UPGRADING ethekwini S RURAL ACCESS ROAD NETWORK A MUNICIPAL PERSPECTIVE

Similar documents
Transcription:

UPGRADING ethekwini S RURAL ACCESS ROAD NETWORK A MUNICIPAL PERSPECTIVE Shaun Moodley Pr Tech Eng

ethekwini Metropolitan Municipality iteku means bay of the sea Largest city in KZN & 3 rd largest in SA Area 2 291km 2 Population 3 442 361 Hilly topography Sub-tropical climate Africa s busiest port

ethekwini what are we famous for?

but can we build roads? WMA trials - Mpumalanga Fully functioning PMS GB5 trials Solomon Mahlangu Drive Embracing Greenroads HiMA trials South Coast Road Reclaimed asphalt in BSM

ethekwini s Road Network An Overview 6762 km 1440 km 777 km 8979 km 1004 km 1200 km 2204 km 365 km 1052 km

ethekwini s Road Network An Overview Roads Provision Dept. Road & Stormwater Maintenance Dept. 8202 km

FIELD VALUE ROAD_ID 13446 LINE_ID R12825 LINK_ID L12532 ROAD_LABEL LESLEY DR LENGTH_M 78 WIDTH_M 4.9 FROM_DESC KINGSBROOK/ LESLEY TO_DESC BEVERLEY/ LESLEY WARD 16 SUBURB Hatton Estate DISTRICT Pinetown OWNER ETHEKWINI PAVE_TYPE F CATEGORY C RISFSA Class 4 VCI 78 AGG_LOSS D/E 2/2 BINDER D/E 4/5 PATCHING D/E 3/1 SURF_CRACK D/E 2/5 VCI 78 IRI 2.5 MTEF_COST_R 16052 MTEF_TRT Reseal MTEF_YR 2014 GIS Integration Road centre-line dataset 18 000 roads & 49 000 links Attributes relevant to the PMS Maintained Roads Surfaced & gravel Basis of road asset register Linked to accounting system Proposed Roads Proposed town planning layouts Tracks Access paths in informal areas

Defining The Maintained Gravel Network Urban Core Urban Periphery Peri-urban Rural 1 km 276 km 310 km 853 km Graded twice a year Re-gravelled once every five years R 50 000/km

Land Ownership Issues Peri-urban Rural 310 km 853 km Corporate entity to administer land traditionally owned by the King The trust does not pay taxes to the ethekwini Municipality. The Trust owns approximately 32% of land in KZN.

To Pave Or Not To Pave Inferior LOS?? Inclement weather Steep terrain

To Pave Or Not To Pave Large cost component is haulage. Sensitive to fuel price increases.

To Pave Or Not To Pave Non-compliance by operators Borrow pits situated on Tribal land Geology does not produce good gravel Mineral & Petroleum Resources Development Act (No. 28 of 2002) Mining permit from Dept. of Minerals & Energy Fluctuating Supply Data from Dept. of Mineral Resources (www.aspasa.co.za) Scarce Resource

Gravel to Surface Upgrade Programme Zone Length (km) LOS Lifecycle (years) Annual Upgrade (km) Eliminate Backlog (years) Cost (Rm/km) Peri-urban & rural (public transport) 60 TRH 4 20 5 12.0 6 Urban & urban periphery 277 TRH 4 30 10 27.7 6 Peri-urban & rural (low volume) Single 1103 stabilised 6 8 layer + WC 60 18.4 1 Ok so which do we upgrade first?

Taking up the Challenge Select roads for upgrading in an objective manner based on engineering principles while satisfying nonengineering demands Network Level Prioritisation Model

Prioritising Upgrades Using A Buffer

Network Level Prioritisation Model CRITERIA DESCRIPTION ATTRIBUTE/VALUE WEIGHT Public transport route Gravel roads that form part of the public transport network are strategically important to the city and were thus considered high priority for upgrading. Public transport route: YES 1 Public transport route: NO 0 40 Linked to an existing paved road Upgrading a gravel road that links to an existing paved road is a logical first step to extending the paved network. Linked to a paved road: YES 1 Linked to a paved road: NO 0 30 Development location The location of a gravel road was considered in the context of various development policies. Urban core 1 Urban periphery 0.7 Peri urban 0.5 20 Rural 0.3 Gradient Affects drainage. Both the steepest gradient* and average gradient** of each road was calculated. 0 to 0.049 0.3 0.05 to 0.159 0.4 0.16 to 0.299 0.6 0.30 to 1 1 10* 20**

