CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Similar documents
CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

m³ R R m 3.km R 8.00 R

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY

GENERAL(Smallworks) & ENGINEER'S OFFICE. Ablution and toilet facilities on site and elsewhere Sum 1

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

ITEM NO SABS SECTION 1 : PRELIMINARY AND GENERAL 1200 A FIXED-CHARGE ITEMS Contractual Requirements Sum 1.0 -

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

Bill of Quantity (BOQ)

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Method of Measurement for Road Works Series MM Earthworks

8.01. SUB TOTAL 1 1,168, ADD 16% VAT 187, TOTAL 1,356, Total Carried Forward to Form of Tender:

ITEM 706 PIPE SLOPE DRAIN

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Bill of Quantity (BOQ)

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

PART A: Works Specifications

REHABILITATION OF DRIVEWAY AND GROUND FLOOR OF THE SECOND BUILDING AT MIDDLE STREET OFFICE

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

Appendix 15 Estimated costs of dams

SECTION EXCAVATION AND FILL

DEMOLITION TRADE SPECIFICATION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

Bill No.1: Preliminaries

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

DIVISION 4100 SITEWORK

PART C2: PRICING DATA. C2.1 : Pricing Instructions. C2.2 : Bills of Quantities

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

Advanced Engineering Projects Management

DOORNVALLEI EXT 5 & 6

2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY:

CONSTRUCTION SPECIFICATION FOR GRADING

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS

Bill of Quantity (BOQ)

BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

ITEM 750 ROCK FILTER DAMS

CONSTRUCTION SPECIFICATION

SECTION PAYMENT PROCEDURES

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

DESIGN & CONSTRUCTION GUIDELINES

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

SECTION MEASUREMENT AND PAYMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES

July Bill No.1: Preliminaries

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

LABOR AND MATERIAL PROPOSAL

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

CASE STUDY SERIES #10

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

- Earthwork Operations & Equipments

GABIONS PVC Coated. Product Standard Specifications Installation Instructions Method of Measurement and Payment. Update: May 1999

REHABILITATION OF ASBESTOS MINE STEELPOORT CONTRACT MTK 5/2018 VOLUME 2 PART 3: SCOPE OF WORK

GABIONS AND REVET MATTRESSES

ROAD COMMISSION FOR OAKLAND COUNTY. SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F 10/28/2013

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start.

Item Quantity Amount No BILL NO 1

A Provide for Contractor's Office, Store etc. Sum

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

B512 - GABIONS - OPSS 512

CONSTRUCTION SPECIFICATION FOR BORROW

CONSTRUCTION SPECIFICATION

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

6. ENGINEERING SYSTEMS REQUIREMENTS G10 SITE PREPARATION

CONTENTS. Cellular Confinement System INTRODUCTION MATERIALS Multi-Cell Fill... 2

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

CONSTRUCTION SPECIFICATION

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

SECTION RIPRAP, BOULDERS, AND BEDDING

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

HALIFAX REGIONAL MUNICIPALITY SECTION

SECTION MEASUREMENT AND PAYMENT

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

CONSTRUCTION SPECIFICATION FOR EARTH BORROW

A.2.a Random Riprap... Table

Description Unit Quantity Rate Kshs. Amount Kshs.

Transcription:

SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability insurance 1.1.3 Insurance of construction plant and equipment 1.1.4 Third Party Insurance ESTABLISH FACILITIES ON THE SITE 8.3.2.1 FACILITIES FOR THE ENGINEER 1.1.5 (a) Construction and setting out of survey beacons No. 20 1.1.6 (b) Name boards No. 2 1.1.7 PSAB 8.3.1 (c) Services 1.1.8 PSAB 8.3.5 (d) Engineer's Office 8.3.2.2 FACILITIES FOR THE CONTRACTOR 1.1.9 (a) Offices and storage sheds 1.1.10 (b) Workshops 1.1.11 (c) Plant 1.1.12 (d) Tools and equipment 1.1.13 PSA 8.3.2.2 (g) (e) Water supplies, electric power & communications 1.1.14 8.3.2.2 (f) Dealing with water 1.1.15 (g) Access 1.1.16 8.3.3 Other fixed charge obligations 1.1.17 8.3.4 Removal of site establishment 1.1.18 Compliance with the Occupational Health and Safety Act and Specification PD.3

SECTION 1: PRELIMINARY AND GENERAL 1.1.19 Provision of decontamination installation, wash bays and the like for specific safety requirements for working in an Asbestos area in accordance with the Occupational Health and Safety Specification and the Access Control Specification for all staff and service providers 1.1.20 Compliance with the Environmental Management Plan 1.1.21 Hazard Identification and risk assessment 1.1.22 Health & Safety Plan 1.1.23 Construction safety officer and other appointments 1.1.24 Work Skills Plan and Implementation Report to CETA 1.1.25 Pre-employment medical examination 1.1.26 Personal Protective Equipment 1.1.27 Asbestos regulation training (for all employees on site) 1.2 TIME RELATED ITEMS 8.4.1 CONTRACTUAL REQUIREMENTS 1.2.1 Surety or bank guarantee 1.2.2 Common Law Liability insurance 1.2.3 Insurance of construction plant and equipment 1.2.4 Third Party Insurance OPERATE AND MAINTAIN FACILITIES ON THE SITE 8.4.2.1 FACILITIES FOR ENGINEER FOR THE DURATION OF CONSTRUCTION 1.2.5 (a) Name boards No. 2 1.2.6 PSAB 8.3.5 (b) Engineer's office 1.2.7 PSAB 8.3.1 (h) Services PD.4

