Hsien-Ming CHANG Aerospace MBA Toulouse Business School Toulouse, France

Similar documents
CONTENTS. Introduction The GKN Aerospace Western Approach facility... 4

The Next Decade of Carbon Fiber Composites: Challenges and Opportunities

Trends in the Aerostructures Composite Supply Chain

Developments and Challenges for Aluminum A Boeing Perspective

STELIA AEROSPACE NORTH AMERICA

AMTAS Project: First year planning

Clauses applicable only when specified by Q-number on the purchase order.

Composite Structure Engineering Safety Awareness Course

Global aviation parts supplier

INDUSTRY COMPOSITE SOLUTIONS FOR THE AEROSPACE INDUSTRY COMPOSITE SOLUTIONS FOR THE AEROSPACE INDU

Commercial Aerostructure Titanium Demand Back to the Future?

QUALITY SYSTEM DEVELOPMENT FOR THE MANUFACTURE OF PRIMARY COMPOSITE AIRCRAFT STRUCTURE

Development of an Ultrasonic System for C-Scan of Aircraft Components

SOME MANUFACTURING ACTIVITIES IN JAPANESE AIRCRAFT INDUSTRIES (JAI)

Figure 4: Preforming of PMC LDB

New Challenges for Airlines/MRO dealing with New generation of Composite Aircrafts

Quality Improvement through Mistake-Proofing of Countertop Fabrication and Installation

The Felters Group Operations Manual

Industry Meeting. Minutes

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration

BOEING QUALITY / CONTRACT CLAUSES

Resource for Composite Tooling and Parts Fabrication Since 2000

COMPOSITES MATERIALS FOR AVIATION INDUSTRY

Airbus Roadmap and Typical Solutions

Development of Large-sized Aircraft Fuselage Panel Mixed-flow Production Line

THE COMPOSITE MATERIALS HANDBOOK (CMH-17) (VOLUME 3, CHAPTER 3)

FAA Bonded Structures Workshop 06/17/04 1

PRECISION CONVERTING & OUTSOURCE MANUFACTURING SOLUTIONS FOR. Aerospace

The information presented in this presentation is designated as proprietary to Air Flight Technical LLC

Precision CNC Machining Complex Parts for Critical Applications

Supplier Quality Requirements

GKN plc Overview. 21 st November 2012

Principles for determining material allowable and design allowable values of composite aircraft structures

Fleet Issue Collaboration; Improving Safety, Operational Cost and Reliability Through The Sharing of Aircraft Operational Data

The Quickstep Story. Creating markets through innovation: A manufacturing case study. Ray Tettman, Watermark Philippe Odouard, Quickstep

Trainee Maintenance Technician

Composite Manufacturing and Quality Control

A Strategic Guide to Visibility & Cost Reduction

OEM-CERTIFIED AEROSTRUCTURES SOLUTIONS

Boeing Commercial Airplanes

2.1 This work instruction will apply to all Suppliers, Engineering, Planning, Maintenance, Manufacturing, Supply Chain and Purchasing.

Section 13 Contract OR Section 28 Registration

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

COMPOSITE LANDING GEAR COMPONENTS FOR AEROSPACE APPLICATIONS

COMPOSITE MATERIALS HANDBOOK. Volume. Structural Sandwich. Composites

Contents Introduction to Logistics... 6

Jeff Turner President and Chief Executive Officer Credit Suisse Aerospace and Defense Conference December 6, 2006

Bringing you the future of aerostructures

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

GKN Aerospace Advanced Composite Structure

X-55A Advanced Composite Cargo Aircraft

The Realities of Modern Manufacturing

The Power of Excellence

Shaping a better future. Part Production for the aerospace industry.

Manufacturing Supplier Requirements Manual

EFFECT OF LAMINATE B-STAGING ON OUT-OF-AUTOCLAVE COMPOSITE REPAIR

KESTREL GROUP AIRCRAFT CERTIFICATION, ENGINEERING, MODIFICATIONS AND CUSTOM DESIGN

Advancing Composites Education and Training through Curriculum Design

Composite Materials: Advantages and Cost Factors

CURING OVENS for Composite Manufacturing & Repair with Advanced Process Computer Control A Turn-Key Service for Oven Engineering For OEMs and MROs.

