Policy context & Projects on the comprehensive network

Similar documents
ANNEX 2: PRIORITY "PRE-IDENTIFIED PROJECTS ON OTHER SECTIONS OF THE CORE NETWORK (RAILWAYS, INLAND WATERWAYS, ROADS, MARITIME AND INLAND PORTS) "

Railways. CEF Blending Info Day 27 February Francesco Buscaglia INEA Frederic Versini DG MOVE

ANNEX ANNEX. to the. Commission implementing Decision

CEF Transport Info day 2016 Greece

European Mobility Network EU TEN-T Policy & CEF Pawel Stelmaszczyk European Commission DG MOVE

2016 CEF Transport Call Priorities and Types of Calls

How are ports benefiting from the Connecting Europe Facility?

Connecting Europe Facility (CEF) Financing Opportunities

TEN-T Corridors, Ports and Motorways of the Sea

The CEF 2014 Calls - The MOS Call

European funding programmes: TEN-T, Nariné Svensson, SMA

NORWAY (NO) The tables work in the following way: Dear TEN-TaNS partner.

2018 CEF Transport MAP call

ESPO Conference Rotterdam, 31 May Stephen O Driscoll Head of Division: Air, Maritime and Innovative Transport

The EU Transport Policy Leo Huberts, European Commission

The process of developing and financing port development

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

Scandinavian- Mediterranean Corridor WiderMos conference La Spezia, October 2015

Symposium Competition & Regulation in the Rail Sector

INEA. Innovation and Networks Executive Agency. Making implementation happen. Motorways of the Sea Priority funding options

WHITE PAPER 2011 TENT & CEF Beyhond 2014!

2015 CEF Transport Calls

The Trans European Transport Network TEN-T and its role for Austria. Workshop Vienna

Use of ITS technologies for multimodal transport operations River Information Services (RIS) transport logistics services

ANNEX. to the COMMISSION IMPLEMENTING DECISION

3. OBJECTIVES AND PRIORITIES:

BLUE GROWTH STRATEGY Blue economy and mecanisms of innovation

INEA Corridor report: state of play of CEF funding for Rhine-Alpine CNC. Peter Van Bockland Rhine-Alpine Corridor Technical Advisor, INEA

Motorways of the Sea. Who What When How Much? NOVEMBER 2015 Goteborg Jose Anselmo Policy Advisor TEN-T/MoS

2016 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET. Belgium

PORT OF BAR: CASE STUDY. 28 th Meeting of Rail and Intermodal Working Group; Bar, 10 th October

Open letter on the Commission proposal for a Regulation establishing a European Fund for Strategic Investments.

The Connecting Europe Facility & the revised TEN-T Guidelines

2016 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET. Spain

Supply and Demand Analysis

Developments in the EU Inland Navigation Policy

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Portugal

Eligible projects for the blending call

Launching event Plataforma Intermodal Puerto de Huelva

THE LIVORNO PLATFORM

What is an Executive Agency?

ECMAR Brokerage Session

NORTH CLUSTERING EVENT

Luca Lupi, Paul Kyprianou, Carles Rua Bclink: Mos for the Future

Vassilis DEMETRIADES Directorate-General for Mobility and Transport

European Shortsea Network

NextGen Link. Upgrade of the maritime link with the port interconnections in the ScanMed Corridor 2016-EU-TM-0092-W

Nodes of the Core Network

GREEN INFRAPORT PROJECT AREAS OF INTEREST

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

MoS: the paradigm for the development of modern ports

Digital Transport and Logistics Forum (DTLF) Electronic Freight Transport Information (EFTI) European Maritime Single Window environment (EMSWe)

Investments in Transport Infrastructure Projects

Position Paper on MFF. A Sufficient EU Budget for the best Rail System in Europe

INVESTMENTS IN PORT OF GDYNIA

Inland waterway transport - European policy framework and challenges

Inland navigation developments in the EU 2016

2014/94/EU Directive & Port infrastructure: The Poseidon Med II, elemed & CYnergy experience

Project Data Sheet BASIC PROJECT DATA. Fixed and mobile infrastructure for safe operations & environmental protection in Constanta Port

Orient-East Med Corridor

Rail Freight Noise CEF Transport call Virtual Information Day 17 January 2019

Port of Hamburg: Heading into the future with smartport

European Strategy on low emission mobility DG MOVE Isabelle Vandoorne, deputy Head of Unit

Short Sea Shipping: the full potential yet to be unleashed

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Spain

The EU White Paper on Transport: The Vision and How to Get There. Ralf Brand, Ph.D. 2 nd Annual Conference SCCER Mobility 26 August 2015

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Ports & Maritime Organization. Two Proposed Investment Projects of PMO

Rail Interoperability

2012/2013 FIRST SEEDS OF THE WIDERMOS PROJECT EMERGING NEEDS:

Inland Waterways Infrastructure in the Czech republic. Lubomír Fojtů Waterways Directorate of the Czech Republic

SUSTAINABLE SHIPPING AND PORT TRENDS. Habil. Dr., Captain, Prof. Vytautas Paulauskas Klaipeda Shipping Research Centre

