.00 +33.3% 9130001 CU.YD. RIPRAP (DUMPED) Bid Rank Department Estimate 20.000 $150.000 $3,000.00 1 FNF CONSTRUCTION, INC. $200.000 $4,000.00 +33.3% 2 VASTCO, INC. $171.220 $3,424.40 +14.1% 3 GRANITE CONSTRUCTION COMPANY $300.000 $6,000.00 +100.0% 9130002 CU.YD. RIPRAP (WIRE-TIED) Bid Rank Department Estimate 54.000 $160.000 $8,640.00 1 FNF CONSTRUCTION, INC. $250.000 $13,500.00 +56.3% 2 VASTCO, INC. $171.220 $9,245.88 +7.0% 3 GRANITE CONSTRUCTION COMPANY $600.000 $32,400.00 +275.0% 9130005 CU.YD. RIPRAP (GABIONS) Bid Rank Department Estimate 498.000 $200.000 $99,600.00 1 FNF CONSTRUCTION, INC. $280.000 $139,440.00 +40.0% 2 VASTCO, INC. $412.460 $205,405.08 +106.2% 3 GRANITE CONSTRUCTION COMPANY $660.000 $328,680.00 +230.0% 9130010 CU.YD. RIPRAP (GROUTED) (GABIONS) Bid Rank Department Estimate 196.000 $200.000 $39,200.00 1 FNF CONSTRUCTION, INC. $380.000 $74,480.00 +90.0% 2 VASTCO, INC. $493.160 $96,659.36 +146.6% 3 GRANITE CONSTRUCTION COMPANY $925.000 $181,300.00 +362.5%

Printed: 1/23/2019 Page 14 of 18 Measure Description Quantity Unit Price Extended Amount 9140121 SQ.FT. RETAINING WALL (REINFORCED CONCRETE) Bid Rank Department Estimate 1,037.000 $75.000 $77,775.00 1 FNF CONSTRUCTION, INC. $120.000 $124,440.00 +60.0% 2 VASTCO, INC. $171.170 $177,503.29 +128.2% 3 GRANITE CONSTRUCTION COMPANY $120.000 $124,440.00 +60.0% 9160001 L.FT. EMBANKMENT CURB Bid Rank Department Estimate 72.000 $20.000 $1,440.00 1 FNF CONSTRUCTION, INC. $26.000 $1,872.00 +30.0% 2 VASTCO, INC. $24.490 $1,763.28 +22.4% 3 GRANITE CONSTRUCTION COMPANY $45.000 $3,240.00 +125.0% 9170001 L.FT. EMBANKMENT SPILLWAY (C-4.10) Bid Rank Department Estimate 40.000 $100.000 $4,000.00 1 FNF CONSTRUCTION, INC. $100.000 $4,000.00 +0.0% 2 VASTCO, INC. $151.450 $6,058.00 +51.5% 3 GRANITE CONSTRUCTION COMPANY $60.000 $2,400.00-40.0% 9170021 EACH INLET (C-4.10) (SINGLE) Bid Rank Department Estimate 2.000 $3,000.000 $6,000.00 1 FNF CONSTRUCTION, INC. $2,600.000 $5,200.00-13.3% 2 VASTCO, INC. $1,460.130 $2,920.26-51.3% 3 GRANITE CONSTRUCTION COMPANY $3,500.000 $7,000.00 +16.7% 9170041 EACH OUTLET (C-4.10) Bid Rank Department Estimate 1.000 $2,500.000 $2,500.00 1 FNF CONSTRUCTION, INC. $3,000.000 $3,000.00 +20.0% 2 VASTCO, INC. $4,166.750 $4,166.75 +66.7% 3 GRANITE CONSTRUCTION COMPANY $2,000.000 $2,000.00-20.0% 9240010 L.SUM FORCE ACCOUNT WORK (BIOLOGIST) Bid Rank Department Estimate 1.000 $15,000.000 $15,000.00 1 FNF CONSTRUCTION, INC. $15,000.000 $15,000.00 +0.0% 2 VASTCO, INC. $15,000.000 $15,000.00 +0.0% 3 GRANITE CONSTRUCTION