General Notes: 1. Design Specifications: International Building Code (2015 Edition). Design Loads: Catwalks for maintenance access: 40PSF Dead load: Actural 2. The construction falsework/shoring/design (if any) is the responsibility of the Contractor. The design shall be performed by a Registered Engineer and shall be submitted for approval before commencing of the work. 3. Where a detail is shown on Structural Drawings for one condition, it shall apply to all similar or like conditions, unless noted or shown otherwise on plans. 4. All items shall be tightly anchored or attached square, plumb, and true, or in other planes and shapes as shown on the drawings. Joints shall be tight, even, and free of offsets. No field altering of any members will be allowed that will cause them not to be in accordance with the drawings and specifications, without written approval of the Project Engineer. 5. The dimensions shown with a suffix "±" are approximate and shall be verified by the Contractor before fabrication. 6. If the Contractor finds a difference between these drawings & existing conditions, or finds any other conditions which prohibit execution of the work as directed in these drawings, the Contractor shall notify the Engineer immediately. 7. Any revision/modification to the original design during the shop drawing process, the Contractor shall clearly cloud line all the changes and shall receive approval from the Engineer in writing before fabrication. Any costs associated with correcting the unapproved change shall be at the Contractor's expense. +75.25" +22.50"± Area 3 see S3.0 +82.25" Denote proposed catwalk Timber: 1. All materials shall conform to the approved standards of the American Wood Preservers' Association. Each piece shall be treated in accordance with AWPA standards, and certified by an approved inspection agency. All cuts, holes, and machine areas shall be liberally brushed with a solution of copper naphthenate containing a min. of 2% metallic copper in accordance with AWPA standard M4. 2. All lumber shall be #2 southern pine unless noted otherwise. All pieces shall bear the grade mark of a recognized agency or independent inspection service certified by the board of review, American lumber standard committee. 3. Metal connectors shall be hot-dipped galvanized in accordance w/ ASTM A153, and shall be installed in strict accordance with the manufacturer's specification. 4. Metal connector designation as by Simpson's strong tie. Product substitutions shall be permitted only if submitted in advance, as outlined in specifications, and approved by the engineer as an equal. 5. Nails shall be commercial grade common wire nails, hot-dipped galvanized in accordance with ASTM A153. Nail spacing shall be sufficient to develop maximum connection strength without splitting the members. All split members shall be replaced. 6. All bolts used in connections shall be ASTM A307 bolts in sizes as indicated in the plan. All bolts shall be installed with 1 1/Ø 1/8" galvanized washers under the head and nut, and shall be torqued until the wood just begins to yield under the washers. Bolts shall not be overtorqued so as to deform the washers or damage the lumber, hole size shall not exceed bolt diameter by more than 1/16". Area 1 see S2.0 ± Elevation 0'-0" is referring to the top of the ceiling Key Plan Area 2 see S2.0 +71.50" catwalk, +57.75"±, General Notes and Key Plan S1.0

5'-4"± 5'-4"± 7'-10"± 4'-8" 5'-4"± 7'-3" 8'- girder (+"11.50"±) angle brace (+6.00"±) (+6.00"±) (+6.00"±) Timber 9'-0"± 4 3 girder (+"11.50"±) 2 (2)2X10 1 9'-0"± brace, brace, (+"20.5"±) Install onto existing. see connection 5/ see 8/S2,1 framing, 2x8 @ 24" o.c., the rest were not shown for Install onto existing. see connection 5/ see 13/ angle brace, notch members as required at intersecting locations, see detail 10/ Install onto existing, see 5/ Sawcut existing catwalk and attach both to new using connection. Contractor shall provide temporary support during construction (+"20.5"±) catwalk 4'-8"± Notes: 1) Please see for elevations of platform members. 2) Cross braces are not shown for. All landings shall have cross bracing installed. See for more details. 5'-8"± 2'-9"± 15'-6"± 9'- (+20.5"±) 9 7'-11" 7'-7" 10'-4"± catwalk 71.50" (+23.5") (+23.5") 9'-6"± girder (+11.50"±) 2x8 @ 24" o.c. Remaining not shown for (+20.5) brace 11 (+9.375") (+12.375") (+12.375") (+9.375") 12 9'-8"± girder (+11.50"±) angle brace,notch members as required at intersecting locations, see detail 10/S2,1 see see see see 13/ see motor support (+17.75"±) motor support (+17.75"±) 2'-10"± 4'- 5 3/4" brace Areas 1 and 2 Plan View AREA 1 AREA 2 (+20.5"±) 1'-6" 2'-6" S2.0 1/23/18

