CE 2031 WATER RESOURCES ENGINEERING L T P C

Similar documents
SOUTHEAST TEXAS CONTINUING EDUCATION

Chapter 1 Introduction

Hydrology and Water Resources Engineering

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination

Suspended Sediment Discharges in Streams

Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds. ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya

Hydrostatistics Principles of Application

Simulation of Daily Streamflow

INTENSE STORM-RUNOFF ROUTING OF HATIRJHEEL-BEGUNBARI LAKE OF DHAKA CITY

Water Resources Engineering

CHAPTER ONE : INTRODUCTION

Module 3. Lecture 6: Synthetic unit hydrograph

Alternative Approaches to Water Resource System Simulation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

Computer Determination of Flow Through Bridges

Course Title: Hydrology, Irrigation and Flood Management Course Code: CE 4163 Credit: 3

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

Hypothetical Flood Computation for a Stream System

CE Hydraulics. Andrew Kennedy 168 Fitzpatrick

Pilot Study for Storage Requirements for Low Flow Augmentation

Evaluating the use of DHI software MIKE Basin to optimize the water use in Malaprabha catchment area in Karnataka, India.

Sacramento and San Joaquin Basins Study & Climate Adaptation Options

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

Engineering Hydrology Class 3

NAP-GSP REGIONAL TRAINING WORKSHOP FOR ASIA Mainstreaming Climate Change Adaptation into Water Resources Seoul, September 2017

Uncertainty in Hydrologic Modelling for PMF Estimation

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

Review for Chapter 1 Introduction. 1. Sketch the hydrologic cycle and label the location and movement of water.

Managed Aquifer Recharge (MAR) Practical Techniques for the Caribbean

To estimate the magnitude of a flood peak the following alternative methods available: 1. Rational method 2. Empirical method

HYDROLOGY WORKSHEET 1 PRECIPITATION

Course: Wastewater Management

The Effect Of Flood Reduction And Water Conservation Of Decentralized Rainwater Management System

Participating States A.P. Chhattisgarh. M.P. Maharashtra Karnataka Kerala Orissa Tamil Nadu

Climate Change, Climate variability and Water Management

Flood Management of. Han River Flood Control Office. Dr. Sung, Ji Youn. Water Resources Information Center

WATER RESOURCE ENNG.(NCE-702)

Drainage Analysis. Appendix E

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

Distribution Restriction Statement Approved for public release; distribution is unlimited.

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

Rural & Agricultural Water Resource Information System in KOREA

Hydraulics & Irrigation Engineering Laboratories

Reservoir on the Rio Boba

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Dams and the World s Water


What we are looking for through utilizing the global earth observation. 14 January 2012 Japan International Cooperation Agency (JICA) Yusuke AMANO

Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation

Use of IDF Curves Design of a roof drainage system

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

Lecture 19: Down-Stream Floods and the 100-Year Flood

A Finite Difference Method for Analyzing Liquid Flow in Variably Saturated Porous Media

SECTION IV WATERSHED TECHNICAL ANALYSIS

ENGN.4010 ENGINEERING CAPSTONE DESIGN Watershed Analysis. CiA

The Drainage Basin System

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

Introduction to Hydrology, Part 2. Notes, Handouts

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

LECTURE NOTES - V. Prof. Dr. Atıl BULU

Latest tools and methodologies for flood modeling

Reservoir for Flood Moderation and Water Utilization: Some Critical Issues

ESTABLISHMENT OF AN EMPIRICAL MODEL THAT CORRELATES RAINFALL- INTENSITY- DURATION- FREQUENCY FOR MAKURDI AREA, NIGERIA

Presented by: Peter Spal, IBI Group. OECS Regional Engineering Workshop October 1, 2014

PARAMETERS OF LOW FLOW AND DATA ON LOW FLOWS IN SELECTED IRISH RIVERS

2. Potential Extreme Peak Discharge in Texas

Application of the SWAT Hydrologic Model for Urban Stormwater Management

Stormwater Management in Your Backyard: Stormwater 101

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

HYDROLOGY - BASIC CONCEPTS

WASA Quiz Review. Chapter 2

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

1 INTRODUCTION. 1.1 Definition of Hydrology and Hydrometry

Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Names: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