COMPANY $15,000.000 $15,000.00 +0.0% 9240015 L.SUM FORCE ACCOUNT WORK (DEWATERING) Bid Rank Department Estimate 1.000 $100,000.000 $100,000.00 1 FNF CONSTRUCTION, INC. $100,000.000 $100,000.00 +0.0% 2 VASTCO, INC. $100,000.000 $100,000.00 +0.0% 3 GRANITE CONSTRUCTION COMPANY $100,000.000 $100,000.00 +0.0% 9240111 L.FT. MISCELLANEOUS WORK (CONCRETE LINED DITCH, DETAIL B) Bid Rank Department Estimate 483.000 $50.000 $24,150.00 1 FNF CONSTRUCTION, INC. $75.000 $36,225.00 +50.0%

Printed: 1/23/2019 Page 15 of 18 Measure Description Quantity Unit Price Extended Amount 9240111 L.FT. MISCELLANEOUS WORK (CONCRETE LINED DITCH, DETAIL B) Bid Rank Department Estimate 483.000 $50.000 $24,150.00 2 VASTCO, INC. $215.410 $104,043.03 +330.8% 3 GRANITE CONSTRUCTION COMPANY $60.000 $28,980.00 +20.0% 9240170 L.SUM CONTRACTOR QUALITY CONTROL Bid Rank Department Estimate 1.000 $75,000.000 $75,000.00 1 FNF CONSTRUCTION, INC. $120,000.000 $120,000.00 +60.0% 2 VASTCO, INC. $56,941.890 $56,941.89-24.1% 3 GRANITE CONSTRUCTION COMPANY $75,000.000 $75,000.00 +0.0% 9240181 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (MANUAL / MECHANICAL METHODS) Bid Rank Department Estimate 21,780.000 $0.600 $13,068.00 1 FNF CONSTRUCTION, INC. $0.600 $13,068.00 +0.0% 2 VASTCO, INC. $0.640 $13,939.20 +6.7% 3 GRANITE CONSTRUCTION COMPANY $0.500 $10,890.00-16.7% 9240182 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (HERBICIDE) Bid Rank Department Estimate 26,620.000 $0.300 $7,986.00 1 FNF CONSTRUCTION, INC. $0.200 $5,324.00-33.3% 2 VASTCO, INC. $0.240 $6,388.80-20.0% 3 GRANITE CONSTRUCTION COMPANY $0.500 $13,310.00 +66.7% 9250001 L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate 1.000 $100,000.000 $100,000.00 1 FNF CONSTRUCTION, INC. $120,000.000 $120,000.00 +20.0% 2 VASTCO, INC. $126,537.520 $126,537.52 +26.5% 3 GRANITE CONSTRUCTION COMPANY $175,000.000 $175,000.00 +75.0% 9280034 L.FT. GROUND-IN RUMBLE STRIP (6 INCH) Bid Rank Department Estimate 4,928.000 $0.500 $2,464.00 1 FNF CONSTRUCTION, INC. $1.000 $4,928.00 +100.0% 2 VASTCO, INC. $0.320 $1,576.96-36.0% 3 GRANITE CONSTRUCTION COMPANY $1.000 $4,928.00 +100.0% 2020002 A L.SUM REMOVE BRIDGE Bid Rank Department Estimate 1.000 $250,000.000 $250,000.00 1 FNF CONSTRUCTION, INC. $189,000.000 $189,000.00-24.4% 2 VASTCO, INC. $337,423.340 $337,423.34 +35.0% 3 GRANITE CONSTRUCTION COMPANY $340,000.000 $340,000.00 +36.0% 2030501 A CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate 150.000 $50.000 $7,500.00 1 FNF CONSTRUCTION, INC. $320.000 $48,000.00 +540.0% 2 VASTCO, INC. $1,013.170 $151,975.50 +1926.3%

