USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL. Kambiz Farahmand

Similar documents
SOLVING LOGISTICS AND TRANSPORTATION PROBLEMS IN A JOB SHOP. Kambiz Farahmand Arun Balasubramanian

USING SIMULATION TO SCHEDULE MANUFACTURING RESOURCES. Hank Czarnecki Bernard J. Schroer M. Mizzanur Rahman

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

CLUSTER TOOL SIMULATION ASSISTS THE SYSTEM DESIGN. Sarayuth Poolsup Salil Deshpande

CHAPTER 1 INTRODUCTION

CAPACITY PLANNING SIMULATION OF AN OLIVE PROCESSING PLANT. Richard A. Phelps

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

A SIMULATION STUDY OF AN AUTOMOTIVE FOUNDRY PLANT MANUFACTURING ENGINE BLOCKS

Ch 19 Flexible Manufacturing Systems

Computer-Integrated Manufacturing

A DECISION TOOL FOR ASSEMBLY LINE BREAKDOWN ACTION. Roland Menassa

A GENERIC SIMULATOR FOR MODELING MANUFACTURING MODULES

A SORTATION SYSTEM MODEL. Arun Jayaraman Ramu Narayanaswamy Ali K. Gunal

ANALYSIS OF ELECTRONICS ASSEMBLY OPERATIONS: LONGBOW HELLFIRE MISSILE POWER SUPPLY. John D. Hall

Chapter 11. In-Time and Lean Production

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

Ch 16 Automated Production Lines

CAPACITY ANALYSIS OF AUTOMATED MATERIAL HANDLING SYSTEMS IN SEMICONDUCTOR FABS. Michael E. Kuhl Julie Christopher

STUDY NO 5 INTRODUCTION TO FLEXIBLE MANUFACTURING SYSTEM

Where to Use Automated Production Lines. Automated Production Lines. Benefits of Automated Production Lines. Automated Production Line - Defined

Flexible Manufacturing systems. Lec 4. Dr. Mirza Jahanzaib

Finished goods available to meet Takt time when variations in customer demand exist.

MODELING LOT ROUTING SOFTWARE THROUGH DISCRETE-EVENT SIMULATION. Chad D. DeJong Thomas Jefferson

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

standard component library

Proceedings of the 2016 Winter Simulation Conference T. M. K. Roeder, P. I. Frazier, R. Szechtman, E. Zhou, T. Huschka, and S. E. Chick, eds.

Planning manufacturing systems

Discrete Event simulation

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald

ANALYZING PRINTED CIRCUIT BOARD ASSEMBLY LINES USING A PCB ASSEMBLY TEMPLATE. Pradip D. Jadhav Jeffrey S. Smith

PLUS VALUE STREAM MAPPING

Flexible Manufacturing Systems

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A. M. Uhrmacher, eds.

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Step 4: Can my rate of production be met with a single. Step 5: Prepare a simple line drawing of the ideal and

AN AIRCRAFT OPERATIONS SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR PARK. 2.1 Objectives

SIMULATION OF A LARGE-SCALE BREWERY DISTRIBUTION SYSTEM. K. Heinz Weigl. ESLA Scheibengasse 5 A-1190 Vienna, AUSTRIA

Use of Simulation in Different Phases of Manufacturing System Life Cycle

WHY LEAN NEEDS SIMULATION

Manufacturing Systems & Single Station Manufacturing. Lecture 2

UNIT III GROUP TECHNOLOGY AND FMS

MM 323 MANUFACTURING SYSTEMS PRODUCTION AND LAYOUT TYPES

A PRACTICAL MODULE-BASED SIMULATION MODEL FOR TRANSPORTATION-INVENTORY SYSTEMS. Soemon Takakuwa

EXPERIENCES WITH BACKWARD SIMULATION BASED APPROACH FOR LOT RELEASE PLANNING. Sanjay Jain Stephen Chan

Stochastic Modeling and Validation of Three-Tier Supply Chains Using Multiple Tools

CHAPTER 1 INTRODUCTION

Session 5 DFMA Roadmap- Concurrent Engineering

Proceedings of the 2017 Winter Simulation Conference W. K. V. Chan, A. D'Ambrogio, G. Zacharewicz, N. Mustafee, G. Wainer, and E. Page, eds.

