YUMBAH AQUACULTURE LTD

Similar documents
Yumbah Nyamat abalone farm works approval decision

LICENCE AQUASURE PTY LTD. Holder of Licence: Issued:

Yumbah Nyamat Works Approval Application October Environmental Risk Assessment

9.3.9 Industry uses code

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Environmental Control Plan

Conditions of Approval for the MDP for the brickworks at Perth Airport

Draft Policy Review. Use of Shipping Containers

BEVERAGE CANS REVESBY

Works, services and infrastructure code

Manningham Works Code of Practice

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

Kurnell Refinery Conversion Project

AM-PR-003 Construction Environmental Management Plan (C-EMP)

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

City of Guelph Transfer of Review Procedures 7 March, 2017

Engineering Compliance East London Regional Waste Disposal Site A Case Study

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

Santos Gas Field Development Project (GFD Project)

Environmental Conditions. Mushroom Farms

Kurnell Terminal Demolition Project

Preferred Project Report for. Sydney s Desalination Project

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED]

LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989

GRADING, EROSION AND SEDIMENTATION CONTROL

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, January 2016

WINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Loy Yang B Environment Improvement Plan

This Report has been cleared for submission to the Board by

Division 15 Earthworks Code (including Lot Filling)

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

Central NSW Regional Contaminated Land Policy Template

Construction Environment Management Plan

tel fax ABN

LIQUEFIED NATURAL GAS FACILITY REGULATION 146/2014

(1) Site Suitability PURPOSE

12. Environmental management

DRAFT Type B Water Licence G18L8-001 NWT Energy Corporation (03) Ltd. Inuvik Wind Project

in brief corrs Policy What it means for developments in april 2012

DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS OF THE 2012 DEEMED PLANNING PERMISSION (TRACK CHANGE)

Waste Licensing Waste Recovery/Disposal Activities (Other than Landfill Sites)

DRINKING WATER WORKS PERMIT

Kurnell Refinery Conversion Project

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

Management Plan: Hazardous Materials Removal & Demolition

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.

Catchment Water Quality Protection

Concrete Batching Plants Monitoring Programme Annual Report

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Rural industries code

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Sulcor Pollution Incident Response Management Plan (PIRMP)

Register of Contaminated Land Consent Conditions

TABLE OF CONTENTS 8.0 HEALTH & SAFETY PREVENTION AND HANDLING OF FIRES MAINTENANCE OF EQUIPMENT CONTINGENCY MEASURES 8-2

CCSD#1 Stormwater Standards

1 18 August 2017 Version 2 (Noise and vibration)

ANNUAL ENVIRONMENTAL MANAGEMENT REPORT

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands

Orica Australia Pty Ltd A.C.N MATRAVILLE NSW 2036

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PUBLIC)

Trade Waste Management Policy Supporting Document

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

EF10 Site Environmental Audit - 1 / 8

Charging Arrangements for New Connection Services

Pollution Incident Response Management Plan - Summary. Medway Mine Medway

EID POLICY MANUAL. WATER Water Delivery and Operations Policy Revised January [supersedes May ]

Construction Environment Management Plan (CEMP) Requirements

Auckland Unitary Plan Operative in part 1

Victorian Desalination Project

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance

Stormwater and Drainage

SECTION TEMPORARY SEWER BYPASS PUMPING

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

GUIDE TO THE PREPARATION OF A WORKING PLAN WASTE TRANSFER / TREATMENT FACILITY

Memorandum of Understanding

Environment Protection Licence

Notice of Clean Up Action

List of Conditions-Proposed residential development at Bois Sec By Arthur & Morgane Ltd [ENV/1575]

Community Consultation Policy. Date this document was approved 8 May 2018 Legislative

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Traffic Management Plan. Environmental Management and Monitoring Program. Appendix VI

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

Environmental Guidelines for Preparation of an Environmental Management Plan

ANNUAL PERFORMANCE STATEMENT

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN.