SECTION 1: PRELIMINARY AND GENERAL 8.4.2.2 FACILITIES FOR CONTRACTOR FOR THE DURATION OF CONSTRUCTION 1.2.8 (a) Offices and storage sheds 1.2.9 (b) Workshops 1.2.10 (c) Ablution and latrine facilities 1.2.11 (d) Tools and equipment 1.2.12 PSA 8.4.2.2 (g) (e) Water supplies, electric power and communications, dealing with water and access 1.2.13 (f) Dealing with water 1.2.14 (g) Access 1.2.15 (h) Plant 1.2.16 (i) Supervision for duration of construction 1.2.17 Community Liaison Officer Prov. Sum 1 R80 000.00 1.2.18 Ongoing operation and maintenance of decontamination installation, wash bays and the like for specific safety requirements for working in an Asbestos area in accordance with the Occupational Health and Safety Specification and the Access Control Specification for duration of contract 1.2.19 Supervision of decontamination for duration of contract monthly 1.3 8.7 DAYWORK 1.3.1 Expenditure on dayworks (i.e. wages paid to workmen and invoiced cost of materials, delivered on site) Prov. Sum R 30 000.00 Extra over item above for supervision, overheads and all other costs related to the daywork items under items below for the following: 1.3.2 Skilled artisans % 15 000 1.3.3 Unskilled labourers % 10 000 PD.5

SECTION 1: PRELIMINARY AND GENERAL 1.3.4 Material % 5 000 PLANT HIRE RATES The appropriate types and sizes (T&S) of the plant shall be stated in the space provided: 1.3.5 Tip Trucks (Type & Size...) hrs. 40 1.3.6 TLB's (Type & Size...) hrs. 40 1.3.7 Rollers (Type & Size...) hrs. 40 1.3.8 Water carts (Type & Size....) hrs. 40 1.3.9 Portable compressor and breakers etc. (Type & Size...) hrs. 40 1.3.10 Portable pumps and hoses (Type & Size...) hrs. 40 OTHERS GIVE FULL DETAILS 1.3.11 hrs. Rate only 1.3.12 hrs. Rate only PD.6

SECTION 2: SITE CLEARANCE AND TEMPORARY WORKS SECTION 2: SITE CLEARANCE AND TEMPORARY WORKS 2.1 SANS 1200C SITE CLEARANCE 2.1.1 8.2.1 Clear and grub ha 1.2 2.1.2 8.2.3 Remove and grub all trees and tree stumps regardless of girth ha 1 8.2.8 Demolish and remove structures 8.2.9 Transport materials and debris to unspecified sites and dump (Provisionally) 2.1.3 Transport debris and shrubs of materials cleared on the site to a dumping site identified by the Engineer ( incl. hauling up to 5km) 2.1.4 Transport debris and shrubs of materials cleeared for temporary access to the dumping site identified by the Engineer (in excess of 5 km freehaul) m 3 1 200 m 3.km 2.2 SANS 1200DM EARTHWORKS (ROADS, SUBGRADE) 2.2.1 8.3.2 (a) Preparation and stripping of Site/removal of topsoil to 150mm, stockpiling and maintaining 2.2.2 (1) Temporary access road m 3 150 8.3.3 Treatment of road-bed 8.3.3 a) Road-bed preparation and compaction of material to 2.2.3 8.3.3 a) (2) Minimm of 93% of modified AASHTO maximum density m 3 150 2.2.4 Minimm of 95% of modified AASHTO maximum density m 3 150 8.3.4 Cut to fill 2.2.5 8.3.4 a) Compact to 90% of modified AASHTO maximum density m 3 150 8.3.7 Cut to spoil 2.2.6 8.3.7 a) Soft excavation m 3 15 2.2.7 8.3.7 b) Intermediate excavation m 3 8 PD.7

SECTION 2: SITE CLEARANCE AND TEMPORARY WORKS 2.2.8 8.3.15 Stormwater berm and channel (as per Detail 9 of Dwg. 17099-73-01-05) m 200 2.2.9 PSU 8.1 Removal of temporary access PD.8

