EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

Mars Power & Steel Ltd.

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

INSPIRE INDUSTRIES PVT. LTD.

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

Environmental Clearance Compliance Half Yearly Report

J-11011/45/2009- IA II (I)

EXECUTIVE SUMMARY 1. INTRODUCTION

Environmental Clearance Compliance Half Yearly Report

2 NECESSITY OF THE PROPOSED PROJECT

V: PROJECT SCOPING & METHODOLOGY

CHAPTER-10 SUMMARY AND CONCLUSION

Roquette Riddhi Siddhi Private Limited

Rajasthan State Pollution Control Board

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Simran Industries Pvt. Ltd.

Executive Summary for R-EIA Report for 60

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

Environmental Clearance Compliance Half Yearly Report

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

Questionnaire (Conventional Energy)

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

Environmental Impact Assessment

INTRODUCTION ENVIRONMENTAL STATEMENT

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Scanned by CamScanner

District: Chhindwara (MP)

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

EXECUTIVE SUMMARY 1.0 INTRODUCTION

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

Environment protection measures / technology

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

ENVIRONMENTAL MONITORING PROGRAMME

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

PRE-FEASIBILITY REPORT

Cement Manufacturing Company Ltd. Page 1

New 790-Megawatt Unit. Council Bluffs Energy Center

Telefax: 011: Dated:10 th May, 2013

PRE FEASIBILITY REPORT

Environmental Clearance Compliance Half Yearly Report

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

A Case Study: Problem Associated With Fly Ash Disposal

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT of

Calcom Cement India Limited

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Executive Summary in English

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

Proposed Terms of Reference for EIA studies

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Rajasthan State Pollution Control Board

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Shri Girija Alloy & Power (I) Pvt. Ltd.

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

- 1 S. NO. PARTICULARS DETAILS

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

ENVIRONMENTAL MONITORING REPORT

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Energy & Water linkages in the power sector Implications for future planning

EIA STUDY for 2x600MW Coal Based Thermal Power Plant at Anuppur, Madhya Pradesh

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT


JANUARY Prepared by:

ANACON LABORATORIES PVT. LTD. 1

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

TABLE OF CONTENTS. Para No. Contents Page No

EXECUTIVE SUMMARY TABLE - 1

PRE FEASIBILITY REPORT

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

EXECUTIVE SUMMARY. (Approved Consultant)

ENVIRONMENTAL MONITORING REPORT

Transcription:

Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH ENVIRONMENTAL CONSERVATION BOARD By Dheeru Powergen Private Limited, Flat No. 110, Amrutha Ville, Raj Bhavan Road, Somajiguda, Hyderabad - 500 082

1.0 Introduction DHEERU POWER PROJECT 2 X 300 MW Dhanras village, Katghora Tehsil, Korba District. Chhattisgarh State. EXECUTIVE SUMMARY Ranhill Berhad a leading infrastructure developing company in Malaysia. Ranhifl Berhad was formed in 1973 and then onwards the company is marching forward in development in the areas of water, power, oil and gas, high raise buildings as well as roads and bridges. The company owns 320 MW Gas based power plant in Sabah, Malaysia, which is being expanded to 190 MW, The company is developing a Hydro Power Project at New Bong Pakistan. Ranhill Berhad is one of Malaysia's market leaders in the design, engineering and construction of power transmission and infrastructures, as well as being the Malaysia's largest manufacturer of medium voltage switchgearri and distribution transformers which they export to 14 countries. In addition, they operate and maintain power plants and power distribution networks, and undertake the retrofit and upgrading of electrical equipment. DHEERU POWERGEN PRIVATE LIMITED (DPPL) Dheem Powergen Private Limited (DPPL) promoted by Ranhill Berhad proposes to setup a 2 x 300 MW Coal Based Power Plant in Dhanras village in Korba District, Chhattisgarh State, DPPL has entered into a MOU with the Government of Chhattisgarh /Chhattisgarh Slate Electricity Board (CSEB) on 20lh October 2004. Ranhill Berhad is the majority equity partner of DPPL and will be financing the project. DPPL will implement the project at an estimated total capital cost of about Rs. 2600.00 Crores.

2.0 REQUIREMENTS OF THE PROJECT. LAND : DPPL has identified an area of 701.15 acres falling in the jurisdiction of Dhanras and Chum villages, in Katghora Tehsil, Korba District of Chhattisgarh, FUEL: Coal is considered as the main fuel for [he proposed plant. The coal requirement of the plant is estimated to be about 93l5t/day at 100% plant load factor for 365 operational days, which will be obtained from the mines of South Eastern Coalfield Limited (SECL). The coal consumption has been worked out based on coal calorific value of 3865kcal./kg (GradeF), sulphur content of 0.5% with ash content of 45%. DPPL has considered power plant operation at 85%PLF for which the annual coal requirement to be about 2.88 Million Tonnes. However for estimation of impacts and design of ash pond, the coal consumption is taken at 100%, Coal will be transported from the South Eastern Coalfield Limited (SECL) mines through railway wagons to Korba, where there is already railway station catering the needs of the nearby power plants, Fonri Korbii, the coal transportation to the proposed plant site is by raii ihrough existing railway lines from Korba station to Surakachar and then via BALCO power plant. Also about 9.8 KM long railway siding will be laid from Surakachar-Balco Siding by tapping at L.S.2,73 km of the siding. WATER: The total water requirement is estimated to be about 57600 Cu,M per day. This requirement will be met from Hasdeo River by laying a pipe line to plant site. The approximate distance of the pipe line from the river to the project is about 6.5 Km.DPPL has applied for permission from Water Resource Department Government of Chhattisgarh for water drawal from Hasdeo River.

