1850 COUNTY OF SANTA CLARA CALGREEN NON-RESIDENTIAL CHECKLIST The rovisions of individual sections of Chater 5 aly to newly constructed buildings, building additions of 1,000 square feet or greater, and/or building alterations with a ermit valuation of $200,000 or above er 301.3. A code section will be designated by a banner to indicate where the code section only alies to newly constructed buildings (N) or to additions and/or alterations (A). When the code section alies to both, no banner will be used. New Buildings < 25,000 SF (MAND), 25,000 SF (MAND + TIER 1) County Amendments in Italics. Project Data: Address: APN: Owner: Directions to Alicant: Incororate this form onto the lans and comlete the Plan Check Review Data found in the table below. Date: REFERENCE ( Comliance or detail ) Agency PLANNING AND DESIGN: MANDATORY S 1 5.106.1 Storm water ollution revention lan 2 5.106.4 Bicycle Parking 3 5.106.4.1.1 Short-term bicycle arking 4 5.106.4.1.2 Long-term bicycle arking 5 5.106.5.2 Designated Parking 6 5.106.5.2.1 Parking stall marking 7 5.106.5.3 7a 5.106.5.3.1 Electrical Vehicle (EV) charging. At least 5 ercent of the total arking saces, but not less than one, shall be caable of suorting future electric vehicle suly equiment (EVSE). (N) Single charging sace requirements. When only a single charging sace is required, a raceway is required to be installed at the time of construction and shall be installed in accordance with the California Electrical Code. (N)

Plan Check Review Data ( or detail ) Agency 7b 5.106.5.3.2 7c 5.106.5.3.3 Buildings with more than 100 new arking saces. Install Level 2 EVSE to service one (1) ercent of the total number of arking saces. The ercentage calculated shall be rounded u to the next whole number. The EVSE shall be located within the arking area. (N) Shared Parking. When arking is rovided to new buildings from shared arking lots, including existing and new arking lots, the requirements of this section may be met through the installation of re-wiring and/or EVSE among both the existing and new arking lots. (N) 8 5.106.8 Light ollution Reduction (N) 9 5.106.10 Grading and Paving PLANNING AND DESIGN: TIER 1 S 10 A5.106.5.1.1 11 A5.106.11.2 Designated Parking for fuel-efficient vehicles (10% of total saces) Cool Roof for reduction of heat island effect 12 13 5.201.1 Comly with one elective measure ENERGY EFFICIENCY: MANDATORY S Building meets or exceeds the requirements of the California Energy Efficiency Standards WATER EFFICIENCY & CONSERVATION: MANDATORY S 14 5.303.1.1 New buildings or additions in excess of 50,000 square feet/submeter 15 5.303.1.2 Excess comsumtion 16 5.303.3 Water Conserving lumbing fixtures and fittings 17 5.303.3.1 Water Closets

( or detail ) Agency 18 5.303.3.2 Urinals 19 5.303.3.3.1 Single Showerheads 20 5.303.3.3.2 Multile Showerheads 21 5.303.4 Areas of additions or alteration 22 5.303.6 Standards for lumbing fixtures and fittings 23 5.304.1 Water Budget 24 5.304.2 Outdoor otable water use 25 5.304.3 Irrigation Design 26 5.304.3.1 Irrigation controllers WATER EFFICIENCY & CONSERVATION: TIER 1 S 27 A5.303.2.3.1 12% Savings (Plumbing Fixtures) 28 A5.304.4.1 Potable Water Reduction (Tier 1) 29 Comly with one elective measure

Plan Check Review Data or detail ) Agency ( MATERIAL CONSERVATION & RESOURCE EFFICIENCY: MANDATORY S 30 5.407.1 Weather rotection 31 5.407.2 Moisture control 32 5.407.2.1 Srinklers 33 5.407.2.2 Entries and oenings 34 5.407.2.2.2 Flashing 35 5.408.1 Construction Waste management 36 5.408.1.1 Construction Waste management lan 37 5.408.1.2 Waste management comany 38 5.408.1.3 Waste stream reduction alternative 39 5.408.1.4 40 5.408.3 41 5.410.1.1 on of the waste management lan Excavated soil and land clearing debris Additions shall rovide recycling areas on site (A) 42 5.410.2 Commissioning (N) 43 5.410.2.1 Owner's Project Requirements (N)

Plan Check Review Data or detail ) Agency ( MATERIAL CONSERVATION & RESOURCE EFFICIENCY: MANDATORY S 44 5.410.2.2 Basis of Design (N) 45 5.410.2.3 Commissioning Plan (N) 46 5.410.2.5.1 Systems manual (N) 47 5.410.2.5.2 Systems oerations training (N) 48 5.410.2.6 Commissioning reort (N) 49 5.410.4 Testing and adjusting 50 5.410.4.2 Systems 51 5.410.4.3 Procedures 52 5.410.4.3.1 HVAC balancing 53 5.410.4.4 Reorting 54 5.410.4.5 Oerations and maintenance manual 55 5.410.4.5.1. Insections and reorts MATERIAL CONSERVATION & RESOURCE EFFICIENCY: TIER 1 S 56 A5.405.4 Recycled Content - Tier 1 57 A5.408.3.1 Enhanced construction waste reduction- 65% 58 Comly with one elective measure

or detail ) Agency ( ENVIRONMENTAL QUALITY: MANDATORY S 59 5.503.1 Firelace 60 5.503.1.1 Woodstoves (as alicable) 61 5.504.1.3 Temorary Ventilation 62 5.504.3 Covering of duct oenings and rotection of mechanical equiment during construction 63 5.504.4 Finish Material ollutant control 64 5.504.4.1 Adhesives, sealants, caulks 65 5.504.4.3 Paints and Coatings 66 5.504.4.3.1 Aerosol aints and coatings 67 5.504.4.3.2 Verification 68 5.504.4.4 Caret systems 69 5.504.4.4.1 Caret Cushion 70 5.504.4.4.2 Caret adhesive 71 5.504.4.5 Comosite Wood Products 72 5.504.4.5.3 on

or detail ) Agency ( ENVIRONMENTAL QUALITY: MANDATORY S 73 5.504.4.6 Reslient flooring systems 74 5.504.4.6.1 Verificiation of comliance 75 5.504.5.3 Filters 76 5.505.1 Indoor moisture control 77 5.506.1 Outside air delivery 78 5.506.2 Carbon dioxide monitoring 79 5.507.4 Acoustical Control 80 5.507.4.1 81 5.507.4.1.1 Exterior Noise Transmission Prescritive Method Noise Exosure where noise contours are not readily available 82 5.507.4.2 Performance Method 83 5.507.4.2.1 Site features and on 84 5.507.4.3 Interior Sound Transmission 85 5.508.1 Ozone deletion and global warming red. 86 5.508.1.1 CFCs 87 5.508.1.2 Halons 88 5.508.2 Suermarket refrigerant leak reduction ENVIRONMENTAL QUALITY: TIER 1 S 89 A5.504.4.7 Resilient floor systems 90 A5.504.4.8 Thermal Insulation 91 Comly with one elective measure