Printed: 1/23/2019 Page 16 of 18 Measure Description Quantity Unit Price Extended Amount 2030501 A CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate 150.000 $50.000 $7,500.00 3 GRANITE CONSTRUCTION COMPANY $150.000 $22,500.00 +200.0% 2030506 A CU.YD. STRUCTURE BACKFILL Bid Rank Department Estimate 180.000 $100.000 $18,000.00 1 FNF CONSTRUCTION, INC. $220.000 $39,600.00 +120.0% 2 VASTCO, INC. $170.710 $30,727.80 +70.7% 3 GRANITE CONSTRUCTION COMPANY $250.000 $45,000.00 +150.0% 6010003 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500) Bid Rank Department Estimate 622.000 $650.000 $404,300.00 1 FNF CONSTRUCTION, INC. $1,300.000 $808,600.00 +100.0% 2 VASTCO, INC. $1,378.170 $857,221.74 +112.0% 3 GRANITE CONSTRUCTION COMPANY $1,000.000 $622,000.00 +53.8% 6010005 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500) Bid Rank Department Estimate 642.000 $750.000 $481,500.00 1 FNF CONSTRUCTION, INC. $1,100.000 $706,200.00 +46.7% 2 VASTCO, INC. $1,161.300 $745,554.60 +54.8% 3 GRANITE CONSTRUCTION COMPANY $1,200.000 $770,400.00 +60.0% 6010505 A SQ.YD. BRIDGE REPAIR (PENETRATING CRACK SEAL) Bid Rank Department Estimate 2,059.000 $25.000 $51,475.00 1 FNF CONSTRUCTION, INC. $12.000 $24,708.00-52.0% 2 VASTCO, INC. $26.570 $54,707.63 +6.3% 3 GRANITE CONSTRUCTION COMPANY $33.000 $67,947.00 +32.0% 6010831 A SQ.YD. GROOVE BRIDGE DECK Bid Rank Department Estimate 1,938.000 $12.000 $23,256.00 1 FNF CONSTRUCTION, INC. $7.000 $13,566.00-41.7% 2 VASTCO, INC. $8.650 $16,763.70-27.9% 3 GRANITE CONSTRUCTION COMPANY $6.000 $11,628.00-50.0% 6011140 A L.FT. F-SHAPE BRIDGE CONCRETE BARRIER AND TRANSITION (34") Bid Rank Department Estimate 1,124.000 $130.000 $146,120.00 1 FNF CONSTRUCTION, INC. $120.000 $134,880.00-7.7% 2 VASTCO, INC. $99.910 $112,298.84-23.1% 3 GRANITE CONSTRUCTION COMPANY $129.000 $144,996.00-0.8% 6011345 A L.FT. DECK JOINT ASSEMBLY (STRIP SEAL JOINT) Bid Rank Department Estimate 68.000 $300.000 $20,400.00 1 FNF CONSTRUCTION, INC. $250.000 $17,000.00-16.7% 2 VASTCO, INC. $347.860 $23,654.48 +16.0% 3 GRANITE CONSTRUCTION COMPANY $359.000 $24,412.00 +19.7%

Printed: 1/23/2019 Page 17 of 18 Measure Description Quantity Unit Price Extended Amount 6011371 A SQ.FT. APPROACH SLAB (SD 2.01) Bid Rank Department Estimate 1,108.000 $35.000 $38,780.00 1 FNF CONSTRUCTION, INC. $35.000 $38,780.00 +0.0% 2 VASTCO, INC. $45.300 $50,192.40 +29.4% 3 GRANITE CONSTRUCTION COMPANY $43.000 $47,644.00 +22.9% 6014956 A L.FT. PRECAST, P/S MEMBER (AASHTO TYPE 