Town of Jamestown Multi-family Residential. Building Permit Application Packet

Similar documents
Boone County Area Plan Commission Residential Structure Accessory, Addition, Remodel, Deck, Porches, Gazebos, Pergolas, Farm Buildings, Swimming Pool

City of Roanoke. Commercial Permit Submittal Guidelines

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

Residential Building Permit & Inspection Procedures

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

PROCEDURE FOR REQUESTING A BUILDING PERMIT

Village of Merrimac 100 Cook St. Merrimac, WI APPLICATIONS GUIDE. For. Building Permits. Driveway/Access Permits. Updated: February 20, 2012

Residential Building Permit Checklist

Residential Building Permit & Inspection Procedures

Building Permit Checklist

A. -Application Form Ensure following is filled out on your building permit application:

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Deck Permit Zoning requirements Adopted Code Submission Requirements Fees Review time Contractor licensing Inspections

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

City of Jacksonville Development Guide Building Permits

Permit Procedures For New Construction, Additions, and Alterations

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work.

The following information is required when submitting a building permit application:

MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

DEVELOPMENT PERMIT APPLICATION COMMERCIAL

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Applicant s Name Applicant s Address Phone # Year Built (verified) Property Owner s Name Address Phone # Site Phone # Description of Proposed Work:

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

B U I L D I N G P E R M I T A P P L I C A T I O N

Zoning Permit Application

INSTRUCTIONS. Address: Sec/Block/Lot:

CONSTRUCTION GUIDELINES

Scale Drawing This drawing will need to show the full lot and location of the proposed

Application for Commercial Plan Review and Building Permit. Address:

NEW CONSTRUCTION PERMIT APPLICATION

PERMITS PERMIT FEES, PLAN RE- VIEWS, AND INSPECTIONS

Town of Kingsville. Building Department

Solar Photovoltaic System Permit

NEW COMMERCIAL AND/OR COMMERCIAL TENANT IMPROVEMENTS, REMODELS, ADDITIONS AND ALTERATIONS

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Commercial Remodel Permit

BUILDING DEPARTMEN T

City of Meadowlakes Builder s Packet for New Construction Builder/Contractor or Property Owner

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

THE CITY of YUBA CITY COMMUNITY DEVELOPMENT DEPARTMENT

Washoe County PLAN SUBMITTAL

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Commercial Permit Process

THIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application

Town of Grantham, NH Building Permit Application Procedures

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

NEW COMMERCIAL CONSTRUCTION PLAN REVIEW AND APPROVAL CHECKLIST Return a signed copy of this page to the City with submission.

RESIDENTIAL PROJECT GUIDELINES 1500 SOLANA BOULEVARD, BUILDING 7, SUITE 7200 WESTLAKE, TEXAS 76262

Property Address: Builder: Phone #: Address:

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Building Permit For new construction projects

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

New Commercial Construction Permit

CITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

City of Centerville Building, Zoning & Code Enforcement Department

NEW ONE & TWO FAMILY PERMIT REQUIREMENTS

Town of Orange, New Hampshire Application for a Building Permit

CITY OF VINE GROVE BUILDING PERMIT APPLICATION

TOWN OF GREENVILLE APPLICATION FOR PERMIT

Single Family Residential Building Permit. Application Guidelines. August 2000

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

PERMIT APPLICATION FOR ALTERATION, BASEMENT FINISH, REMODEL, OR REPAIR

Commercial Solar Photovoltaic System Permit

Site Development Permit Application Procedures and Guidelines

Community Development Department 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

City of Hunters Creek Village #1 HUNTERS CREEK PLACE HUNTERS CREEK VILLAGE, TEXAS (713) phone (713) fax

CITY OF DEARBORN COMMERCIAL BUILDING & RENOVATION PERMIT

CLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS

Basement Build-Out Guidelines

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

COMMERCIAL CONSTRUCTION PACKET

CAREFULLY REVIEW AND COMPLETE ALL THE ENCLOSED DOCUMENTS PLEASE ALLOW THREE (3) WEEKS FOR PROCESSING

BASEMENT FINISH CONSTRUCTION

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Development Advisory - 40 March 21, 2018

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

SUBMITTAL REQUIREMENTS FOR MANUFACTURED HOMES

All new construction, mobile home placement & additions.

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Transcription:

Town of Jamestown Multi-family Residential Building Permit Application Packet Contact: Administrator (317) 258-8046, dluzier@grwinc.com This application packet is for multi-family residential building permits and includes: New Multi-family Structure Addition to a Multi-family Structure includes additions to existing primary and accessory structures. Remodel of a Multi-family Structure includes modifications to existing primary and accessory structures. In order to expedite the permit application review process, a pre-application consultation by phone is required before filing. Contact the Administrator at (317) 258-8046 if This is your first time filing an application with the Town of Jamestown (or it s been more than two months since you previously filed). You are a tenant who is finishing space in an existing structure or building shell. You will be pulling more than one permit for a single project. Your project will have phases. You have questions about the application process. Submittal. If you have any questions about the application or what to submit, please feel free to contact the administrator at (317) 258-8046. Applications must be submitted entirely in electronic format (email, CD, or jump drive). Email - Applications can be submitted electronically to dluzier@grwinc.com. The application and one copy of each of the attachments must be merged into one single pdf attachment in the order outlined on the following Submittal Checklist. In Person or by Mail Electronic applications may be dropped off in person or mailed to the Jamestown Town Hall, ATTN: BUILDING PERMITS, 421 E Main St, PO Box 165, Jamestown, IN 46147. NOTE: Be sure to submit all of the necessary information on the following checklist in order to complete your application. If you are unsure if an item is applicable to your project, contact the Administrator at (317) 258-8046 to verify. Failure to submit the required items may add unnecessary time to the process. Refer to page 3 of this packet for a detailed explanation of each item to be submitted. Multi-family Building Permit Application Packet Page 1 of 7

