Instruction Guide APPLICATION OF CIM TO EARTHEN PONDS AND RESERVOIRS (USING CIM SCRIM)

Similar documents
Instruction Guide APPLICATION OF CIM TO ASPHALT

Instruction Guide APPLICATION OF CIM TO CONCRETE

CIM IG 13 11/06. Instruction Guide

Semstone Construction Details

ITEM 458 WATERPROOFING FOR STRUCTURES

Product Guide Specification

Application Specification:

Guideline Specification ACRYMAX ARS-1-C Reinforced Composite Elastomeric Membrane System for Concrete Roofs Fluid-Applied Roofing

POLYURETHANE FOAM SAMPLE DESIGN GUIDELINE ACRYLIC

Application Specification:

Application Specification:

Student Services & Classroom Addition

Pol-E-Base Modified Bitumen Roof System

SECTION DAMPPROOFING AND MEMBRANE WATERPROOFING. 2. Cast-in-place concrete structures; Section

Product Guide Specification

Product Guide Specification

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

ERSYSTEMS ONESTEP PLUS

SECTION CONCRETE PAVING

Acrylic/Urethane. Metal Roof Restoration Sample Design Guideline

ReflectiClean Acrylic/Urethane

Application Specification:

POLYURETHANE FOAM SAMPLE DESIGN GUIDELINES URETHANE

A. Submit product data sheets and literature verifying physical properties of materials.

MODIFIED BITUMINOUS SHEET AIR / VAPOUR BARRIERS SELF ADHESIVE

CARLISLE DECK COATING INSTALLATION OVER EXISTING POLYURETHANE COATINGS

CIM 800 / CIM 1000

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

EPDM SINGLE-PLY SYSTEM SUMMARY

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

SECTION mil thickness REINFORCED LIQUID-APPLIED WATERPROOFING

A Design Review of Waterproofing Codes

ACRYLIC Elastek #127 Solar One Plus

DMX AG AIR-GAP MEMBRANE. Section Damproofing and Waterproofing

URETHANE. Asphalt Restoration Aged BUR and Modified Bitumen Sample Design Guideline

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

MANUFACTURERS (SHORT FORM) SPECIFICATION / SECTION

A. Submit product data sheets and literature verifying fire ratings and physical properties of materials.

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING

SECTION mil thickness REINFORCED LIQUID-APPLIED WATERPROOFING

1.1 This procedure governs the installation of PENNTROWEL UT500 Polyurethane Mortar Flooring Systems CE-286, CE-287 and CE-288.

SOLAR COATING SYSTEMS SYSTEM EMULSION /ACRYLIC. Specification for Built-Up Roofing MULSION/A 1.01 SUMMARY

ERSYSTEM ONESTEP PLUS

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

General Applications Before applying, mix the pre-measured catalyst* into Liquid Roof by following label directions.

the SureCoat Roof System.

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

GE SCM3500 High Solids Silicone Roof Coating

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

TOPCOAT Restoration Specifications Fiberglass & MB Granulated Cap Sheets

ACRYLIC. AGED (PVC, CPE, CPA) SINGLE-PLY (Thermoplastic) Membrane Restoration Sample Design Guideline

BENEFITS & ADVANTAGES:

Pacific Polymers Elasto-Deck 5000X2 Guide Specification

PG 9600 HIGH SOLIDS SILICONE ROOF COATING

SILICONE ROOF COATING RESTORATION (RCR) SYSTEM OVER METAL ROOF PANEL

Application Specification:

URETHANE. CONCRETE ROOF WATERPROOFING SYSTEM Sample Design Guideline

Pacific Polymers Elasto-Deck 5000MR Guide Specification

THE BRITE THING TO DO

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

SILICONE ROOF COATING RESTORATION (RCR) SYSTEM OVER GRAVEL SURFACE BUR

Pacific Polymers Elasto-Deck BT Guide Specification

SECTION SELF-ADHERING SHEET MEMBRANE WATERPROOFING

AVM System 500. Aussie Membrane 500

AVM System 500. Aussie Membrane 500

Delivery, Storage, and Handling

A. The work of this section includes, but is not limited to, the following:

Appendix B.2. Construction Specifications for Infiltration Practices

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

Section Pre-Applied Sheet Membrane Waterproofing

APPLICATION GUIDELINE

Installation Instructions

Installation Manual. Foundations. Version 4.3ᵠ

SECTION TW-60 Self-Adhering Sheet Waterproofing Membrane

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces.