6 MOD. GR.) Bid Rank Department Estimate 2,540.000 $320.000 $812,800.00 1 FNF CONSTRUCTION, INC. $524.000 $1,330,960.00 +63.8% 2 VASTCO, INC. $535.380 $1,359,865.20 +67.3% 3 GRANITE CONSTRUCTION COMPANY $630.000 $1,600,200.00 +96.9% 6015101 A EACH RESTRAINERS, VERTICAL EARTHQUAKE (FIXED) Bid Rank Department Estimate 24.000 $200.000 $4,800.00 1 FNF CONSTRUCTION, INC. $150.000 $3,600.00-25.0% 2 VASTCO, INC. $283.480 $6,803.52 +41.7% 3 GRANITE CONSTRUCTION COMPANY $200.000 $4,800.00 +0.0% 6015102 A EACH RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION) Bid Rank Department Estimate 16.000 $250.000 $4,000.00 1 FNF CONSTRUCTION, INC. $300.000 $4,800.00 +20.0% 2 VASTCO, INC. $330.330 $5,285.28 +32.1% 3 GRANITE CONSTRUCTION COMPANY $400.000 $6,400.00 +60.0% 6050002 A LB. REINFORCING STEEL Bid Rank Department Estimate 122,120.000 $1.300 $158,756.00 1 FNF CONSTRUCTION, INC. $2.000 $244,240.00 +53.8% 2 VASTCO, INC. $1.410 $172,189.20 +8.5% 3 GRANITE CONSTRUCTION COMPANY $1.700 $207,604.00 +30.8% 6050012 A LB. REINFORCING STEEL (EPOXY COATED) Bid Rank Department Estimate 163,875.000 $1.500 $245,812.50 1 FNF CONSTRUCTION, INC. $2.000 $327,750.00 +33.3% 2 VASTCO, INC. $1.620 $265,477.50 +8.0% 3 GRANITE CONSTRUCTION COMPANY $1.930 $316,278.75 +28.7% 6090060 B L.FT. DRILLED SHAFT FOUNDATION (60") Bid Rank Department Estimate 251.000 $1,800.000 $451,800.00 1 FNF CONSTRUCTION, INC. $2,100.000 $527,100.00 +16.7% 2 VASTCO, INC. $1,696.290 $425,768.79-5.8% 3 GRANITE CONSTRUCTION COMPANY $1,622.000 $407,122.00-9.9% 6090149 B L.FT. DRILLED SHAFT FOUNDATION (108") Bid Rank Department Estimate 63.000 $4,000.000 $252,000.00 1 FNF CONSTRUCTION, INC. $6,000.000 $378,000.00 +50.0%

Printed: 1/23/2019 Page 18 of 18 Measure Description Quantity Unit Price Extended Amount 6090149 B L.FT. DRILLED SHAFT FOUNDATION (108") Bid Rank Department Estimate 63.000 $4,000.000 $252,000.00 2 VASTCO, INC. $4,992.460 $314,524.98 +24.8% 3 GRANITE CONSTRUCTION COMPANY $4,624.000 $291,312.00 +15.6% 6091025 B L.FT. DRILLED SHAFT FOR FOUNDATION (ROCK) (54") Bid Rank Department Estimate 40.000 $2,000.000 $80,000.00 1 FNF CONSTRUCTION, INC. $4,000.000 $160,000.00 +100.0% 2 VASTCO, INC. $1,515.440 $60,617.60-24.2% 3 GRANITE CONSTRUCTION COMPANY $1,496.000 $59,840.00-25.2% 6091030 B L.FT. DRILLED SHAFTS (ROCK) (102") Bid Rank Department Estimate 82.000 $7,000.000 $574,000.00 1 FNF CONSTRUCTION, INC. $5,000.000 $410,000.00-28.6% 2 VASTCO, INC. $5,257.890 $431,146.98-24.9% 3 GRANITE CONSTRUCTION COMPANY $5,050.000 $414,100.00-27.9%