DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang

Similar documents
Vietnam seaport system. PHAM ANH TUAN Deputy General Director Portcoast Consultant Corporation

NEW FEED-IN- TARIFF MECHANISM FOR VIETNAMESE SOLAR ENERGY PROJECTS

OVERVIEW OF RURAL WATER SUPPLY IN VIETNAM

Lessons Learned: NAMA development in Vietnam

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 13/2008/QD-BGTVT Hanoi, August 6, 2008

Asia: Water Opportunity Workshop

MSMEs' Competitiveness and Innovation in the Digital Age

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 1037/QĐ-TTg Hanoi, June 24, 2014 DECISION

Low Carbon Development and Nationally Appropriate Mitigation Action - Status and the Development of Wind and Waste NAMA

PPP in Vietnam- Current Status & Prospect VFCEA. Prof. Dr(sr). PHAM HONG GIANG Vietnam Federation of Civil Engineering Associations

STRATEGY OF VIETNAM TOWARDS ADDRESSING ENVIRONMENT AND CLIMATE RISKS

3 Classification of post items to the letters according to their size (Conv., art. 14; Regs., art. RL 121.2) No

DECISION On approval of the Forest Protection and Development Plan for the period PRIME MINISTER OF THE GOVERNMENT

Current status of exploitation and utilization of mineral water and hot water resources in South central Vietnam

The Red River Delta Transport Development Program

A Comparative Analysis of Domestic Patent Applications of South-East Asian Countries using Harschman-Herfindahl Index

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

PORT AND LOGISTICS INFRASTRUCTURE IN VIETNAM, OPPORTUNITES FOR COOPERATIVE DEVELOPMENT. MSc. NGUYEN XUAN TINH Busan, Oct 2018

Viet Nam Urban Development Policies/Strategies toward adaptation for climate change

SALINITY INTRUSION TREND IN RIVER AND CANAL SYSTEMS AND SOME PREVENTION METHODS IN BEN TRE PROVINCE

Cao trình đập bê tông trọng lực vị trí I

ASIAN DISASTER REDUCTION CENTER Visiting Researcher Program (FY2017B)

TRANSPORT INFRASTRUCTURE DEVELOPMENT & LEGAL FRAMEWORK ON PPP INVESTMENT OF VIET NAM

Decentralized Trade Support Services for Strengthening the Competitiveness of Vietnamese SMEs

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 355/QD-TTg Hanoi, February 25 th 2013 DECISION

The potential, orientation of Vietnamese port system

Urban Governance Challenges: Evidence and Implication from PAPI

FLOOD CONTROL MEASURES IN THE LOWER DONG NAI - SAI GON RIVER BASIN

Briefing on Drought on Mekong Delta

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN

MINISTER OF AGRICULTURE AND RURAL DEVELOPMENT

Abnormal Behavior of Storm and Tropical Cyclones That Hit Viet Nam

GROUNDWATER ARTIFICIAL RECHARGE AND SALINIZATION PREVENTION AS A DROUGHT-FIGHTING MEASURE IN CENTRAL COASTAL AREAS OF VIETNAM.

Vietnam Sea-Ports Sector Overview

CHALLENGES OF INTEGRATED WATER RESOURCES PLANNING & MANAGEMENT IN MEKONG DELTA

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM

ANNEX 6 PUBLIC CONSULTATION

SOME SOLUTIONS TO RESPOND CLIMATE CHANGE FOR THE MEKONG DELTA, VIET NAM

Pham Huy Toan Branch of Viet Nam Maritime Administration in Ho Chi Minh City

Adaptation to Sea Level Rise in the Vietnamese Mekong River Delta: Should a Sea Dike be Built? Vo Thanh Danh

Preparatory Study for Development Study (M/P or F/S)

THE ZONING AND CALCULATION OF AREAS ENDURED THE EFFECTS OF CLIMATE CHANGE IN THE LOWER MEKONG RIVER DELTA

PETROVIETNAM The Partner of Choice

NEWS LETTER OF JUNE,2008

19 Jun Daily Procurement News of Vietnam

Saigon Newport Holding Company 2

CURRICULUM VITAE NAME NGUYEN HAI HOA. Living address: House N0. 24B, Group I, Tan Xuan, Xuan Mai town, Chuong My

MOIT FiT Circular No. 02 Decision No. 39

University of Agriculture & Forestry - Hue University. Châu Thành court, Cai Lậy court & Sắc Tứ pagoda, Tiền Giang

