Ref. - CTO No. F(CPM)/Baran(Chhabra)/1(1)/ dated 29/

Similar documents
SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

..~..~. Regd. Office:. (). :\. BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA "'Ai66S~'". 1ts8~a6

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

.fj..fj Regd. Office: p\.." o j ~~I BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA 166~'!o ~S8l

Regd. Office:. BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA lit 66Sl"

fgunqlrku ftad fyfevsm PIN Code

Scanned by CamScanner

FORM V (See rule 14) Environmental Statement for the financial year ending the 31 st March 2017

Environmental statement for the financial year ending the 31 st March 2014

Environmental statement for the financial year ending the 31 st March 2012

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

Rajasthan State Pollution Control Board

ENVIRONMENTAL STATEMENT FOR THE YEAR

vedanta HZLt fpj;l,r;tm,tl2!!1 ~JP.lL6ff~

Rajasthan State Pollution Control Board

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

COMPLIANCE STATUS REPORT

2 x 300 MW (STAGE-I)

Regd. Office:.. BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA J;jf " lts 83\)1."

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Hind Energy & Coal Beneficiation (India) Ltd.

Telefax: 011: Dated:10 th May, 2013

Regd. Office:. (). :\I ~ ~ BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~665~" WS83 a6 "AiS71.(,6 o(u

SHREE ~e~~~n(i' ~to~"i)

-~..~..~..~I. Regd. Office:. 0" (,,, e. :'> BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA PAt 665~" ~SS:~a ;tjs 71&6

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

J aypee JAIPRAKASH. JVPL/EC/ES/ September 25th, 2017

Calcom Cement India Limited

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal

Environment protection measures / technology

Mangalam Cement Ltd. (Unit-II) Stack No.

Environmental statement for the financial year ending the 31 st March 2012

Mangalam Cement Ltd.(Unit I)

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Hind Energy & Coal Beneficiation (India) Ltd.

3. Up stream & Downstream water quality monitoring report of Kali River. ZZM/CLAB-KSPCB/17/ Environmental Officer,

Mangalam Cement Ltd.

Environmental Clearance Compliance Half Yearly Report

ENVIRONMENT STATEMENT

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

SHREE CEMENT LTD. D.'1>~B~too~ Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA 'if 665~" 'Its Ais 72 66

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

MIEL/NP/EMD/ 303/2015 Date:

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ "5~"

Himachal Pradesh State Pollution Control Board

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

We are sending herewith the following for the month of September 2016.

SHREE CEMENT. LTD Regd. Office:. 0. :l. BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~66S~" ~S83a6

Environmental Clearance Compliance Half Yearly Report

\,$ti q\ *4;+/- -4\;-;t-i

ZZJ/CLAB-KSPCB/04/ Environmental Officer,

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Environmental Clearance Compliance Half Yearly Report

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Mars Power & Steel Ltd.

ENVIRONMENT STATEMENT

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Environmental Clearance Compliance Half Yearly Report

NORTH NORTH NAUBASTA LIMESTONE MINE (ML-II) ML area ha. (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.

Environmental Clearance Compliance Half Yearly Report

ZZH/CLAB-KSPCB/04/ Environmental Officer,

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

The data for the period, April 2016 September 2016, is enclosed at Annexure III (1 nos. of pages)

J-11011/45/2009- IA II (I)

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

Janki Corp. Ltd., Six Monthly Compliance Report

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

~'a'"'' t}fj. ~a SHREE CEMEN.T LTD.

REGISTRATION CERTIFICATE

c;.: GRAPHITE INDIA LIMITED GIL:SEC:181l9: August 8,2018

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

*#' ffiptfl] q*r'e' l:bl- Lir""ton" Mine for the year for your reference and record. We trust you will find the same in order.

ZZL/CLAB-KSPCB/17/ Environmental Officer,

ZZM/CLAB-KSPCB/17/ Environmental Officer,

MANGALAM CEMENT LTD. BK BIRLA GROUP OF COMPANIES MANGALAM CEMENT LTD.

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

Mangalam Cement Ltd. Clearance Letter No. :- F NO. J / 30/ IA II (I), dtd 17/07/2007

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

Transcription:

I I,! I E-Mail: D Website. SHREE ~e~~~nt LTD. BANGUR NAGAR, POST BOX NO.33, BEAWAR 305 901, RAJASTHAN, INDIA 1iSi665~" t &-t, -& CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 shreebwr@shreecementltd.com : www.shreecement.in a'isio/ o:,as18. <:>0140.. SCLlCHHABRAJENV/2015-161 Date: 24/09/2015.fl.. ~I. 01(8 8)\)1,,'" ~hjs 721,,1,,'" The Member Secretary Rajasthan Pollution Control Board 4, Institutional Area, Jhalana Doongri Road JAIPUR (Rajasthan) File No. C-126 Sub: - Environmental Statement of fly ash silos installed in the premises of Thermal Power Plant of RVUNL situated at Chhabra (Chouki Motipura), Baran (Rajasthan) for the period of April, 2014 to March, 2015. Ref. - CTO No. F(CPM)/Baran(Chhabra)/1(1)/2010-20111 7003-7005 dated 29/1112013. Dear Sir, Kindly referred to above subject matter and reference letter. In this regards, we are submitting herewith the Environmental Statement of fly ash silos installed in the.prernises of Thermal Power Plant of RVUNL. This is for your kind information please. Thanking you, Yours faithfully, For Shree Cement Ltd. (Rakesh Bhar ava) JA... Vice President (Environment) Copy to: 1) Regional Officer, Rajasthan State Pollution Control Board, Special Plot No. 2-A, Paryavaran Marg Road, No.6, LP.LA. KOTA (Rajasthan). Page 1 of6 JAIPUR OFFICE: SB-187, Bapu Nagar, Opp. Rajasthan University, JLN Marg, Jaipur-302 015 Phone: 0141 4241200,4241204, Fax: 0141 4241219 NEW DELHI OFFICE: 122-123, Hans Bhawan, 1, Bhadurshah Zafar Marg, New Delhi 110002 Phone: 011 23370828,23379218,23370776, Fax: 011 23370499 CORP. OFFICE: 21, Strand Road, Kolkata 700 001 Phone: 033-22309601-4 Fax: 033 22434226