PRACTICE PROBLEM SET Topic 1: Basic Process Analysis

SHOP SCHEDULING USING TABU SEARCH AND SIMULATION. Mark T. Traband

5.3 Supply Management within the MES

A Case Study of Lead Time Reduction by Transformation to Cellular Production

OPTIMIZING EARTHMOVING OPERATIONS USING OBJECT-ORIENTED SIMULATION. Mohamed Marzouk Osama Moselhi

Scheduling of Three FMS Layouts Using Four Scheduling Rules

Operations Management - 5 th Edition

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader

A SUPPLY CHAIN CASE STUDY OF A FOOD MANUFACTURING MERGER. David J. Parsons Andrew J. Siprelle

Optimizing Equipment Utilization In Semiconductor Manufacturing

Optimisation of R-1040 Engine Assembly Line using TPS Techniques and Simulation

SOME TYPICAL REAL BENEFITS Some benefits I have seen companies achieve with simulation modeling as part of their approach include

A CAPSTONE EXPERIENCE IN MANUFACTURING AUTOMATION THROUGH INTEGRATION OF ROBOTICS, MACHINE VISION AND PROGRAMMABLE CONTROLLERS

Julie Christopher. IBM Microelectronics 2070 Route 52 Hopewell Junction, NY 12533, USA

MFS605/EE605 Systems for Factory Information and Control

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

EVALUATION OF CLUSTER TOOL THROUGHPUT FOR THIN FILM HEAD PRODUCTION

SIX MONTHS TO A STRONGER OPERATION

BUSINESS PROCESS MODELING WITH SIMPROCESS. Maya Binun. CACI Products Company 3333 North Torrey Pines Court La Jolla, CA 92037, U.S.A.

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

LEAN ASSESSMENT TO OPTIMIZE YOUR OPERATIONS

Analysis of a Manual Mixed-Model Assembly Line in Food Processing Industry: A Case Study

SCREENING CELL DESIGNS BASED ON SYNCHRONOUS MANUFACTURING

A SIMULATION STUDY OF HIGH POWER DETONATOR PRODUCTION TRANSITION. Johnell Gonzales-Lujan Robert J. Burnside George H. Tompkins

SIMULATING TEST PROGRAM METHODS IN SEMICONDUCTOR ASSEMBLY TEST FACTORIES. Chad D. DeJong

Increasing Your Competitiveness in PCB Assembly

Flow and Pull Systems

Dynamic simulation for optimisation solution of manufacturing processes

This article is on Facility Layout and Types of Layouts. It contains concepts like -

Facility Layout. Facilities Planning. Facility Layout. Facility Layout. INEN 416 Facility Location, Layout, and Material Handling 9/1/2004

Methods Engineering. Methods Engineering

Keywords: Product Family Design, Production Cost Estimation Framework, Activity Based Costing, Product Family Structure, Resource Sharing Methods

USE OF DYNAMIC SIMULATION TO ANALYZE STORAGE AND RETRIEVAL STRATEGIES

MANUFACTURING PROCESS MANAGEMENT USING A FLEXIBLE MODELING AND SIMULATION APPROACH. Duilio Curcio Francesco Longo Giovanni Mirabelli

IT 470a Six Sigma Chapter X

IMPROVEMENT OF A MANUFACTURING PROCESS FOR SUSTAINABILITY USING MODELING AND SIMULATION Thesis

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

APPLYING SIMULATION TO INTERATIVE MANUFACTURING CELL DESIGN

Affordable plant layout and process simulation software

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

INTERFACING SIMULATION WITH COSTING SOFTWARE TO DRIVE THE TRANSFORMATION FROM PROTOTYPE MANUFACTURING TO HIGH VOLUME MANUFACTURING

PULL PRODUCTION POLICIES: COMPARATIVE STUDY THROUGH SIMULATIVE APPROACH

Productivity Improvement Techniques in Apparel Manufacturing Industry

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample

IMPROVING EFFICIENCY IN GARMENT INDUSTRY BY IMPLEMENTING SINGLE PIECE LINE PRODUCTION SYSTEM M Parthiban *1 & Adarsh H 2

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

Welcome to Principles of Lean Manufacturing

Transcription:

Proceedings of the Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL Kambiz Texas A&M University Department of Mechanical & Industrial Engineering MSC 191 Kingsville, TX 78363, U.S.A. ABSTRACT A simulation model was developed and tested using Taylor II to justify the implementation of a Flexible Manufacturing Cell (FMC). The current production capacity at the existing Continuous Flow (CF) assembly line must be increased and among other proposals, a FMC is highly recommended. Simulation models are developed, tested, verified, and the model sensitivity is evaluated. The simulation models provide valuable information about performance parameters, critical elements, and bottlenecks that may appear when the line capacities have been altered. Manufacturing line evaluation and assessment of the improvements from one layout to the other is accomplished by tracking performance parameters such as lead-time, throughput, work-in process, and resource utilization. The simulation models resulted in a more in-depth understanding of manufacturing parameters and clear understanding of the improvements achieved by switching to FMC. The FMC model showed a reduction in production lead-time, average WIP, the burn-in capacity, and the number of operators required. 1 INTRODUCTION Today s manufacturing industry is facing problems that have been growing in size and complexity over the last several years. As a result, there is an immediate need for procedures or techniques in solving various problems encountered in today s manufacturing arena without extended shutdowns or expensive modifications (Clark 1996). Computer simulation is a powerful tool that allows experimentation with various manufacturing techniques and layouts without actual implementation. Application of simulation for solving manufacturing problems has been the cornerstone of the industry. Continuous flow assembly lines are most commonly used for mass production manufacturing, in which the processing and assembly workstations are placed along the product flow-line. With emphasis on reducing setup and flow times, inventory, and lead-time among other things, more companies are considering FMC as an alternative. FMC is composed of several workstations where similar parts from a family of parts are processed. A discrete event system represented by either stochastic or deterministic models capable of simulating machine or workstation production on existing and new products and evaluating the performance measures related to the manufacturing goals of the company was developed. The model could be utilized for optimizing performance parameters and is capable of predicting systems performance resulting from interactions among system components and changes in the key parameters. 2 CONTINUOUS FLOW ASSEMBLY Continuous Flow Assembly (CFA) Processes are most commonly used in assembly line production. With this type of layout, the processing and assembly workstations are placed along the flow-line of the product (Figure 1). The Work-In-Process is moved by conveyor or similar means from one workstation to the next. The product is progressively fabricated as it flows through the sequence of workstations. An electronic device is manufactured in the Continuous Flow Assembly line shown in Figure 1. The electronic device is then inspected for performance specification and required physical finish. The model performance parameters include Throughput, Resource Utilization, In-Process Inventory, Lead-times, Travel Distances, and Percent Defects. These performance parameters could fully characterize the manufacturing operation ( 1994). 1272

1 1b 9 13 15 19 21 16 I II III IV V I II III IV 2 3 4 5 6 7 8 1 11 12 14 17 18 22 23 Side Table Electrical Tester Buffer Conveyor Belt (with 5 marks) Conveyor Belt (with 4 marks) Operator 1. Manual Assembly #1 7. llumination Inspection 14. Parametric Tester #3 & #4 1b. Manual Assembly #1b 8. Visual Process Inspection 15. Parametric Tester #5 2. Manual Assembly #2 9. Electrical Repairing 16. Burn-in Rack 3. Manual Assembly #3 1. Mechanical Repairing 17. & 18. Customer Check #1, #2 4. Manual Assembly #4 11. Pre-Test 19. &. Customer Check #3, #4 5. Manual Assembly #5 12. Cover Assembly 21. Memory Verification 6. Manual Assembly #6 13. Parametric Tester #1 & #2 22. Final Inspection 23. Packing Figure 1: Continuous Flow Assembly Layout 2.1 Description of the CFA Operations 2.1.1 Manual Assembly Operations 1 to 8 are performed one after the other. Operation 1b feeds directly to operation 6 through a buffer. These eight positions are synchronized by green light bulbs which flash every 38 seconds and remain ON (to signal the operators to pass the product to the next position) for 2 seconds before the assembly begins. 2.1.2 Illumination & Visual Process Inspections Illumination Inspection must detect any possible light leakage on the product s trim plate, and inspect the process for poor assembly or possible missing or loose screws. For each position a certification is required. 2.1.3 Pre-Test A final tuning of the product is performed before the encapsulation process is complete. Again a certified operator must perform this task. 2.1.4 Cover Assembly At this position the operator places the top lid on the product to complete its mechanical assembly and place it in the next immediate available conveyor. 2.1.5 Parametric Testers At this operation, a series of electrical tests are performed on the product, all controlled by a computer. The operator loads and unloads the product on the test fixture, and does some manual operations over the product guided by the computer via the monitor screen. 2.1.6 Burn-in Rack It is a rack with capacity to hold up to 18 products. Each product will have to remain on the rack at least minutes. One operator is in charge of placing the products on the rack and back on the conveyor after the -minutes cycle is over. 2.1.7 Customer Checks At this position the operator performs a functional testing of the product. Because of the importance of this final functionality inspection, the operators must be fully trained and certified. 2.1.8 Memory Verification At this operation a final memory verification of the product is performed via a computer. 1273

