TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO.

Similar documents
ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

SLAUGHTERHOUSES AND ABATTOIRS

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

Proposed Terms of Reference for EIA studies

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

3.0 APPROACH AND METHODOLOGY

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

The Standard Criteria, current as of November 2013, as defined in Schedule 4 of the EP Act are as follows:

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

PROPOSED TERM OF REFERENCE

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO

Summary of Preparatory Study

Environmental Impact Assessment Report

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

V: PROJECT SCOPING & METHODOLOGY

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

5. OTHER CEQA CONSIDERATIONS

WHICH PROJECTS REQUIRE EIA?

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

1 Introduction 1-1. Project Need and Objectives

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

Proposed Terms of Reference for EIA studies

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

6 Risk assessment methodology

Technical Guidance Document for Preliminary Environmental Review (PER)

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

BACKGROUND INFORMATION DOCUMENT:

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Environmental Assessment in Canada

1 Environmental and Social Action Plan

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

PROPOSED TERMS OF REFERENCE (TOR) FOR

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

MINING EIA REVIEW CHECKLIST

SUMMARY LOUISIANA-PACIFIC CANADA LTD. - TEN YEAR FOREST MANAGEMENT PLAN (CLIENT FILE NO.: )

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5

DISTRICTWIDE CONTAMINATION ASSESSMENT and REMEDIATION SERVICES

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

South Landfill Annual Cover Rate Screening Criteria Checklist

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

5. ENVIRONMENTAL IMPACT ASSESSMENT

APPENDIX M CEQA Initial Study Checklist

H28. Special Purpose Quarry Zone

City of Mississauga Environmental Impact Studies Terms of Reference 2002

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

Mining Environmental Impact Assessment Guidelines. May 2018

Draft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands

6 IMPACT ASSESSMENT METHOD

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

2017 No. 593 AGRICULTURE, ENGLAND. The Environmental Impact Assessment (Agriculture) (England) (No. 2) (Amendment) Regulations 2017

September 2016 ID Competency Statement Type

ENVIRONMENTAL SUSTAINABILITY TARGETS AND CONDUCTING A COMPLIANCE AUDIT

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CHAPTER 7

2 ENVIRONMENTAL IMPACT ASSESSMENT

Environmental Information Worksheet

Appendix General Environmental Risk Analysis

12. Environmental management

Incremental Recycled Water Program 2007 ADDENDUM TO PROGRAM ENVIRONMENTAL IMPACT REPORT

Performance Standard 6

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

18 Cumulative Impacts and Interaction of Effects

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

Appendix M. Criteria, Measures and Indicators for Effects Assessment

8 Geology, Hydrology & Hydrogeology

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Performance Standard 6 V2

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Section 4 Environmental Impact Assessment Framework

KRC would like to construct a high density Commuter Rail line from xxx including the lines associated facilities. 1

5.0 LONG-TERM CEQA CONSIDERATIONS

Objective NAT-1.1. Maintain the best possible air quality, meeting or exceeding state and federal air quality standards.

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Comparative Evaluation Option #1 & Option #2

Transcription:

TERMS OF REFERENCE (TOR) FOR THE PROPOSED RESIDENTIAL APARTMENTS LOCATEDON PLOT L.R NO. 1/95 ALONG ARGWINGS KODHEK ROAD, IN HURLINGHAM, NAIROBI CITY COUNTY. PROPONENT DOUBLE WIN COMPANY LIMITED P.O. BOX 25839-0100, NAIROBI. JULY 2018

DOCUMENT AUTHENTICATION This Terms of Reference report has been prepared by Green Builders & Planning Consultants Limited (NEMA Reg. No. 9571) in accordance with the Environmental Management and Coordination Act (EMCA) 1999 and the Environmental Impact Assessment and Audit Regulations 2003 which requires that every development project must have an EIA report prepared for submission to the National Environmental Management Authority (NEMA). We the undersigned, certify that the particulars in this report are correct and righteous to the best of our knowledge. EIA/EA LEAD EXPERT: GREEN BUILDERS & PLANNERS CONSULTATS LIMITED FIRM REG. NO. 9571 P.O. BOX 40247 00100, NAIROBI, KENYA TEL: 0704707633 EMAIL:greenbuildersplanningconsult@gmail.com,elizabethwanza35@gmail.com Signature Date.... ELIZABETH W. MUTUA (NEMA REG. NO.8731) PROPONENT: DOUBLE WIN COMPANY LIMITED P.O. BOX 25839-0100, NAIROBI. NAME:. POSITION:. Signature. Date.. 2