Appendix X.6 Queensland Government CSG Water Management Policy

Building Better Storm Water Quality

Section 51 Light Industrial Zone

PALMERSTON NORTH CITY PALMERSTON NORTH WATER SUPPLY BYLAW

City of Sydney Contaminated Land Development Control Plan 2004

Section 75J of the Environmental Planning and Assessment Act 1979

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

ULDA Decision Notice

EPA Inquiry: Submission on behalf of Paper Australia Pty Ltd

Transcription:

ENVIRONMENT PROTECTION ACT 1970 SECTION 19B WORKS APPROVAL YUMBAH AQUACULTURE LTD Holder of Works Approval: 194725 Issued: 15/04/2019 ABN: 89 082 219 636 Registered Address: c/- Newcombe Clifton Atkins 9 Bishop Street JOLIMONT WA 6014 Premises Address: Lots 1 and 8 315 Dutton Way BOLWARRA VIC 3305 Scheduled Categories: B03 Fish Farms Lot 2 Princes Highway BOLWARRA VIC 3305 Description: To construct a new abalone farm, Yumbah Nyamat, at Bolwarra. The proposed farm will include a hatchery, nursery and grow out tanks, pumping seawater to the land-based farm, before discharging treated water through a series of outlet pipelines. ------------------------------------ TIM EATON Executive Director, Regulatory Standards, Assessments & Permissioning Delegate of the Environment Protection Authority Issued under the Environment Protection Act 1970, Section 19B

PREAMBLE Works Approvals Who we are: The Environment Protection Authority ( EPA ) is an independent statutory authority established under the Environment Protection Act 1970 ( the Act ). Our purpose is to protect and improve our environment by preventing harm to the environment and human health. Why we issue works approvals: EPA is responsible for preventing or controlling pollution (including noise) and improving the quality of the environment. This responsibility includes regulating activities that may present a danger to the environment. One of the tools available to EPA is issuing works approvals for scheduled premises to prevent or minimise risk to the environment. Section 19A of the Act requires the occupier of a scheduled premises to obtain works approval to construct or install plant and equipment in order to discharge, handle, treat or dispose of waste to the environment. These types of premises are defined in the Environment Protection (Scheduled Premises and Exemptions) Regulations 2007 ( the Regulations ). When we issue works approvals: EPA will issue a works approval when satisfied that an applicant has put in place measures to protect the environment. Works approvals allow construction of works to occur and set control measures to minimise a site s environmental risk. EPA can amend a works approval in response to changes in standards and site activities. Works approval holders must submit reports if required by a condition of the approval. Works Approval information and obligations For the purposes of this works approval You means the works approval holder identified on the first page of this works approval at the premises identified on the first page and represented in Schedule 1. If you object to any of the works approval conditions, you may have the decision reviewed by applying in writing to the Registrar, Planning and Environment Division, Victorian Civil and Administrative Tribunal ( VCAT ), 7 th Floor, 55 King Street, Melbourne within 21 days of the date of issue. An application fee may be applicable when lodging an appeal with VCAT. Contact VCAT on (03) 9628 9777 for further details on fees associated with an appeal. A copy of the appeal should also be forwarded to the Manager, Development Assessments Unit, Environment Protection Authority, GPO Box 4395, Melbourne, 3001, within 7 days of lodgement of the appeal. Interested (third) parties may also appeal against the works approval within 21 days of the date of issue. The Tribunal will notify you if such appeals are received. If an appeal is lodged, you must not go ahead with the works until the appeal is resolved. Compliance: You must comply at all times with the Act and all policies and regulations administered by EPA. Strict penalties apply for non-compliance with any part of your works approval. Works Approval structure Structure: Your works approval has: Works conditions - setting out requirements for construction or installation; Schedule 1A - locality plan of your premises; Schedule 1B - plan of premises (provided by you). Some types of works approvals also contain Schedule 1C - final landfill contour plan Works Approval: 194725 Issued:15/04/2019 Page 2 of 9