Terms and Conditions Form OL-668 Rev l

The Philippines. in the Aerospace

Supplier Quality Requirements

Suong V. Hoa Concordia Center for Composites Mechanical and Industrial Engineering Concordia University

Srinivasan Lakshmanan Research Scholar, Noorul Islam University, Kanyakumari District, Tamil Nadu, India.

In search of excellence; How to grow in a cash consuming world

AUTOMATED SOLUTION TO HIGH VOLUME MANUFACTURING USING LOW-COST PCM TOWPREG

PRODUCTION SERVICES WHERE GREAT IDEAS TAKE SHAPE.

NQP 100 March 11, 2010 Working Draft Rev - 1. The candidate must have sufficient command of the English language, both oral and written.

Quality Clause Q2A. First Article Inspection

Review of. FAA Guidelines for Fabric Prepreg Material Specification

Innovative Solutions for

FAA Workshop on Adhesive Bonding. Ch. KAUFFMANN Head of Technology Department

Analysis and design of composite structures

Thrust Area Working Group # 3 Composites. Product and Technology Roadmap Overview

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

Excellence Through Integrated Solutions. Tiers of Excellence. Precision Machining Assembly Inventory Management & Packaging Transition Sourcing

Session 5 - MECHANICAL ENGINEERING PROFILE, ITS IMPORTANCE AND APPLICATION

Management Science 2 ABI-301 Prelim Period Lecture Note#3. Introduction to Operations Management. 1 Page

For Cost-Effective Composite Solutions

First Class Building Products, Inc.

Military Division. Our Mission is Supporting Yours

Advantages of Composite Materials in Aircraft Structures

Trainee Process Technician

Heanor September 18, Welcome & Introduction to Safety Rules

Noise Attenuation and Control for Business Aircraft

Advanced Composite Damage Identification, Inspection and Repair for Engine Components. Tim Mathis Director of Engineering, Components

Highland Composites. Expandable on-site to ~188k sq. ft. (expansion area purchased and graded).

Bonded Structures Industry Survey

Supplier questionnaire. 1. Organisation Details (Mandatory) Quality Department Details (or representative)

Deutsche Bank s 13 th Annual Global High Yield Conference. September 29, 2005

Utilization of PCM technology with various applications of commercial production vehicle. Koichi Akiyama Yoshihide Kakimoto

Celebrating 30 years of. Spares Care. for the. Air

MANAGERIAL PROCESS STANDARDIZATION THROUGH ILLUSTRATIVE CASE STUDY

Finished goods available to meet Takt time when variations in customer demand exist.

Progress on Developing Radio Frequency Identification within Commercial Aviation

Aviation Management System

Mission Support Overhauls U.S. Air Force B-52s using Verisurf Reverse Engineering Software

OFFSHORE PROMOTION, INC. - Integral Maquiladora Services

PRODUCT QUALITY & SAFETY IN FOOD SUPPLY CHAIN - UNILEVER

Transcription:

Competitive Operation Model for the Supply Chain of Aircraft Composite Parts Hsien-Ming CHANG Aerospace MBA Toulouse Business School Toulouse, France Abstract The demand trend of civil aircraft is stable and increasing in the future years. Due to the material technology development and fuel price volatility, the composite materials become more important in aero-structures, also starting to apply in the aero-engine category. It is a good opportunity to integrate the supply chain in the aircraft composite parts and get benefits from well operation. This study propose the Competitive Operation Model, which introduce the concepts of value stream, risk management and lean production into the supply chain processes and management processes for aircraft manufacturers and aerostructures suppliers. Thus the aircraft manufacturers and their suppliers can increase the performance and competence in the competitive market. Key words: aircraft, supply chain, composite parts, Competitive Operation Model. I. INTRODUCTION Although the number of new transport aircraft sold in a given year has whip-sawed over the past decade, production and deliveries have trended steadily upward. As seen in Figure 1, this trend will continue in the coming decade. Aircraft manufacturers are expected to deliver more than 17,000 aircraft (including dedicated cargo planes) between 2012 and 2022. About 60 percent of these aircraft will replace aging aircraft. [1] Boeing B787 and the Airbus A350 XWB (Extra Wide Body). From the manufacturing perspective, this is a major step change since it imposes the need to create and update existing knowledge bases to adapt industry to this new demand. [2] For commercial planes, composites penetration continues in new design as composites are applied to all critical parts. This trend is driven by the positive economic global impact of composites - weight reduction leading to fuel cost savings. [3] Composite materials used in commercial airplanes typically are produced by combining layers of carbon or glass fibers with epoxy. In recent years, manufacturers have expanded the use of composites to the fuselage and wings because these materials are typically lighter and more resistant to corrosion than are the metallic materials that have traditionally been used in airplanes. The percentage of total structural weight attributed to composites show as Figure 2. [4] Figure 1 Demand of Transport Aircraft [1] A recent challenge in aerospace engineering is the trend to switch from predominantly aluminum to predominantly composite structures, as evidenced by the development of the Figure 2 Commercial Airplane Models over time by Percentage of Composites. [4] Page15 Bombardier s International Composite Centers of Excellence includes 6 main manufacturing plants with Composite manufacturing facilities for civil aircraft structures. They structure for composites new product development approaches. They focus on the quality of the manufacturing

process; enhance the quality of the interfaces and communications with all internal resources; follow a disciplined project management approach; reduce time to market and minimizing engineering changes following design freeze. [5] The business opportunity for increased use of composites - aero-engine components. The company sees a long-term trend towards lighter engines, featuring lower speed, higher-diameter fans, in order to meet fuel consumption and emissions targets over the coming years. The advantages of carbon fiber epoxy in this context is that it is 66% lighter than titanium, its properties can be tailored to critical load/stiffness directions, and carbon fiber is inherently resistant to fatigue loading. [6] The demand trend of civil aircraft is stable and increase in the future years. Due to the material technology development and fuel price volatility, the composites material become more important in aero-structures, also starting to apply in the aeroengine. It is the good opportunity to construct a robust and efficient supply chain of composite parts in the aerospace industry. The procedures of aircraft composite parts include the material procurement, fabrication process, supply chain management, components assembly and final assembly. This study construct and propose Competitive Operation Model, shows as Figure 3. We describe the material procurement in section 3, explain the fabrication process in section 4, design the supply chain management in section 5, develop the component assembly in section 6, and discuss the final assembly in section 7. II. COMPETITIVE OPERATION MODEL Structural airworthiness is the first aspect in airworthiness certification for composite material structure which has particular devisable performance, togetherness of material and structure, multiplicity of potential failure modes and lack of regularity, sensitivity to out-of-plane loads and to operating environment. The items of structural airworthiness regulation are established on above key problems and have close relations with the improved knowledge of safety for aircraft structure. In the period of service life, structure must be designed to bear limit load and meet the rigidity requirement in the appropriate environment, this is not only applied to new structure and also to aging structure. [7] Due to the following reasons, we have to create the Competitive Operation Model for the supply chain of aircraft composite parts. 1) Aerospace industry utilize more composite materials: New design aircraft such as A380, A350, B787, C-Series apply more composite materials in aero-structure. The aeroengine has started to apply composite materials. 2) Shelf life constraint is critical to the quality of details parts and components: so reserve and acquire the material in time and keep a suitable/reasonable inventory level for production turn around are essential for the effective supply chain. 3) High capital investment in composite: The main facility in composite shop, including clean room, autoclave, autolayup machine, 5-axis trimming machine, the purchase cost and invest are high. Figure 3 Competitive Operation Model III. MATERIAL PROCUREMENT The major raw material for composite parts production are prepregs, resin, honeycomb...etc., shows as Figure 4. Those materials have to store inside the temperature control container (e.g. ice box) during the shipment and storage. Even exposure in the room temperature, we have to measure/count and control the shelf life until enter the autoclave and start the curing cycle. Figure 4 The Raw Material- Prepreg [8] If the composite production shops are located far away from the raw material supplier, such as emerging area. The material procurement become a critical issue for stable and smooth production. Page16

