BUILDING MATERIALS EVALUATION COMMISSION (BMEC) AUTHORIZATION REPORT

Similar documents
BUILDING MATERIALS EVALUATION COMMISSION (BMEC) AUTHORIZATION REPORT

777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5

BUILDING MATERIALS EVALUATION COMMISSION AUTHORIZATION REPORT

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) HPB (High Performance Bedding)

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) Royal PVC DWV Starter Fittings

Date of Authorization November 25, 2004 BMEC Authorization BMEC #

Date of Authorization November 30, 2006 BMEC Authorization Number BMEC Application A

BMEC AUTHORIZATION:

Date of Authorization February 25, 2010 BMEC Authorization Number BMEC Application A BMEC Expiration Date February 26, 2015

Date of Authorization April 29, 1999 BMEC Authorization Number BMEC Application A

BMEC AUTHORIZATION: Biolan Greywater System

BMEC Authorization Number Date of Issuance September 25, 2008 BMEC Application A Date of Expiration September 25, 2013

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) AUTHORIZATION REPORT

BMEC Authorization Number Date of Issuance September 26, 2013 BMEC Application A Date of Expiration September 26, 2018

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) AUTHORIZATION REPORT

Date of Authorization September 25, 2003 BMEC Authorization BMEC #

Authorization Report Insul-Tarp. 1. Applicant 2. Manufacturing Facilities

Date of Authorization APRIL 29, 2004 BMEC Authorization BMEC # BMEC Application #A

NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH

BMEC Authorization Number Date of Issuance July 28, 2011 BMEC Application A Date of Expiration July 28, 2016

Date of Authorization September 27, 2007 BMEC Authorization Number BMEC Application A

Date of Authorization September 30, 2004 BMEC Authorization # BMEC Application A

FLOWTECH WASTEWATER TRENCH SYSTEMS Manufactured with 100% Recycled Artificial Aggregate

BMEC AUTHORIZATION:

Date of Authorization July 27, 2006 BMEC Authorization Number BMEC Application A

Date of Authorization November 25, 2004 BMEC Authorization # BMEC Application # A AUTHORIZATION REPORT- Pavilion Membranes

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) CONSOLIDATED AUTHORIZATION REPORT

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WATER PROTECTION SECTION

Date of Authorization January 26, 2012 BMEC Authorization Number BMEC Application A BMEC Expiration Date January 26, 2017

Date of Authorization February 23, 2012 BMEC Authorization Number BMEC Application A BMEC Expiration Date February 23, 2017

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

MMAH 2012 OBC Implementation

BUILDING CODE COMMISSION

Klickitat County. On-Site Sewage System. Construction Manual

GRAY WATER RECYCLING SYSTEMS

Content Copy Of Original

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: SC Series

***NO SEPTIC SYSTEM EXCAVATION WITHOUT AN APPROVED PERMIT IN POSSESSION****

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: WC Series

Date of Authorization April 28, 2005 BMEC Authorization BMEC Application # A Date of Amendment February 28, 2013

Content Copy Of Original

San Joaquin County. Residential Onsite Systems Bulletin

SMALL WASTEWATER FACILITY APPLICATION PACKET

Common Septic System Installation Mistakes

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

Content Copy Of Original

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

130A-343. Approval of on-site subsurface wastewater systems. (a) Definitions. As used in this section: (1) "Accepted wastewater dispersal system"

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Holding tank Interceptor Leaching Leaching bed Leaching bed fill Loading rate Pail privy Percolation time Portable privy Potable Pressurized

AUTHORIZATION REPORT. Steel Framed Fabric Covered Building System. 1. Applicant 2. Manufacturing Facilities Wanuskewin Road 3815 Wanuskewin Road

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Township of Georgian Bluffs

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

Education on Common Household Sewage Treatment Systems Found In Allen County, OH

ONSITE SEWAGE SYSTEMS*

Content Copy Of Original

Sewage Permit Process Backgrounder and Guide

DRIP EMITTER SYSTEM STUDY GUIDE

Section 10 Design Criteria: Components

SECTION FOUNDATION DRAINAGE

Existing System Evaluation Report for Onsite Wastewater Systems

BMEC AUTHORIZATION:

one (1) 4,000 L new Septic Tank equipped with one (1)

XII. APPENDIX B DECENTRALIZED MANAGED WASTEWATER SYSTEMS (DMWS) IN DETAIL

ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 3107-ASXQAX Issue Date: November 28, 2017

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION

SEPTIC TANK CONSTRUCTION GUIDELINES

Septic system recommended standards and guidelines.