Table of Contents DOCUMENT AUTHENTICATION... 2 CHAPTER ONE: INTRODUCTION... 4 CHAPTER TWO: PROJECT DESCRIPTION... 5 2.1.1 Name of Project...5 2.1.2 Project Proponent...5 2.1.3 Objective of the Project...5 2.1.4 Major Activities of the Project...5 2.2 EIA Consultant...6 2.3 Scope of Work... 6 2.4 Context, Components and Activities of the Project...7 CHAPTER THREE: BASELINE INFORMATION... 8 3.1 Description of the Environment/Baseline Studies Data Collection and Interpretation...8 3.2 Policy, Legislative and Regulatory Considerations...9 3.3 Identification and Assessment/Analysis of Potential Impacts...9 3.4 Assessment of key Environmental impacts... 10 3.5 Recommended Mitigation Measures... 11 3.6 Key Monitoring Programs... 12 3.7 Drainage Assessment... 12 3.8 Mitigation & Emergency Preparedness and Response... 12 3.9 EHS Management and Monitoring Plan... 13 3.10 Project Alternatives... 13 3.11 Public Participation/Consultation Programme... 13 CHAPTER FOUR: WORK SCHEDULE... 14 4.1 Research Activities... 14 CHAPTER FIVE: PROJECT ORGANISATION AND MANAGEMENT... 15 CHAPTER SIX: THE E.I.A REPORT... 16 3

CHAPTER ONE: INTRODUCTION Green Builders and Planning Consultants Limited, herein referred to as the consultants has prepared these Terms of Reference (TOR) to provide the guidelines for undertaking an Environmental Impact Assessment (EIA) study report for the proposed development. The proponent (DOUBLE WIN COMPANY LIMITED of P.O. BOX 25839-00100, NAIROBI) has proposed to put up residential apartment development on Plot L.R No. 1/95 Located along Argwings Kodhek Road in Hurlingham area, Nairobi City County. By Enactment, building and construction operation is a prescribed activity as per the second schedule in section 58, of Environment Management and Coordination Act, 1999 among other law enactments. Under these laws, any activity out of character with its surrounding which is likely to cause substantial impact to the environment in areas such as waste disposal, sustainable resource use, ecosystem s maintenance, social environment, land use and water extraction; an Environmental Impact Assessment (EIA) report is required to assess such impacts and propose mitigation measures. By the Enactment, the Project Proponent is required to submit an EIA report to NEMA for approval before commencing implementation of the project. By this report the relevant government authorities are able to monitor impacts within the life span of the project on the immediate environment, so as to enable major stakeholders of the project including the Government agencies to manage the environment for the well being of the community. These TORs have been prepared based on the scoping result, field visits and information collected from both primary and secondary sources including information provided by the Project Proponent. The Terms of Reference (TOR) for conducting the EIA Study are based on the General Guidelines for Conducting EIAs in Kenya as per Environment (Impact Assessment and Audit) Regulations, 2003, which operationalizes the Environmental Management and Coordination Act, (EMCA) 1999. 4

CHAPTER TWO: PROJECT DESCRIPTION 2.1 Project Description The proposed development will comprise of 2 Blocks of 14 storey residential apartments on plot L.R No. 1/95 as follows: BASEMENT 1&2: Will have 130 number of parking GROUND FLOOR: will have 63 number of parking bays, driveways and gate house. Typical 1 nd to 14 th Floor plan: BLOCK A: will comprise of 4, two(2) bedroom units and 2, three(3) bedroom units with DSQ giving a total of 6 units in the entire floor BLOCK B: Will comprise of 4, two(2) bedroom units and 2, three(3) bedroom units with DSQ giving a total of 6 units in the entire floor Each block will consist of 84 units giving a total of 168 units in the 2 blocks More/fine details of the development, Specifications and features of the proposed project will be given on the study report. 2.1.1 Name of Project Proposed residential apartment Development located On Plot L.R No. 1/95 in Hurlingham area Nairobi City County. 2.1.2 Project Proponent The project proponent is; DOUBLE WIN COMPANY LIMITED of P.O. 25839-0100, NAIROBI 2.1.3 Objective of the Project The proposed project has the overall objective of developing Residential Apartments on plot L.R NO. 1/95 2.1.4 Major Activities of the Project The construction activities shall involve civil and engineering works as here on: 5