2.1.9 Final Inspection A final visual inspection of the product is performed by visual inspection. 2.1.1 Packing The finished product is enclosed in a bag and placed in a box. 2.1.11 Electrical & Mechanical Repairing Is in charge of any mechanical or electrical repairs. 3 CFA SIMULATION MODEL As part of the model verification process, a simulation model was developed for the CFA process and the results of the simulation were compared to the actual production data. The focus parameters include WIP, throughput, leadtime, and machine utilization. These performance parameters proved critical in previous studies by and Heemsbergen (1994) and (1997) in manufacturing environment. The time study measurements are collected for all operations including the loading and unloading the product from the conveyor on to the fixture and back. The average operation times are used for the simulation model. 3.1 Work-In-Process (WIP) Figure 2 shows the WIP inventory on the manufacturing line at different times (every half-hour) during the entire shift. The 1st proposal behaves very similarly to the current layout model (on its shape and trend), but with a much higher WIP (almost pieces more on the average). This is basically because of the added stations to speed up the process and increase the capacity. # of parts in-process 18 1 1 1 1 8 1.5 2.5 3.5 4.5 Work-In-Process Tim e 5.5 6.5 7.5 8.5 Current Situation 1st prop 2nd prop Figure 2: WIP Plotted Against Operation Times The 2nd proposal shows a pretty stable WIP inventory levels after 1.5 hours of running the process. The WIP inventory levels are less even though the production capacities are much larger (almost % more). The two contributing factors are: (1) the number of parametric testers were not increased, (2) the burn-in time was reduced to 45 minutes which decreased the number of products loaded onto the burn-in racks at this station significantly. The time spent by the products on the burnin racks must be reduced as the process cycle time is increased. 3.2 Throughput (Production Rate in Pieces/Hour) Figure 3 compares the simulation results for the proposal #1 and # 2 against the current layout. Both proposals generate the same production output. Naturally, this production rate is higher than the current layout production in order to achieve a higher capacity. It is also important to notice that the different number of workstations used in the two different proposals do not affect the production rates significantly. Parts produced/hour 1 1 8 1.5 2.5 3.5 4.5 Throughput 5.5 Tim e (in hours) 6.5 7.5 8.5 Current Situation 1st Proposal 2nd Proposal Figure 3: Throughput (production/hour) Results 3.3 Lead-Time Figure 4 shows the results obtained from the simulation model for the proposal #1 and #2 along with the current layout. The peaks observed on the 1st and 2nd proposal lead-time curves are due to the 9% quality requirements (parts being sent back to repair station) applied to these two scenarios. For the current layout lead-time curve these peaks were erased to have a better visualization of the two curves under study. The curves for all three scenarios follow the same shape, but the 1st and 2nd proposal curves are shifted due to their higher output rate. It is also important to notice that the 1st proposal lead time curve switch between levels equals to the current layout leadtime and the 2nd proposal lead-time values, thus, making this option a very attractive one due to added production flexibility. The second scenario shows an average leadtime value of 17 minutes less than the other two scenarios. This is directly as a result of decreasing the burn-in time from 1 hour to 45 minutes. 1274

Leadtime in minutes 18. 1. 1. 1. 1. 8... Leadtimes Current layout 1st proposal 2nd proposal changeover requirements in the design of fixtures, capabilities, and programming. Ma chi ne Test Inspection Packing Output (Finished Product).. 1 52 13 154 5 256 37 358 9 4 511 562 Nth part produced 613 664 715 766 817 Assembly Input (Raw m aterial/ Subassemblies) Figure 4: Lead Time Values Figure 5: Typical FMC Arrangement 3.4 Machine Utilization The machine percent utilization values determined for both proposals are higher than the values obtained for the current layout. Both proposals yield similar machine utilization. From the proposed scenarios for increasing the capacity to 8 pieces per day, the second one is selected. It resulted in a lower lead-time and a lower work-in-process inventory. The throughput is the same for both proposals. The number of operations and operators required has been reduced. The first proposal demanded a much larger burn-in capacity than expected which in turn affected the production rate and throughput through the system. 4 FLEXIBLE MANUFACTURING CELL (FMC) The concept of a manufacturing cell consists of an automated process, which may include more than one processing capability or facility. The definition of a cell usually includes material handling or transfer capability. Robots are used to facilitate the movement of the product in combination with the human operator for loading and unloading the machines. Cells are customarily arranged in a U or circular configuration so that the operator or robot can easily reach all of the machines. The chief advantage of a cell is the efficient movement of the work from one facility to the next, completing a cycle with minimal handling and delay resulting in short lead time and little work-in-process inventory (at least within the cell). (Turbide 1991) A Flexible Manufacturing Cell (FMC) is a group of machines, working together to perform a set of functions on a particular part or product, with the added capability of being conveniently changeable to other parts or products. Figure 5 shows a FMC designed to consider the The actual layout of the flexible manufacturing cell is depicted in Figure 6. It shows the actual elements that influence the model based on the performance parameters: Throughput, Resource Utilization, In-Process-Inventory, Lead-Time, and Percent Defects. 4.1 Description of the FMC Operations 4.1.1 Manual Assembly The assembly process starts in position # 1. Only positions # 1 and # 1b are synchronized by a green light bulb, which flashes every 63 seconds and remains on (to signal the operator to pass the product through to the next position) for 2 seconds. Position # 1b feeds directly to position # 4 through a buffer while position #1 feeds to the assembly position #2. The remaining positions are not synchronized by any light bulb. They pass their sub-assembly to the next position as soon as they finish their own assembly operation. 4.1.2 Manual Assembly # 4 + Visual Process Inspections At this position the operator performs a manual assembly of the product and inspects it for possible poor assembly, and missing or loose screws. A certification for the operator is required to perform this task. 4.1.3 Pre-Test + Illumination Inspection At this position a final tuning inside the product is performed before its final encapsulation. The operator also checks visually for possible light leakage on the products trim plate. Again, a certification for the operator is required to perform this task. 1275

