Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

Similar documents
DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR. Robert Small 1, Rob Jameson 2

Misan University - College of Engineering Civil Engineering Department

Schnabel Foundation Company

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

Grouting Bilfinger Spezialtiefbau GmbH

Specialising in Ground Engineering & Slope Stabilisation

Learning Outcomes. Background Definitions. Lesson 2 & 3. Definitions, Background, Classification, Applications and Costs

SECTION DUCTILE IRON PILES

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SPECIAL INSPECTION AGREEMENT

SHAFT CONSTRUCTION SECANT PILE

Product Evaluation Report

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years.

Over the last decade, drilled and postgrouted micropile foundations have

Underpinning. Underpinning

CHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10

ICC-ES Evaluation Report Reissued March 2014 This report is subject to renewal May 1, 2015

EFFICIENCY OF MICROPILE FOR SEISMIC RETROFIT OF FOUNDATION SYSTEM

SECTION 39 - MANHOLES TABLE OF CONTENTS

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

MICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA. Casey Garneau 1

Diaphragm wall Construction

Micropile Lateral Load Testing in the Charleston, SC Area

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Figure 1. Horst Aschenbroich, President/CEO, Con-Tech Systems Ltd.

SAS Micropile Manual. Basic dimensioning and design recommendations. Table of Content:

Typical Specifications of Compaction Grouting Scope

Commercial Structures

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Helical Design. Theory, Applications & Seismic Testing 5/2/2017. Helical System. Helical System. Common Helical Piles/Anchors Components

Hollow Bar and Accessories

SECTION GRAVEL PACKED WATER WELL

Hollow Bar and Accessories

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

East Central College

PER See all Pei ES Listings at: Report Owner

TECHNOLOGY. Continuous Flight Auger

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

penetrometer test (CPT) soundings were done to supplement the SPT data. Construction recommendations were made for most of the new buildings.

DRILLED-IN DISPLACEMENT MICROPILES INSTALLED WITH NO VIBRATION + NO NOISE

MICROPILE LATERAL LOAD TESTING IN CHARLESTON, SOUTH CAROLINA, USA

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

Wastewater Capital Projects Management Standard Construction Specification

WATER LINE IN TUNNELS

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.

DESCRIPTION OF THE RD-PILE SYSTEM

INNOVATIVE DEEP FOUNDATION SUPPORT USING DUCTILE IRON PILES

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

CONSTRUCTION SPECIFICATION FOR TUNNELLING

Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA

Lesson 7 & 8 Construction Inspection/ Quality Control (QA/QC) Load Testing. Learning Outcomes. Quality Assurance and Quality Control (QA/QC)

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

Site Preparation... 2

DYNAMIC-RESPONSE CHARACTARISTICS OF STRUCTURES WITH MICROPILE FOUNDATION SYSTEM

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents:

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Construction Technology B (CON4313)

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

Section WATER LINE IN TUNNELS

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

Helical Pile/Anchor Deep Foundation MODEL SPECIFICATION

Outline. Introduction. Structural Redesign Gravity System Floor System Lateral System Weight Comparison Seismic Comparison

Civil Engineering Construction I (CBE5031)

Thermoflex Tubing! Reinforced Thermoplastic Gathering, Disposal and Injection Lines! Overview and Case Studies!!! December 17, 2009!

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

SECTION DRILLED CONCRETE PIERS AND SHAFTS

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Franklin Square Hospital Center Patient Tower

Advanced Construction Techniques. Underpinning. Underpinning

This method significantly reduces the over-consumption of concrete and eliminates any risk of over-augering.

PROPOSED GRADE COMPACTED SOIL EXCAVATION REQUIRED LOAD PER TYPE SERIES 90º AB CHANCE SS5 AB CHANCE SS T "/10" 11.5 T

Remedial Foundation Solutions for Existing Tanks

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

STANDARDIZED STRUCTURES

Bond Strength of Hollow-Core Bar Micropiles

A Brief History of Micropiling in

DIVISION 300 TRENCHING SECTION 308 BORING AND JACKING 2.2 STEEL CASING PIPE

Compaction and Jet Grouting

Akiki Engineering Est.

Ground Improvement Prof. G. L. Sivakumar Babu Department of Civil Engineering Indian Institute of Science, Bangalore

/CHA BuyLine 1386

ICC-ES Evaluation Report Reissued January 1, 2012 This report is subject to renewal in one year.