a) Site clearance and preparation b) Normal excavation of soil and filling with hardcore c) Laying of foundation slab and walling d) Plastering and painting e) Landscaping f) Storm water and drainage construction g) Laying of the pavement blocks h) Installation of electrical works i) Government inspection/occupation certificate and completion of works issued j) Beginning of occupation 2.2 EIA Consultant Licensed NEMA consultant, Green Builders & Planning Consultants Limited (EIA / EA Expert Reg. No. 9571) works with a team of experts with proven track record of excellence focusing mainly on environmental management and physical planning. The team has undertaken numerous development projects since its inception for individual as well as corporate local and international clients, providing topquality environmental impact assessments and environmental management plans. 2.3 Scope of Work The Environmental Impact Assessment will include but not necessarily be limited to: 1) Project Objectives 2) Complete description of the existing site proposed for development. 3) Significant environmental issues of concern through the presentation of baseline data, which should include social, cultural and heritage considerations. Assess public perception of the proposed development. 4) Policies, Legislation and Regulations relevant to the project. 5) Likely impacts of the development on the described environment, including direct, indirect and cumulative impacts, and their relative importance to the design of the development s facilities. 6) Mitigation action to be taken to minimise predicted adverse impacts if necessary and quantify associated costs. 7) Monitoring Plan that should ensure that the mitigation plan is adhered to. 6

8) Alternatives to the project that could be considered at that site or at any other location including no action alternative. 9) Conclusions To ensure that a thorough environmental impact assessment is carried out, the following tasks are necessary: 2.4 Context, Components and Activities of the Project To provide a comprehensive description of the project and the surrounding environment specifying any information necessary to identify and assess the environmental effects of the project. This includes project objectives and information on, rationale for the project and background, the nature, location/existing setting, timing, duration, frequency, general layout including relocation of people and any additional impacts on the surroundings communities, pre-construction activities, construction methods, works and duration, and post construction plans. A description of raw material inputs, technology and processes to be used as well as products and by-products generated, should be provided. Note areas to be reserved for construction and areas to be preserved in their existing state as well as activities and features which will introduce risks or generate impact (negative and positive) on the environment. The EIA study shall include an assessment of the context, components and activities of the project. This includes among others: Context: Description and assessment of the location of the land, the land use characteristics, including the planned use of the land and description of the existing land use and their patterns within 3-km radius from the boundary of the Project Area and project characteristic Activities: Description and assessment of the specific phases and activities; including timing and location, for: (i) pre-construction (planning) phase (Plan preparation and seeking of the appropriate approvals from the relevant authorities, baseline condition appraisal), (ii) construction phase (base camp establishment, site clearance, acquisition and transportation of building materials, construction of the apartment); (iii) Occupation phase (running and managing the facility as per the laid down rules and procedures; and (iv) Decommissioning/abandonment phase (demolition of facility). 7