Catwalk handrail, see detail 10/ decking 2X8 bridge @ 2' o.c max. beyond cat walk, typ cat walk, sawcut and attach to new catwalk with Simpson U210-2. Contractor to provide temporary support during construction. ± to connection, see 5/, ±, see 5/S2,1 Simpson U210-2 hanger, ± 6.00"± 2x8 Bridge @ 24" o.c. max. required at end bearings. Install 2x4 to existing using 16Ga. "U-Shape" bent plate. See 5/. Toe nail to blocking. 1 - Section Scale: NTS 2 - Section 3 - Section 4 - Section ± 11.50"± Top existing Scale: NTS Scale: NTS Scale: NTS,Notch (2) 2x10 as required at girder connection, max. see 13/, girder Toe-nail, 2x4 Seat as required Simpson BC4 Simpson Top Flange Hanger THA218-2 2x4 Nailer plate to existing using PAF #10 self taping screws @ 1 o.c., Simpson U210-2 Joist Hanger or equal 16Ga. Bent Plate "U-Shape" 16 Ga. Bent plate "U-Shape" #10 Self tapping screws Varies (2)PAF's @ 1 o.c. Hilti X-U 16 P.A.F 5 - (2) 2x10 to existing connection Scale: NTS 6 - Section Scale: NTS 7 - Section Scale: NTS 8 - Section post, required Buildup steps catwalk platform 71.50" 57.75"± 20.5"± 4x, conduits, see 7/,, see 6/, beyond 11" 7", Post cap connection, see 4/, Corner post cap connection, see 4/, Stair Stringer, see 13/ sim., 9.375" angle 6" Min. Catwalk handrail, see 10/ Handrail, see 10/ see 7/, Scale: NTS 20.5" Areas 1 and 2 Details 9 - Section Scale: NTS 10 - Section Scale: NTS 11 - Section Scale: NTS Majority of the handrail is not shown for support, to connection, see 7/, Blocking as required 9.375"± 's top flange Varies 1.5" min. bearing 16 Ga. angle connected to 's top flange and 2x seat using PAF 1/4" Ø through bolts w/ washers, Post Simpson's BC4 Splice, see sim., 12 - Section Scale: NTS 13 - Section Scale: NTS 14 - Section Scale: NTS

9'-8"± 9'-6"± 9'-8"± 8'-0"±, motor Notes: 1) Please see for elevations of platform members. 2) Cross braces are not shown for. All landings shall have cross bracing installed. See for more details. post, 8 1'-6" 9 6 1/ 2x8 @ 24" o.c., the rest were not shown for 13/ motor, see 7/ 5'-3" 8'-3" on existing connection, see 5/ built-up girder (Top +11.25"±) 2 catwalk (+20.5"±) 6 13/, 13/ 3 (+9.50"±) (+9.50"±) (+9.50"±) 1 75.25" Denote new catwalk Denote existing HVAC Duct work 5'-± 7'-3"± 1'-1" 82.25" 2'-11" 3" 3'-9"± mechanical duct Area 3 Plan View Columbiam SC 29201 catwalk S3.0

handrail 22.50"± Majority of the handrail is not shown for, see Decking required, Handrail, see 10/, see 13/ ±,, see 5/ Splice connection, see 13/ 1 - Section Scale: NTS 2 - Section Scale: NTS 3 - Section Scale: NTS 4 - Section Scale: NTS 7" min. 4"x4" 16 Ga. angle 2x12 Stair stringer 11" min. 1/Ø through bolt w/ wahsers, mechanical duct Post cap connection, see 4/, 2x8 bridge,, Stair stringer to connection, see 5/, 2x12 Stair stringer, 2x4 cross brace. Connect to post see 11/, 11.25" built-up girder Splice Handrail not shown for clrity purpose 9.75" 2X6 Decking, Corner post connection, see 4/, post, Post base connection, see 14/ Simpson ECCLLQ-SDS2.5 post Portion of the handrail shown for clarity purpose, see 10/ for more detail 4" max. max spacing Simspon BC4 post 2x8 bridge at every post post @ 48" o. c. max. ± 20.50" 11.25"± framing, Hand rail not shown for Decking, 2x8 bridge, 5 - Section Scale: NTS 6 - Section Scale: NTS 7 - Section Scale: NTS 75.25" 11.25"± ± post, Corner post connection, see 4/,, Stair stringer to connection, see 5/, 2x12 Stair stringer, mechanical duct 2x4 cross bracing, Handrail not shown for mechanical duct Posts,, Stair Sringer, Post base to connection, see 14/,, 20.5"± built-up girder to 's top flange connection, see 7/,, Post cap connection, see 4/, Stair stringer to connection, see 5/, Corner post connection, see 4/, 2x4 cross brace. Connect to post see 11/3.1, C L 2-5/8"Ø A307 hot-dipped galvanized through bolts 1 3/4" 5.25" post @ 48" o.c. decking 21" Note: 1. All railing members shall be No. 1 Southern Pine 4 Area 3 Details 8 - Section 9 - Section Scale: NTS 10- Handrail Detail Scale: NTS post 2x4 cross brace 1/ dia. through bolt w/washers, 1.5" Provide blocking between both cross braces 1/ dia. through bolt w/ washer 11- Cross Brace Detail Scale: NTS 12 - Cross Brace Blocking Detail Scale: NTS