GLOBAL INDUSTRIAL WATER

Similar documents
OEM Equipment Support, with 3rd Party Manufacturing

Subcontractor / Supplier Pre-Bid Qualification All fields must be filled out unless otherwise noted.

TURBO MACH A DIVISION OF VT SAA

SUPPLIER SURVEY REPORT

SUPPLIER QUALITY SCOPE AND FACILITY QUESTIONNAIRE. Bantrel Co. Project #:

Qualification Program for Electrofusion Fittings

SUPPLIER EVALUATION A. QUALITY SYSTEM. 1. Management (Note: Please select all that apply. For those that do not apply, please respond with N/A) Yes

Gas & Equipments Pvt. LTD. AN ISO 9001 : 2008 CERTIFIED COMPANY.

General Manufacturing Industrial Solutions

35 STATION DOUBLE ROTORY COMPRESSION MACHINE

Supplier Quality Manual

Validation. An Easy to Understand Guide Validating Purified Water Systems

Contents: 1) Introduction: QUALITY PROCUREMENT PLANNING QA/QC TECHNICAL SUPPORT

VALIDATION AS A KEY TOOL IN SUCCESSFUL TRANSFER OR ESTABLISHMENT OF A MEDICAL DEVICE COMPANY IN A NEW FACILITY

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

PURITAN PRODUCTS QUALITY OVERVIEW. Quality Management System Self-Audit. September 15, 2015

SUPPLIER QUALITY SYSTEM SURVEY

Company Name: Click here to enter text. Contractor Contact (Name & Ph #): Click here to enter text. OpQual & DER USE ONLY

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS

Detailed Supplier Audit Report

National Animal Supplement Council

Self-Audit Checklist. Thank you. General:

User Requirement Specifications

The Brands of Excellence

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Page 1 / 11. Version 0 June 2014

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

Your Single Source Provider For Material Handling Solutions and Systems

City State Phone. Type of Ownership: (Click on each that apply) . Years in Business Have you done business with us before Yes No When?

PREQUALIFICATION APPLICATION

UNCONTROLLED DOCUMENT

Solutions Capabilities Badger Fluid System Technologies

SUPPLIER QUALITY SYSTEM SURVEY

User Requirement Specifications

Drug Quality Assurance: Systems at ChemCon Author: Dr. Peter Gockel

HIGH PURITY & PRECISION CLEANING PASSIVATION ELECTROPOLISHING SANITIZATION TESTING

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

Summary Document of the New ABC Level 1, 2 and 3 Qualifications in Fabrication and Welding Practice

BYRON PRODUCTS QUALITY TERMS AND CONDITIONS

Model # SV-R32AU. 2/13/2015 Page 1 of 11

655 Wheat Lane Wood Dale, IL Supplier Quality Assurance Manual Meets ISO 9001:2000 Standard Requirements

Patient Safety: Medical Device Distribution Evaluation and Sterile Barrier System Integrity

INDUSTRIAL WASTEWATER SYSTEMS

Metal Fabricators. Phone DAKA (3252) Fax Serving the Construction Industry and Manufacturers Since 1977

Adam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False

Call for Nomination. Vacuum Vessel Assembly Welding

Biotech Pharmaceutical Cosmeceutical Food. Modular System Design Valves, Pumps, Fittings Heat Exchangers

FORM A: BID (See B7) 1. Contract Title SUPPLY & DELIVERY OF A TRAILER MOUNTED CRASH ATTENUATOR

**PLEASE FORWARD COPY OF CERTIFICATION

Swagelok Custom Solutions Custom Assemblies & Fabrication Swagelok-Certified Integrators High Quality Components

CORPORATE QUALITY SYSTEM PROCEDURE

SECTION L QUALITY ASSURANCE. 1) designating and managing quality control functions, including:

International Quality Assurance Forum. Manufacturing Quality Assurance Guidelines

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472. September 2018 Effective January 1, 2019 PREFACE

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Inspection. Implementation of ICH Q8, Q9, Q10

Supplier Quality Manual

Model # 815P-VCA3. 3/31/2011 Page 1 of 10

Supplier Quality Manual

SUPPLIER PROFILE INFORMATION. Company Name : Address : Telephone: Fax: Internet Homepage: Duns Number: Parent Company : Address :

Overview of Draft API Standard 20M

SUPPLIER QUALITY MANUAL

YOUR TRANSPORTATION CO.

