VILLAGE OF AVISTON ZONING BOARD OF APPEALS / PLANNING COMMISSION

Similar documents
BMP-5. A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched.

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

ACTIVITY: Silt Fence ES 14

PATIOS, STOOPS and PRIVATE WALKWAYS. This hand out is for REFERENCE ONLY. For more details see specific code sections.

The following information is required when submitting a building permit application:

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

Village of Glen Ellyn TREE PRESERVATION GUIDELINES

New Construction/Architectural Control Committee (NCC/ACC) Eagle s Bluff Community Association, Inc.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Accessory Building/Detached Building Permit

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

Ordinance No Lot Surface Drainage

EROSION CONTROL AND GRADING PERMIT APPLICATION

IN T R A / M IN T R A M

INSTRUCTIONS. Address: Sec/Block/Lot:

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

meters (16 Inches) Transportation (T)

Permit Procedures For New Construction, Additions, and Alterations

PART 1 GENERAL REQUIREMENTS

DRIVEWAYS & APRONS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS)

A. -Application Form Ensure following is filled out on your building permit application:

City of Jacksonville Development Guide Building Permits

FENCE PERMIT APPLICATION

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

This silt fence system is composed of geotextile filter fabric and steel posts.

$ Plan Review Fee when Permit Application is submitted SHED BUILDING PERMIT APPLICATION. Application Date / /

This silt fence system is composed of geotextile filter fabric and steel posts.

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Deck Permit Zoning requirements Adopted Code Submission Requirements Fees Review time Contractor licensing Inspections

ARTICLE III. TECHNICAL CODES AND OTHER CONSTRUCTION STANDARDS* Sec Adoption of the Florida Building Code and Countywide Amendments.

RESIDENTIAL DESIGN GUIDELINES FOR BENT TREE OF ROGERS

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

$ Plan Review Fee when Permit Application is submitted (*applies to residential permits only*) FENCES

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

HONEY BROOK TOWNSHIP

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Single Family Residential Building Permit Questions & Answers

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

Building Permit Package

NEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

Property Address: Builder: Phone #: Address:

Residential Building Permit Application

SECTION R-MH - MANUFACTURED HOUSING RESIDENTIAL DISTRICT.

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

SECTION EROSION AND SEDIMENTATION CONTROLS

Building Permit Application

APPLICATION FOR A SITE CONSTRUCTION PERMIT

Figure Inlet protection (Source: Minnesota DOT)

The following materials and documents are required in order for you to obtain a Building Permit:

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

José Nuño, Chairman. Exhibit A Amendments to Table

REQUEST FOR ALTERATION REVIEW COPPERLEAF PROPERTY OWNERS ASSOCIATION, INC.

RESIDENTIAL BUILDING PERMIT INFORMATION

RESIDENTIAL BUILDING PERMIT INFORMATION

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

RESIDENTIAL BUILDING PERMIT INFORMATION

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Residential Building Permit Checklist

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

Town of Grantham, NH Building Permit Application Procedures

FENCES BUILDING DEPARTMENT 160 LAKE STREET NORTH BIG LAKE MN SCOPE

Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them:

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

VILLAGE OF SHAWNEE HILLS 9484 Dublin Rd. Shawnee Hills, Ohio Phone Fax

ATTACHED/DETACHED GARAGE BUILDING PERMIT APPLICATION

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

STORMWATER AND EROSION CONTROL PERMIT

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

STORMWATER AND EROSION CONTROL PERMIT

Fence and Wall Requirements

BUILDING PERMIT GUIDE SHEET

Incorporated Village of Lawrence

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

PROCEDURE FOR REQUESTING A BUILDING PERMIT

MONROE COUNTY ZONING OFFICE

DECKS. This hand out is for REFERENCE ONLY. For more details see specific code sections.

BUILDING APPLICATION FORM

Transcription:

VILLAGE OF AVISTON ZONING BOARD OF APPEALS / PLANNING COMMISSION INSTRUCTIONS TO APPLICANTS: Before beginning any construction, a Building & Zoning Permit must be obtained from the Zoning Administrator. Application for permit must be made by the owner of the property on which the construction is to take place, his duly authorized agent, or the owner of the structure to be constructed. A legal description of the property and a site plan of the proposed construction must be included with the application. The following pages list information, which must be shown for the permit. All information requested on the forms attached must be provided before any permit will be issued. Applicants are encouraged to call the Zoning Administrator for any assistance needed in completing this form. If the proposed construction meets the zoning requirements, a permit shall be issued. The Building & Zoning Permit will be good for one (1) year from the date of issuance. If the Zoning Administrator determines that your application does not comply with the requirements of the Zoning Code, a permit will not be issued. The applicant may then (1) request for an appeal of the regulation before the Planning Commission, (2) request a variance, or (3) request a zoning amendment. The Planning Commission will conduct a public hearing and form a recommendation that will then be forwarded to the Village Board for approval or disapproval on the requested action. A Footing/Foundation Inspection is required before any concrete is poured. You must contact the Zoning Administrator at least 24 hours prior to such action for this inspection. GENERAL NOTES: An authorized representative of the Village must inspect all water hook-ups. Check with the Village Hall for any associated costs. An authorized representative of the Village must inspect all sewer taps to the sewer main. Check with the Village Hall for any associated costs Culverts for any driveways will be installed by the Village of Aviston. Please contact the Village Maintenance Shed for length and size of the culvert before purchasing. All business or commercial structures must present plans that are sealed by a registered architect or engineer. You must check with the Aviston Postmaster regarding the installation of any mailboxes.

VILLAGE OF AVISTON FILING FEES PERMIT FEES: Single-Family Residence $150.00 Multi-Family Residence $225.00 Commercial Structure $300.00 Industrial Structure $300.00 Mobile Home Replacement $500.00 Accessory Building $ 50.00 per building Structural Additions (residential) $ 50.00 Preliminary Plat 40 Acre Tract 2 Phases 10 acres or less $300.00 20 acres $400.00 40 acres $500.00 Sidewalk Permit $ 25.00 Sign Permit $ 50.00 Miscellaneous Permit (non-structure) $ 50.00 (i.e., parking lot, patio, driveway, pool and deck permanently installed) Renewal of expired filing fee (no changes to plan) $ 75.00 Renewal of expired filing fee (with changes to plan) $150.00 ZONING BOARD OF APPEALS AND PLANNING COMMISSION FEES: Special Use Permit $150.00 Variance Permit $150.00 --Additional Fees Publication fees as determined by the newspaper. Notice to all property owners within 250 yards $ 1.50 per mailing CONTACT NUMBERS FOR YOUR CONVENIENCE Gary Rakers, Zoning Administrator 618-623-8361 cell 618-228-7361 office Aviston Village Hall 618-228-7262 618-228-7244 fax Village Maintenance Shed 618-228-7361 For culverts/drainage 618-228-7361 leave message For water/sewer Gary 618-623-8361 Aviston Postmaster 618-228-7759

VILLAGE OF AVISTON APPLICATION FOR CERTIFICATE OF ZONING COMPLIANCE Applicant(s) Information Date: Name: Address: Phone: Project Information 1. Property interest of applicant: ( ) Owner ( ) Lessee ( ) Contract Purchaser ( ) Other 2. Name of owner if other than applicant: Name: Address: Phone: 3. Street address of proposed construction or improvement: Legal description (property #): 4. Proposed improvement (check all applicable items): ( ) New Building ( ) Addition or alteration (explain) ( ) Relocation of existing building ( ) Other (explain) 5. Brief description of proposed improvement to property:

6. Describe the proposed construction or improvements, as applicable: Number of rooms: Square feet of structure: Number of stories: Estimated cost of structure: Construction start date: Target completion date: Percentage of brick: Contractor (if applicable): 7. Height of foundation above curb (should not be greater than 30, if so explain): 8. Site plan / full set of blue prints: (8 ½ x 11 would suffice) Must Include (a grid is attached to this application for your convenience): 1. Location and dimension of lot, building, driveways and off-street parking spaces. 2. Distance between building(s) and front, side and rear lot lines. 3. Distance between principal building and accessory building. 4. Location of signs and easements, 5. Duplexes must have a double wide drive to park 2 cars side by side per each unit. 9. Utilities (check all applicable items): ( ) Public water service ( ) Public sewer service ( ) Ameren IP ( ) Private well ( ) Aeration tank ( ) REA ( ) Other: ( ) Other: ( ) Other: 10. Present use of property:

ZONING ADMINISTRATOR S CHECKLIST: Completed application with estimated cost Site Plan / Sealed Plan Applicant s signature / Developer s signature Zoning Fee $ made payable to: VILLAGE OF AVISTON Date Building Permit Issued Date of Footing / Foundation Inspection: Date of Final Inspection after completion