SECTION 3: REHABILITATION WORKS SECTION 3: REHABILITATION WORKS 3.1 SANS 1200D EARTHWORKS 3.1.1 8.3.1.2 Remove topsoil to nominal depth 150mm, stockpile and maintain (1) Stormwater channels m 2 700 (2) Stormwater berms m 2 3 675 (3) Gabions m 2 860 (3) Anchor trench m 2 144 8.3.2 Bulk Excavation Excavate in all materials and use for embankment or backfill or dispose on existing dump area as shown on Dwg. 17099-73-01-02 3.1.2 Area 1 m 3 205 3.1.3 Area 2 m 3 3 027 8.3.2 b) Extra over for 3.1.4 8.3.2 b) (1) Intermediate excavation m 3 970 8.3.3 Restricted Excavation 3.1.5 8.3.3 a) Excavate for restritcted foundations, footings and pipe trenches in all materials and use for backfill or embankment or dispose (1) Stormwater channels m 3 420 (2) Stormwater berms m 3 368 (3) Gabions m 3 1 720 (4) Anchor trench m 3 43 8.3.3 b) Extra-over for PD.9

SECTION 3: REHABILITATION WORKS 3.1.6 8.3.3 b) (1) Intermediate excavation m 3 255 3.1.7 8.3.3 b) (2) Hard rock excavation m 3 128 8.3.4 Importing materials 3.1.8 8.3.4 a) Extra-over for importation of materials from commercial sources or from borrow pits m 3 724 3.1.9 8.3.4 b) Opening up and closing down of designated borrow pit 3.1.10 8.3.4 c) Dealing with overburden (designated borrow pits only) m 3 36 3.2 Opening of designated quarry pits 3.2.1 8.3.4 b) Opening up of designated quarry pits 3.2.2 Blasting and transport material (freehaul 5km) obtained from quarry pit identified by Engineer to crushing and screening plants m 3 72 3.2.3 Closing down and rehabilitation of designated quarry pits Extra over in normal rock for: 3.2.4 3) Excavation in Class A boulders m 3 32 3.2.5 4) Excavation in Class B boulders m 3 32 Crushing Plant 3.2.6 PSD 8.3.4 (1) Establishment crusher on site 3.2.7 Crushing of oversize rock to nominal size of 100mm two stage 3.2.8 Dismantle, remove from site and clean up 3.2.9 Move crusher plant on site from position to another and clean up Screening Plant No. 1 3.2.10 PSD 8.3.4 (2) Provide, erect and commission on site 3.2.11 Dismantle, remove from site and clean up PD.10

SECTION 3: REHABILITATION WORKS 3.2.12 Move screen plant on site from one position to another and clean up No. 1 3.3 SANS 1200DK GABIONS AND PITCHING 3.3.1 8.2.1 Surface preparation for bedding of gabions 8.2.1 a) Cavities filled with approved excavated material or rock m 2 860 Gabion formed with a hot dipped galvanized 275mg/m 2 coated with 4mm PVC coating (4mm SANS 1580) hexagonal double twist 3mm wire mesh type 60 with 0.08mm tolerance (SANS 675) filled with selected dump rock (without asbestos seams) and tied into adjoining gabions. 3.3.2 8.2.2 Gabion 2000mm x 1000mm x 1000mm basket m 3 860 Reno mattress formed with a hot dipped galvanized 275mg/m 2 coated with 4mm PVC coating (4mm SANS 1580) hexagonal double twist 3mm wire mesh type 60 with 0.08mm tolerance (SANS 675) filled with selected dump rock (without asbestos seams) and tied into adjoining gabions. 3.3.3 Reno mattress m 3 210 3.3.4 PSLE 8.2.17 Erosion control blanket m 2 11 010 3.3.5 Y12 hot dipped galvanised ground ground anchor pegs 1.5m in length (as shown in Detail D7 on Dwg. 17096-73-01-05) No. 455 3.4 SANS 1200G CONCRETE - STRUCTURAL 8.2 Formwork 3.4.1 8.2.1 Rough m 2 6 8.3 Reinforcement 3.4.2 8.3.1 High tensile Y16 steel bars t 1 PD.11

SECTION 3: REHABILITATION WORKS 8.4 Concrete 3.4.3 8.4.1 25 MPa concrete m 3 8 3.5 LANDSCAPING AND GRASSING Topsoiling on site with: 3.5.1 3.5.2 PSVA 8.3 a) (1) PSVA 8.3 a) (2) Topsoil obtained from the site (150mm thickness) Topsoil obtained from commercial sources (150mm thickness) m 2 11 020 m 2 100 3.5.3 PSVA 8.4 a) Hydroseeding m 2 11 020 Planting and establishing of: 3.5.4 3.5.5 PSVA 8.7 c) (1) Trees PSVA 8.4 c) (2) Shrubs No. 100 No. 100 3.6 SIGNAGE 3.6.1 Supply and install permanent sign boards Prov. PD.12

SUMMARY OF BILL OF QUANTITIES Section Description Amount R 1 2 Preliminary and General Site clearance and temporary works 3 Rehabilitation works Subtotal 1 ADD Contingency @ 10% (Solely for the use of the Client, and only on instruction to Contractor) Subtotal 2 ADD VAT @ 14% TOTAL CARRIED TO FORM OF OFFER.... SIGNATURE OF TENDERER DATE.... NAME OF TENDERER DESIGNATION SUMMARY SHEET