OFTEN USED ABBREVIATIONS AND ACRONYMS

C O M PA N Y P R O F I L E

VIET NAM LOSSES CAUSED BY TYPICAL DISASTERS FROM 1978 TO 2005 TYPICAL DISASTERS IN VIET NAM ECONOMIC LOSS RECORDED FROM

Monitoring and Evaluation of Government Performance in Viet Nam

DECISION No. 256/2003/QD-TTg OF DECEMBER 2, 2003 APPROVING THE NATIONAL STRATEGY ON ENVIRONMENTAL PROTECTION TILL 2010 AND ORIENTATIONS TOWARDS 2020

21 Aug Daily Procurement News of Vietnam

PPP Policies and Potential PPP projects in waste treatment and water supply in Vietnam

10 Mar Daily Procurement News of Vietnam

Vietnam- NCAP Study CLIMATE CHANGE IMPACTS IN HUONG RIVER BASIN AND ADAPTATION IN THUA THIEN HUE PROVINCE

Institutionalizing the Integrated Management of Viet Nam s Coasts and Islands

David Corderi Novoa Department of Agricultural & Resource Economics University of California Davis, United States

CCAI Demonstration Projects in Viet Nam. Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee

30 May Daily Procurement News of Vietnam

C O M PA N Y P R O F I L E

6 EVALUATION OF PROJECT SECTIONS

EXPERIENCE OF URBAN DEVELOPMENT AND CLIMATE CHANGE ADAPTATION IN DA NANG CITY

MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT OF VIETNAM DEPARTMENT OF WATER RESOURCES

Factors influencing the Vietnam Provincial Governance and Public Administration Performance Index (PAPI)

M E K O N G D E LTA C L I M AT E C H AN G E F O R U M N o v e m b e r

Lam Du Son Vice President of EVN, Vietnam

LIST OF CONSTRUCTION MATERIALS COMPANIES IN VIETNAM

ACTIVITY REPORT OF NEWCHOICE SOCIAL MARKETING PROJECT Under the Health and Family Planning Program Phase 4

EVALUATING AND FORECASTING FLOODING IN HO CHI MINH CITY USING MIKE FLOOD MODEL

PRIME MINISTER. SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness. No: 54/2010/QĐ-TTg. Ha Noi, 24 August 2010

Chapter 4 Confirmation on Project Scope and Validity Existing Transmission Line and Substations in Southern Region. Pitoong Hoa Binh Thuong Tin

VUNG TAU PETRO JSC 2013

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness. No.: 428/QD-TTg Hanoi, 18 March 2016

March Prepared for: The Ministry of Economy, Trade and Industry

Enhancing Sustainability

PAPI 2010 HA TINH PROFILE. The Viet Nam Governance and Public Administration Performance Index. Introduction: What is PAPI?

Evaluating and improving the awareness of the coastal communities in Khanh Hoa province (Vietnam) on natural marine living resources

82 nd Annual meeting of ICOLD Bali, Indonesia, June 2 nd to 6 th, 2014 ICOLD «Ad Hoc Committee on Prospective and Challenges»

INTRODUCTION OF SHORT-HAUL TRANSPORTATION

VIE: Mong Duong 1 Thermal Power Plant

Decision No. 158/2008/QD-TTg of December 2, 2008, approving the national target program on response to climate change.

29 May Daily Procurement News of Vietnam

Evaluating the Effectiveness of Agricultural Production Model

11 Jan Daily Procurement News of Vietnam. Daily Procurement News of Vietnam Procurement items.

Japanese ODA loan. Ex-ante Evaluation

RESULTS FOR SEMESTER II THE ACADEMIC YEAR

How does Vietnam Rehabilitate its Forests? 1

vietnam environment administration magazine (vem) Website: tapchimoitruong.vn English Edition I-2014 Decision 25/2014/QĐ-TTg:

Promoting Poor Women s Participation in Water Resources Management in Periurban Hanoi

REPORT ON RESIGNATION AND SUPPLEMENTARY APPOINTMENT OF MEMBER OF THE BOARD OF DIRECTORS FOR OFFICE TERM To: General Shareholders Meeting

Vietnamese ocean shipping: Potential, Orientation, and Application

DECISION. on support mechanism for the development of power generation projects using solid waste(s) in Vietnam

OVERVIEW OF ENERGY SECTOR IN VIET NAM AND PARTNERSHIP INVESTMENT OPPORTUNITIES. Nguyen Thai Son Director of Planning Department

7. LANGUAGES/ DEGREE OF PROFICIENCY English Excellent

Vietnamese ports: Capacity and development orientation

Transcription:

PRIME MINISTER ------- No: 667/QD-TTg SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness -------------- Hanoi, 27 2005 2009 DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang PRIME MINISTER Pursuant to the Law on Government Organization on 25 December 2001; Consider the request of the Minister of Agriculture and Rural Development (at the submitted document no 2818/TTr-BNN-DD on 18 September 2008), DECIDES Article 1. Approve program to strengthen and upgrade the system of sea dike from Quang Ngai to Kien Giang with the following main contents: I. GUIDING VIEWPOINTS 1. Establish a sea dike system from Quang Ngai to Kien Giang into a closed system to ensure saline prevention, flood drainage, water supply and other related objectives, ensure security and socio-economic development of each coastal region. 2. Sea dike system is built on the basis of using favorable natural conditions, and incorporates the scientific solutions between infrastructure and non-infrastructure solution, organized in association with the coastal population arrangement; meet the demands in short term consistent with the long term objectives, and adapt to the adverse impacts of climate change to coastal region in Vietnam. 3. Focusing on management and maintenance after construction, especially reforestation of mangroves is inseparable part of the sea dyke system. Strengthen propaganda and education to raise community awareness and responsibility to protect seadyke; while expanding cooperation and exchange experience in the international sea dikes. II. OBJECTIVES 1. Complete a closed seadyke system from Quang Ngai to Kien Giang to prevent the negative impacts from the sea, protect people's livelihood and sustainable socio-economic development in coastal provinces. 2. Contribute to creating infrastructure in accordance with the socio- economic development plan, environmental protection and national defense security of each locality, put priority investment in urgent areas. 3. In the long term, the sea dyke system ensures safety of people, economic development, environmental protection ecological coastal areas, to adapt to the risks of sea level rise and the adverse impact of climate change; while gradually establishes the coastal road for socioeconomic development and coastal defense. III. MAJOR CONTENTS OF THE PROGRAM 1. Strengthen and upgrade the existing dykes and build other assisted facilities, plant and maintain wave break forests along the dyke, create an unified and stable seadyke system, ensure security and socio-economic development of the coastal provinces. 2. Base on local socio-economic development plans, in each period, with consideration the effects of climate change, the coastal provinces regularly review, adjust and supplement the planning sea dyke system in accordance with the programs, sector s strategies and the whole country. IV. THE SOLUTIONS

1. Infrastructural solutions: a) Adjust and identify sea dike system: the adjustments of existing dykes and identification new dykes based on the following principles: - Select dykes that pass to high terrain areas, geological background is relatively good to ensure stability and far from eroded areas. - In front of sea dike, it requires having planted mangroves area with minimum of 500 m width. - Use sand dunes, hills, existing infrastructures to complete dyke system; sustainably connect among stable points. In the river mouth, established dike should not affect to flooding releasing, and far away from eroded river bank. - Selected dike that integrates with transportation service must comply with standards and guidelines of transport sector. - To depositional areas, steps can be arranged to build extra dykes in front of the main dyke for land reclamation for socioeconomic development. - To eroded areas, it requires doing research, carefully consider to remove residential areas to behind of the dike. When this solution is impossible, it requests to build infrastructures to prevent erosion, artificial deposition and site keeping. b) Dike design guidelines Based on the importance of protected areas to determine the appropriate design standards, but at least against the storm level 9 and tidal level with 5% frequency, in order: the urban and the concentrated residential areas; security and defense facilities; the economic, cultural and important infrastructure areas and agricultural areas. c) cross-section of the designed dike based on the principles - Ensure stability in accordance to the design of existing sea dikes, easy to make higher for sea level rise. - Road traffic is built in the dike s corridor based on sector s standards. - For sea dikes in central region, it should be reinforced in three sites or arrange appropriate spill and combine to traffic on the dike s crest. d) Upgrade and build new bridges, drains: Improvement of old culverts, building new bridges and culverts must be ensured: prevent water; suitable for agricultural plan, aquaculture; control salinity intrusion; can be combined with the avoiding storm area for boats and ships. At first, it focuses on the areas where high demands for fresh water, high traffic have, the rest will be done in other phases of the program. e) Strengthening monitoring, research to evaluate seasonal erosion of sea dike, the adverse effects of nature or negative effects of human... and promptly proposed solutions and long terms responses to prevent or adapt to the impacts that ensure security and sustainable development of coastal provinces. e) Planting trees and protecting coastal dikes: resources focus, especially in mobilizing the participation of communities in the protection and conservation of forest areas in front of the dike, ensuring the mangrove forest belts with a width minimum 500m. At the same time, each locality must be planned and plans to create planting area in front of the dike against waves. It must be planted grass on 2 sites of the dike or protect by stable materials to prevent erosion. 2. Non infrastructure solutions: a) Organize the survey, measurement, basic surveys in each region and each locality, on the basis of the review planned sea dike system from Quang Ngai to Kien Giang, ensuring compliance with the program, socio-economic development strategy in each coastal region, sectoral plan to adapt to negative impacts of climate change in coming years. b) Continue to research and apply scientific and technological advances to consolidate and upgrade the system of dykes; enhancing research, monitoring, early warning erosion, deposition in high-risk areas to propose adjustments for appropriate sea dikes and prevention measures to mitigate or adapt.

