Charleston Harbor Deepening Feasibility Study (Post 45 Study) Public Meeting

Similar documents
New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement

Charleston Harbor Post 45 Draft Integrated Feasibility Report/Environmental Impact Statement Executive Summary

PUBLIC SCOPING MEETING AGENDA

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT

JACKSONVILLE HARBOR DEEPENING MAYOR S TASK FORCE

Seattle Harbor Navigation Improvement Project Public Information Meeting

e7'-vi C. DAVID TUR~ER Brigadier General, USA Commanding

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET

Mobile Bay National Estuary Program Project Implementation Committee Meeting

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Ms. Jenny Jacobson Mr. Justin McDonald. Delta Roundtable Five Rivers Delta Center June 17, 2015

FINDING OF NO SIGNIFICANT IMPACT

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

The Army Corps of Engineers and America s Coasts and Estuaries

Louisiana s Marine Transportation System Plan and Sponsored Projects

Conference for Ecological and Ecosystem Restoration July 30, US Army Corps of Engineers BUILDING STRONG

BAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

Houston Ship Channel Expansion Channel Improvement Project, Harris, Chambers, and Galveston Counties, Texas

Using Social Impact Assessments to Develop Community Mitigation Plans. Developed in partnership with the SCSPA, SCDOT and SC Public Railways

J O I N T P U B L I C N O T I C E

DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C

VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT

Baltimore Harbor & Channels 50-Foot Project, MD & VA Notice of Intent to Prepare a Supplemental Environmental Impact Statement (SEIS)

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

Public Meeting - Workflow

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

ROSS VALLEY FLOOD PROTECTION & WATERSHED PROGRAM U.S. ARMY CORPS OF ENGINEERS CORTE MADERA CREEK PROJECT. Community Meeting.

Appendix L. Plan Formulation. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Notice of Availability (NOA) of the Draft Environmental Impact Statement. (DEIS) and the Announcement of a Public Hearing for the Installation of a

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Navigational Channel Dredging, Beneficial Reuse and the South Bay Salt Pond Restoration (SBSP) at Eden Landing, Alameda County

2.00 PURPOSE AND NEED FOR ACTION Project Area

US Army Corps of Engineers

Coastal Texas Protection and Restoration Study

Ocean Disposal Partnership

Savannah Harbor Expansion Project. Critical Infrastructure Expansion for the United States

Report Synopsis for Mobile Harbor General Reevaluation Report

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

PA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles

GENERAL OVERVIEW MEETING JANUARY 10, 2019

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study

Strategies for Scoping 3x3x3 Studies

Galveston Harbor Channel Extension Feasibility Study Houston-Galveston Navigation Channels, Texas

GIWW Dredging at West Bay Response to Public Concerns

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

CELEBRATING 10 YEARS. Advancing Safety Leadership in the Dredging and Marine Construction Industry

Model Comparison Report In Support of the Savannah Harbor Expansion Project

Philadelphia Water Department 9/24/13

REVIEW PLAN. Galveston District

U. S. Army Corps of Engineers Charleston District Overview

COASTAL SHORE PROTECTION WITH LIVING SHORELINES

USACE NAVIGATION R&D UPDATE

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS

SWG Dredging Conference. Status of Corps Studies and Projects

Silviculture Exemption Update

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Strategies for Implementing Regional Sediment Management: Using a Collaborative Approach to Implementing RSM Principles in Alabama

Public Meeting. NEPA Environmental Review Process. To seek comments on the Draft EIS

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE ROYAL RIVER, YARMOUTH, MAINE

U.S. Army Corps of Engineers Reservoir Operations Maria Placht, Institute for Water Resources, USACE 49

BRAZOS RIVER FLOOD GATES FEASIBILITY STUDY

Public Meeting June 22, :00 7:30 pm

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study

The release of the Final Environmental Impact Statement (FEIS) for the Bogue

TETRA TECH 2110 Powers Ferry Road Suite 202 Atlanta, Georgia Telephone: (770) Telefax: (770)

b. Projects Without PED Agreements. Credit for PED Coordination Team activities will be provided under the following criteria:

Clean-Up Isn t the End in Sediment Remediation

Global Reach. Local Benefits. AAPA 2018 CAPITAL PROJECTS SEMINAR

PN Comment Period: January 29, 2016 to February 18, 2016

30 DAY PUBLIC NOTICE MAINTENANCE OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT NEW HAVEN, CONNECTICUT

LETTER F. City of Del Mar

Distribution Restriction Statement

Condition of Improvements 30 December 2014 Cordova Harbor, Alaska (CWIS No , , )

Corpus Christi Ship Channel Improvement Project USACE Galveston District Winter 2018 Stakeholder Partnering Forum

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT

ATTACHMENT (12509-SPD EIS SOP) Statement of Responsibilities (Template)

Skagit River General Investigation Preliminary Alternatives

J O I N T P U B L I C N O T I C E

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

U. S. Port and Waterway Modernization Strategies: Environmental Impacts Section. Institute for Water Resources March 13, 2011