HYDRAULICS DIVISION. Assoc. Prof. Dr. Mustafa ERGİL. Assoc. Prof. Dr. Umut TÜRKER

Impact Study of a check dam on Ground Water Recharge

Code No: RR Set No. 1

MULTI-LAYER MESH APPROXIMATION OF INTEGRATED HYDROLOGICAL MODELING FOR WATERSHEDS: THE CASE OF THE YASU RIVER BASIN

OPTIMISATION OF HYDROPOWER IN A MULTI-OBJECTIVE CONTEXT

NBI strategic water resources analysis Phase I findings

Hydrologic engineering Hydraulic engineering Environmental engineering Ecosystems engineering Water resources engineering

HERPIC County Storm Drainage Manual

Insights from editing the ARR Urban Book. Peter J Coombes

Analysis of Flood Routing

2

Water Resources in Korea

ENGINEERING HYDROLOGY

Federal Democratic Republic of Ethiopia STATE PARTY REPORT IN RESPONSE TO THE WORLD HERITAGE COMMITTEE DECISION WHC 34 COM 7B.44

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

IJSER. within the watershed during a specific period. It is constructed

Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

Introduction, HYDROGRAPHS

Transcription:

CE 2031 WATER RESOURCES ENGINEERING L T P C 3 0 0 3 QUESTION BANK PART - A UNIT I GENERAL 1. Write short notes on Water Resources Survey. 2. How do you calculate Average Annual Runoff depth? 3. Write short notes on Water Resources in India and Tamilnadu. 4. Define Meteorology. 5. What are the different types of Meteorological and Hydrological Data? 6. What are the steps involved in planning a Water Resources project? 7. Write short notes on National Water policy. 8. List out the softwares used for Meteorological data collection. 9. Article 246 and 262 deals with what? 10. List out the central agencies in water resources sector. 11. What are the traditional methods in Water Resources planning? 12. Write down the steps for Water Resources planning. 13. Write short notes on Roof top rain water harvesting. 14. Write down the methodologies in watershed management. 15. Write down the order of water allocation priorities in National Water policy. 16. What is the Need for National Water policy? 17. When will you revise National Water policy and State Water policy? 18. Define Ecology. 19. How Drought Prone Area will be developed? 20. Differentiate between National Water policy (1987) and National Water policy (2002)? 21. List out any 4 important river basins in India. UNIT II NETWORK DESIGN 1. Define Hydrological cycle. 2. State the water budget equation. 3. What are the essential requirements of data? 4. List out any 4 hydrological data. 5. List out the types of precipitation. 6. What are the different forms of precipitation? 7. Differentiate b/w snow and hail. 8. What are the different types of rain gauge? 9. What are the difficulties in the measurement of precipitation?

10. How will you select the site for rain gauge? 11. What are the reasons for error in measurement of precipitation? 12. How will you calculate optimum number of rain gauge? 13. List out the methods for computation of average rainfall data. 14. Define Intensity frequency curve. 15. Draw Discharge Area Depth (DAD) Curves. 16. Define Double Mass curve. 17. Differentiate b/w arithmetic and Isohyetal Method. 18. What do you mean by rain gauge density? 19. Write down the advantages and disadvantages of recording type rain gauges. 20. List out the recording and non recording type rain gauges. 21. How will you classify rainfall based on intensity? 22. What do you mean by orographic precipitation? 23. How will you measure flow in stream and rainfall? 24. List out any 4 data required for hydro meteorological studies? UNIT III WATER RESOURCE NEEDS 1. Define water budget. 2. Differentiate b/w consumptive and non consumptive use of water? 3. List out the factors affecting the consumptive use of water. 4. Differentiate b/w consumptive use and delta? 5. What are the different methods to measure consumptive use? 6. How will you estimate the quantity of water consumed? 7. What are the physical and chemical characteristics of water? 8. How will you integrate characteristics of water? 9. What are the factors on which water requirement for irrigation (Drinking water, Navigation) depends on? 10. Write down the contents of Master Plan? 11. What do you mean by Master Plan? 12. List out the components of Master Plan. 13. Define basin. 14. Define inflow and outflow. 15. Define Area of drainage basin. 16. What are the principles of Master Plan? 17. What is the purpose of Master Plan? 18. Define BOD. 19. What do you mean by hardness of water? 20. Define ph. 21. List any 4 equation for determination of consumptive use?

