NEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act

Similar documents
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

CHAPTER 4: APPROACH TO EIA, LEGISLATION AND PUBLIC CONSULTATION 4-1

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

Environmental Affairs and Development Planning ("Department") taken in terms of section 22 of the ECA.

EIA Listed activities & Time Lines

BACKGROUND INFORMATION DOCUMENT

BOLAND ENVIRONMENTAL CONSULTANTS CC

NOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AN ENVIRONMENTAL IMPACT ASSESSMENT DEA&DP Ref.: 16/3/3/6/7/1/F4/6/3072/16

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation

Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation

Anglo Operations (Pty) Limited. Goedehoop Colliery, Hope No. 4 Seam Project. Draft Scoping Report

(For official use only) File Reference Number: Application Number: 14/12/16/3/3/1/1114 Date Received:

INTRODUCTION PROJECT DESCRIPTION

NMBM Seaview Low Income Housing Development Final Scoping Report

BASIC ASSESSMENT FOR THE PROPOSED ELECTRICITY EXPANSION PROJECT AND SEKGAME SWITCHING STATION AT THE SISHEN MINE, NORTHERN CAPE PROVINCE

Proposed Langhoogte Wind Energy Facility: Motivation for Amendment of Environmental Authorisation

THE PROPOSED HOUSING DEVELOPMENT ON FARM UITKOMS NO. 463, PORTION 1, KURUMAN RD, KATHU, NORTHERN CAPE

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE

PAST AND PRESENT. Composting Bagful of Environmental Surprises : Durban Convention Centre Wastecon. Past more focus on open windrow composting

BASIC ASSESSMENT REPORT

Goewermentskennisgewings

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL

Eskom Holdings SOC Ltd

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

DRAFT SCOPING REPORT

Cape Environmental Assessment Practitioners (Pty) Ltd

Eskom Holdings SOC Ltd

EnviroLeg cc NATIONAL WATER Reg p 1

ENVIRONMENTAL SCOPING REPORT

Report No: /11664 WORKING FOR WETLANDS REHABILITATION PROGRAMME, WESTERN CAPE

Mining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs

Postal Private Bag X6546, GEORGE, 6530 Physical Fourth Floor York Park Building, York Street, GEORGE, Website

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

THE PROPOSED UPGRADING AND CONSTRUCTION OF MOUNT AYLIFF GRAVEL ACCESS ROADS AND CONCRETE CAUSEWAYS

WATER USE AUTHORISATIONS 12 October 2016

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT

Strategic Environmental Assessments (SEAs) for large scale infrastructure projects

Guideline for the Screening of Projects in a Drainage Area of Concern Adjacent to Parlee Beach

Eskom Holdings (SOC) Ltd Gauteng Operating Unit J34156 DEA REF: 14/12/16/3/3/1/1358 ORIGINAL. June 2015

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE

Environmental Legislation Update

To license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson

Environmental Planning and Assessment Act 1979

MARCH 2018 SUSTAINABILITY LEGISLATION UPDATE

For information on water pollution, see our Fact Sheet on Pollution.

JUTA'S WEEKLY STATUTES BULLETIN

BACKGROUND INFORMATION DOCUMENT (BID)

LEGISLATION, REGULATION AND PARLIAMENTARY UPDATE

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE

ENVIRONMENTAL RISK ASSESSMENT: PROPOSED INSTALLATION OF VODACOM OPTIC FIBRE CABLE BETWEEN NELSPRUIT, KABOKWENI AND WHITE RIVER, MPUMALANGA PROVINCE

BACKGROUND INFORMATION DOCUMENT

OCTOBER 2018 SHE LEGISLATION UPDATE

SCRCA SECTION 28 WETLAND POLICY

Freshwater Consulting cc Unit 23, Imhoff Farm Kommetjie Road Kommetjie 7975

LEGISLATION, REGULATION AND PARLIAMENTARY UPDATE

TRADITIONAL AND KHOI-SAN LEADERSHIP BILL, 2015

HAS IRRIGATION CAUSED THE MAIZE SURPLUS? DR PHILIP THEUNISSEN COMPUTUS BESTUURSBURO

Inform Practice Note #13

Technical Report: KRANSKLOOF SCOPING/0916. November 2016

Management Plan for the Koeberg Nature Reserve

DRAFT NATIONAL ATMOSPHERIC EMISSION INVENTORY: FIRST NATIONAL EMISSION INVENTORY REPORT

FINAL Basic Assessment Report:

Environmental Legislation Update

DRAFT SCOPING REPORT

Draft Northern Regional Land Use Planning Framework

Legal Basis of Water Management in Austria

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

This Section constitutes a regulatory governance framework for the proposed Project.