ECP Steel Piers Technical Service Manual

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Transcription:

The Challenge The Owners of a former warehouse located in the vibrant tech start-up area south of Market St. in San Francisco made the decision to bring the building up to current earthquake standards and to have the option to add on another 3 stories. Bringing A Drill Rig Into The Basement Installing Casing Driver On Drill Rig The very large structure was situated on fill and bay muds to depths of up to 130 ft. and the foundation was supported on driven wood pilings from the early 1900s that only extended 60ft. from grade. The building had experienced marked differential settlement from perimeter and point loads along with down-drag on the wood pilings from the settling fill. Access was a major issue, with only 20ft. wide alleys Limited Access: Installing Micropile At Perimeter Of Building

on the exterior of the long sides of the building and 8ft headroom inside the basement. Driven piles were not an option because of settlement concerns for the neighboring properties and inaccessibility in the interior. The bay muds and debris-laden fill presented a problem in being able to install drilled piles down into bedrock without having to insert and remove casing in 130 ft. of clinging, collapsing material in tight and/or low headroom conditions. The perimeter micropiles were installed with a 45,000 lb. rotary drilling rig plumbed for continuous injection. The interior piles were installed with 18,000 lb. drill rigs similarly plumbed. Action After RWR analyzed the test borings, load requirements, and access and overhead issues, a hollow bar injection drilling system was selected as the best method to obtain the necessary up to 183 kips design compression load: The bars are drilled down with a sacrificial bit as grout is continuously pumped under high pressure through the annulus and out the bit ports to form a cement column around the drilling bar. When the necessary depth has been reached, the bar is left in place and is the reinforcing member of the composite column. Tops Of Micropiles Visible In Trenches A portable silo and a 10,000 lb. automatic grout plant were installed in one of the alleys to batch and pump the grout to the drill rigs. Since the soil borings had stopped at the top of the bedrock, it was discovered during installation of the test piles that the bedrock was of extreme hardness. Even with 30,000 lbs. of down pressure the rock could only be penetrated to approximately 3-5 ft. with the ported carbide tipped cross bits that were standard for Two 18k Drill Rigs In The Basement Frictional resistance factors were assigned to the various layers of fill and muds below the top 30ft, which was still settling, and used to calculate diameter and depths for the piles. The size of the building and the addition of 3 more stories required that a total of 352 piles needed to be installed and extended 10ft into bedrock. Crossbit Customized In RWR Welding Shop, To Penetrate Extremely Hard Bedrock

rock drilling with the hollow bars. Rotary percussion was ruled out because the impact energy would mostly be lost through the extreme depths of the muds. The bits were taken to RWR s welding shop and after pre-heating, conical carbide tipped drill teeth were welded on to the cross bits. This adaptation allowed penetration through the bedrock to the necessary depths. Exterior: Top Of Micropile With Bearing Plate & Nuts Visible Along With Plastic Sleeving At Far End Casing And Hollow Bars For Exterior Installation constructed and used to insert the top of the 13 ft. long exterior casing to the proper depth. Disposable plastic piping was then inserted that reached from grade into the top of the steel casing to prevent collapsing and guide the drill bars into the casing. In order for the piles to have the necessary resistance to lateral earthquake forces, the top 13 ft. of all the piles were reinforced by first installing 10 diameter x ½ thick steel casing, then injection drilling through the casings. Footing trenches were already excavated in the basement so the casing was installed 13 ft. below the bottom of excavation. But the exterior was 11 ft. above bottom of footing, so a casing driver was The exterior micropiles were installed using 3 diameter hollow drill bars in 3 meter lengths. Due to the 8 ft. headroom, the casings in the basement were threaded and installed in 1 meter lengths and the bars in 1 meter lengths as well. All bars were connected using couplers with special metal seals that could withstand the up to 600psi grout pressures. 2nd Grout Pump In Basement 2 Drill Rigs Working Opposite Trenches

Production Micropile Testing Using Adjacent Piles As Reactions And To Suspend Testing Frame Over Footing Reinforcement Due to the tight schedule, there were 2 low overhead rigs and crews operating inside, 1 rig and crew outside and a grout plant with crew. The grout plant was modified to be able to pump grout to 2 machines at once: a Y valve was installed that would direct the batched grout to either the high pressure pump on the grout plant or to a double-hopper grout plant in the basement that fed a 2nd machine. A dance of casing installation and injection grouting between the 3 rigs required constant oversight and careful scheduling. Up to 20 tons of cement were delivered in a double hopper truck every-other morning and blown into the silo to feed the grout plant. The grout, which consisted of neat cement and a retarder to allow for the hard rock drilling time, had a specified strength of 8000psi. There was continuous sampling of grout batches during the installation and crush results ranged from 8000 to 10,000psi after 40 days. Three initial compression tests were performed to verify the loading requirements. 20% of all production piles were pull tested to 133% of compression design loads, which also verified tension load requirements.

Results: Almost 7 miles of micropiles were installed successfully in tight access and very challenging subsurface conditions, around and under the existing structure. This was a key element to bring the building up to current seismic standards and allowed the Owners to lease out the entire building, including the additional 3 stories, to a large Bay area tech Company. Compression Test On Sacrificial Pile, Using Production Piles As Reactions. Failure Occurred At 350 kips Plan View Of 352 Micropiles Layout