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

TERRASTOP SYSTEM 2 RETAINING WALLS. Section Page 1 PART 1 - GENERAL 1.1 SUMMARY

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION (07100) - DAMPPROOFING AND WATERPROOFING

LS 486 / GLASS MAT REINFORCED SYSTEM A LAVALINE - SERIES 48 SYSTEM / Vinyl Ester CONCRETE & MASONRY SURFACES

Application Specification:

GE SCM3500 High Solids Silicone Roof Coating

SECTION 503 TEMPORARY PAVEMENT RESTORATION

A. Submit product data sheets and literature verifying physical properties of materials.

ERSYSTEMS OneStep Plus

BAYBLOCK HT/BAYBLOCK HT BASE

FLUID APPLIED WATERPROOFING

INSTALLATION GUIDE SPECIFICATION

GUIDE SPECIFICATION SECTION 07576

FireShield System Specifications Mineral Surface Cap, Mop Granule and Torch Granule APP Cap Sheets

BENTONITE WATERPROOFING

A. Modular Unit - A concrete wall interlocking element, machine made from portland cement, water and aggregates.

RECOMMENDED DESIGN SPECIFICATION

ACRYLIC Elastek #127 Solar One Plus

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Transcription:

23 Elm St., Peterborough, NH 03458 Tel: (800) 543-3458 (603) 924-9481 Fax: (603) 924-9482 Web site: Instruction Guide APPLICATION OF CIM TO EARTHEN PONDS AND RESERVOIRS (USING CIM SCRIM) 1.0 DESCRIPTION This guide covers the installation of a CIM coatings and linings (CIM) over Scrim for lining earthen ponds and reservoirs. The CIM shall consist of a minimum of 55 dry mils (see CIM Technical Data Sheet and appropriate coverage chart) applied by spray equipment. See Instruction Guide Spray Application Guide (IG 12) for more information on spraying CIM. 2.0 MATERIALS 2.1 CIM Premix & Activator 2.2 CIM Scrim 2.3 Optional Materials 2.3a. CIM 1000 Trowel Grade Premix & Activator 2.3b. CIM Bonding Agent 3.0 SAFE PRACTICES Use equipment and procedures designed to minimize danger to personnel and materials. Special attention should be made to provide adequate ventilation and respirators for personnel applying CIM in confined spaces or operating spray equipment. See Applying CIM Within Confined Space Applications (IG 9) for more detailed information. 4.0 SURFACE PREPARATION All areas adjacent to those being coated with CIM which are not intended to be coated should be protected with suitable temporary splash covers such as polyethylene, carpenters paper, or masking tape. 4.1 Construction of the Basin The basin may be excavated by any convenient means. Excavated soil is graded into a compacted embankment. All surfaces of the basin shall be tightly compacted, smooth, and free of holes, rocks, stumps, debris or sharp protrusions of any sort. The finished liner is anchored by backfill in a trench excavated around the perimeter of the embankment (see Figure 1). 4.2 Limitations on the Slope of Sides The slope of the sides will vary with site conditions and shall be determined according to good engineering practice after due consideration of the type of soil, the intended use of the basin, the risk of danger in case of collapse, etc. 1

