Project Component, Impact Concern, and TK Recommendations that Informed Snap Lake Mine Designs

Similar documents
NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview

Agency Activities

Re: Closure and Reclamation at Ekati

INDUSTRIAL WATER USE INSPECTION REPORT

APPENDIX A SUMMARY OF MULTIPLE ACCOUNTS ANALYSIS (MAA) FOR THE GAHCHO KUÉ PROJECT

APPLICATION FOR WATER LICENCE, AMENDMENT OF LICENCE, OR RENEWAL OF LICENCE

Operations Mine Site, Tote Road and Railway

What is the Terms of Reference?

SNAP LAKE MINE SNAP LAKE SITE WATER BALANCE MODEL REPORT

Planning a Complex Mine Remediation. Remediation Technologies Symposium October 14-16, 2015.

Agency Activities

Moving Forward, Together

Highway 11 Realignment

APPENDIX 3C RISK ASSESSMENT FOR ACCIDENTS AND MALFUNCTIONS OF THE JAY PROJECT

TALTSON HYDROELECTRIC EXPANSION PROJECT

Clean Marina Award Checklist

Preliminary Screening Report Form EIRB. Reference number:

Alberta Transportation The City of Edmonton The City of Calgary

APPENDIX H ENVIRONMENTAL MITIGATION ACCESS2040 APPENDIX X ENVIRONMENTAL MITIGATION 1

February 2017 Environmental Update for SLEMA Board Zhong Liu February 28, 2017

Appendix 3 Whale Tail commercial lease work plan

March 15, 2013 File:

Report of Environmental Assessment And Reasons for Decision. Dominion Diamond Ekati Corp. Jay Project EA

APPENDIX I DUST SUPPRESSION/CONTROL PLAN

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment

Date Location Waste Spilled

ROADS: OPERATION AND MAINTENANCE

Gahcho Kué Project. Environmental Impact Statement. Section 7. Key Line of Inquiry: Caribou

NORTH SLAVE MÉTIS ALLIANCE

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Hardrock Mining POTENTIAL IMPACTS TO WATER, WILDLIFE, AIR AND LAND. BY BONNIE GESTRING

eitan dehtiar May 24, 2012

WILDLIFE EFFECTS MONITORING PLAN FOR THE EKATI DIAMOND MINE. Dominion Diamond Ekati Corporation

Ms. Violet Camsell-Blondin Chair Wek èezhὶi Land and Water Board Box 32 Wekweètì, NT X0E 1W0. 20 April 2017

Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021

Operations Stage. Mining Ready Summit Timmins Ontario October 25, 2011

APPENDIX D 2017 PHOTO ESSAY

Environmental Design Criteria for Project Engineering

Environmental Management Plan during Construction Phase

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Environmental Assessment Registration Destination RV Resort

Wednesday, April 27, 2016 Stream E2: Giant Mine Remediation Project Location: Level 4, Sal de Bal Centre/Ouest

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED]

Construction Environmental Management Plan (CEMP) for Potash Overland Conveyor

Ore mineral: a mineral from which one or more metals can be extracted.

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

D EROSION AND SEDIMENT CONTROL. Table of Contents

HAPPENINGwith. in the NWT March Ongoing Land and Resource Negotiations. What s. in areas. Contaminated Site Remediation

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

AREVA Resources Canada Inc. WILDLIFE MITIGATION AND MONITORING PLAN

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan

Facilities Environmental Protection Plan: Burnaby Terminal

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION

Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table

Environmental Information Worksheet

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Draft Terms of Reference for the Environmental Assessment of Dominion Diamond Ekati Corporation s Jay Cardinal Project

Mrs. Erica Bonhomme Snap Lake Mine, De Beers Canada Inc. Suite 300, th Avenue Yellowknife NT X1A 3S8

Barren-ground Caribou and Cumulative Effects

Environmental Impact Assessment (EIA)

Canada s Northwest Territories Biodiversity Action Plan. Prepared by: Jody Snortland, SRRB & Suzanne Carriere, GNWT

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012

WELCOME! COMMUNITY MEETING

Appendix E Fish Habitat Compensation Plan Workshop Presentations

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

SITE C FIELD WORK FOR 2019

MINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc.