c) Improve management and protection of sand dunes, strictly control the exploitation of natural resources and minerals in coastal areas. d) Organize the sea dike management after investment, and strengthen propaganda and education to raise awareness, responsibility and mobilize the participation of communities in the management of tree planting and protection of wave brake forests, sea dike protection and ensuring the effectiveness and sustainability. 3. Capital investment: Investment in strengthening, upgrading and building sea dike system from Quang Ngai to Kien Giang is focused from the following sources: - The central budget to support the target s programs. - Integrating from related programs and projects in the region such as transportation program in coastal area and coastal defense program and the East Sea Island program. - ODA loans, loans and other funding sources. - Mobilizing from enterprises who benefit directly or have assigned exploitation and use coastal land for business purposes. VI. Duration The program starts from 2009 to 2020, divided into three stages: - Phase 1: from 2009 to 2012: mainly planting, soil filling to create a closed dyke system from Quang Ngai to Kien Giang. - Phase 2: from 2013 to 2016: continue to strengthen dykes and roads. - Phase 3: from 2017 to 2020: building bridges, major drainage, complete dyke system and road system. Article 2. Organization of implementation 1. Responsibilities of Province people Committees and cities from Quang Ngai to Kien Giang are: - To direct the functional agencies developing investment projects and submit to authority for approval and implement approved investment projects. - To arrange, spend capital from the local budget, combination of capital from other programs and projects in the province and capital support from the central government to, organizing the implementation of projects following the priority, ensuring the activeness and effectiveness of the capital investment. - To promote the propaganda to enhance awareness and responsibility of local community on dyke protection, forest plantation and protection. - To guide and encourage people to participate in afforestation, forest protection and management, dike protection and environmental protection in coastal areas. - To create favorable conditions, and promote the socialization to attract organizations and individuals in construction, management and exploitation of infrastructures and ensure efficient investment and socio-economic development. 2. Ministry of Agriculture and Rural Development shall: - Implement state management functions in dyke management, ensuring the dike system to be built as planned, become an unified system, consistent with the strategic development of the sector and local level; implement research, mechanism guidelines and policies relating to construction, maintenance and management of sea dikes... - Be guiding, investigating and urging the provinces to organize and implement construction projects as planned; apply regulations and standards in design and construction works; provide technical advices to important projects, needing technical complexity when the local authorities require. - Implement research and apply scientific studies and advanced technologies in upgrading and constructing dikes, bridges, culverts on the dike...

- Summarize, preliminary evaluate result of each investment phase to withdraw experience to improve the efficiency of investment and feasibility of the program. 3. Ministry of Planning and Investment will coordinate with the Ministry of Finance, Ministry of Agriculture and Rural Development and related localities to arrange capital to implement the program; based on the needs and state budget availability, annually provides budget to individual program to support the local authority in implementation; monitor and supervise the implementation of investment to ensure the performance and efficiency objectives. 4. Central Steering committee for flood and storm prevention is responsible for central monitoring and urge ministries, sectors and localities in organizing the implementation of programs, ensuring appropriate objectives and national action plan in prevention and mitigation of natural disasters by 2020. Article 3. This decision takes effect from the date of signing. Article 4. The ministers, heads of ministerial-level agencies, heads of agencies under the Government, Head of Steering committee for floods and storms prevention, Chairman of Province People Committee and cities: Quang Ngai, Binh Dinh, Phu Yen, Khanh Hoa, Ninh Thuan, Binh Thuan, Ba Ria - Vung Tau, Ho Chi Minh City, Tien Giang, Ben Tre, Tra Vinh, Soc Trang, Bac Lieu, Ca Mau and Kien Giang is responsible for implementing this decisions. /. Recipients: - As Article 4; - Secretary of the Party Central Committee; - Prime Minister, the Deputy Prime Ministers; - Office of Central Steering Committee on the prevention and fight against corruption; - Office of the Central Committee and the Party; - Office of President; - Ethnic Council and the Commission of the National Assembly; - Office of the National Assembly; - Supreme People's Court; - Institute of the Supreme People's Procuracy; - State Auditor; - Fatherland Front of Vietnam; - The Central Agencies of unions; - Government office: head office, vice head office, informatic Ports, the Departments, Subsidiaries, Gazette; - For filling, KTN (4 copies). KT. PRIME DEPUTY PRIME (signed) Nguyen Sinh Hung