Step 3: Submittal Checklist New Multi-family Structure Addition or Remodel 1. Application 2. Full State Construction Design Release 3. Boone County Health Department Approval 4. Site Plan 5. Erosion Control Plan 6. Construction Plans including HVAC, Plumbing, and Electrical Layout 7. Dimensioned Elevations and/or Renderings 8. COMCheck Compliance Certificates (electrical; mechanical; interior lighting and power) 9. State Variance Approval (if applicable) 10. Inspection Estimate Form 11. Building Layout Plan Multi-family Building Permit Application Packet Page 2 of 7

Submittal Details 1. Application Fill out all applicable fields completely. Parcel Number This 10-digit identification number is required on ALL permit applications and can be found on the Boone County GIS website at www.boonecounty.in.gov. Click GIS on the menu at the top left of the page and then Agree to the disclaimer. You can do a search by address or zoom in on the parcel and obtain the detailed information. 2. Full State Construction Design Release Including fire suppression if applicable. Contact: Indiana Department of Homeland Security, www.in.gov/dhs. 3. Boone County Health Department Approval If the project involves a swimming pool or food service, include a permit of approval from the Health Department (765) 483-4458. 4. Site Plan A site plan prepared by a registered professional surveyor showing All property lines and streets The location and size of all existing and proposed structures The distance from each structure to the property lines and distance to the road The location of existing and proposed driveways The location of all drainage, utility, and roadway easements on the property Utility mains and lateral connections Drainage Spot elevations. An arrow indicating NORTH 5. Erosion Control Plan - A plan showing the measures to prevent erosion, contain sediment control, and drainage. 6. Construction Plans including HVAC, Plumbing, and Electrical layouts. 7. Dimensioned Elevations and/or Renderings Illustration of the proposed sign, drawn to scale, and dimensioned. For wall signs, include an elevation of the building façade showing the location of the sign as well as the length and height of the building facade. 8. COMcheck Compliance Certificates - Commercial check version of the Model Energy Code used for demonstrating compliance will all commercial energy code requirements in Indiana. 9. State Variance Approval submit a copy of any building code variances approved by the State. 10. Inspection Estimate Form indicate the estimated quantity of each inspection that will be needed for the project. Additional inspections will be charged the respective rate and fees will be collected prior to the final inspection or Certificate of Occupancy issuance. 11. Building Layout Plan submit a one-page, basic site plan that numbers each building and lists the following information for each structure: Building number for each building Area of each building (square feet) Number of units in each building i. Number of units with 1 bedroom ii. Number of units with 2 bedrooms iii. Number of units with 3 or more bedrooms Respective floor plan name/number for each building (if applicable) Multi-family Building Permit Application Packet Page 3 of 7

Permit Fees and Other Fees Permit Fees are based on the type of permit applied for as well as the required inspections. Fees are not paid until the permit has been issued and is ready for pick up. Failed inspections will be assessed a respective re-inspection fee and must be paid prior to the final inspection or issuance of the Certificate of Occupancy. Questions about inspections or code requirements can be directed to the Administrator at (317) 258-8046. New Commercial or Industrial Structure $450 base fee plus all applicable inspections. Temporary Electric... $115 Footing or Slab/Foundation... $190 Rough-in Electric... $115 Rough-in Plumbing... $115 Rough-in HVAC... $115 Rough-in Framing... $115 Insulation, Energy Efficiency... $150 Final... $275 Addition, Remodel, Accessory Structure, Swimming Pool - $250 base fee plus all applicable reviews and inspections. Site Plan Review (additions, accessory, pool)... $200 Temporary Electric... $115 Footing or Slab/Foundation... $190 Rough-in Electric... $115 Rough-in Plumbing... $115 Rough-in HVAC... $115 Rough-in Framing... $115 Insulation, Energy Efficiency... $150 Final... $275 Electrical Only - $115 Multi-family Building Permit Application Packet Page 4 of 7

Permit Application This application is being submitted for: New Multi-family Structure Addition Remodel For Office Use Only Permit Number: Permit Fee: Issued: Expires: Date Application is Submitted: Has sewer/water service been secured? State CDR #: Applicant and Contact Information Name of applicant: Address of applicant (street, city, state, zip): Contact person for the permit: Contact phone: Contact email: Contractor and Contact Information Name of contractor: Address of contractor (street, city, state, zip): Contact person: Contact phone: Location and Development Information Address of location to be improved (street, city, zip): Name of project/development: Subdivision: Section #: Lot #: Parcel number: Approximate total construction cost: Total number of buildings: Total number of units: Total number of units with 1 bedroom: Total number of units with 2 bedrooms: Total number of units with 3 or more bedrooms: The undersigned represents that such work shall start within 90 days and will be completed without delay; that said improvements will be finished in a good workmanlike manner. Should said work not start in good faith within 90 days, the undersigned understands this application will be void and of no force or effect whatever. The above information, to my knowledge and belief, is true and correct: Signature of Applicant: Multi-family Building Permit Application Packet Page 5 of 7

Inspection Estimate Form Use the form below to estimate the quantity of each inspection that will be needed for the project. Additional inspections and re-inspections will be assessed respectively and must be paid prior to the final inspection or issuance of the Certificate of Occupancy. This application is being submitted for: New Multi-family Structures Addition Remodel Inspection Quantity Needed per Building Temporary Electric Footing or Slab/Foundation Rough-in Electric Rough-in Plumbing Rough-in HVAC Rough-in Framing Insulation / Energy Efficiency Final Other (describe): Multi-family Building Permit Application Packet Page 6 of 7