7 8 9 11 12 13 14 15 6 SKID 5 1 16 4 1b Table Operator 3 Electrical Tester 2 1 Buffer 1. Manual Assembly #1 6. Cover Assembly 12. Customer Check #2 1b. Manual Assembly #1b 7. Parametric Tester #1 13. Memory Verification 2. Manual Assembly #2 8. Parametric Tester #2 14. Packing & Final Visual Inspection 3. Manual Assembly #3 9. Parametric Tester #3 15. Electrical Repairing 4. Manual Assembly #4 + 1. Burn-in Rack 16. Mechanical Repairing Visual Process Inspection 11. Customer Check #1 5. Pre-Test + Illumination Inspection Figure 6: Flexible Manufacturing Cell - Physical Layout 4.1.4 Cover Assembly At this position the operator places the top and bottom lids on the part to complete its mechanical assembly and sticks several control labels on it. Finally the operator stamps one of the labels and passes the product to the next position. 4.1.5 Parametric Testers At this position a series of electrical tests controlled by a computer are performed on the product. The operator loads and unloads the product on the test fixture, and does some manual operations on the product guided by the computer via the monitor screen. One operator is controlling all 3 testers. 4.1.6 Burn-in Rack 4.1.7 Customer Checks At this position the operator performs a functional testing of the product. The operators for these positions are trained and certified because of the importance of this final product-functionality checking. 4.1.8 Memory Verification, Final Visual Inspection, and Packing At this position a final memory verification of the product is performed via a computer. Once this verification is finished, the operator performs a final visual inspection of the whole product and then encloses it on a bag and place it on a box. A single operator performs these three operations. 4.1.9 Electrical & Mechanical Repairing It is a rack with capacity to hold up to products. Each product will have to remain here at least minutes. One operator is in charge of taking the products leaving from any one of the 3 parametric testers to the rack and, once they have been there for an hour, the operator passes the products to the next customer check tester available. 1276 At these positions, repairing of the product due to mechanical or electrical defects takes place. When a defective part is detected at any of the stations, this is picked up directly by the quality auditor who takes it to the repairing position. Once that the part is fixed, it is placed on the buffer before the position #5 (Pre-Test + Illumination Inspection) to re-enter the normal process. Electrical defects are detected by the Pretest + Illumination Inspection, Parametric tester, Burn-in Rack, Customer Check, and Memory Verification stations.