LIST OF SEA DIKE SYSTEM FROM QUANG NGAI TO KIEN GIANG (promulgated enclosed with the decision no 667 dated 27 May 2009 of the Prime Minister) No Name of work tasks of work requested investment (billion VND) 1 st 2 nd 3 rd phase phase phase (2009- (2013- (2016-2012) 2015) 2020) Total I. Quang Ngai province 300 350 215 865 50 1 sea dykes in Binh Son 2 Sea dykes in Son Tinh 3 Sea Dykes in Tu Nghia 4 Sea Dykes in Mo Duc 5 Sea Dykes in Duc Pho 6 Sea dykes in Ly Son island II. Binh Dinh Province 150 200 145 495 50 1 Sea Dykes in Hoai Nhon 2 Sea Dykes in Phu My 3 Sea Dykes in Phu Cat 4 Sea Dykes in Tuy Phuoc 5 Sea Dykes in Qui Nhon city III. Phu Yen Province 300 300 280 880 50 Estimated budget in 2009 (billion VND)

1 Sea Dykes in Song Cau 2 Sea Dykes in Tuy an 3 Sea Dykes in Dong Hoa IV. Khanh Hoa province 300 400 292 992 50 1 Sea Dykes in Van Ninh 2 Sea Dykes in Ninh Hoa 3 Sea Dykes in Nha Trang city 4 Sea Dykes in Cam Ranh V. Ninh Thuan Province 150 150 182 482 30 1 Sea Dykes in Ninh Hai 2 Sea Dykes from Phan Rang town to Thap Cham 3 Sea Dykes in ninh Phuoc VI. Binh Thuan province 600 600 502 1702 100 1 Sea Dykes in Tuy Phong 2 Sea Dykes in Bac Binh 3 Sea Dykes in Phan Thiet city 4 Sea Dykes in Ham Thuan Nam 5 Sea Dykes in Ham

Thuan Tan 6 Sea Dykes in La Gi town VII. Ba Ria- Vung Tau province 1 Sea Dykes in Xuyen Moc 2 Sea Dykes in Dat Do 3 Sea Dykes in Long Dien 4 Sea Dykes in Vung Tau city 5 Sea Dykes in Con Dao island 6 Sea Dykes in Ba Ria town 800 800 447 2047 100 VIII. Ho Chi Minh city 300 400 236 936 50 1 Sea Dykes in Can Gio IX.Tien Giang province 400 500 522 1422 50 1 Sea Dykes in Go Cong Dong 2 Sea Dykes in Tan Phu Dong X. Ben Tre province 500 500 480 1480 100 1 Sea Dykes in Binh Dai 2 Sea Dykes in Ba Tri 3 Sea Dykes in Thanh Phu

XI. Tra Vinh province 400 500 346 1246 50 1 Dykes in river mouths of Ta, Huu Co Chien river in Chau Thanh, Cau Ngang 2 Sea Dykes in Duyen Hai 3 Sea Dykes in the south of Rach Tra Cu, Tra Cu XII. Soc Trang province 200 200 282 682 50 1 Cu Lao Dung sea dykes, Cu Lao Dung District 2 Sea dykes from My Thanh 1 Bridge to My Thanh 2 bridge, my Thanh 3 Sea Dyke from My Thanh 2 bridge to Rach Bac Lieu, Chau Thanh XIII. Bac Lieu province 400 400 242 1042 50 1 East sea dykes 2 Dykes in river mouths XIV. Ca Mau province 900 1200 1019 3119 150 1 West sea dykes 2 East sea dykes 3 Dykes in river mouths XV. Kien Giang province 800 800 483 2083 100 1 Sea dykes from Mui Nai to Cong Cung Lon 2 2 Sea dykes from Cong

Cai Tre to Rach Gia city 3 Sea Dykes in Rach Gia city 4 Sea Dykes from Tac Cau ferry station to Cong Tieu Dua (An Bien- an Minh) Total 6.500 7.300 5.681 19.481 1010