Figure No. 1 CIM Pond Liner Details CIM Coatings and Linings CIM Coatings and Linings CIM Scrim CIM Scrim Compacted Soil Compacted Back Fill Soil 4.3 Venting Elastomeric pond linings can be damaged or ruptured by gas pressure created beneath them. Gas formation is common in certain oil and gas producing areas and can occur anywhere organic materials are present in the soil beneath the CIM. Landfill caps require especially careful engineering site work to allow for possible gas formation in the materials beneath the liner. The decomposition of the organic materials present in existing landfills can produce very significant quantities of gas. Provision for proper venting at the time of basin construction is critical. Carefully survey areas to determine whether there is a possibility of gas formation. If continuous gas evolution is suspected, the reservoir should be built with a bottom slope, opposed to a flat bottom, and sloped underdrains (French drains or perforated pipe) should be used to vent gases that form below the CIM. Locations with a lot of sandy soil or gravel may not be a concern because they are porous enough to naturally vent gases. Refer to Figure 2 for a representative vent detail. Other appropriate vent designs may alternatively be used, but care must be taken to ensure a similarly good seal to the CIM. 2

4 " 1/4" 1 CIM Coating System Schedule 40 2" 24" 2 CIM tack coat 3 Vent embedded in tack coat 4 CIM cover coat 4 3 2 10" 1 Figure 2 Vent Detail 4.4 Specification of CIM Scrim It is recommended to use CIM Scrim for earthen systems. CIM Scrim is a stitch bonded polyester fabric packaged in 100 yard roll lengths. The fabric is used to cover earthen substrates to control application rates. CIM Scrim is available in 100 yard long rolls with widths of 6, 12, 40, and 120. Other fabrics may also be used, but should be tested for compatibility. 4.5 Placement of the CIM Scrim CIM Scrim shall be placed over the entire surface of the basin using a six (6) inch (15 cm) overlap on all longitudinal and transverse joints. Refer to Figure 1 for a detailed depiction of an overlapped joint. Particular attention should be paid to fitting the lining with a full six inch overlap along the bottom of any sloped walls where they meet the bottom of 3

the basin, as detailed in Figure 1. Weights (sandbags, used tires, containers, etc.) may be required to contain CIM Scrim and keep it in place during construction. The CIM Scrim shall extend over the outside edge of the basin into, and across the bottom of a perimeter trench excavated to a minimum depth of one (1) foot (30 cm) as depicted in Figure 1. After construction of the CIM is completed, the perimeter trench shall be backfilled and compacted thoroughly. The CIM Scrim shall be cut to fit each corner so that no area shall have more than three (3) layers. There shall be no air pockets under the fabric and no bulky areas with too many layers. 5.0 APPLICATION 5.1 Penetrations and Other Substrates CIM will adhere to most clean construction materials. When coating substrates, please see the specific substrate Instruction Guide for detailed information of application procedures. 5.2 Quantity Applied CIM must be spray applied to CIM Scrim over earth and must be applied at a thickness of at least 60 wet mils. See Instruction Guide Spray Application of CIM (IG 12). The CIM Scrim will absorb most of this amount, creating a waterproof system. Apply sufficient CIM so that the fabric is no longer visible in order to assure that the CIM is at least 60 wet mils. The finished section should appear shiny, not dull, indicating that the fabric is fully saturated. 4

Concrete trench areas, inflow and outflow structures and equipment pads within ponds and reservoirs must also be coated with at least 60 wet mils of CIM. Refer to the appropriate instruction guide for applying CIM to other substrates. 5.3 Horizontal and Sloped Surfaces CIM should be applied to CIM Scrim at a wet film thickness of 60 wet mils or more, depending on application type. This can be achieved in a single coat on horizontal and multiple coats on sloped surfaces. 5.4 Vertical and Near-Vertical Surfaces (non-earthen) Vertical and near-vertical surfaces can be coated by spraying or rolling. Small walls may be coated with rollers or brushes; large walls should be sprayed with an air assisted airless spray system or plural component spray system. See Instruction Guide Spray Application of CIM (IG 12) or contact for suggested equipment configuration. CIM products will require a minimum of two coats of approximately 30 mils each, to obtain the required 60 mils on these surfaces. If more than 60 wet mils is specified on a vertical or nearvertical surface, additional coats will be required. Subsequent coats are performed after the previous pass becomes tack free. The first pass becomes tack free typically 1 4 hours after mixing for any CIM. See section 5.5, Multiple Coats for further instruction. 5.5 Multiple Coats Second/multiple coats can be applied as soon as the previous coat can be touched lightly without coming off on your finger. For CIM at 70 F, the tack free time is typically one (1) hour but no longer than four (4) hours after the previous coat has been applied. Higher temperatures speed up the curing time, and tack free time, therefore significantly shortening the 1 4 hour recoat window. Colder temperatures have the opposite effect. As soon as the coating becomes tack free, the second coat should be applied. For immersion or traffic service, apply all coats within the recoat window except at joint lines. If second/multiple coats cannot be applied within the recoat window (1 4 hours under standard conditions), the previous coat must be abraded. Abrading shall be performed by surface grinder or other mechanical means. The CIM must be solvent wiped (MEK or xylene) to clean up any loose debris. After the solvent flashes off, a light mist of CIM Bonding Agent must be applied. Allow the Bonding Agent to flash off and recoat within one (1) hour. For immersion or traffic service, 5