CONDITIONS General Conditions WA_G1 Subject to the following conditions, this approval allows the construction of the following works and associated equipment a land-based abalone farm, producing up to 1,000 tonnes per annum of, generally consisting of the following key components: 1. Infrastructure comprising: a. hatchery facility (approximately1,500m 2 ); b. nursery facility (approximately 11,100m 2 ) - includes 200 tanks; and c. grow out tanks - includes 2,000 tanks (concrete) constructed on a concrete slab and divided into four modules with a dimensions of tank area approximately 112,000m 2 under approximately 181,655m 2 of shade cloth 2. Water supply (to a maximum daily flow of 518 ML/day) comprising: a. Intake pipes a maximum of 20 pipes contained within one easement each pipe with screens to minimise biota entering the pipes; b. Internal pipes/drains 40 lateral drains for grow out area; c. Tank flushing systems; and d. Emergency recirculation reservoirs four in total each with capacity of 1.25ML. 3. Wastewater management system comprising: a. Southern Collection Channel (SCC) total length 500m - divided into four compartments one per module; b. Solids Settling Channels (SSC) four in total (one per module); and c. discharge easements three with a maximum total of eight outlet pipes built through a combination of trenching and underground boring (if feasible) 4. Stormwater management system comprising: a. a stormwater retention pond (size to be confirmed during detailed design); b. internal stormwater swale drains and pipes; and c. wetland (specifications confirmed during detailed design). 5. Solid waste handing comprising: a. a 200m 2 dewatering facility (sludge drying pad); and b. a refrigerated/freezer abalone mortality storage area in an enclosed shed. 6. Pumping station comprising: a. compartmentalised into four pumping houses with a total pumping capacity of 8.66KL/s and 35% redundancy; b. surrounding concrete walls and roof top above ground with an earthen, vegetated bund; c. with pumps located below ground level (at approximately RL0 depth). 7. Utilities and ancillary facilities comprising: a. approximately 5,800 solar panels producing 2MW power; b. staff amenities and administration offices, as well as car parking; c. main site workshop; d. live abalone harvest depot; e. four aquafeed storage silos (35t capacity each); f. diesel fuel storage (approximately 20,000L); g. emergency pump house containing back-up generators; h. pipeline pig retrieval station; i. pumping station workshop ; j. bird netting on all channels, ponds, lagoons and retention basins; k. removal and reconstruction of seawall (approximately 100m) during pipe installation; and l. security fencing around entire site. Works Approval: 194725 Issued:15/04/2019 Page 3 of 9

WA_G2 The works must be constructed in accordance with the application accepted on 29 October 2018 as augmented or amended by additional information dated 3 January 2019, 10 February 2019, 27 March 2019, 4 April 2019, 8 April 2019 and 15 April 2019 ( the application ) except that, in the event of any inconsistency arising between the application and the conditions of this approval, the conditions of this approval shall apply. WA_G3 WA_G4 This approval will not take effect until a copy of any permit which is required under the Planning and Environment Act 1987 has been served on the Authority by You. This approval will expire on 15 April 2021 if the works have not commenced by this date to the satisfaction of EPA. Works Conditions WA_W1.1 The works shall be constructed in 8 stages, as shown in Drawings YUM-003-02-38, YUM-003-02-39, YUM-003-02-40, YUM-003-02-45, YUM-003-02-46, YUM-003-02-47, YUM-003-02-48, and YUM-003-02-49. Before commencing construction of any works, you must provide to EPA the following report or reports with accompanying plans and specifications including: 1. the final detailed designs and schematics of the works, which must include a minimum 30m setback from the edge of the solar array to any adjoining property boundary; 2. details of the fuel and chemical storage facility, designed to meet the requirements of AS1940-2017, AS3833-2007, AS3780-2008 and EPA Publication 1698 3. an updated premises plan with location of discharge points; 4. an updated Construction Noise and Vibration Assessment following detailed design which includes: a. modelled construction noise and vibration emissions and impacts following detailed design and selection of the pipe laying method at the most impacted sensitive receptors the modelling to also consider any concurrent activities that may occur throughout the construction period and report on the total expected noise levels at those peak concurrent periods; b. details of and justification for any work that is likely to be undertaken outside of day time hours; c. details and duration of any activities likely to cause noise and vibration emissions that may exceed the recommended limits; d. details on the installation and performance of any noise mitigation measures including the use of sonic panels and/or sonic curtains. 5. an updated Operational Noise Assessment following detailed design which includes: a. the low noise emission criteria to be included within the specifications for the pumps and backup emergency generators; b. the final design of the pump shed, which including required acoustic mitigation measures to meet relevant noise limits; and c. updated modelling based on the final location and specifications of noise sources and which demonstrates compliance with relevant noise guideline limits. 6. an updated Construction Groundwater Assessment following detailed design that includes: a. an updated identification and analysis of potential environmental impacts, hazards and risks; b. proposed mitigation measures; and c. any residual risks to groundwater during construction; 7. a Groundwater Monitoring and Management Plan (GMMP) that includes: a. a detailed groundwater monitoring program and network designed in accordance with EPA publication 668, including systems used to continuously detect potential leakage and/or spills cause by operations; Works Approval: 194725 Issued:15/04/2019 Page 4 of 9