CHAPTER THREE: BASELINE INFORMATION 3.1 Description of the Environment/Baseline Studies Data Collection and Interpretation Description and assessment of the location of the land, the land use characteristics, including the planned use of the land and description of the existing land use and their patterns within 3-km radius from the boundary of the Project area and project characteristic. Baseline is important to give an overall evaluation of the existing environmental conditions, including a historical meteorological evaluation to include but not be limited to characteristics and analysis, values and functions of the area, as follows: i.) Physical environment ii.) Biological environment iii.) socio-economic and cultural constraints The methodologies employed to obtain baseline and other data to be clearly detailed. Baseline data included but not limited to: Physical i). A description of the existing soil and geology, landscape, aesthetic values and hydrology. Special emphasis should be placed on storm water run-off, drainage patterns, and aquifer characteristics. Any slope stability issues that could arise should be thoroughly explored. ii). Water quality of any existing wells, rivers, ponds, streams or coastal waters in the vicinity of the development. iii). Terrestrial ecosystem, including but not limited to any wetlands and other ecologically sensitive areas with indication of their function and value in the project area. iv). Noise levels of undeveloped site and the ambient noise in the area of influence v). Obvious sources of existing pollution and extent of contamination vi). Availability of solid waste management facilities Biological Present a detailed description of the flora and fauna (terrestrial and aquatic if applicable) of the area, with special emphasis on rare, threatened, endemic, protected and endangered species. Migratory species, wild food crop plants and presence of invasive alien species should also be considered. There is need to incorporate micro-organisms to obtain an accurate baseline assessment. Generally species dependence, habitats/niche specificity, community structure and diversity ought to be considered. 8

Socio-economic & cultural Present and proposed land use; transportation of heavy equipment, road widening and associated traffic considerations particularly in the construction phase of the project, planned development activities; issues relating to squatting and relocation; public health and safety. The historical importance (heritage, archaeological sites and feature) and other material assets of the area should also be examined. While this analysis is being conducted, it is expected that an assessment of public perception of the proposed development be conducted. This assessment may vary with community structure and may take multiple forms such as public meetings and/or questionnaires/surveys. 3.2 Policy, Legislative and Regulatory Considerations Outline the pertinent regulations and standards governing environmental quality, safety and health, protection of sensitive areas, protection of endangered species, siting and land use control at the national and local levels. The examination of the legislation should include at minimum, legislation such as the Environmental Management and Coordination Act No.8 of 1999 (EMCA) Act, The Environmental Management and Co-ordination (Waste Management Regulations 2006), the Public Health Act, Waste Water Management; Physical planning act, 1999, Local Government Act (265), Building code 2000 and the appropriate international convention/protocol/treaty where applicable. 3.3 Identification and Assessment/Analysis of Potential Impacts Examine and identify the major potential environmental and public health issues of concern and indicate their relative importance to the development project. These should include the occupational exposure, health and safety measures and population exposure in the appropriate study area(s) and changes and or enhancement in emergency response plan. Identify potential impacts as they relate to, (but are not restricted by) the following: change in drainage patterns flooding potential if necessary landscape impacts of excavation and construction loss of and damage to geological and paleontological features loss of species and natural features habitat loss and/or fragmentation pollution of potable, surface or ground water air pollution socio-economic and cultural impacts impact of flooding, loss of natural features, excavation and construction on the historic 9

landscape, architecture and archaeology of the site risk assessment noise and vibration solid waste disposal soil change in land use visual impacts aesthetics impact on traffic and the transportation of heavy equipment to the site Distinguish between significant positive and negative impacts, direct and indirect, long term and immediate impacts to include discussion on site restoration and residual impacts and the proposed mitigation measures. Identify avoidable as well as irreversible impacts. Cumulative impacts of this and other proposed and/or existing developments will be explored. Characterize the extent and quality of the available data, explaining significant information deficiencies and any uncertainties associated with the predictions of impacts. A major environmental issue is determined after examining the impact (positive and negative) on the environment and having the negative impact significantly outweigh the positive. It is also determined by the number and magnitude of mitigation strategies, which need to be employed to reduce the risk(s) introduced to the environment. Project activities and impacts will be represented in matrix form. 3.4 Assessment of key Environmental impacts The following environmental impacts (a, b, c) are the key potential adverse impacts identified during the scoping phase. Other potential adverse impacts (d) - waste disposal, flora and fauna and dust - shall be assessed in less detail. a. Noise Pollution, Solid Waste pollution, Energy and Water Constraint Construction activities (excavation, building construction, transportation and machinery) are among the major contributors to noise and solid wastes. Construction and operation phase may affect the level of water and energy usage within the area. The following activities and assessment shall be undertaken: Status of water usage and capacity within the Project Area, e.g. pipe type, estimated users, pipe size and other water sources shall be described and assessed. Status of energy (electricity) usage and capacity within the Project Area, e.g. phase type, estimated users, layering type and other energy sources shall be described and assessed. The impact of noise pollution, solid waste and traffic congestion shall be determined and assessed. 10