Due to the most of raw materials are shelf life control, so the target of material procurement is provide the right quantity of material in the right timing to ensure the production quality is qualified and stable. The whole process should focus on shelf life control, 1) Inventory and consuming control. 2) Delivery/shipment process control. 3) Prepreg group cutting/lay-up and curing. The solution of the whole aircraft material procurement should take the following actions: 1) The aircraft manufacturer should link with material suppliers in design/develop stage of the new model to select the suitable materials. 2) The aircraft manufacturer should forecast his long term demand and secure the continuously supply of raw material from those suppliers. 3) Aircraft manufacturer should group the demand of aerostructures suppliers to negotiate and deal with the price with raw material supplier to control the cost and resources. 4) The aero-structures suppliers should alliance with raw material supplier and build the consignment inventory near the place of those composite shops to acquire the benefit of shelf life control. IV. FABRICATION PROCESS The fabrication process include prepreg cutting, lay-up, curing, trimming and cutting, non-destroy inspection, post treatment and painting, shows as Figure 5. The process is continuous and technological intensive. The Production Planning has to integrate the production resources to ensure start and complete on time. The Production Engineering has to improve the process to reduce the cost in competitive level. Figure 5 Fabrication Process-Cutting [9] Due to the whole fabrication process should satisfy the requirement of specification and meet the mechanical/ chemical property. So the stable process can improve the quality and increase the yield rate. Also, improve the process and can control the product in the target cost. The whole process should focus on process control, 1) Production sequence and control. 2) Production recipe and methodology. 3) Environment control of working area. The solution of the whole fabrication process should take the following actions: 1) Production Engineering should understand the lean production skill to improve the process and reduce the cost. 2) Production Control should merge all the demand from different customers, then manage and level the frustration load into stable/smooth load. 3) Aero-structures suppliers should consider the characteristics of products and introduce some automation machines or facilities to labor intensive operations, such as auto-layup, robot, NC machine etc. 4) The environment control of clean room (e.g. temperature, humidity etc.), periodic calibration and Preventive Maintenance of critical equipment/machines (e.g. autoclaves, NC routers, NDI scanner etc.) are important for the production. Page17

V. SUPPLY CHAIN MANAGEMENT The aircraft manufacturer and primary supplier should determine the core competences. They can concentrate the resources in high value added categories. Figure 6 shows the value chain of composite process. Some non-core business, such as overload job or operation, raw materials shipment, standard parts etc. can off load or purchase from suppliers. aero-structures supplier site. Figure 7 shows components assembly in assembly line. After quality check and on-site representative buyoff, then delivery to main aircraft manufacturer. Figure 6 Value Chain of Process [10] Due to the procurement and outsourcing items can provide the company quality products at target price, so it will benefit the aircraft manufacturer and primary supplier concentrate in their expertise and value added items. The whole supplier chain management should focus on quality requirements and cost control: 1) Supplier certification and qualification. 2) Performance monitoring and evaluation. 3) Risk management. The solution of the whole aircraft supply chain management should take the following actions: 1) Aircraft manufacturers should certify and survey periodically the quality system of suppliers. 2) Aircraft manufacturers should forecast their long term demand of aircraft market and flow down to the supply chain. 3) Aircraft manufacturers send representatives on-site the critical suppliers to witness and find potential risk. 4) Aircraft manufacturers should help their supplier to reduce the cost and achieve the win-win situation. VI. COMPONENTS ASSEMBLY The component assembly process include the operation from bushing/bearing install, sub-assembly to component at Figure 7 Components Assembly [11] Because of there are several models/components with different rate in the assembly line of aero-structures supplier. The target of component assembly is allocate the human resource and keep the flexibility to support the fluctuation in the assembly line. The whole process should focus on resource allocation, 1) Crew load evaluation. 2) Line balance. 3) Learning curve monitoring. 4) Discipline education and cross training. The solution of the components assembly should take the following actions: 1) Base on the customer demand (time and quantity) to calculate the load and capacity analysis. Allocate the suitable workforce to perform the operation. 2) Apply the lean production technology to reduce the waste and construct the flow line. Consider to build moving line in high product rate projects/components. 3) Record the quality defects, working hours of each shipset to monitoring the long term performance. Page18