YOUR PARTNER FOR TURNKEY SOLUTIONS IN PHARMA & BIOTECH INDUSTRY AN ISO 9001:2008 CERTIFIED COMPANY

Process filtration, engineering and equipment

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Supplier Quality Manual

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

PP Quality Assurance Procurement Clauses for Suppliers

Model # 504S-P. 9/14/2011 Page 1 of 9

Specification Section XXXXX Interior Water walls

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

CITY OF BELLINGHAM, WASHINGTON Purchasing-Vendor Guide

Model # V. 1/31/2014 Page 1 of 8

Model # 600H-D. 4/2/2012 Page 1 of 6

Model # 612H. 7/11/2016 Page 1 of 6

Model # 940S-P6-BB. 6/7/2017 Page 1 of 10

SUPPLIER MANUAL Quality Policy

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472

Model # 158-P4. 12/12/2013 Page 1 of 11

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

Quality Manual. Wilson-Hurd Manufacturing Company. Electronic Control Products (ECP) 311 Winton Street Wausau, WI 54402

BATES SUPPLIER MANUAL

CHINA INSPECTION SERVICE CO.,LTD

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Connecticut Valve & Fitting Co.

Total Solution Total Value

SECTION Inline ULTRASONIC FLOW METERS

OIL TECH SERVICES, INC.

Bidders Pre-Qualification Questionnaire For ONSHORE/OFFSHORE EPCI HOKCHI PROJECT

Tech Ord Supplier Quality Survey. Supplier Survey Evaluation

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /11/2011 PAGE 1 OF 6 SUBCONTRACTOR/SUPPLIER QUALIFICATION

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

Model # 338S-OP. 9/30/2011 Page 1 of 13

Supplier Requirements Manual

Model # 338S-PR. 5/1/2014 Page 1 of 12

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Transcription:

MANUFACTURING FACILITY, TAMPA, FL USA 5321 West Crenshaw Street Tampa, FL 33634 USA 1 P age

Trade Name: GENERAL INFORMATION Global Industrial Water Inc. (GIW) Date Incorporated: January 16 th, 2009 Factory Address: 5321 W. Crenshaw Street, Tampa, FL 33634, USA Telephone Number: +1 (214) 613-7863 Fax Number: +1 (214) 613-7863 Mechanical Contractors License: #CA012320 Sales Tax #: 39-8012030091-4 Federal ID#: 59-3150206 Dun & Bradstreet #: 80-947-6716 Bonding Agent: Bonding Limits: Officers and Principles: Banking Information: Bank Contact: The Shrum Agency Mr. Bud Shrum 2227 Pinnacle Circle N. Palm Harbor, FL 34684 Telephone Number: (727) 781-9797 $2,000,000 per Project $5,000,000 Aggregate Account Number: 7600228581 Banking Since: 2001 Charles Solomon, President charles@globalindustrialwater.com Mercantile Bank 10821 N. Dale Mabry Highway Tampa, FL 33618 Telephone Number: (813) 908-9555 Fax Number: (813) 908-9805 Erin C. Gorski Vice President & Branch Manager 2 P age