UNIT IV RESERVIOR PLANNING AND MANAGEMENT 1. Define reservoir. 2. List out the factors to be considered in selection of site for reservoir. 3. Differentiate b/w single and multipurpose reservoir. 4. What are the different types of single purpose reservoirs? 5. Differentiate b/w retarding and detention basins. 6. What are the preferable combinations for a multipurpose reservoir? 7. List out the various zones of storage in a reservoir. 8. Write short notes on reservoir sedimentation. 9. What are the different types of sediment loads? 10. Differentiate b/w suspended load and bed load? 11. List out the factors affecting sedimentation. 12. List out the control measures for sedimentation. 13. How do you fix a capacity of reservoir? 14. Differentiate b/w flow mass curve and double mass curve? 15. What do you mean by Rule curve? 16. Define design flood. 17. Define MPF. 18. What are the different methods for estimate design flood? 19. Define envelope curve. 20. List out the formula for estimating flood peak based on area. 21. What do you mean by rational method? 22. Differentiate b/w Levees and Flood walls? 23. How will channel improvement could help for flood control? 24. Define frequency analysis. 25. What do you mean by reservoir operation? UNIT V ECONOMIC ANALYSIS 1. Define Benefit Cost Ratio. 2. Explain Discount rate. 3. What do you mean by Discounting Factors? 4. List any 4 discounting factors. 5. What do you mean by Discounting Techniques? 6. List any 4 discounting techniques. 7. What are the techniques used in computer application for economic analysis? 8. What do you mean by Dynamic Programming? 9. Define Optimization Model. 10. Define Simulation model. 11. What are the components of a simulation model? 12. List down the steps in simulation model.

13. What are the advantages of combining optimization and simulation? 14. Differentiate b/w present worth and annual cost method? 15. Differentiate b/w rate of return and benefit cost ratio method? 16. What are the different types of single payment factors? 17. List out the factors in uniform annual series. 18. Differentiate b/w single payment and uniform annual series? 19. Differentiate b/w fixed and variable cost. 20. List out the types cost. PART B UNIT I GENERAL 1. Discuss the salient feature of National Water Policy. 2. Briefly discuss about water resources in India and tamilnadu. 3. Briefly explain the steps involved in water resources planning. 4. Discuss the points about water allocation priorities in National Water Policy. 5. Define meteorology. What are the data required for meteorology? How will you collect it? 6. What is the importance of water resource survey for the development of the country? 7. Mention the importance of various data required for water resource development and how will you collect them? 8. What are the management strategies for excess and deficit water imbalance? How will you implement a water resource project? 9. Briefly discuss about Necessity of National Water Policy. 10. Briefly discuss about economics of water resource planning. UNIT II NETWORK DESIGN 1. Briefly discuss about different types of precipitation. 2. Briefly discuss about different forms of precipitation. 3. Explain the various methods of analyzing hydrological data for water resource planning. 4. Explain DAD, IDF, Double Mass curves. 5. What is the procedure to find the optimum number of rain gauge stations in an area? 6. Briefly discuss about different methods to find the mean rainfall in catchment area. 7. Explain in detail about the instruments used in hydrological data collection? 8. Explain any two types of recording type rain gauges? 9. Explain any two types of non - recording type rain gauges? 10. A certain catchment area has rain gauges. The mean annual rainfall recorded at these rain gauges are 1150, 1100, 950, 1000,900,800,650,500 and 600 mm respectively. The permissible error is 5%. Determine the optimum number of rain gauges.