Mechanical defects are detected by the Visual Process Inspection, Illumination Inspection, Cover Assembly, Customer Check, and Final Visual Inspection stations. 4.2 Verification and Validation of the Model The following aspects of the model were verified during the model coding: Cycle times of each element. Here the computer model code was verified to match the time studies tables gathered during the conceptual model development. Control of flows such as Routing. Visually, it was verified that the product was following the right path either when it was considered as good or when it was detected as defective. Here the visual display of Taylor II proved to be a powerful aid. 4.2.1 Computer Model Validation. There is no such thing as general validity. A model is only validated with respect to its purpose. It cannot be assumed that a model that is valid for one purpose is valid for another. 4.2.2 Lead Time In order to validate the lead-time obtained by the simulation model, first a theoretical calculation is performed. Table 2 shows this calculation, which is based on the individual process time of all the stations where the product passes through. Thus, the theoretical expected lead-time is 7.6 minutes or 71 minutes rounded. Table 2: Lead Time Calculations Average time Reason (in seconds) 48 Manual Assembly # 1 Manual Assembly # 2 62 Manual Assembly # 3 55 Manual assembly # 4 + Visual Process Inspection 61 Pre-Test + Illumination Inspection 44 Cover Assembly 13 Parametric Tester 3 Burn-in Rack 116 Customer Check 61 Memory Verification + Final Visual Inspection + Packing 4,237 seconds or 7.62 minutes of Leadtime Next, the simulation model was executed for one shift (or 51 minutes). The initial conditions were to have 58 parts already loaded on the Burn-in Rack (as it happens normally) at the beginning of the shift. Figure 7 shows the result of the lead-time observed as each piece is produced throughout the whole shift. Leadtime observed @ Time Leadtimes through the time 57 pcs 51 pcs 9 pcs 132 pcs 68 pcs 13 pcs 11. 1. 9. 8. 7.. 5.. 3.. 1.. 3 3 57 114 153 181 21 238 266 295 352 379 9 438 466 494 Time (minute by minute) during the whole shift Figure 7: Lead Times Observed during a Complete Shift 4.3 Sensitivity Analysis The model sensitivity was evaluated based on the need to increase the current FMC capacity by 25 % or more. Three proposals were to be considered for achieving the capacity increase. Computer simulation made it possible to measure how the performance measurements of the FMC (leadtime, throughput, work-in-process, utilization) are affected by increasing this capacity. 4.3.1 First Proposed Scenario The first proposal focuses on speeding up the process by reducing the cycle time of the cell. This is accomplished by increasing the number of operations that represent a bottleneck to the new suggested cycle time. When dealing with the continuous line flow assembly line, there are just a few major bottlenecks such as: parametric and customer check. In the case of the FMC, the process is so well balanced that, if the capacity needed to be increased, it was also necessary to increase the number of operations for almost each segment of the process and not just the parametric and customer check positions. Table 3 shows the cycle-time suggested for each position, as well as the number of extra position required through the entire process to accomplish a capacity of 5 pieces/shift. This option required an investment for extra equipment and operators. 4.3.2 Second Proposed Scenario The second proposal focused also on speeding up the process by reducing the cycle time of the cell. But the approach to accomplish this cycle time reduction was different. Instead of increasing the number of positions that represent a bottleneck to the new suggested cycle time, 1277

Table 3: First Scenario Proposal to Increase Capacity Up to 4 Pieces/Day Capacity >= 5 products/shift FTQ = 97 % Average leadtime =??? minutes Average Throughput =??? products/hour Avg Work-In-Process =??? products maximum Description of cycle in # of Total of Task seconds positions people Manual Assembly #1 5 1 1 Manual Assembly #1b 5 1 1 Manual Assembly #2 5 1 1 Manual Assembly #3 5 1 1 Extra-1 Manual Assembly 5 1 1 Manual Assembly #4 + Visual process inspection 45.5 1 1 PreTest + Illumination inspection 45.5 1 1 Cover Assembly 45.5 1 1 Extra-2 Manual Assembly 45.5 1 1 Parametric Tester 42 4 2 Burn-in Rack 3??? 1 Customer Check 42.8 3 3 Memory verification + Final visual inspection + Packing 48 1 1 Total 4,165 17 16 the direction here was to focus on those bottleneck positions that could be improved by reducing process time (test and inspection, but not assembly), thus avoiding the need to increase numbers of operators or workstations. Test process improvement could be achieved by testing only those parameters that were not quite under control. Table 4 shows the cycle-time suggested for each position, as well as the positions required establishing this new cycle time. Table 4: 2nd Proposal - 4 Pieces/Day Capacity >= 5 products/shift FTQ = 97 % Average leadtime =??? minutes Average Throughput =??? products/hour Avg Work-In-Process =??? products maximum Description of cycle in # of Total of Task seconds positions people Manual Assembly #1 5 1 1 Manual Assembly #1b 5 1 1 Manual Assembly #2 5 1 1 Manual Assembly #3 5 1 1 Extra-1 Manual Assembly 5 1 1 Manual Assembly #4 + Visual process inspection 45.5 1 1 PreTest + Illumination inspection 45.5 1 1 Cover Assembly 45.5 1 1 Extra-2 Manual Assembly 45.5 1 1 Parametric Tester 45.8 3 1 Burn-in Rack 27??? 1 Customer Check 49 3 3 Memory verification + Final visual inspection + Packing 48 1 1 Total 3,275 16 15 4.3.3 Third Proposed Scenario The third proposal differed from the first proposal by taking advantage of the current FMC layout with respect to equipment utilization. Table 5 shows the current utilization of the parametric testers. Table 5: Current Parametric Testers Utilization Position Utilization Time Time Time No Name (%) Busy Idle Pause 14 URT # 1 7.99 362.6 87.94. 15 URT # 2.17 36.89 143.11. 16 URT # 3 44.5 226.94 223.6. The third proposal eliminated the need for an extra parametric tester without making an in-depth analysis of the current tests at the workstation. Table 6 shows the final requirements for this proposal. Table 6: 3rd Scenario - 4 Pieces/Day Capacity >= 5 products/shift FTQ = 97 % Average leadtime =??? minutes Average Throughput =??? products/hour Avg Work-In-Process =??? products maximum Description of cycle in # of Total of Task seconds positions people Manual Assembly #1 5 1 1 Manual Assembly #1b 5 1 1 Manual Assembly #2 5 1 1 Manual Assembly #3 5 1 1 Extra-1 Manual Assembly 5 1 1 Manual Assembly #4 + Visual process inspection 45.5 1 1 PreTest + Illumination inspection 45.5 1 1 Cover Assembly 45.5 1 1 Extra-2 Manual Assembly 45.5 1 1 Parametric Tester 42 3 1 Burn-in Rack 3??? 1 Customer Check 42.8 3 3 Memory verification + Final visual inspection + Packing 48 1 1 Total 4,165 16 15 5 SIMULATION RUNS AND RESULTS Considering the parameters such as Work-In-Process, Throughput, Lead-time, Machine Utilization, and Capacity, the results of each simulation model are presented here. Each of the parameters is reviewed and the current layout model is compared to the three proposed scenarios for increased capacity. 5.1 Work-in-Process Figure 8 shows the results of the model execution for the proposal No 1, No 2, and No 3 along with the current layout. Figure 8 shows the work-in-process inventory on the flexible manufacturing cell at different times (every half hour) during the entire shift. The 1st and 3rd proposal have the same WIP performance. And they both behaves pretty much like the current layout model considering shape and trend, but with a much higher WIP, almost pieces more on the average. This is basically because of the added stations to speed up the process and increase the capacity. 1278