INFORMATION REQUIRED

SECTION STORM DRAINAGE

ON-SITE SEWAGE PERMITTING PROCESS

Schedule 2A: Sewage System Information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Content Copy Of Original

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

BMEC AUTHORIZATION: Camino Modular Floor System: SC Series

SANDERS COUNTY ENVIRONMENTAL HEALTH PROPERTY OWNER SEPTIC INSTALLATION BOOKLET

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE

Contactor & Recharger Septic Chambers

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con.

A. This section includes the furnishing and installation of a foundation drainage system.

AOWA:Basic Installer Course 1

On-lot System Component Requirements

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

Pressure Distribution Design

SPECIAL SPECIFICATION 3504 Septic Tank System

Sudbury & District Health Unit

ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 9773-AS3S9M Issue Date: December 12, 2017

March, 2017 Nova Scotia On-site Sewage Disposal Systems Standard revisions effective May 1, Appendix C Falling head permeameter

4.8. Subsurface Infiltration

Design and Installation Manual for the Infiltrator ATL System in British Columbia

BIG 'O' HDPE Tubing CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE. Proudly owned and operated in Canada. aquaq.

64E System Size Determinations.

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS

ACCESS RISERS & EFFLUENT FILTER

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

SECTION TRENCHING

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

Transcription:

BUILDING MATERIALS EVALUATION COMMISSION (BMEC) AUTHORIZATION REPORT DATE OF AUTHORIZATION NOVEMBER 29, 2001 BMEC REFERENCE BMEC # 01-19-271 BMEC APPLICATION # BMEC # A2001-11 BMEC AMENDMENT MARCH 25, 2004 BMEC APPLICATION # BMEC # A2004-01 * denotes draft changes EZ Flow Drainage System 1. Applicant 2. Manufacturing Facilities Ring Industrial Group EZ Flow 65 Industrial Park Road 2175 Old Hendersonville Highway Oakland, Tennessee Brevard, North Carolina USA, 38060 USA, 28712 Tel: (877) 368-8294 EZ Flow Fax: (901) 465-1181 5050 Duncanville Road Dallas, Texas USA, 75236 EZ Flow 5840 US Highway 1 South St. Augustine, Florida USA, 32086 3. Description The EZ Flow Drainage System is a subsurface drainage product which may replace stone, with a geo-synthetic aggregate. The EZ Flow Drainage System consists of a basic EZ Flow drain cylindrical bundle with 100 mm (4") pipe plus one or more cylindrical bundles of aggregate tubes (without pipe). The EZ Flow Drainage System is provided in prefabricated 3.0 m (10 foot) pipe and aggregate bundle lengths. The EZ Flow Drainage System is intended for use in a sewage system in lieu of the stone / distribution pipe arrangements within an absorption trench or filter bed. EZ Flow Drainage System Page 1 of 7

4. Authorization Requested The applicant sought authorization for use of the EZ Flow Drainage System as an alternative to the construction of absorption trenches as required by Section 8.7 of the Ontario Building Code. The applicant requested that the EZ Flow Drainage System be used to replace stone and distribution pipe in absorption trenches and filter beds that are: gravity fed, and dosed (non-pressurized distribution system) Note: For the purposes of this authorization, dosed means a system in which effluent is pumped to the leaching bed either by pump or siphon, but the effluent is not pressurized within the leaching bed. 5. Assessment Reports, assessments and information provided by the applicant indicate that if the EZ Flow Drainage System is designed and installed in accordance with the manufacturer's instructions and limitations, and the specific terms and conditions stated in this authorization, it will provide a level of performance that would be achieved by the conformance with the OBC. Reports, assessments and information reviewed included the following: 1. Technical Background Information (TBI) Memo relating to EZ Flow Drainage System, dated 27 June 2001. 2. Video Tape: "EZ Flow : Generic Drainage Systems." 3. Alternative to gravel approval letter from the Ministry of Health and Ministry Responsible for Seniors in the Province of British Columbia, dated 24 April 1998. 4. Alternative to gravel approval letter from the Department of Insurance in the State of North Carolina, dated 17 February 1988. 5. Compliance Report Listing, Southern Building Code Congress International, Inc., No. 8971, date issued 12 January 2001. 6. Limited Usage approval letter, State of North Carolina, Department of Transportation, dated 23 May 1990. EZ Flow Drainage System Page 2 of 7

