Highways Square Trolley Pole. HSTP Range. Sales Direct: +44 (0) w: e: Highways Square Trolley Pole

Similar documents
Transcription:

The brand new HSTP is the latest innovation in square CCTV trolley poles and is an ideal column for urban and traffic CCTV schemes. Built to complement our extensive range of highway masts as well as boasting a number of new and improved features, it has endured rigorous in-house enhanced testing. Designed in accordance with the Highways Specification under the sector 6 scheme, the unique features of the HSTP Highways Square Trolley Pole provide a greater reliability of operation and ease of use for the engineer. Available in heights of 4 metres to 15 metres, the pole comes with a galvanised finish as standard and optional specialist paint finishes to match any highways scheme. Sales Direct: +44 (0)1254 700200 w: www.wec.uk.net e: all@wec.uk.net 1

DESIGN FEATURES - An ideal column for urban & traffic CCTV Schemes - Square section pole design for maximum carriage stability - Designed in accordance with Highways Specifications under the sector 6 scheme - Eliminates the use of mechanical lifts for servicing purposes - Camera maintenance carried out at ground level for safety and ease of maintaince - Built in winch unit with dual cable barrel feature - Battery drill winch operation - Unit is lowered to ground level in less than 2 minutes from 15 metres high - Excellent stability characteristics ensures minimal camera movement - Twin and single arm versions available - Totally concealed cable management system - High security flush fitting door - Extra low positioning door aperture. Lower door positioning also optional (idea for plinth mounted applications) - Single action dual camera/lighting lowering mechanism - Galvanised to BS EN ISO 1461:2009 - Specialist paint finishes available - Carriage stop indication (Bell sounder) - Custom versions available to suit all applications GENERAL SPECIFICATIONS - Arms supplied with standard pan and tilt fixing of 101.6 PCD - Built in cable entry and exit points - HA root bases - templates and bolts supplied as standard - Standard heights available from 4 to 15 metres - Compatible with WEC adaptors and accessories PRODUCT CODES - HSTP4 - HSTP6 - HSTP8 - HSTP10 - HSTP12 - HSTP14 - HSTP15 Single action lowering mechanism TECHNICAL SUPPORT Our in-house design facility enables us to manufacture towers to any customer specification. The technical sales department will offer expert advise on any exact requirements. Full training and instruction on the erection of towers, fixings, safe use and procedures is available on all WEC products. Project engineers, installation teams and service engineers, will all benefit from practical demonstrations, all of which can be shown on our own test site facility. 2

TECHNICAL SPECIFICATION single Lowering arms Saftey Latch Internal Pulley Aid cable management Saftey Latch Dual Lowering arms Closed top cap 250sq 250sq 'M' Height lower position PTZ Camera Mount Fixing 4 hole on a 101.6 PCD Carriage Rest Stop Arm Motion Arm Motion Flush Fitting Door Aperture 250sq Cable Access STANDARDS APPLICABLE - ILE TR7 The Institution of Lighting Professionals high masts for lighting and CCTV. - BD94/07 design of minor structures - BS5950:1:2000 structural use of steelwork - BS EN 1991:1-4 : 2005 wind actions - Structural Steelwork: BS EN 1090-2:2008 - General Steelwork: BS1449:1991, BS1387:1985, BS EN 10025:1993 - Hot Dipped Galvanized: BS EN ISO 1461:2009 - Welding Procedures: Comply with BS EN 1090-2:2008 - Fasteners: Grade 8.8 BS3692:2001, BS4190:2001, DIN931, DIN934 - Design Wind Loading: In accordance with CP3 chapter V Pt 2 & BS 6399 Pt 2:1997 - UK national annex to Eurocode 1 - part 1-4 - wind actions BS/EN 1090 0086-CPR-613630 All WEC products are subject to ongoing development. Therefore, we reserve the right to make technical modifications without notice. BRITANNIA HOUSE, JUNCTION STREET, DARWEN, LANCASHIRE, BB3 2RB. TEL: (01254) 700200. E-MAIL: all@wec.uk.net 3

Ø584 DOOR AND BASEPLATE DETAILS Standard Mounted Pole A 250 x 250 x 10 Hot Formed Box section 203 200 10 5mm Thk Inner frame 500 497 Bell sounder( Carrige stop indication) Flush fitting door with 2 x security locks 500 Plynth Mounted Pole A 203 250 x 250 x 10 Hot Formed Box section 200 10 497 Flush fitting door with 2 x security locks 600 300 Support Gussets 200 Support Gussets Bell sounder( Carrige stop indication) 10 10 Formed Winch Mounting Plate Formed Winch Mounting Plate Holes to suit M24 + M27 root fixings Holes to suit M24 + M27 root fixings View On A View On A Battery drill winch operation Carriage stop indication (Bell sounder) HA root bases - templates and bolts supplied as standard Sales Direct: +44 (0)1254 700200 w: www.wec.uk.net e: all@wec.uk.net 64

BASE AND WINDLOAD SPECIFICATIONS Model Ref. Ht. HSTP4 4m HSTP6 6m 1.1x1.1x 0.55m Dp. HSTP8 8m 1.4x1.4x HSTP10 10m HSTP12 12m 1.7x1.7x 0.85m Dp HSTP14 14m HSTP15 15m Concrete Foundations Table X x Y x Z Area of Country Area of Town A B C A B C 0.65m Dp. 1.7x1.7x 0.85m Dp. 2.2x2.2x 1.1m Dp A minimum soil bearing pressure of 75 KN/m2 is assumed 1.1x1.1x 0.55m Dp. 0.65m Dp. 1.4x1.4x 0.65m Dp. 1.7x1.7x 0.85m Dp 1.4x1.4x Foundation sizes are determined for three sets of wind speeds, which will cover most of the British Isles. Area A = 44m/s (98mph) Area B = 48m/s (107mph) Area C = 52m/s (116mph) 8 - M24 or M27 Root Studding Maximum gust speed is likely to be exceeded on average once every 50 years at 10m above the ground in open level country. 230 INSTALLATION METHOD 1. From the map, select location of installation 2. Excavate as per recommended area and depth 3. Assemble root base as shown in fig. 1 4. Insert root base into the hole ensuring that it is level and that the four studs protrude 60-70mm above the concrete foundation 5. Fit the cable duct if routing via the interior of the column. A plastic pipe of approximately 100mm outside diameter is recommended for this. Ensure this protrudes through the template by 50mm minimum. 6. Pour concrete ensuring that it is a mix of C35 to table 6 BS 8110 and then tamp down well 7. Fit the setting template over the four protruding studs, double-checking that they are level and that clear access can be gained to the cable duct if it is being used 8. Leave the concrete to cure for a minumum of 72 hours prior to attempting to erect the column 9. When fitting the column, ensure that the concrete base is in complete contact with the underside of the column and grout accordingly. Torque the nuts to 230-270 Nm (175-200 fl. lb.) 10. When the column has been fitted, protect the studs with a suitable protective coating. Denzo tape or similar is recommend for this Z M24 or M27 Full Nut Locking Nut Plain Washer Connection Nut Flush With Concrete Foundation X x Y Section Thro' Stud Fixing 25 thk Baseplate 770 fig. 1 All WEC products are subject to ongoing development. Therefore, we reserve the right to make technical modifications without notice. BRITANNIA HOUSE, JUNCTION STREET, DARWEN, LANCASHIRE, BB3 2RB. TEL: (01254) 700200. E-MAIL: all@wec.uk.net 5