11. The cumulative rainfall starting at 9 a.m. and stops at 11 a.m. and the data is observed at every 15 minutes. From the data, compute Maximum intensities for the various durations and plot the intensity duration curve for the storm. Time (minutes) Cumulative Rainfall mm) 0 15 30 45 60 75 90 105 120 0 13 20 30 45 63 83 100 116 12. Write short notes on i. Network Design ii. Errors in rainfall measurement UNIT III WATER RESOURCE NEEDS 1. Briefly discuss about consumptive use of water and the factors affecting consumptive use of water. How will you measure it? 2. Briefly explain the methods for determination of consumptive use? 3. Explain the water characteristics to be investigated? 4. Explain the water requirements for irrigation, hydropower generation, navigation, drinking and disposal of sewage and industrial waste? 5. What is Master Plan in water resources? Explain the scope and aims in detail. 6. Briefly discuss about the contents of Master Plan? 7. Briefly discuss about the concept of basin as a unit for development? 8. What are the different characteristics of water? Briefly discuss about it? 9. What are the different equations for determination of consumptive use? Briefly explain it? 10. Write short notes on i. Water budget equation ii. Components of Master Plan UNIT IV RESERVIOR PLANNING AND MANAGEMENT 1. Discuss the strategies for reservoir sedimentation. 2. Discuss about single and multipurpose reservoir with its advantages and disadvantages. 3. Discuss the strategies for reservoir operation. 4. Discuss about levees and flood walls? 5. How will you fix the capacity reservoir? 6. Briefly discuss about the flood control methods. 7. Differentiate between structural and non structural measures for flood control? 8. What are the factors affecting sedimentation and control measures for sedimentation? 9. Briefly discuss about the planning of multipurpose reservoir/ 10. Write brief notes on channel improvement?

UNIT V ECONOMIC ANALYSIS 1. Define Benefit Cost analysis. Explain it with flow chart. 2. Briefly explain about discounting factors and its types. 3. Discuss the various discounting techniques. 4. Briefly explain about techniques used in computer application for economic analysis? 5. Differentiate between simulation and optimization model. What are the advantages of combining them? 6. What are the optimization techniques used in water resource planning? Explain any two of it. 7. A city plans to augment its water supply system. There are two project alternatives under consideration. One alternative calls for the construction of a storage dam and a treatment plant which would cost Rs. 48, 00,000 and would satisfy the estimated demand over the next 12 years. The expected annual operating cost would be Rs. 300,000.er 12 years, a second dam and additional treatment facility would be constructed with an additional operating cost of Rs. 250,000. The second alternative calls for the construction of a single large storage dam whch together with a new treatment plant would cost Rs. 6200000. The annual operating cost is Rs.260,000 for the first 12 years. After 12 years additional treatment facilities would be added for Rs. 500,000 and annual operating cost would be Rs. 320,000. Examine which of the two alternatives is better for adoption. Rate of interest may be assumed uniform at 8%. (Use present worth and rate of return method) 8. The flood control project for a river basin involves evaluation of the five alternatives. (a) Channel improvement alone (b) Dam at site A (c) Dam at site B (d) Dam at site A with channel improvement (e) Dam at site B with channel improvement The investment, average annual flood damage and annual operation and maintenance charges for each of the alternative projects are listed in Table 1. The average flood damage without flood control is Rs. 35 lakhs. Assuming life of dam as 100 years, life of channel improvement as 30 years and a rate of interest of 8%, determine which of the project alternatives should be adopted as the most economical in design. 9. Write short notes on i. Benefit cost ratio method ii. Rate of return method 10. Write short notes on i. Present worth method ii. Annual cost method

Table 1. Project Channel improvement alone Investment in Lakhs Average annual flood damage in Lakhs Annual operation and maintenance In Lakhs 30 23 6 Dam at site A 180 6 4 Dam at site B 250 4 2 Dam at site A with channel improvement Dam at site B with channel improvement 280 3 2.5 300 2 3