SMART CITY PROPOSAL BILASPUR CITY
Final Smart City Proposal Study of DPRs and proposals under various schemes of ULB, State and Center in the city such as AMRUT, SBM, Digital India, Housing for All, IPDS, ECBC, SCP, CMP etc. Priorities of Citizens shortlisted. Study of other Documents Data Collection from different departments of municipal corporation and other para statal bodies Baseline Study: City Profile Consultation workshops with MPs, MLAs, Representatives of Governmentt from State as well city, Experts of various backgrounds. Citizen Consultation- 2 nd Round Citizen Consultation- 3 rd Round Draft Smart City Proposal for feedback. Citizen Consultation- 1 st Round Draft Smart City Proposal Ward Level Consultation, Target Group Discussions, Awareness Workshops and on other platforms such as website, FB, Twitter. Conducting Essay Competition for Vision of the city. Shortlisting of Projects for Area Based Development on key 24 parameters and finalization of smart initiative for Pan City in consultation with Nodal Officers and other representatives. An AIILSG Presentation 09-12-2015 2
Bilaspur is the second-largest city (after Raipur) in the state. This part of the state is known as Rice Bowl of Chhattisgarh Bilaspur is the center of agro products. There are approx. 500 rice and dal mills in the surrounding area. Bilaspur is also known as 'Nyayadhani' (Law Capital) of the state, Chhattisgarh State High Court is situated at bilaspur. The city is on of the major centers of electric power generation in India. Bilaspur (South East Central Railway) is the highest revenue generating railway zone in India among 17 zones. SECL headquarter one of the Miniratna company in public sector located in Bilaspur. 3
Essay & Painting Competition 100 Top Suggestions Brand Ambassador Ward Consultation Round 1 Facebook Stake Holders Meeting My Gov Survey Form Schools & Colleges Meeting
Below 12 13 to 20 21 to 35 36 to 60 Above 60 61% MALE 39% FEMALE 14% of the Total Population Participated in Survey 1% 23% 43% 29% 4% CITIZEN CONSULTATION ROUND 1 ONLINE Survey forms Offline Progress 8040 37,904 forms received Data entry completed
6
8
9
10
11
12
LOCATION OF IDENTIFIED AREAS FOR AREA BASED DEVELOPMENT 13
LOCATION OF IDENTIFIED AREAS FOR AREA BASED DEVELOPMENT OPTIONS WITH MODEL OPTION 1 RETROFITTING & GREENFIELD Area (In acres) 1197 Approx. EXISTING SALIENT FEATURE ( BILASA PARK TO BILASPUR BARRAGE ) PART OF KONI, SARKANDA, CHATIDIH, LINGYADIH, MOPKA, MANGALA, KUDUDAND, BILASPUR NAZUL, JUNA BILASPUR, TORWA OPTION 2 RETROFITTING OPTION 3 REDEVELOPMENT OPTION 4 REDEVELOPMENT OPTION 5 REDEVELOPMENT 500 Approx. GOLE BAZAAR, SANICHARI BAZAAR, TELIPARA, OLD BUS STAND CHOWK, AGRASEN CHOWK, MAGARPARA CHOWK, MANDIR CHOWK,NEHRU CHOWK, TILAK NAGAR & GONDPARA AREA 50 Approx. 50 Approx. 50 Approx. MAHARANA PRATAP CHOWK, GAURAV PATH, SBR COLLEGE, RAIPUR ROAD, HUGE LAKE (JATIYA TALAB) TALAPARA BASTI, PART OF VAISHALI NAGAR, BEHIND MAGNETO MALL, HUGE LAKE (TALAPARA TALAB) SANJAY TARAN PUSKAR, PART OF 27 KHOLI, MUNGELI MAIN ROAD, 14
Cultural Capital of Chhattisgarh, Bilaspur (C3) छत त सगढ़ क स स क त क र जध न, ब ल सऩ र Goal s 1- To strengthen Tourism & Multi-cultural Activities. 2- To Adapt Technology for Development 3- To facilitate Industries and Commerce 15
16
17
18
S.NO FEATURES STATUS 1 Location ARPA RIVER FRONT 2 Landmarks BILASA PARK TO BILASPUR BARRAGE 3 Length 10km (APPROX ) 4 Area 1197 Acre 5 Population 62,150 persons 6 Households 13,000 nos. 19
Total Area = 1197 acres S.No. Land Use Area For Greenfield Development(Acr e) Area for Retrofitting (Acre) 1. Residential 66.90 246.38 2. Commercial 0.20 30.07 3. Industry - 4.03 4. Infrastructure 16.03 50.44 5. Recreational 21.59-6. Public-Semi- Public 7. Public Utilities and Facilities 11.60 37.46 0.21 0.408 8. Vacant land 112 125.29 9. Agriculture 197.17 126.83 10 Reclaimed Water Body 45.42 102.56 Total 471.42 724.56 Retrofitting = 724.56 acres Greenfield = 164.37 +306.97 acres 20
GOVERNMENT & RECLAIM LAND PRIVATE LAND 613 Acres 584 Acres 51% 49% 09-12-2015 21
14 NOTIFIED SLUM WITH TOTAL AREA OF 92 ACES REQUIRED 3640 UNIT 22
EXISTING ROAD NETWORK 23
PROPOSED ROAD NETWORK 24
Establish of 32 choice centres and up-gradation of 2 choice centres for decentralized municipal facilities. Developing linear park over 2.5 km of tunnel, OAT, Exhibition Space, Museums along ARPA River. Redevelopment of 14 slums under PPP mode & construction of 3640 units. Replacing hand pulled rickshaws with 300 E-rickshaws at market place. Underground road tunnel of 2.5 km length from old bridge to existing Apollo bridge Ropeway cable car of 0.4km length Smart parking lots and cycle on rent facility at six major intersections Construction of 32 bus stops along river front road. Pedestrian footpath & signals, Cycle tracks, street furniture and Tree plantation on major roads. Sanichary market to be developed as pedestrian street (500 m length) WIFI Hubs near Bus stations, Education institutes, Hospitals & public open spaces. E-classroom facility in Municipal schools. Under laying electric wiring on 400 km of road length. 25