TRADE REFERENCES Topline Process Equipment P.O. Box 264 Bradford, PA 16701 Telephone: (800) 458-6095 Fax: (814) 362-4453 Siemens 75 Technology Drive Lowell, MA 01851 Telephone: (800) 875-7873 Fax: (978) 453-5161 Please Reference Site #: 520303 Ryan Herco Products Corporation P.O. Box 10369 Burbank, CA 91510-0369 Telephone: (800) 848-1141 Fax: (407) 851-2176 Grundfos Pumps Corporation 3215 Solutions Center Chicago, IL 60677 Telephone: (913) 227-3400 Fax: (913) 227-3550 PERSONNEL Total Number of Employees: 40 Engineering: 5 Office: 3 Shifts per Day: 1 to 2 Days per week: 6 Union Affiliation Name: None - Non-Union Employment Levels: 40 in 2008, 35 in 2007, 32 in 2006 PRODUCT INFORMATION Manufacturing Capabilities: Skidded fluid and gas handling systems with integrated controls. GIW is 100% vertically integrated, so all aspects of systems are designed and produced in our Tampa facility. Installation Capabilities: Field supervision and project management of Process Piping, & Skid Systems including controls. Main Products: Standard offerings are: Process Water Systems, Waste Water Systems, Product Distribution / Process Skids for handling filtration systems, variety of chemical, gas delivery and purification systems. GIW is proud to partner with firms in specific business segments, in some cases our agreements may 3 P age

prevent us from building certain products that would be in conflict with other partners. Regardless of the product that we build, all efforts are supported by: Experience Critical Industry knowledge in demanding market segments. Sales and Design Support Direct Sales and Design Resources to assist in capital equipment or systems orders. Application Engineering To insure chemical, mechanical and electrical designs are appropriate for each application. Facilities World Class fabrication facility, vertically integrated from building frames to class 1000 clean room assembly (if required). Structural Fabrications All frames are made in-house (which expedites orders). Custom Controls UL and CUL control panel designed and constructed in house. Building analog through complex PLC s with data acquisition including remote monitoring features. Pipe Joining Technologies Include: Carbon Steel, Stainless Steel, Automatic Orbital Welding, Polypro Socket & IR Butt Fusion, and Bead & Crevice Free PVDF. Custom O&M Manuals All systems ship with comprehensive O&M manuals, drawings, and material literature support designed to aid in continued service by your organization. Factory Acceptance Test Fully operational and functional tests at our factory that can be witnessed by your firm and or your clients. Validation Documents and Services Documentation offered includes User Requirement Worksheet (URW), Functional Requirement Summary (FRS), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ). Additional services include field execution of the validation protocol documents as well as annual qualification services. Calibration Services Instrument and gauge calibration services either at our facility or at clients site. 4 P age

Extended Warranty Program All GIW fabricated equipment is eligible for an extended warranty that will bringing greater value to the services you offer your client. ISO Quality Program A quality program designed to deliver a quality product. CLIENT REFERENCES Siemens Contact: Wes Maffett (813) 282-2836 Denso Manufacturing Contact: Mr. Keith Plemons (423) 746-0000 Ionz Blue Water Contact: Mr. Jon Stewart (954) 907-7625 SALES / FINANCIAL Annual Sales: $4,200,000.00 in 2006 $4,808,000.00 in 2007 $7,000,000.00 in 2008. Forecast: $8,000,000.00 in 2009. GIW has focused on four market segments that we feel are important to our growth and stability. The percentage of our sales to these industries is as follows: Dairy / Food & Beverage / Citrus Industries - 20% General Industrial - 20% Semiconductor / Microelectronics - 10% Pharmaceutical / Biotech - 50% Business with International Companies: In the past and currently, we perform about 20% of our volume with international firms. These projects have included prefabricated assemblies as well as on site field installations. 5 P age