ENVIRONMENTAL STATEMENT FORM-V FLY ASH SILOS OF M/s SHREE CEMENT LIMITED, INSTALLED IN THE PREMISES OF THERMAL POWER PLANT OF RVUNL SITUATED AT CHHABRA, BARAN, RAJASTHAN APRIL 2014 TO MARCH 2015 PART A 1. Name and address of the Owner / Occupier of the Industry operation or process M/s Shree Cement Limited Bangur Nagar Post Box No. 33 BEAWAR 305 901 Distt. Ajmer (Rajasthan) 2. Industry Category Primary (S.T.C. Code) Secondary (S.T.C. Code) Fly Ash Silos of Shree Cement Ltd, Beawar (Raj.) in the Premises of Thermal Power of RVUNL at Chhabra, Baran(Rajasthan). 3. Storage Capacity 1000 MT (2 Nos. X 500 MT) 4. Year of Establishment 2011 5. Date of the last Environmental Audit Report submitted 24/09/2014 Page 2 of 6

PART B WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION: Process : Cooling and dust : Suppression Domestic : Name of Product Process Water Consumption per Unit of Product Output During Previous During Current Financial Year Fly Ash Handling (II) FLY ASH HANDLING : Name of Raw Material Name of Product (Handling) Handling of Fly Ash (MT) During Previous Fly Ash Fly Ash 80167 275369 During Current (III) POWER CONSUMPTION (KWH/T OF FLY ASH): During Previous During Current 15.1 8.0 Pollutants PART C DISCHARGED TO ENVIRONMENTAL / UNIT OF OUTPUT Quantity of Pollutants Discharged (Mass/Day) Concentration of Pollutants in Discharge (Mass/Value) (a) Water - (b) Air Please refer Annexure I & II Percentage of variation from prescribed standard with reasons Page 3 of 6

PART D HAZARDOUS WASTE (As specified under Hazardous Wastes (Management, Handling & Transboundary Movement) Rules amended up to 2010) a) From Process Hazardous Waste (b) From Pollution Control Facilities During Previous. Total Quantity (Ltrs.) During Current. PART E SOLID WASTE Total Quantity During Previous During Current (a) From Process (b) From Pollution Control Facility Dust collected in the Bag Houses is recycled to the system. (c) 1) Quantity rejected or reutilized within the unit 2) Solid 3) Disposed PART F Please specify the characterization (in terms of composition and quantum) of hazardous as well as solid wastes and indicate disposal practice adopted for both the categories of wastes: Hazardous Wastes:- Solid Wastes: Battery Waste: - - E-Waste: - Page 4 of 6

PART G IMPACT OF THE POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON THE COST OF PRODUCTION The fly ash silo mechanism is based on dry material handling mechanism & itself is an environmentally clean technology. The fugitive emission generated from fly ash handling system during ash feeding is controlled by Bag Filters installed at top of silos & fly ash loading points. Ash collected in Bag Filters is recycled back in system. Use of fly ash in cement plant helps in natural resources conservation which results in CO2 emission reduction. PART H ADDITIONAL MEASURES / INVESTMENTS PROPOSAL FOR ENVIRONMENT PROTECTION INCLUDING ABATEMENT OF POLLUTION PART I ANY OTHER PARTICULATES FOR IMPROVING THE QUALITY OF ENVIRONMENT. 1. We have full-fledged Environment Department with three separate cells, one for monitoring and one for maintenance of pollution control equipment and one for Green Belt development. 2. Monitoring of ambient air & noise level is being done regularly. 3. Maintenance department is doing regular checking and scheduled maintenance of all the pollution control devices. On support of above, we are enclosing herewith following:- Annexure I : Ambient Air Monitoring. Annexure II : Stack emission level report Annexure III : Noise Level report. Page 5 of 6

Annaxure-1 AMBIENT AIR QUALITY AT CTPP BOUNDARY FOR YEAR, 2014-2015 Month PM 2.5 (µg/m3) PM 10 (µg/m3) May-14 31 50 Aug-14 25 42 Nov-14 27 46 Feb-15 32 51 Annexure-II STACK EMISSION LEVEL FOR YEAR, 2014-2015 Month PM (Mg/Nm3) May-14 27 Aug-14 26 Nov-14 30 Feb-15 23 Annexure-III NOISE LEVEL FOR YEAR, 2014-2015 Noise level Leq db (A) Month Day Night May-14 72.8 61.5 Aug-14 71.6 63.1 Nov-14 70.7 56.4 Feb-15 69.1 57.3 Page 6 of 6