TEN-T POLICY REVIEW. UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Geneva, 7-8 September 2010

EUROPEAN UNION. Brussels, 22 November 2013 (OR. en) 2011/0294 (COD) PE-CONS 42/13 TRANS 316 ECOFIN 533 ENV 546 RECH 265 CODEC 1403

Information on Rail Baltica Planned Procurements for the Global Project (indicative)

ERTMS the right investment for the future. EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit

DaHar Danube Inland Harbour Development

Economic and Social Council

A8-0023/138. Knut Fleckenstein Market access to port services and financial transparency of ports COM(2013)0296 C7-0144/ /0157(COD)

Vamp Up Project Overview

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Szczecin-Świnoujście as a point infrastructure of the Baltic-Adriatic Corridor. Opatija, Nov. 2017

THE ROUTE MAP TO A CONNECTED EUROPE

Abstract This study represents the technical basis for the first and second update of the Baltic-Adriatic corridor work plan by the European

GNSS opportunities in Transport

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

The Infrastructure Challenge: Perspectives on the Road Ahead

EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project

Overview of activities & initiatives

Consultation on the draft of the limited revision of the TSI relating the subsystem rolling stock Noise (TSI Noise)

EUROPEAN SEA PORTS ORGANISATION RAPID EXCHANGE SYSTEM GUIDELINES 2016

Revision of the TEN-T Guidelines

Report on CLECAT activities on EU RAIL FREIGHT CORRIDORS

The ERTMS in 10 questions

Roadmaps to 2050 FFE (Madrid, Spain) 21 September 2017

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME

TEN-T Days Ljubljana - April 2018

Jean Monnet Network Conference Energy and Transportation in the Atlantic Basin

Denmark. Ulla Fabricius and Christian Benedictsen-Nislev. NJORD Law Firm

Transcription:

10.05-10.30 Policy context & Projects on the comprehensive network 2019 CEF Transport call Virtual Information Day 17 January 2019 João Ferreira Policy officer in the Unit for 'Transport 'investment' Directorate-General Mobility & Transport (DG MOVE)

General policy context CEF Transport: grant budget of almost EUR 23.6 billion Calls 2014-2018: 690 projects - EUR 23 billion (total investment EUR 48.3 billion) CEF 2018 Multi-Annual call: EUR 450 million (General envelope), launched on 17/05/2018, deadline 24/10/2018 evaluation ongoing CEF 2019 Annual call: EUR 100 million (present call) The 2018 and 2019 calls virtually exhaust the grant budget available Looking ahead: progress review, 'use-it-or-lose-it' principle, re-injection of reflow funds 2019-2020 2

Annual call 2019 EUR 100 million Cross-border sections Rail, Road Connections to and development of maritime ports EUR 65 million TEN-T Comprehensive network Reimbursement of eligible costs actually incurred Reducing rail freight noise: retrofitting of existing rolling stock EUR 35 million TEN-T network Unit costs: unit contributions per type of wagon

As a reminder: outcome of Annual Call 2016 Cross-border projects on the TEN-T Comprehensive network: EUR 140 million for 13 projects (railway and road) Reduction of rail freight noise: EUR 27.6 million for 7 projects Commission Decision of 25 July 2017: https://ec.europa.eu/transport/themes/infrastructure-ten-tconnecting-europe/reference-documents-work-programmesselection_en https://ec.europa.eu/inea/connecting-europe-facility/ceftransport/cef-transport-projects 4

Priority 1: Cross-border sections rail-road / maritime ports Studies and/or Works TEN-T Comprehensive network Reimbursement of eligible costs actually incurred RAIL ROAD Maritime ports Actions in line with the requirements of Regulation (EU) No 1315/2013: Chapter II, section 1 Chapter II, section 3 Chapter II, section 4 Maximum possible rates of co-funding: Studies 50% / Works: 40% 10%* 20% * For road networks in the case of MS with no railway network or in the case of MS with an isolated network without long-distance rail freight transport: 30% of the eligible costs for actions addressing bottlenecks and 40% for actions concerning cross-border sections

General conditions applying to Priority 1 Actions Studies: technical, legal or financial, preparation of tender documentation and permission procedures including EIA assessment (no studies which do not directly lead to implementation) Works (or mixed proposals works / studies): accompanied by a Cost-Benefit Analysis Railway and road cross-border proposals must include a written agreement between the MS concerned 6

Railways: objectives and scope ONLY proposals concerning cross-border rail sections of the TEN-T Comprehensive network are eligible for funding Take account of provisions of: Directive 2008/57/EC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system Directive 2016/797 of the European Parliament and of the Council of 11 May 2016 which will replace Directive 2008/57/EC as of 16 June 2020 7