7. Approval Letter, United States Department of Agriculture, State of Georgia. 8. Alternative to gravel approval letter from the Department of Insurance in the State of North Carolina, dated 21 January 1994. 9. "Building Codes Division Ruling on Acceptability of Material, Design or Method of Construction", Ruling No. 94-31, Oregon State Plumbing Speciality Code (OSPSC). 10. Instructions for the installation of EZ Flow Drainage System 1203H, 1006H, 1003H, 1006V, 1006T, 1003T, 1003V, and 1002V in the State of Alabama. 11. Instructions for Sizing EZ Flow Drainage Systems in the State of Alabama. 12. Technical Article "Comparison of EZ Flow Installations to a 3' Gravel Trench", dated 18 January 2001. 13. Instructions for the installation of EZ Flow Drainage Systems 1203H, and 1003H in the State of Florida. 14. Product specifications for geo-foam particles. 15. Product specifications for polystyrene aggregate. 16. Polyethylene drain pipe specifications. 17. Manufacturer's Information: Product Note 3.106, "Standard Pipe Perforations", dated January 2000. 18. Manufacturer's study "Report on Evaluation of Seven Year Old Eee Zzz Lay Effluent Drainfield Systems Installed in Two Feet Wide Trenches in Clay Soils (Class IV) in The State of Texas." 19. American Society of Agricultural Engineers, Paper No. 91-2578, "Sediment Retention Efficiencies of Sediment Basin Filtered Outlets.", dated 1991. 20. Retrospective Study "Survey and Study of Installed Expanded Polystyrene (Esp) Aggregate Onsite Sewage Treatment and Disposal Systems in Georgia: 1998 Thur 1998." 21. "Hydraulic Conductivity: an Evaluation of Drainage Media in Controlled Conditions" delivered 17 July 2001, prepared Donald Oderkirk, P.Eng, BPI, pllc, Memphis Tennessee. EZ Flow Drainage System Page 3 of 7

22. "Determination of Hydraulic Conductivity of a Gravel System at the Trench Bottom", dated October 08, 2001. * 23. BMEC Application A2004-01 "Amendment to BMEC #01-19-271 to Include EZ 1401P for Standard and Shallow Buried Trenches in Septic Fields." * 24. "In-Ground Dispersal of Wastewater Effluent: The Science of Getting Water into the Ground" Kevin White, February 23, 2003. * 25. Survey and Study of Installed Expanded Polystyrene (EPS) Aggregate Onsite Sewage Treatment and Disposal Systems in Georgia: 1989 thru 1998" presented by Sam Robertson 2000. * 26. Assessment of Hardened EPS, Geosynthetic Systems Under Various Soil Conditions in Alabama" Kevin White, June 28, 2001. 6. Authorization The use of the EZ Flow Drainage System is authorized in sewage systems within the scope of Part 8 of the Ontario Building Code 1997, as an alternative to stone and distribution pipes in absorption trenches and in filter beds, when installed in accordance with the manufacturer s recommendations and the Specific Terms and Conditions of this Authorization. A. Specific Terms and Conditions 1. This authorization is valid only for EZ Flow Drainage System produced by Ring Industrial Group. 2. This authorization is valid only for the EZ Flow Drainage Product designated: 1202H, 300 mm (12") diameter, where two cylindrical bundles of the product shall be installed side by side, in a 600 mm (24") wide trench, one cylindrical bundle shall be of solid aggregate fill (without pipe) and the other cylindrical bundle (with pipe) shall be of aggregate and drainage tile, or 1003T, 250 mm (10") diameter, where three cylindrical bundles are installed in a triangular configuration, with two solid aggregate fill cylindrical bundles (without pipe) side by side on the bottom, and an aggregate and drainage tile cylindrical bundle (with pipe) which shall be placed on top of the two cylindrical aggregate bundles to form a triangle, in a 600 mm (24") wide trench. EZ Flow Drainage System Page 4 of 7