REQUEST FOR STATEMENTS OF INTEREST PIEDMONT SOUTH ATLANTIC COAST CESU NUMBER W912HZ-19-SOI-0001 PROJECT TO BE INITIATED IN FY 2019

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

Environmental Assessment Appendix G: Coastal Zone Consistency. U.S. Army Corps of Engineers New York District

Water Data Needs and Applications in the Private Sector. Robert Annear, Vice President, Ph.D., P.E. Water is our nature

Cook Inlet Navigation Channel

Indirect and Cumulative Effects

Deepening/Dredging Impact on Navigational Efficiency in the Delaware River Main Channel

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

Transcription:

Charleston Harbor Deepening Feasibility Study (Post 45 Study) Public Meeting LTC Edward P. Chamberlayne, P.E. District Commander Charleston District U.S. Army Corps of Engineers 30 April 2013 US Army Corps of Engineers

Purpose: To inform public of progress on the Post 45 feasibility study. Format: Voluntary, informal workshop designed to allow attendees to circulate among and ask questions of the study team. 2

Why Does the Corps Have to Prepare a Study? To Ensure Wise and Efficient Use of Taxpayer Funds! 3

Post 45 Feasibility Study Problems Increased operation costs due to light loading and tidal delays Growth trends in container traffic necessitates navigational improvements Opportunities Reduce transportation cost of trade Reduce operations and maintenance costs for federal channel Reduce navigation constraints facing harbor pilots Beneficial use of dredged material Enhance natural resources in the project area Preserve cultural/historical resources Preliminary Alternatives Deepening channel(s) to a variety of depths, including 50+ feet MLLW, Widening channel(s), Adjusting existing channel alignments/bend easing, and Widening and/or lengthening turning basins. 4

When will the Corps complete the Study? By September 2015 5

Post 45 Overview Civil Works Study Feasibility Phase Feasibility Study Cost <$13M Reduction from original $18-$20M estimate Preliminary Construction Cost Estimate $300-$350M Cost Share Sponsor South Carolina State Ports Authority Target for Chief s Report Completion Sept 2015 Reduction from original estimate of 5 8 years Selected for the President s We Can t Wait Initiative 6

Post 45 Overview Last Public Workshop held in December 2011 NEPA scoping period ended February 2012 Taking into account feedback received during scoping and current USACE Civil Works Transformation initiatives, the study team: refined the study scope developed detailed plans for assessments to address concerns refined the study schedule and cost 7

Post 45 Overview Since Aug 2012, the following efforts have been completed or are substantially complete: Water Quality and Velocity Data Collection (USGS) Cultural and Hard Bottom Resources Survey (CCU) Sub-bottom Profiling (CCU) Environmental Sediment Sampling (ANAMAR) Benthic Sampling (SCDNR) Wetland Mapping (USACE) Refining Environmental Model (TETRA TECH) Subsurface Wash Probes (ATHENA) 8

Water currents and water quality information, collected by the US Geological Survey (USGS), are being used by Tetra Tech, Inc. to validate the Environmental Fluid Dynamics Code (EFDC) modeling of existing harbor conditions. Effectively representing key parameters within the harbor is crucial because projections of the future without-project and future with-project condition (alternative analysis) will be built upon this foundation. Joint Airborne Lidar Bathymetry Technical Center of Expertise (JALBTCX) has conducted an aerial imagery assessment to identify dominant wetland plant communities along the upper Cooper River where existing data is limited. 9

In the fall of 2012, our partners at Coastal Carolina University performed vessel based surveys necessary to assess the presence and/or absence of both cultural and hardbottom resources in areas of the harbor with limited or no data. By locating these resources, we will be able to formulate plans to avoid, minimize, or mitigate potential impacts. Our partners at the SCDNR Marine Resources Research Institute have completed 3 of the 4 scheduled field studies that collect and analyze data necessary to evaluate the macrobenthic communities, sediment composition, and bottom water quality characteristics in areas of the harbor with limited or no data. 10

ANAMAR Environmental Consulting, Inc. is substantially complete with a contract to collect and conduct physical/chemical, toxicological, and bioaccumulation evaluations on sediment samples for the purpose of determining where and how sediment dredged during potential deepening can be disposed. Athena Technologies, Inc. recently completed collection and analysis of 194 wash probes within the entrance channel. A wash probe consists of an open-ended drill rod through which water is jetted to advance the pipe through unconsolidated sediments to refusal. This effort will help engineers quantify the amount of consolidated material that may be removed during deepening. 11

What s Next? Continue to Develop Alternatives and Analyze the Costs and Benefits DEIS & Draft Report for Public Review Summer 2014 FEIS & Final Report Complete Spring 2015 Final Chief s Report September 2015 Preconstruction Engineering and Design (PED) Phase Authorization and Appropriation for Construction Construction 12

13