b. a groundwater sampling regime (refer EPA publication 669) that enables impacts to groundwater to be detected with sufficient time to be protective of existing receptors; c. a groundwater analytical program consistent with potential contaminants of concern associated with the site operation; and d. trigger levels and contingency plans to protect beneficial uses. 8. a site-specific Waste Monitoring and Management Plan (WMMP), which includes: a. the design of the abalone mortality and storage shed; b. confirmation of quantities of waste requiring dewatering and the sizing of the dewatering facility; c. details of the anticipated volume of construction wastes and the method of disposal, equipment, machinery; and d. details of the measures to avoid, reuse and minimise waste during future operation of the farm. 9. a detailed Construction Quality Assurance Plan (CQA plan) for all civil engineering works and in particular underground pipe, butt welds and flange connection anchors and all designed impermeable areas; 10. a Construction Environment Management Plan (CEMP) that details: a. construction working hours b. intake and outflow pipes construction details including: i. how construction will not involve physical removal of any significant seabed habitat of conservation value; ii. details on depth of pipes, including measures which will avoid obstructing whale movement along the coast; iii. details on how intake pipes will be constructed so as not to cause entrapment or entrainment of marine fauna; and iv. details on measures to prevent entanglement with marine mammals, including that marker buoys on ends of intake and outlet pipes should be attached with chains not ropes, and the chains are covered in rigid sleeves c. mitigation measures to reduce dust emissions including activities with the potential to create and mobilise Respirable Crystalline Silica; d. reactive downwind mitigation that includes monitoring of PM10 and PM2.5 to confirm the effectiveness of the standard dust suppression mitigation measures e. a description of the methodology to identify and mitigate any potential soil or groundwater contamination found on-site during construction being mobilised and prevent off-site migration of any such contaminants in groundwater f. trigger action levels, and how compliance with the procedures set out in the CEMP will be monitored, independently audited and actioned; and g. include provisions for a bi-monthly newsletter to transparently publish noise, dust, odour and groundwater monitoring data during construction, the current status of construction, any issues encountered and additional mitigation measures identified, as well as any received complaints and responses provided by You, construction plans for next period to the EPA, Glenelg Shire Council, local residents and any community reference group; 11. a detailed operational procedure to cater for a 1 in 100 year rainfall event; 12. a detailed Community Engagement Plan that includes the establishment of a Community Reference Group, a Community Complaints Register and Response Plan for the construction and commissioning phase and consideration of recommendations 17 & 18 from the s20b Community Conference Report (dated 2019 and included as Appendix B of the Works Approval Application Assessment Report); and 13. updated Yumbah Nyamat Biosecurity Plans prior to the finalisation of the design of the next module, taking into account any such developments in best practice biosecurity, as well as, any learnings from performance monitoring of earlier stages. WA_W2 You must not commence construction of those parts of the works for which reports are required by condition WA_W1.1 until written EPA approval of those reports has been received. Works Approval: 194725 Issued:15/04/2019 Page 5 of 9

WA_W3 Where any reports specified in condition WA_W1.1 and approved by EPA differ from the application, the works must be constructed in accordance with those approved reports. WA_W4.1 You must notify EPA when the construction of each stage of the works covered by this approval has commenced in accordance with the approved staging plan. WA_W5.1 You must notify EPA in writing when the construction of the works covered by this approval has been completed in accordance with the approved staging plan. WA_W7 WA_W8 You must not commission or operate the works without the written approval of EPA. You must install 1. bird netting over all open surface water on-site (i.e. the southern collection and solids settling channels, emergency recirculation reservoirs, all components of the stormwater management systems); 2. water flow meters and a Programmable Logic Control system (or similar), to provide real time monitoring of water flows throughout the farm for leak, spill and overflow detection and to record wastewater discharge flow on the discharge outlets; 3. groundwater monitoring boreholes as per the GMMP (required under WA_W1.1) 4. any noise abatement and barriers as identified as being required to protect nearby receptors and as identified by the noise report required in condition WA_R4 below; and 5. PM10 and PM2.5 monitors detailed in condition WA_W1.1(11) and approved by WA_W2. WA_W13 You must implement all liquid storage containment and handling measures in accordance with EPA Publication 1698 Liquid storage and handling guidelines, dated June 2018. WA_W14 You must install all wastewater discharge points so that provision for sampling are included in accordance with EPA publication 441 Guide to the Sampling and Analysis of Waters, Wastewaters, Soils and Wastes, as amended from time to time. WA_W15 During construction, unacceptable noise (and vibration) above relevant guideline levels must not be emitted beyond the boundaries of the premises. WA_W16 During construction, stormwater discharged from the premises must not be contaminated with waste. WA_W17 All construction activities must be undertaken in accordance with EPA publication 480 Environmental Guidelines for Major Construction Sites, as amended from time to time. WA_W18 During construction, you must undertake an environmental monitoring program that enables you and EPA to determine compliance with conditions(s) WA_W15 and WA_W16. WA_W19 During construction, you must ensure that all activities are carried out in accordance with the information provided in the works approval application except that, in the event of any inconsistency arising between the application and the conditions of this approval, the conditions of this approval shall apply. Works Approval: 194725 Issued:15/04/2019 Page 6 of 9