* (c) 1401P, 350 mm (14") diameter, where one cylindrical bundle is installed in trench not more than 600 mm (24") wide. 3. The drainage tile shall comply with ASTM F405. 4. The EZ Flow Drainage System shall be stored in UV protective plastic film bags, and the UVI (Ultra Violet Inhibitor) treated shipping bags shall serve to protect the product from UV degradation prior to installation. 5. The EZ Flow Drainage System shall be covered by a two (2) year manufacturer warranty. 6. When the EZ Flow Drainage System is installed in lieu of distribution piping and stone, the length of this installation shall equal the required lengths of distribution pipe specified in Article 8.7.3.1. 7. A barrier cover shall be placed over the top of the EZ Flow Drainage System prior to backfilling, and the barrier cover shall be a permeable filtration fabric of the type recommended by the manufacturer. 8. The EZ Flow Drainage System shall be covered with a minimum of 150 mm (6") of backfill as per Sentence 8.7.2.1(2) of the OBC. * 8.1. The EZ Flow 1401P may be used in shallow buried trench installations provided that the total trench depth to the finished grade is not greater than 600 mm (24"). 9. When the EZ Flow Drainage System is installed in lieu of distribution piping and stone, the leaching beds shall satisfy the general construction requirements specified in Section 8.7. of the OBC. 10. The minimum clearance distances required by Article 8.2.1.6. for distribution piping shall be met by the EZ Flow Drainage System. 11. When installed in lieu of distribution piping and stone in filter beds, the cylindrical bundles of the EZ Flow Drainage System shall be placed side by side to cover the surface of the filter medium to which the sewage effluent is applied, and the maximum spacing between the cylindrical bundles (with pipe) shall not be greater than 1.2 m (3.9'). 12. When used in gravity fed conditions, the EZ Flow Drainage System shall be: EZ Flow Drainage System Page 5 of 7

installed such that all joints between EZ Flow components and where the EZ Flow product joins other pipes are to be securely connected, and free of structural damage and used full length (not cut), 13. Where the sewage effluent is dosed to the leaching bed by pumps or a siphon, the EZ Flow Drainage System shall: pump the effluent into a header line or distribution box to achieve uniform distribution over the entire absorption bed or trenches and, comply with the requirements of Sentence 8.6.1.3.(4) of the OBC. B. GENERAL CONDITIONS 1. The use of the EZ Flow Drainage System must comply with the Building Code Act, 1992 as amended or re-enacted from time to time and except as specifically authorized herein, with the OBC as amended or remade from time to time. 2. A copy of this Authorization shall accompany each application for a building permit and shall be maintained on the site of the construction with the building permit. 3. The Applicant named in Part 1 hereof shall promptly notify the BMEC of: the failure of the applicant, or of the material, system or building design that is the subject matter of this authorization, to comply with any of the Specific Terms and Conditions set out in 6. A. above; or the occurrence of any of the events described in Specific Terms and Conditions 6. B. 4. and (ii) below. 4. The BMEC may amend or revoke this Authorization where it determines that: any change has been made to: (i) (ii) the material, system or building design that is the subject matter of this authorization; the address of the applicant specified in Part 1 of this authorization; or, EZ Flow Drainage System Page 6 of 7

(iii) the ownership of the applicant specified in Part 1 of this authorization. the use of the material, system or building design authorized herein; (i) (ii) does not comply with the Building Code Act, 1992 or any relevant legislation as they may be amended or re-enacted from time to time; or provides an unsatisfactory level of performance, in situ. (c) (d) the applicant, or the material, system or building design that is the subject matter of this authorization, has failed to comply with any of the Specific Terms and Conditions set out in this Authorization; or any Ontario Building Code provision relevant to this Authorization has been amended or remade. Dated at Toronto this 25th day of March 2004. BUILDING MATERIALS EVALUATION COMMISSION Rashmi Nathwani, Chair EZ Flow Drainage System Page 7 of 7