Railways: Eligible infrastructure components and requirements High-speed and conventional railway lines, including sidings, tunnels and bridges High speed lines: new lines equipped for speeds in order of 250 km/h and upgraded conventional lines 200 km/h Associated equipment (e.g. electrification systems, equipment for the boarding/alighting of passengers, loading/unloading of cargo, automatic gauge-changing facilities...) Full electrification of line tracks (+ sidings where required) Nominal track gauge for new railway lines = 1435mm NB: Railway station facilities are of lower priority unless they concern the railway infrastructure component. If included in the application, they should be clearly described, quantified and 8 priced separately

Railways: "Ideal" proposals Studies, including final designs and environmental permissions, for the construction of a new crossborder section Electrification of an existing cross-border section Migration to 1435 mm nominal gauge Works to increase the speed of a conventional line to 200 km/h 9

Railways : what will NOT be funded Any study not directly leading to implementation ERTMS and GSM-R deployment Passenger buildings, car parks, commercial parts of an existing station Maintenance 10

Roads objectives and scope ONLY applications concerning cross-border road sections of the TEN-T Comprehensive network are eligible for funding In Member States with no railway network or with an isolated network (e.g. CY, IE, MT), proposals concerning removal of bottlenecks are also eligible for funding Take account of provisions of: Directive 2008/96/EC of the European Parliament and of the Council of 19 November 2008 on road infrastructure safety (currently under revision) Directive 2004/54/EC of the European Parliament and of the Council of 29 April 2004 on tunnel safety 11

Roads: eligible infrastructure components and requirements High-quality roads (motorways, express roads or conventional strategic roads) including bridges, tunnels, junctions, crossings, interchanges, hard shoulders Associated equipment (e.g. equipment for traffic management, information and route guidance) Other infrastructure components listed in Section 3 of the TEN- T Guidelines provided that they are located on a cross-border road section of the TEN-T Comprehensive network 12

Roads: "Ideal" proposals Studies, including final designs and environmental permissions, for the upgrade of an existing, or the construction of a new, cross-border section Works for the upgrade of an existing, or the construction of a new, cross-border section Removal of existing bottlenecks on cross-border sections (or in MS without or with isolated railway network) Tunnel safety upgrades to comply with Directive 2004/54/EC 13

Roads: what will NOT be funded Any study not directly leading to implementation Maintenance 14

Maritime ports: objectives and scope ONLY proposals concerning ports of the TEN-T Comprehensive network are eligible for funding Take account of provisions of: Directive 2000/59/EC of the European Parliament and of the Council of 27 November 2000 on port reception facilities for shipgenerated waste and cargo residues Directive (EU) 2016/802 of the European Parliament and of the Council of 11 May 2016 relating to a reduction in the sulphur content of certain liquid fuels Directive 2014/94/EU of the European Parliament and of the Council of 22 October 2014 on the deployment of alternative fuels infrastructure Regulation (EU) 2017/352 of the European Parliament and of the Council of 15 February 2017 establishing a framework for the provision of port services and common rules on the financial transparency of ports

Maritime ports: type of supported Actions Hinterland connections to the Comprehensive Network Port access (rail, inland waterway or road if other hinterland connections are not an option) with adequate capacity and efficiency, including digital solutions to improve connectivity and the infrastructure necessary for transport operations within the port area aiming at providing safe maritime access in the form of breakwaters, capital dredging activities, access channels, locks and navigational aids Port infrastructure Reception facilities Implementation of new facilities & technologies (e.g. internal basins, quay walls, jetties, backfills, land reclamation) including safety, security and checks equipment and facilities for oil and other waste, including residues from exhaust gas cleaning systems, to meet environmental requirements regarding use of alternative fuels and energy, e.g. LNG bunkering, shore-side electricity, etc., in line with the Directive 2014/94/EU, excluding pilot actions

Maritime ports: specific conditions Not eligible: superstructure, construction and expansion of terminals, storage/warehouses, maintenance, cruise ships infrastructure and facilities, cargo and passenger terminals, infrastructure dedicated to private operators, port community systems incompatible / in contradiction with EMSW proposal Works Actions: based on proper needs assessment (market analysis and analysis of impact on competition with neighbouring ports), demonstrate long term port development strategy with adequate links to hinterland

Maritime ports:"ideal" proposals Improvement of rail access to a comprehensive port IT system to improve the connectivity with other actors in the supply chain e.g. through port community system development Land reclamation and construction of LNG bunkering facility in a port Internal basin lengthening for accommodating larger ro-pax vessels Construction of an access channel or investing in navigational aids improving access to a port Facility and equipment for container security checks in a port Capital dredging to increase the depth of fairway Building port reception facility for scrubber sludge from ships

Maritime ports: what will NOT be funded Pilot action for testing methanol bunkering facility in a port (pilot actions are not eligible) Waste reception facilities in a cruise terminal (dedicated infrastructure and facilities for cruise ships are not eligible) Expansion of a passenger terminal, for e.g. departure hall, gangways, etc. (expansion/constructions of passenger terminals are not eligible) Annual maintenance dredging operation on a port fairway (maintenance is not eligible) Construction of a terminal or purchase of gantry cranes in a container terminal (terminal construction/expansion/capacity increase and superstructure are not eligible) Improvement of rail access to a privately owned and exclusively operated terminal (no public access)