4) Apply the information technology to display the assembly progress and logistic support. From the foreman, shop leader, top manager can receive the same information and keep the visibility of performance and current progress. VII. FINAL ASSEMBLY The aircraft receive the components from different suppliers and proceed the final assembly process, testing, painting, fly test and delivery to customers/airlines. Figure 8 shows final assembly of civil aircraft. Due to meet the customer needs is very important to gain the revenue and reputation, so the aircraft manufacturer has to keep the dependability and keep the market share. If late to lunch a new model aircraft or delivery the aircraft, it will cause penalty and canceled the orders by the customer. The whole final assembly smooth and stable production, 1) Quick response. 2) Risk management and backup plan. 3) Logistic supports. 4) Functional group integration. The solution of the final assembly should take the following actions: 1) Base on the assembly schedule, the components, purchase parts, fasteners, sealants etc. should arrive shop floor on time. 2) Monitor detail schedule for the critical path and warning any issue will stop the line to management level. 3) Different functional groups sent the authorized representatives on-site the final assembly to work as a team to solve any issues which stop the line. 4) Dig out the potential risks and prepare the backup plan, monitor the risk till vanished. VIII. CONCLUSION The demand trend of civil aircraft is stable and increase in the future years. Due to the material technology development and fuel price volatility, the composites material become more important in aero-structures, also starting to apply in the aeroengine. It is the good opportunity and right timing to integrate the supply chain in the aircraft composite parts. This study provides the Competitive Operation Model, which introduce the concepts of value stream and lean production into the supply chain process and management process for aircraft manufacturers and aero- structure suppliers. In each stage of value chain, this study provide the direction and solutions. Thus the aircraft manufacturer and their suppliers can increase the performance and competence in the competitive market. REFERENCES Figure 8 Final Assembly [12] [1]http://www.compositesworld.com/articles/composites-inaircraft-interiors-2012-2022 [2] Wim J.C. Verhagen, Pablo B. Garcia, Pierre Mariot, Jean- Pierre Cotton, Domingo Ruiz, Romaric Redond and Richard Curran, Knowledge-based cost modelling of composite wing structures, International Journal of Computer Integrated Manufacturing, Vol. 25, No. 4-5, April-May 2012, pp368 383. [3] Asian Aviation Magazine, JUNE 2013, pp33-34. [4] http://www.1001crash.com/index-page-composite-lg-2.html [5] Rodney McAdam, Tom O Hare, Sandra Moffett, 2008, Technovation 28, pp245-256. [6] Duncan Macrak, UK Aerospace Industry-GKN Aerospace sets its sights on lost-cost composites, Interavia Business and Technology, 684, pp18-19 [7] XIE Jian, LU Yao, 2011, Study on Airworthiness Requirements of Composite Aircraft Structure for Transport Page19

Category Aircraft in FAA, Procedia Engineering 17 (2011) pp 270 278. [8] http://www.zoltek.com/products/panex-35/prepreg/ [10]http://www.oatsystems.com/industries/aerospace/rfid_in_a viation.php [9]http://www.airbus.com/innovation/proven-concepts/indesign/innovative-materials/ [11]http://www.jyi.org/issue/the-boeing-787-dreamlinerdesigning-an-aircraft-for-the-future/ [12]http://www.dailymail.co.uk/sciencetech/article- 2041863/Boeing-787-Dreamliner-reality-carbon-fibre-planedelivered-Japan.html Page20