9 8 Work-In-Process Figure 1 shows the average throughput for each of the 4 scenarios. All proposals to increase the capacity show the same average throughput. # of parts in-process 7 5 3 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 Time (hours) 6 6.5 7 7.5 8 8.5 Current Situation 1st prop 2nd prop 3rd Proposal Figure 8: Work-In-Process Results The 2nd proposal shows a flat WIP inventory after 1.5 hours, which is not much higher than the current. The main reasons for this is that burn-in time was reduced to 45 minutes causing the number of products being loaded at this station (burn-in rack) at any given time not to be increased significantly. Therefore, it is concluded that the factor contributing to major changes in calculating the WIP is the number of products being processed by the burn-in rack. In other words, in order to increase the line capacity without increasing the WIP inventory significantly, the time spent by the products on the burn-in rack must be somehow reduced as the process cycle time is decreased. 5.2 Throughput Figure 9 shows the results of the simulation model for the proposal 1, 2, and 3 along with the current layout. Figure 9 shows the output rate (in pieces/hour) for the manufacturing cell at different times (every half-hour) during the whole shift. All the proposals show the same output rate performance. Naturally this output rate is higher than the one shown by the current layout in order to achieve a higher capacity. It is also important to notice that the differences in the number of stations between the proposals do not affect the output rate. Pa rts pr od uc ed/ ho ur 7 5 3 1 Throughput 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 Time (in hours) Current Situation 1st Proposal 2nd Proposal 3rd Proposal Average parts produced/hour 5.3 Lead Time 5 3 1 Current Layout 47 Throughput 1st proposal Options 2nd proposal 3rd proposal Figure 1: Average Throughput Results Figure 11 shows the results of the simulation model for the proposal 1, 2, and 3 along with the current layout. The lead times observed for each of the parts being produced in all 4 scenarios are presented. The peaks observed on the lead time curves are due to the application of first time quality of 97%. Leadtime in minutes 18. 1. 1. 1. 1. 8..... 1 Leadtimes 34 67 1 133 166 199 232 265 298 331 364 397 43 463 496 529 Nth part produced Figure 11: Lead Times Results Current layout 1st proposal 2nd proposal 3rd Proposal All curves present similar behavior, but the 1st, 2nd, and 3rd proposal curves are shifted to the right due to their higher output rate. It is also important to notice that the 1st and 3rd proposal lead time curves shift to levels equal to the current layout lead time curve, thus making this option much more attractive. Figure 12 shows the average lead times obtained for each of the scenarios. The second proposal shows an average lead-time of 15 minutes lower than the other three scenarios. This is as a result of decreasing the burn-in time from 1 hour to 45 minutes. Figure 9: Throughput (production/hour) Results 1279