LED lights for Street Lighting, Bus stops, public places and government building. Linear solar plant on 14km of retaining wall along ARPA river font. Smart water meter and pre-paid electric metering in 13000 households. Extending water pipelines and Construction of ESR of 10 MLD. Replacing existing sanitary fittings to water efficient with dual plumbing system in public and semi-public spaces. Mechanised Street sweeping with RFID based waste management system, Door to Door collection and segregation facility. City library, OAT, Exhibition space, Boat and recreational activity, Old age home Installation of sensor based signals and CCTV Cameras at 6 traffic junctions and public places. 26
S. N. Essential Feature Project Cost (In Crore) 1 Assured electricity supply with at least 10% of the Smart City s energy requirement Timeline (In Months) 200 15 coming from solar 2 Adequate water supply including waste water recycling and storm water reuse 19.9 18 3 Sanitation including solid waste management 28.5 18 4 Rain water harvesting (on Govt. Buildings) 11 12 5 Smart metering 268.4 36 6 Smart metering including operation and Maintenance 22.5 36 7 Robust IT connectivity and digitalization 20 24 8 Cable car ropeway (0.4 km) 9 24 9 Encouragement to non-motorised transport (e.g. walking, cycling,300 e-rickshaw) 5.5 12 10 Non-vehicle streets/zones (500 m length ) 2.4 18 11 Procurement & operation of mobile toilets 5 12 12 Safety of citizen 3.5 24 13 Establishing 22 Choice centers 4.4 12 14 Redevelopment of slums under Housing for All ( 3640 Nos. ) 218.4 36 15 Smart city app 4.5 12 16 livelihood centre for women 4.5 24 17 Environmental conservation training centre 11.5 24 18 Public amenities kiosks 5 24
S. N. Essential Feature Project Cost (In Crore) Timeline (In Months) 19 80% of buildings should be energy efficient and green building 20 36 20 visible improvement in the Area (Landscaping and Urban Design) 13 12 21 River Channel 467 36 22 Barrage, Anicut, waste water recycle 402 36 23 Road pedestrian infrastructure - 20km River front road ( 109.4 cr ) Approach road ( 84.3 cr ) Local access road ( 53.5 cr) 2.5KM length of Tunnels ( 150 cr ) (Old bridge Proposed Apollo bridge) Bridges & pedestrian friendly pathway ( 68.5 cr) 24 URBAN INFRASTRUCTURE - Water supply trunk network ( 29.6 cr ) Sewerage trunk network ( 52.8 cr) Power supply ( 127.4 cr) Park, Promenade & Open space ( 96.7cr) City library, OAT, Exhibision space (18.5cr) Boat and recreational activity, (12.4 cr) Oldage home ( 5.5cr ) Command center, Administrative building ( 13.5cr ) 465.5 36 366.4 36 25 DPR/ SUPERVISION/ CONTINGENCY 92 -- TOTAL 2670
E-governance: City performance dashboard, Integrated command and control centre, online workforce resource management, Online citizen services, Social media helpline. Transportation: Smart parking- Parkplace management, Video analytics, real time pricing. Smart Traffic Incident Management: Installation of sensors along road network, Video camera and infrastructure to verify the incident. Intelligent traffic signals, e-challans, red light violation detection. Street light management- Installation of smart devices on light poles, Individual control and monitoring. Water Management: GIS based asset mapping and consumer indexing, smart metering, Sensors in sewer line infrastructure, Online billing and payment system. Waste management: Tracking devices installed on each vehicle, CCTV cameras at secondary and final dumping site, Bin monitoring with RFID tags. 29
30
S. N. Essential Feature Project Cost (In Crore) Timeline (In Months) 1 Optical fibre lines 67 36 2 ICT BASED PAN CITY PROPOSAL Traffic management Public safety City lighting Pollution/ environment Waste management Parking optimization 26 36 TOTAL 93 31
PROJECT COST CONVERGENCE S.No. Particulars Amount (in Crore) TOTAL ABD PAN (In Crore) 1. TOTAL PROJECT COST 2670 93 2763 Remarks 2. Grant Central 500 1000 State 500 ABD Pan City 3. Convergence AMRUT 27.65 27.65 Water supply, sewerage, park development PWD 4.15 4.15 Road construction SWATCH BHARAT 28.5 28.5 Municipal solid waste management MISSION HOUSING FOR ALL 218.4 218.4 Slum redevelopment DIGITAL INDIA 4.4 67 71.40 Optical fibre cables, e-classrooms, choice centres, interactive GIS mapping INTEGRATED LOW 1.65 1.65 Construction of private toilets. COST SANITATION Total Convergence 284.75 67 351.75 4. Project Cost Excluding Convergence & grants 1385.25 26 1411.25 32
33