IAIAsa August 2014 Betty Mdala Department of Environmental Affairs

4 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION LEGISLATION AND GUIDELINES PERTINENT TO THIS EIA National Legislation 4-5

One Environmental System and Spatial Planning. Jeannie van Wyk

Kusile Power Station Ash Disposal Facility

FINAL BASIC ASSESSMENT REPORT FOR

2018 OPEN CALL FOR APPLICATIONS MISCELLANEOUS PURPOSES SECTOR PROJECT BUSINESS PLAN

SECTION 3: Water, Wetlands and Waterways

Annex A. Legislative Framework

County of Wetaskiwin Pigeon Lake Watershed Area Concept Plan February 6, 2014

DEPARTMENT OF WATER AND SANITATION. Water and Sanitation, Department of/ Water en Sanitasie, Departement van

BASIC ASSESSMENT PROCESS

Client Command Filling Station (Pty) Ltd Project

REPLACEMENT OF GENERAL AUTHORISATION IN TERMS OF SECTION 39 OF THE NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998)

Environmental Legislation Update

Waste Management Activities. Collection Transportation Storage Re-use, recycling and recovery Treatment Disposal. Waste Management Operators

Prepared for: Lungile Poultry Farming (Pty) Ltd. CSIR Report Reference Number: CSIR/IU/021MH/IR/2018/0003/A

Second document for comment March 2011 Scoping Phase

Annex A1. EIA Application Form

Basic Assessment Process

CEFANI MOUTH HOLIDAY RESORT EXPANSION CHINTSA BACKGROUND INFORMATION DOCUMENT DEDEAT Ref: EC/12/A/LN1/M/13 03 INTRODUCTION

Southern Africa perspective - Identification and Mapping National Freshwater Ecosystems Priority Areas in South Africa

DRAFT BASIC ASSESSMENT REPORT

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

Proposed Inyanda - Roodeplaat Wind Energy Facility Draft Environmental Impact Assessment Report

Draft Basic Assessment Report for the Proposed Raslouw x 15 Sewer Pipeline

E2. Water quantity, allocation and use

ECOLOGICAL INFRASTRUCTURE & SUSTAINABILITY

Development Assessment Guidelines

Chapter 6 Objective: Protect and Enhance the Environment

Transcription:

Addendum IV: Legal considerations for the construction and operation of a constructed wetland NEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act (1) Despite the repeal of section 20 of the Environment Conservation Act by this Act, a permit issued in terms of that section remains valid subject to subsections (2) and (3). (2) The holder of a permit issued in terms of section 20 of the Environment Conservation Act must apply for a waste management licence in terms of this Act, when required to do so by the licensing authority, in writing, and within the period stipulated by the licensing authority. (3) A permit issued in terms of section 20 of the Environment Conservation Act lapses- (a) if a waste management licence is issued in terms of this Act to the same person in respect of the same waste management activity; (b) if the holder of the permit did not apply, within the stipulated period, for a waste management licence within the period contemplated in subsection (2); or (c) if the licensing authority refuses an application contemplated in subsection (2). (4) If a permit issued in terms of section 20 of the Environment Conservation Act lapses as contemplated in subsection (3)(b) or (c), the permit holder remains liable for taking all measures that are necessary to ensure that the cessation of the activity is done in a manner that does not result in harm to health or the environment. (5) During the period for which a permit issued in terms of section 20 of the Environment Conservation Act continues to be valid, the provisions of this Act apply in respect of the holder of such a permit, as if that person were the holder of a waste management licence issued in terms of this Act. (6) Despite the repeal of section 20 of the Environment Conservation Act by this Act, an application for a permit made in terms of section 20 of the Environment Conservation Act that was not decided when section 81 of this Act took effect, must be proceeded with in terms of this Act as if that application were an application for a waste management licence in terms of this Act. (82) Transitional provision regarding listed waste management activities A person who conducts a waste management activity listed in Schedule 1 on the date of coming into effect of this Act, and who immediately before that date lawfully conducted that waste management activity under Government Notice No. 91 of 1 February 2002, may continue with the activity until such time that the Minister by notice in the Gazette directs that person to apply for a waste management licence under this Act.