Average Leadtimes Summary of Results Avg Leadtime (in minutes) 8 7 5 3 1 Current Layout 74 75 1st proposal 2nd proposal 61 76 3rd Proposal Performance 5 3 1 Current Layout 1st proposal 2nd proposal 3rd proposal Options Figure 12: Average Lead Times Results Capacity Average Leadtime Average Thgroughput Average Work-In- Process Parameters # of Positions Total # of people Burn-In capacity required 5.4 Machine Utilization Table 7 shows the machine utilization values obtained from the simulation model for the proposal 1, 2, and 3 along with the current layout. Table 7: Machine Utilization Results Position Current 1st 2nd 3rd Layout Proposal Proposal Proposal No Name Utilization (%) 2 Manual Assy #1 68.5 87.25 87.25 87.22 25 Manual Assy #1b 83.37 86.78 86.71 86.63 34 Manual Assy E1 87. 87.6 87.12 4 Manual Assy #2 83.87 86.84 86.84 86.82 6 Manual Assy #3 86.93 86.71 86.68 86.66 8 Manual Assy #4 76.76 78.18 78.27 78.25 1 PreTest + Illumination 84.75 8.11 8.61 8.59 12 Cover assy 61.74 79.68 79.76 8 36 Manual Assy E2 79.54 79.7 79.75 14 URT # 1 7.99 73.62 7.24 79.29 15 URT # 2.17 67.26 62.19 75.15 16 URT # 3 44.5 55.2 44.36 69.47 37 URT # 4 31.95 19 C. Check # 1 8.45 74.47 78.1 74.88 C. Check # 2 79.61 72.69 75.7 72.75 38 C. Check # 3 68.18 7.97 69.28 22 Packing Station 83.5 79.62 82.32 79.52 26 Electrical Repair 2.79 12.56 13.54 13.94 27 Mechanical Repair 2.95 3.87 6.32 8.13 Looking at Table 3, it can be noticed that the percent for most positions (except for the pretest + illumination, and customer checks) are higher given the proposals than for the current layout. Comparing the utilization between the proposals, only the 3rd proposal shows a higher utilization percentage on the parametric testers. Figure 13 shows a summary of the results for each of the parameters being analyzed for each scenario. In order to increase the capacity to 5 pieces per day, the 2nd proposal looks promising. It shows a lower leadtime and a lower work-in-process inventory. The throughput is the same as the other two proposals. The number of positions and people is lowered. The burn-in capacity required is much lower than the 1st and 3rd proposals, and the same as for the current layout. It can be Figure 13: Summary of Results noticed that the third proposal (without adding an extra URT position) worked as well as the 1st one. 6 CONCLUSIONS The FMC model showed a reduction in production leadtime, average WIP, the burn-in capacity, and the number of operators required. The overall simulation study confirmed a better understanding of some of the concerns addressed earlier. These include: Critical elements or components were identified and relevant issues for the flexible manufacturing cell. Parametric tester, cycle time variability, and its effect on the process flow of the cell were investigated. The process of design of the FMC was made easier by visualizing the cell and evaluating the proposed solutions. The manufacturing process was modified until an optimum solution was at hand. Simulation was also an aid in planning future developments. The model provided a better forecasting of the proposed process performance and possible critical elements or weaknesses that may appear. REFERENCES Clark, Gordon M. 1996. Introduction to manufacturing applications, Proceedings of the 1996 Winter Simulation Conference, J. Charnes, D. Morrice, D. Brunner and J. Swain, eds.: 85-92. Piscataway, NJ: Institute of Electrical and Electronics Engineers., Kambiz. 1997. An integrated technique for minimizing wip and maximizing throughput, International Conference in Industrial Engineering Productivity 97, 125-134, Matamoros, Mexico., Kambiz. and Heemsbergen, Brian L. 1994. Floor inventory tracking of a kanban inventory system, 128

Proceedings of the 1994 Winter Simulation Conference, J. Tew, S. Manivannan, D. Sadowski and A. Seila, eds.: 127-134. Piscataway, NJ: Institute of Electrical and Electronics Engineers. King, Cliff B. 1996. TAYLOR II manufacturing simulation software. Proceedings of the 1996 Winter Simulation Conference, J. Charnes, D. Morrice, D. Brunner and J. Swain, eds.: 569-573. Turbide, David A. 1991. Computers in Manufacturing. Industrial Press Inc. AUTHOR BIOGRAPHY KAMBIZ FARAHMAND is currently an Associate Professor of Industrial Engineering at Texas A&M University-Kingsville. He is the Graduate Coordinator and the Director of the Maquiladora manufacturing program at the department of Mechanical & Industrial Engineering. His primary teaching and research activities are in the areas of design, simulation, implementation, and control of manufacturing systems. He is involved in joint research and consulting with NAVY and industry. He earned a B.S. in Petroleum Engineering from University of Oklahoma. He completed his M.S. and Ph.D. in Industrial Engineering at University of Texas at Arlington. He has 1 years of industrial experience with several fortune 5 companies. He is a registered professional engineer in the state of Texas and the president of IIE Coastal Bend Chapter 182 the IIE s campus advisor at TAMUK. He is currently a member of HFES, IIE, and ASEE. His email and web addresses are <K-@tamuk.edu> and <www.engineer. tamuk.edu/ieen/>. 1281