These shall be predicted based on: (i) Description and assessment of existing topographical and physical characteristics of the project site (based on e.g. topographical maps and ground investigation), (ii) Description and assessment of the existing geological and soils condition within the project site (based on e.g. on ground survey and soil maps available), (iii) Description and assessment of the drainage system within the project area (based on e.g. topographical maps and ground surveys). The impact on waste effluents due to the construction activities and operations of the residential houses shall be assessed. b. Social Impacts Social impacts of the project shall be determined through interviews with a representative number of people potentially affected by the project activities (and quantification of answers). c. Other Impacts The following environmental impacts have to be addressed in less detail: Waste Disposal. Waste generated from construction site and machinery (oil and grease) shall be assessed. Waste generated as a result of occupation will also be assessed. Flora and fauna. The impacts on flora and fauna within the proposed area shall be assessed. This assessment shall mainly be carried through interview with local people, observations and through information obtained from the relevant Government agencies. Dust Pollution. Impact due to dust generated from construction activities especially excavation, material mixing e.g. cement, trucking of materials during transportation shall be assessed. 3.5 Recommended Mitigation Measures Wise water usage. Water conservation shall be emphasized at all phases through activities such as recycling, water conserving taps, notices near water points on need to conserve water. Adopt alternative water sources such as rain water harvesting, borehole sinking. Waste effluents shall be disposed off through the existing sewerage system. Restriction of the number of vehicles entering the construction site to reduce chances of traffic jams. Construction of parking zone for use during operation phase. Mitigation measures related to concerns raised by the local residents in the area surrounding the project areas e.g. being given priority in employment such as unskilled labour. 11

3.6 Key Monitoring Programs Assessment and recommendation concerning compliance monitoring of the water usage. Use of detailed map of water courses (rivers, streams, etc.) and riparian reserves. Assessment and recommendation concerning compliance, monitoring of the noise pollution reduction. Proper work ethics such as switching off engines when not in use has to be considered and recommended upon. Assessment and recommendation concerning compliance, monitoring of the restriction of traffic to the construction site. Use of photographs, timing, location, etc. has to be considered and recommended upon. Assessment and recommendation concerning compliance monitoring of the socio-economic impact related to the concerns raised by the local residents in the area surrounding the project areas. 3.7 Drainage Assessment An assessment of Storm Water Drainage should be conducted. The EIA Report will cover but not be limited to where necessary: i.) Drainage for the site during construction to include mitigation for sedimentation to the aquatic environment ii.) Drainage for the site during operation, to include mitigation for sedimentation to the aquatic environment Drainage control for crossings of rivers and/or gullies, to include impacts that drainage control features could have on aesthetics, water quality and sedimentation of rivers and/or gullies. 3.8 Mitigation & Emergency Preparedness and Response Prepare guidelines for avoiding or reducing (e.g. restoration and rehabilitation), as far as possible, any adverse impacts due to proposed usage of the site and utilising of existing environmental attributes for optimum development. The potential impacts in the area should be addressed. Quantify and assign financial and economic values to mitigating methods. Indicate the emergency preparedness and response plans for dealing with risks and hazards identified as above. Identify, assess and recommend appropriate and practical mitigation measures to remove or minimize the adverse environmental impacts identified. Identify, assess and recommend impact monitoring programs and compliance auditing programs. After completion of the EIA study, the E.I.A consultant shall prepare a comprehensive report and undertake a presentation of the EIA report to NEMA. Below are listed a number of specific issues, based on the scoping phase, the EIA study has to include. 12