Network Level Prioritisation Model CRITERIA DESCRIPTION ATTRIBUTE/VALUE WEIGHT Dwelling density Significant when assessing the dust nuisance factor. Number of dwelling units per unit length of road. total number of dwellings total length of road 15 Access to services or amenities Existing paved ratio The number of social services in the proximity of the road was enumerated. Where roads have both paved and gravel portions, paving the latter improves continuity on the paved network. Schools 10 Fire stations 10 Clinics 10 Police stations 10 Community halls 10 Libraries 5 Cemeteries 5 length of paved portion total length of road 5

Design Philosophy DCP Method Integration with other Municipal projects Existing pavement structure & alignment

Design Process ACTION Preliminary road evaluation PROCESS Horizontal & vertical alignment In-situ pavement strength & material properties Drainage conditions Traffic Peri-urban & rural: 200 vpd Established townships: volumes from ETA Geometrics & road safety Evaluate cross sectional elements Assess signage & pedestrian crossings Pavement design Use DCP method Suitable pavement structure Materials Establish material requirements Material selection Surfacing Consider all alternative options Select most suitable Drainage Evaluate existing drainage Improve where necessary Asphalt haunching

Road Name Gravel to Surface DCP Pavement Design Report 123 STR Traffic Analysis Design Life (Years) 10 Road Width (m) (Average) 0 Growth Rate (%) 3 E80 s per Heavy Vehicle 0 Heavy vehicles per day (both directions) 0 Lane Width Adjustment 2 Cumm. Growth Factor 4309 Cumm. Design Loading (both directions) 0.00 Traffic Class LE 0.01 DCP Analysis Month of Testing Insitu Soil Moisture Condition Jan Normal DCP DN Percentile Utilised 50 Required DN (max.) Insitu DN 50 th Percentile (mm/blow) Design DN 50 th Percentile (mm/blow) Estimated Material Class (TRH 14) DCP CBR Average DN (mm/blow) Std. Dev DN (mm/blow) CoV 8.0 6.9 13.8 G7 15 14.5 4.62 0.32 19.0 4.6 9.2 G7 25 16.4 20.42 1.24 33.0 5.8 11.6 G7 18 13.8 8.24 0.60 40.0 9.5 19.1 G9 10 21.6 13.54 0.63 50.0 15.7 DSN 800 (min.) DSN 800 50 th Percentile (normal) BN 100 50 th Percentile (normal) Average DSN 800 39.0 107.1

Gravel to Surface As Built Sheet Required DN (max.) As Built DN 50 th Percentile (mm/blow) Estimated Material Class (TRH 14) DCP CBR Average DN (mm/blow) Std. Dev DN (mm/blow) 8.0 6.9 G6 29 10.1 5.05 0.50 19.0 4.6 G6 38 7.6 2.10 0.28 33.0 5.8 G6 37 9.1 5.82 0.64 40.0 9.5 G5 57 12.0 11.35 0.94 50.0 15.7 G7 20 12.5 10.14 0.81 DSN 800 (min.) BN 100 50 th Percentile (normal) Inverted Pavement Structure Average DSN 800 39.0 143.2 9.7 119.1 63.32 0.53 CoV

Implementation Use of Bitumen RECLAIMED Stabilised ASPHALT Materials RECLAIMED ASPHALT Environmentally sustainable Cost effective Enhanced performance Trafficked immediately Water resistant Labour intensive methods

Pavement Structures Structure Cost (R/m 2 ) Wearing course 30mm 85 BSM base 150mm 100 G4 granular sub-base 200mm 120 Rip & re-compact sub-grade 150mm 30 service life LCC maintenance costs Pavement structure with sub-grade improvement 5m wide = R 1 675 000-00 per km Structure Cost (R/m 2 ) Wearing course 30mm 85 BSM base 150mm 100 COSTS Rip & re-compact sub-grade 150mm 30 Pavement structure without sub-grade improvement 5m wide = R 1 075 000-00 per km

Reclaimed asphalt spread with a grader

Cement bags placed in readiness for spreading

Spreading cement for in-situ recycling

In-situ recycling in progress KMA recycler Bitumen tanker Water tanker

Electrifying low volume roads?

Construction of the asphalt surface

The completed product

CONCLUSION NETWORK LEVEL PRIORITISATION MODEL

THANK YOU