NEMA (9) (12) Listing Notice 1 (EIA) The construction of facilities or-infrastructure exceeding' 1000metres in length for the bulk transportation of water, sewage or storm water - (i) with an internal diameter of 0,36 metres or more; or (ii) with a peak throughput of 120 litres per second or more, excluding where: a. such facilities or infrastructure are for bulk transportation of water, sewage or storm water or storm water drainage inside a road reserve; or b. where such construction will occur within urban areas but further than 32 metres from a watercourse, measured from the edge of the watercourse. The construction of facilities or infrastructure for the off-stream storage of water, including dams and reservoirs, with a combined capacity of 50000 cubic metres or more, unless such storage falls within the ambit of activity 19 of Notice 545 of 2010 Definitions "indigenous vegetation" refers to vegetation consisting of indigenous plant species occurring naturally in an area, regardless the level of alien infestation and where the topsoil has not been lawfully disturbed during the preceding ten years; "dam" when used in these Regulations means any barrier dam and any other form of impoundment used for the storage of water (23) The transformation of undeveloped, vacant or derelict land to - i) residential, retail, commercial, recreational, industrial or institutional use, inside an urban area, and where the total area to be transformed is 5 hectares or more, but less than 20 hectares, or (ii) residential, retail, commercial, recreational, industrial or institutional use, outside an urban area and where the total area to be transformed is bigger than 1 hectare but less than 20 hectares; - except where such transformation takes place for linear activities. "derelict land" means abandoned land or property where the lawful/legal land use right has not been exercised during the preceding ten year period "undeveloped" means that no facilities, structures or infrastructure have been effected upon the land or property during the preceding 10 years; "vacant" means not occupied for the purpose of its lawful land use during the preceding ten year period.

(24) (35) (37) (41) (52) The transformation of land bigger than 1000 square metres in size, to residential, retail, commercial, industrial or institutional use, where, at the time of the coming into effect of this Schedule such land was zoned open space, conservation or had an equivalent zoning. The expansion of facilities-for agri-industrial purposes outside industrial complexes, where the development footprint of the facility will be increased by a 1 000 square metres or more, with the exception of hatcheries, where activity 36 in this Notice applies. The expansion of facilities or infrastructure for the bulk transportation of water, sewage or storm water where; (a) the facility or infrastructure is expanded by more than '1000 metres in length; or (b) where the throughput capacity of the facility or infrastructure will be increased by 10% or more - excluding where such expansion: (i) relates to transportation of water, sewage or storm water within a road reserve; or (ii) where such expansion will occur within urban areas but further than 32 metres from a watercourse, measured from the edge of the watercourse. The expansion of facilities or infrastructure for the off-stream storage of water, including dams and reservoirs, where the combined capacity will be increased by 50000 cubic metres or more. The expansion of facilities or infrastructure for the transfer of water from and to or between any combination of the following: (i) water catchments; (ii) water treatment works; or (iii) impoundments; where the capacity will be increased by 50 000 cubic metres or more per day, but excluding water treatment works where water is treated for drinking purposes. "agri-industrial" means an undertaking involving the beneficiation of agricultural produce;

Listing Notice 3 (BA) The construction of reservoirs for bulk water supply with a capacity of more than 250 cubic metres. (a) In the Eastern Cape, Free Sate, Kwazulu-Natal, Limpopo, Mpumalanga and Northern Cape provinces: i. In an estuary; ii. In a protected area identified in terms of NEMPAA, excluding conservancies; iii. Outside urban areas, in: (aa) National Protected Area Expansion Strategy Focus areas; (bb) Sensitive areas as identified in an environmental management framework as contemplated in chapter 5 of the Act and as adopted by the competent authority; (cc) Sites or areas identified in terms of an International Convention; (dd) Critical biodiversity areas as identified in systematic biodiversity plans adopted by the competent authority or in bioregional plans; (ee) Core areas in biosphere reserves; ~ (ff) Areas within 10 kilometres from national parks or world heritage sites or 5 kilometres from any other protected area identified in terms of NEMPAA or from the core area of a biosphere reserve; (gg) Areas seawards of the development setback line or within 1 kilometre from the high-water mark of the sea if no such development setback line is determined. In urban areas: (aa) Areas zoned for use as public open space; (bb) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority, or zoned for a conservation purpose; (cc) Areas seawards of the development setback line or within urban protected areas. The clearance of an area of 300 square metres or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation.