MANPOWER. COLONY AND FACILITIES ETC. DPPL proposes to recruit 160 skilled and semi - skilled workers for the project. DPPL will arrange residential accommodation near the plant site for its employees An area of 45 acres in Churri village has been identified for the colony 3.0 rapid environmental impact assessment study DPPL had conducted Rapid Environmental Impact Assessment study (REIAJ of [he proposed 2 X 300 MW coal Based Thermal Power in an area of 10 km radius around the proposed power plant site. 3.1. BASELINE DATA To assess the impacts on the environment due to the proposed 2 x 300 MW Power Plant, baseline data was collected for the winter season 2005-06. Detail of the same are given below. A. MICRO - METEOROLOGY The predominant wind direction during this period was from NW (31-09%) NNW (17.48%) and WNW (13.73%) direction accounting to about 68.3% of the total time with calm wind of less than 1.0 kmph for about 2.07% Wind speeds during this period were varying between 1.0-15 kmph and during some of the times the wind speed was recorded more than 15 kmph. B. AMBIENT AIR QUALITY Twelve ambient air - monitoring stations were selected within the 10 km radius of study area, representing the downwind, cross wind and upwind impact scenario of the project site. Concentrations of Total Suspended Particulate Matter (TSPM) and Reparable Particulate Matter (RPM) in the study area are contributed mainly by the local activities and unmetalled roads in the study area. The concentrations of sulphur dioxide (SO2) and Oxides of Nitrogen (NQx) are contributed by vehicular emissions. The Ambient Air Quality monitored in the study area was found to be well within the limits of NAAQ standards prescribed for Residential, Rural & Other Areas.

AIR POLLUTION CONTROL MEASURES One single chimney of 220 M height with two parallel flues will be provided for effective dispersal of pollutants into the atmosphere. Electrostatic precipitators (EPS) will be provided to bring down the particulate emission in the exhaust of the boiler stack to less than 100mg/Nm 3. Continuous sprinkling of water on coal stock piles lo ensure the suppression of dust. Dust extraction / suppression system shall be provided in the crusher house and transfer points. Adequate number of Bag filters at various coal handling areas to trap dust will he provided. Massive green belt development in an area 47.2 Hectare is proposed. B. NOISE ENVIRONMENT The major source of noise generation in the propose power project will be steam turbine generator, boiler, boiler led pumps and air compressors. The ambient noise levels at plant boundary will be less than 75 dba. The extensive gene belt proposed to be developed in the plant premises will reduce the noise levels. Hence there will not be any adverse impact due to noise on populations in the surrounding areas. C. WATER ENVIRONMENT The total waste water generation from the plant estimated to be 10845 m / day. However, part of the wastewater which is about 1610m 3 / day is recycled in the cooling water system. Hence the net wastewater generation from the plant 9235 m 3 / day and domestic wastewater generated from the plant and colony is 119m 3 / day. Of the industrial wastewater of 9116m 3 / day, 75m 3 / day of wastewater generated from the clarifier blow down will be disposed to ash pond and the balance wastewater will be utilized for dust suppression, ash handling and greenbelt development. The domestic wastewater of 119m 3 / day will be treated in full fledge sewage treatment plant and the treated wastewater will be utilized for greenbelt development.

D. LAND ENVIRONMENT Greenbelt in an area of 47.2 ha. will be developed. This will help in reducing the dust level, noise levels and also the ambient temperature. The fly ash generated will be utilized mid stored as per the Ministry of Environment & Forests, New Delhi Notification on fly ash utilization, DPPL has initiated discussions with Cement manufacturers for utilizing the ash fly in Portland Pozzolona Cement production. Bottom ash and utilization fly ash will be stored in the ash pond. The ash pond in an area 91.2 ha. shall be constructed such that the dyke is formed to contain die fly ash slurry. After settlement of ash slurry, the water will filter into a collection well from where the water will be pumped in the clarifier. The recycle water from a clarifier will be pumped to the ash water sump located in the main plane area for reuse. Suitable impervious lining for the ash pond will be provided to prevent leaching of ash from the pond based on soil investigation during detailed engineering. E. SOCIO - ECONOMIC ENVIRONMENT Any industrial activity will help in improving the Socio - economic condition in areas like secondary employment generation, infrastructure facilities etc. 20 Families located in the identified site are to be displaced. DPPL will follow Rehabilitation and Resettlement guidelines of Government, Construction and operation of the proposed power Plant would result in elevation of the socio economic development of the surrounding villages. A total of about 160 persons under direct employment will be benefited due to implementation of the project. About 2000-3000 (peak) people will benefit during construction activity under each phase. Apart from [his, about 300 people wi l l be benefit under indirect employment during operation of the power plant in areas like house keeping, security, ash management, horticultural and maintenance of infrastructure.

The management of DPPL will give preference to the locals under indirect employment. DPPL will take up various social welfare measures for development of the area in the vicinity of the power plant. The focus areas include. Education Health Youth welfare 4.0 BUDGET FOR IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT PLAN, DPPL will incur a capital expenditure of about Rs.240 Crores towards implementing the Environment Management Plan. ************