FACILITIES Structure, Type: Free Standing Metal Building. Class 1000 Clean Room: 200 Square foot clean room for Ultra High Purity Manufacturing. Total Square Feet: 20,000 Production: 17,000 Administration: 3,000 Age of Building: 20 Years Condition: Excellent Recently Completed Expansion: Added on to the length of the building for additional structural steel fabrication capability. TOOLING We perform 100% of welding, finishing of pipe, and steel fabrication in house. Currently 50% of our machining is subcontracted out. We have 4 robotic welding systems, PVC, Socket & IR fusions Polypro, and BCF PVDF joining machines, as well as approximately one million dollars worth of shop equipment. We have increased our machining capabilities over the last year. Equipment Replacement: Constant Prototype Capabilities: Due to our interests in automation throughout our fabrication efforts, we are involved in all prototype efforts with the only outside involvement being complex machining functions. CAD / CAM Capabilities: Yes, all management staff utilizes AutoCad Release 2002 or later. QUALITY INFORMATION List of Laboratory and Inspection Equipment: High Pressure Test Cart, Mass Spec. Helium Leak Detectors, Video Boroscope, Various Critical Mechanical Measuring Devices, Electrical Measuring and Testing Devices, Moisture Analyzer, Oxygen Analyzer, Particle Counter. Instrument Calibration equipment for pressure, water quality, and flow applications. 6 P age

Number of Quality Control Employees: We have two that are responsible for the quality of products and services; however each technician is ultimately responsible for quality through the project. Plans for Continued Education: Every two weeks there is a mandatory training session at our facility for all employees. The topics range from process technology, fabrication techniques, new product Information through Field Installation Procedures, always enforcing the safety aspect of every task. Written Policies for QC Procedures: All procedures including QC are in the form of "Standard Operating Procedure" (SOP). These cover purchasing, incoming QC through final test and acceptance criteria. We have modeled our quality on ISO9000 standard, although we have not gone through a formal certification process. QC Audits at Suppliers Facilities: We perform an annual audit at each critical supplier s facility. All new suppliers are subject to an initial audit. Incoming Material QC: All received material is inspected and a "Receiving Inspection Report" is completed. 10% of all received components are functionally tested for dynamic performance prior to installation. All materials are tested once installed in a system. Defective Material: If a product is found to be defective it is reported to the manufacturer immediately. The product is required to be shipped from our facility within 24 hours of notification, insuring that no defective devices remain in the facility. Defective Material Analysis: We insist that the vendor issues this information one week after receipt of the defective component at their facility. Corrective Action Procedure: Once the material analysis is received it becomes a determination for our Engineering staff whether this was an isolated incident or a potential problem that will require alternative component selection. This is all documented in a "Product Evaluation Report". Lot Run Traceability: Yes Rejection Rate: 5% Return Goods: 5% Raw Material Testing Equipment: Only for leak tests and visual examination, any destructive analysis is subcontracted. 7 P age

Functional Test Equipment for Parts, Subassemblies and Assemblies: Every part, subassembly, and assembly is 100% functionally tested prior to shipment, this effort is duplicated after field installation. Tool & Gauge Calibration: All tools and gauges are calibrated every twelve months, with a 4X more sensitive instrument than the instrument being tested. The testing device returns for calibration to manufacturer traceable to NIST. Outside Test Facilities: ABC Testing, MA. - Air Products and Chemical, PA. - Advanced Vacuum Systems, FL. DELIVERY JIT Delivery: Currently using. Company Trucks: 2 Type: Ford Age: Average 3 years old. Major Motor Freight Line, Domestic: UPS, Federal Express, R&L Carriers (Customer's Preference). Major Air Freight: Federal Express, Emery, UPS. Nearest Airport: Tampa International Airport, 5 Minutes from GIW. On Time Rating To Customers: 98%. MISCELLANEOUS INFORMATION Minority Status: None. Minority Supplier Program: None. Continuity of Supply: We have extensive insurance that will allow a 4 week recovery if a facility disaster was to affect our production capabilities. Experience with Returnable Packaging: Yes. Safety Record for the Past Three Years: We are pleased to inform you that we have not had a serious safety issue over our 15 years of business. 8 P age

THE BOTTOM LINE if you want to outsource, we have the resource 9 P age