(a) Within any critically endangered or endangered ecosystem listed in terms of section 52 of the NEMBA or prior to the publication of such a list, within an area that has been identified as critically endangered in the National Spatial Biodiversity Assessment 2004; (b) Within critical biodiversity area identified in bioregional plans; (c) Within the littoral active zone or 100 metres inland from high water mark of the sea or an estuary, whichever distance is the greater, excluding where such removal will occur behind the development setback line on erven in urban areas The clearance of an area of 1 hectare or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation, except where such removal of vegetation is required for: (1)the undertaking of a process or activity included in the list of waste management activities published in terms of section 19 of the National Environmental Management: Waste Act, 2008 (Act No. 59 of 2008), in which case the activity is regarded to be excluded from this list. (2)the undertaking of a linear activity falling below the thresholds mentioned in Listing Notice 1 in terms of GN No. 544 of 2010

(a) Critical biodiversity areas and ecological support areas as identified in systematic biodiversity plans adopted by the competent authority. (b) National Protected Area Expansion Strategy Focus areas (c) In Eastern Cape, Free State, KwaZulu-Natal, Limpopo, Mpumalanga, Northern Cape and Western Cape: i. In an estuary; ii. Outside urban areas, the following; aa) A protected area identified in terms of NEMPAA, excluding conservancies; (bb) National Protected Area Expansion Strategy Focus areas; (cc) Sensitive areas as identified in an environmental management framework as contemplated in chapter 5 of the Act and as adopted by the competent authority; (dd) Sites or areas identified in terms of an International Convention; (ee) Core areas in biosphere reserves; (ff) Areas within1 0 kilometres from national parks or world heritage sites or 5 kilometres from any other protected area identified in terms of NEMPAA or from the core area of a biosphere reserve; (gg) Areas seawards of the development setback line or within 1 kilometre from the high-water mark of the sea if no such development setback line is determined. iii. In urban areas, the following: (aa) Areas zoned for use as public open space; (bb) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority or zoned for a conservation purpose; (cc) Areas seawards of the development setback line; (dd) Areas on the watercourse side of the development setback line or within 100 metres from the edge of a watercourse where no such setback line has been determined.

The clearance of an area of 5 hectares or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation, except where such removal of vegetation is required for: (1) purposes of agriculture or afforestation inside areas identified in spatial instruments adopted by the competent authority for agriculture or afforestation purposes; (2) the undertaking of a process or activity included in the list of waste management activities published in terms of section 19 of the National Environmental Management Waste Act, 2008 (Act No. 59 of 2008) in which case the activity is regarded to be excluded from this list; (3) the undertaking of a linear activity falling below the thresholds in Notice 544 of 2010. In Eastern Cape, Free State, KwaZulu-Natal. Gauteng. Limpopo, Mpumalanga, Northern Cape, Northwest and Western Cape i. All areas outside urban areas The expansion of reservoirs for the bulk water supply where the capacity will be increased by more than 250 cubic metres. (a) In Eastern Cape, Free State, KwaZulu-Natal, Limpopo, Mpumalanga and Northern Cape provinces: i. Outside urban areas, in: (aa) A protected area identified in terms of NEMPAA, excluding conservancies; (bb) National Protected Area Expansion Strategy Focus areas; (cc) World Heritage Sites; (dd) Sensitive areas as identified in an environmental management framework as contemplated in chapter 5 of the Act and as adopted by the competent authority; (ee) Sites or areas identified in terms of an International Convention; (ff) Critical biodiversity areas as identified in systematic biodiversity plans adopted by the competent authority or in bioregional plans; (gg) Core areas in biosphere reserves; (hh) Areas within 10 kilometres from national parks or world heritage sites or 5 kilometres from any other protected area identified in terms of NEMPAA or from the core area of a biosphere reserve; (ii) Areas seawards of the development setback line or within 1 kilometre from the high-water mark of the sea if no such en development setback line is determined. ii. Inside urban areas: (aa) Areas zoned for use as public open space; (bb) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority, or zoned for a

conservation purpose; (cc) Areas seawards of development setback line or within 100 metres of the high water mark of the sea where the development setback line has not been determined.