Reporting Conditions WA_R1 WA_R4 WA_R5 At least two months before commencement of any commissioning, you must provide to EPA a report that include(s): 1. a detailed commissioning plan for the works. 2. detailed monitoring program to be undertaken during the commissioning to establish any impacts to soft-sediment and seagrass habitats around the discharge pipes. 3. detailed methodologies for the odour surveys (to be in accordance with European Standard EN 16841-2:2016 Ambient air - Determination of Odour in Ambient air by Using Field Inspection Part 2: Plume Method (Dynamic Plume Assessment)) to be undertaken during commissioning to: a. verify off-site receptors will not experience significant odours generated on-site and that the effectiveness of any proposed odour mitigation measures; b. confirms if (a) the geobags are an odour source and (b) if the dewatering pad has been appropriately located away from sensitive receptors; c. establish the effectiveness of bird netting as an odour mitigation measures; d. be verifiable by an independent auditor; and e. the results of which can be readily made available to the community. 4. detailed noise survey methodologies and program to be undertaken during commissioning to: a. verify compliance with the updated noise and vibration assessment in WA_W1.1; b. confirms the performance of noise attenuation measures; c. be verifiable by an independent auditor; and d. the results of which can be readily made available to the community. 5. a wastewater discharge monitoring plan which includes: a. establishing the rate of and volume of sludge deposition within the wastewater management system, and within the emergency recirculation reservoirs; b. the particle distribution of materials within the sludge and any remaining fine particles in suspension prior to discharge; c. confirmation that performance aligns with modelled concentrations and proposed licence limits; and d. expected water quality parameter concentrations under recirculation conditions against proposed licence limits. 6. A CQA report which details underground pipe detection inspection and commissioning test results for the civil engineering works and in particular underground pipe, butt welds, flange connection anchors, and all designed impermeable areas. This should be conducted by an independent contractor, with all monitoring designed to comply with the monitoring requirements set out in the Licence Management Guideline (EPA publication 1322) Before the commencement of commissioning of each stage, you must provide, to the satisfaction of EPA, a report approved by an EPA appointed auditor that includes: (a) all plans and reports specified in condition WA_R1 of the works approval; and (b) construction verification reports prepared by an EPA-appointed auditor demonstrating that the relevant stage of the farm has been built in accordance with the works approval. You must not commence operation of the works until written EPA approval of the reports required by condition(s) WA_R1 has been received. Works Approval: 194725 Issued:15/04/2019 Page 7 of 9

SCHEDULE 1A LOCALITY PLAN Works Approval: 194725 Company Name: YUMBAH AQUACULTURE LTD ABN: 89 082 219 636 Premises Address: Lots 1 and 8 315 Dutton Way BOLWARRA VIC 3305 Lot 2 Princes Highway BOLWARRA VIC 3305 Issued: 15 April 2019 Before relying on the information in this map, users should carefully evaluate its accuracy, currency, completeness and relevance for their purposes, and should obtain any appropriate professional advice relevant to their particular circumstances. Works Approval: 194725 Issued:15/04/2019 Page 8 of 9

SCHEDULE 1B PREMISES PLAN Works Approval: 194725 Company Name: YUMBAH AQUACULTURE LTD ABN: 89 082 219 636 Premises Address: Lots 1 and 8 315 Dutton Way BOLWARRA VIC 3305 Lot 2 Princes Highway BOLWARRA VIC 3305 Issued: 15 April 2019 Before relying on the information in this map, users should carefully evaluate its accuracy, currency, completeness and relevance for their purposes, and should obtain any appropriate professional advice relevant to their particular circumstances. Works Approval: 194725 Issued:15/04/2019 Page 9 of 9