3.9 EHS Management and Monitoring Plan Design a plan for the management of the natural, historical and archaeological environments of the project to monitor implementation of mitigatory or compensatory measures and project impacts during construction and occupation/operation of the units/facility. An EHS Management Plan and Historic Preservation Plan (if necessary) for the long-term operations of the site should also be prepared. An outline of a monitoring programme (if necessary) should be included in the EIA, and a detailed version submitted to NEPA for approval after the granting of the permit and prior to the commencement of the development. At the minimum the monitoring programme and report should include: An introduction outlining the need for a monitoring programme and the relevant specific provisions of the permit and/or licence(s) granted. The activity being monitored and the parameters chosen to effectively carry out the exercise. Project maintenance and decommissioning The methodology to be employed and the frequency of monitoring. The sites being monitored. These may in instances, be pre-determined by the local authority and should incorporate a control site where no impact from the development is expected. Frequency of reporting to NEMA 3.10 Project Alternatives Examine alternatives to the project including an assessment of the impacts of all the alternatives examined and the no-action alternative. This examination of project alternatives should incorporate the use history of the overall area in which the site is located and previous uses of the site itself. 3.11 Public Participation/Consultation Programme Conduct public presentation(s) on the findings of the EIA to inform, solicit and discuss comments from the public on the proposed development if necessary. Document the public participation programme for the project. Describe the public participation methods, timing, type of information to be provided to the public, and stakeholder target groups. Summarise the issues identified during the public participation process Discuss public input that has been incorporated into the proposed project design; and environmental management systems 13

CHAPTER FOUR: WORK SCHEDULE The EIA study report for the residential apartment development shall be completed within a period of seven (7) weeks from the time of TOR approval. 4.1 Research Activities Study phase Specific activity Time frame(weeks) 1 2 3 4 5 6 7 Field work Consultations xx xx Monitoring studies xx xx Write up Data analysis xx xx xx Impact prediction xx Xx xx xx Identification of mitigation xx xx xx measures Formulation of EMP xx xx xx Compiling the EIA study report xx Submission Submission report to NEMA EIA Presentation xx xx xx 14

CHAPTER FIVE: PROJECT ORGANISATION AND MANAGEMENT The EIA study will be led by a Project Director assisted by Project Research and Corporate Managers with the following duties and responsibilities: Project Director: Appoint team members, outline the terms of reference for each personnel and provide the final decision in respect of the study activities and results. Project Manager: Undertake and coordinate the respective field studies and environmental baseline data collection; coordinate and organize discussions and meetings, and contribute in the environmental management aspects of the EIA study. Research Manager: Coordinate the overall EIA study activities, data collection, analyses, interpretation, and compilation of the study results. The following specialists and personnel will perform data collection, analysis, and interpretation of results: Name QUALIFICATIONS 1. ELIZABETH W. MUTUA MSC. CLIMATE CHANGE & SUSTAINABILITY BSC. ENVIRONMENTAL EDUCATION (NEMA LICENSED EIA/EA LEAD EXPERT) 3. LINGE KITULU BSC. ANALYTICAL CHEMISTRY NEMA LICENSED EIA/EA ASSOCIATE EXPERT 4. YVONNE KEGEHI BSC. ENVIRONMENTAL EDUCATION (NEMA LICENSED EA/EA ASSOCIATE EXPERT) 5. MITCHELLE KUTWO B.A ENVIRONMENTAL PLANNING AND MANAGEMENT 15

CHAPTER SIX: THE E.I.A REPORT All findings will be presented in the EIA report. The report will contain an introduction explaining the need for, and context of the project. The report should, at a minimum, cover the following basic aspects: 1. Executive Summary 2. Policy, Legal and Administrative Framework 3. The EIA Methodology 4. Description of the Existing Environment 5. Description of the Proposed Project in detail 6. Identification and Assessment of Potential Direct, Indirect, Cumulative, Positive and Negative Environmental Impacts Physical Natural Hazard Risk Biological Human/Social Public Involvement Recommended Mitigation Measures Identification and Analysis of Alternatives Management of the Environmental and Heritage aspects of the Project Environmental Management of the Project Environmental Quality Objectives Training Draft Outline Monitoring Programme List of References Appendices including: Reference documents Photographs/ maps/ site plans TOR Notes from Public Consultation Glossary of Technical Terms used Ten hard copies and an electronic copy of the study report will submitted to the National Environment Management Authority for Licensing. 16