minimize areas to be recoated outside the recoat window, severely abrade the areas to be recoated and test recoated areas for acceptable adhesion. Acceptable adhesion may only be achieved through aggressive abrading. 5.7 Overlap at the Joints If work cannot be completed in a single day, a minimum of approximately two (2) feet (60 cm) of fabric shall be left uncoated to form a joint for the next day s work. Whenever the liner has cured for longer than the specified recoat window (four (4) hours for CIM), the last six (6) inches of the coating should be prepared as described in Section 5.6, Recoating After the Recoat Window. 5.8 Backfilling After the liner has cured, all perimeter trenches into which the liner extends shall be backfilled and compacted (See Figure 1). 5.9 Protecting CIM Using a Cover Material CIM, applied over a properly compacted base, are suitable for light to medium duty applications, such as lining ponds subject to occasional foot traffic or occasional light vehicle traffic. A cover material is necessary for heavier duty applications, such as ponds subject to hoofed animals. Cover the cured liner with a minimum of one (1) foot (30 cm) of sand, soil, or gravel to a necessary depth. If the pond, basin or reservoir is to be dredged or harvested using mechanical equipment, a minimum of two (2) feet (60 cm) of cover shall be placed over the CIM. The cover material should consist of two (2) layers of distinctly different characteristics (size, color, texture) so the operator of the harvesting equipment will realize how close to the coating he is operating. This will reduce the risk of damage to the CIM. 5.10 Safety Mechanisms Ponds and reservoirs large enough to swim in, and deep enough to drown in, should be constructed with safety mechanisms. Most coatings become slippery when wet, making it difficult to climb out. Fences are typically used to keep people out of a designated area. Chain link fences should be placed around ponds and reservoirs not meant for swimming. Fences can also be used to get people out of a designated area. A chain link fence can be rolled into a constructed pond and 6

anchored at the top of the pond. This provides a mechanism for exiting a pond with low water levels should someone happen to fall in or go for a swim. Non-skid surfaces can also be created, as an alternative to chain link fences, by broadcasting aggregates into a wet tack coat. See Topcoats (IG 7) for more detailed information on creating non-skid surfaces. 6.0 TOPPINGS The CIM may include toppings of aggregate, decorative coatings, protective coatings, or combinations of the above. See Topcoat Application Guide (IG 7) for more detailed information. 7.0 GENERAL LIMITATIONS Applying any CIM under any of the following conditions is likely to result in poor or unsatisfactory performance: Use of improper mixing equipment. See Instruction Guide, Mixing CIM Premix and Activator (IG 8). Material temperature at the time of application is below 60 F. Use of standard application procedures when substrate temperature is below 50 F. See Instruction Guide Applying CIM Coatings in Cold Weather (IG 11). Substrate moisture is present or rain is imminent. Substrate temperature is less than 5 F above the dew point. Substrate within pond is in a temperature-rising mode/exposed to direct sunlight. Other conditions which are obviously unsuitable. 7 Printed on Tear Resistant Paper