Applicant Representation: Application is hereby made for an Initial Certificate of Zoning Compliance (Building Permit) required under the Zoning Code of the Village of Aviston, for the erection, movement or alteration and/or use of buildings and premises. In making this application, the applicant represents all the previous statements and attached maps and drawings to be a true description of the proposed new or altered uses/and or buildings. The applicant agrees that the permit issued may be revoked without notice on any breach of representation or conditions. It is the responsibility of the applicant to identify and avoid contrary development of that property sections affected by any easements, right-of-ways, or any other covenants, be it by subdivision restrictions, Village Ordinance, or other controlling legal authority. If the application is found in violation, it is further understood that it shall be deemed the owner s responsibility and cost if corrective action ever needs to be taken in the future. It is further understood that any permit issued as a result of information contained in this Application will not grant right of privilege to erect any structure or to use any premises described for any purpose or in any manner prohibited by the Zoning Code or by other Ordinances, codes or regulations of this Village. Signature of Applicant(s) Date Date Sump pump must be hooked up to drainage line. (This will be inspected for proper placement) Signature Required The premises address must be posted on the residence, visible from the roadway. In subdivisions where the home is a ways away from the road the address must be posted on the house, and in the front yard, visible from the roadway. Signature of Applicant(s) Date Home owner will be responsible for removal of buildings and such, required to be moved if built on an easement. Signature of Applicant(s) Date PROPERTY PINS MUST BE LOCATED, MARKED AND VISIBLE TO THE ZONING ADMINISTRATOR BEFORE BUILDING PERMIT IS ISSUED. Signature of Applicant(s) Date

NORTH WEST EAST SOUTH LOT PLAN - Distance between building(s) and front, side and rear lot lines must be shown.

CONSTRUCTION This sediment barrier utilizes burlap, standard strength, or extra strength synthetic filter fabrics. It is designed for situations in which only sheet or overland flows are expected in special cases burlap may be used in drainage ways. 1. The height of the barrier shall not exceed 36 (higher barriers may impound volumes of water sufficient to cause failure of the structure. 2. The fabric shall be purchased in a continuous roll, cut to the length of the barrier to avoid the use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum 6 overlap, and securely sealed. 3. Stakes shall be spaced a maximum of 10 apart at the barrier location and driven securely into the ground (minimum of 12 inches). When extra strength fabric is used without the wire support fence, stake spacing shall not exceed 5 feet. 4. A trench shall be excavated approximately 6 wide and 6 deep along the line of posts and upslope from the barrier. 5. When standard strength filter fabric is used, a wire mesh support fence shall be fastened securely to the upslope side of the stakes using heavy duty wire staples at least 1 long, tie wires or hog rings. The wire shall extend into the trench a minimum of 2 and shall not extend more than 36 above the original ground surface. 6. The standard strength filter fabric shall be stapled or wired to the fence, and 8 of the fabric shall be extended into the trench. The fabric shall not extend more than 36 above the original ground surface. Filter fabric shall not be stapled to existing trees. 7. When extra strength filter fabric or burlap and closed post spacing are used, the wire mesh support fence may be eliminated, in such a case; the filter fabric is stapled or wired directly to the posts with all other provisions of items number 6 applying. 8. The trench shall be backfilled and the soil compacted over the filter fabric. 9. Filter barriers shall be removed when they have served their useful purpose, but not before the upslope area has been permanently stabilized. PLANS AND SPECIFICATIONS Plans should show the locations and all dimensions of the filter barriers. Sufficient detail must be shown that control measures are installed as designed. Material requirements must be specified. See Detail Drawings of erosion control measures on the next pages.

Erosion Control: On any construction where soil is disturbed, a Temporary Barrier of a silt fence or straw bales shall be constructed, two (2) feet from curb, drainage swale, ditch or adjacent to developed property line. All temporary erosion controls shall remain in place at least 30 days after permanent controls are in place at which time these shall be disposed of in a proper manner by the developer and/or his contractor. Specifications for Barriers: Silt Fence Materials 1. Synthetic filter fabric shall be a pervious sheet of propylene nylon polyester or ethylene yarn and shall be certified by the manufacturer or supplier as conforming to the following requirements: PHYSICAL PROPERTY Filtering Efficiency Textile Strength at 20% Elongation Flow Rate REQUIREMENTS 75% (minimum) Extra Strength 50 lbs./lin. In (min) Standard Strength 30 lbs./lin. In (min) 0.3 Gal/Sq. Ft./Min. (min) Synthetic Filter Fabric Requirements 2. Burlap shall be 10 ounce per square yard fabric. 3. End stakes for filter fences shall be either 2 x 2 wood or 1.33 pounds per linear foot steel with a minimum length of 5 feet. Steel posts shall have projections for fastening wire to them. 4. Stakes for filter fences shall be 1 x 2 wood (preferred) or equivalent metal with a minimum length of 5 feet. 5. Wire fence reinforcement for silt fences using standard strength filter cloth shall be a minimum of 36 in height, a minimum of 14 gauge and shall have a maximum mesh spacing of 6.