FORM B: DAMMING AND DIVERSION OF WATER

TABLE OF CONTENTS. Page

EA Information Requests on the Canadian Zinc Corp. Prairie Creek Mine Environmental Assessment Round 1

A Review of the 2015 Diavik Diamond Mine Wildlife Monitoring Report

Finding Balance: The Proposed Mackenzie Valley Pipeline

Division of Surface Water Response to Comments

South Landfill Annual Cover Rate Screening Criteria Checklist

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Air Quality Monitoring Update

Application for resource consent Form B Damming and diversion of water

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session

"Engagement activities with LKDFN regarding the Project have been ongoing since 1998"

DRAFT Type B Water Licence G18L8-001 NWT Energy Corporation (03) Ltd. Inuvik Wind Project

PERFORMANCE OF AN ENGINEERED COVER SYSTEM FOR A URANIUM MINE WASTE ROCK PILE IN NORTHERN SASKATCHEWAN AFTER SIX YEARS

Review Comment Table

Incinerator Management Plan

Thank you for very much Gaetan and organizers for the invitation to speak to you today. I know it s close to the end of the day, but I am confident

APPENDIX 22C: CYANIDE MANAGEMENT PLAN

LESSON 3 OTHER LAND RESOURCES C H A P T E R 6, C O N S E R V I N G O U R R E S O U R C E S

Chapter 10 Summary of Project Effects

Working with thepeople for the Environment

Summary of the Mitigation Measures Proposed by the Proponent

PRELIMINARY SCREENING REPORT FORM

WASTE MANAGEMENT PLAN

Responsible Mining in the Lake Superior Basin Dec. 2013

Westridge Marine Terminal Environmental Protection Plan

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

MINE SITE RECLAMATION GUIDELINES FOR THE NORTHWEST TERRITORIES

2.0 BACKGROUND ON CALCULATED TOTAL DISSOLVED SOLIDS

E1184 v1. 6. Environmental Management Plan (EMP)

Transcription:

Table 1 Project Component, Impact Concern, and TK Recommendations that Informed Snap Lake Mine Designs Project Component Impact Concern TK Recommendation Included in Snap Lake Design Not Included in Snap Lake Design Site layout Worker safety during inclement weather Space buildings close together Buildings are linked by a corridor or spaced closely together Sewage is managed and treated in an engineered facility Sewage Treatment Facility and Associated Wetland Treated water during construction Monitor water, plants and wildlife at wetland Process water quality is monitored before Water quality in Snap Lake is monitored Sewage system cannot be accessed by wildlife Mine Water Clarification Pond Pond will not be effective for clarification or containment of underground mine water Filter, and settle mine water in a fenced management pond Mine water is settled at water management pond and then treated Treated water quality is monitored before Fences can pose an increased hazard to wildlife Mine Site Seepage and Runoff Containment of site water and runoff Site water needs to be contained Site water and runoff is contained and integrated into the water management system Site water is monitored for quality before Underground Mining Activities Underground water seepage Fugitive dust Prevent underground dust from Need to understand water seepage Dust mitigation measures included in the Air Quality Management Plan Water can only seep into the mine due to pressure differential, not out Mine water is collected for water treatment Mine water is monitored for quality before

Table 1 Project Component, Impact Concern, and TK Recommendations that Informed Snap Lake Designs (continued) Project Component Impact Concern TK Recommendation Included in Snap Lake Design Not Included in Snap Lake Design Solid Waste (Mine Rock and Trash) Waste rock dust erosion Air pollution from incinerator Incinerate on calm days Mix small rocks into concrete Monitor dust and effects to vegetation Must incinerate regularly to manage waste, not just on calm days Use of paste technology to recycle rock back underground North Pile will be capped with granite to prevent erosion Air quality, dust and vegetation are monitored Airstrip and Roads Dust production from traffic Disturbance to wildlife Use local trappers to remove animals from the mine Keep the site clean Regular watering of roads and airstrip to suppress fugitive dust Monitor wildlife at site to prevent harm Monitoring has involved local assistants Animals are generally not removed from the mine, unless they pose a safety risk South Esker Quarry and Esker Access Road Loss of archaeological sites, vegetation, wildlife habitat and geological feature Do not completely use esker Monitoring for use by wildlife and effect to vegetation Check for old camp sites Archaeological and wildlife surveys were completed Vegetation is monitored Quarried esker was not fully used Lupin Winter Road and the Winter Access Spur Caribou deflection Spill contamination Feeding wildlife Garbage Suspend traffic while caribou cross road Slow traffic speeds No feeding wildlife Use of fencing Do not park trucks on frozen lakes Clean-up garbage and spills Monitoring portages and fish in lakes Involve communities in monitoring Caribou right-of-way policy Slow traffic speeds (30 km/hr) No feeding wildlife policy A Spill Response Plan is followed Vegetation monitoring plot on portage A Waste Management Plan is followed Community participation in aquatic and wildlife monitoring Routine monitoring of fish and water quality along the Winter Access Road is not deemed to be required. Further Exploration Activity Contamination from drilling Control spills Monitor drill sites A Spill Response Plan is followed Drill sites are monitored for spills, wildlife and waste Fish Compensation Plan Local fish impacted Compensation should occur at Snap Lake An artificial reef was constructed at Snap Lake and monitored

References BHPB (BHP Billiton). 2004. Ekati Diamond Mine. 2003 Wildlife Effects Monitoring Program. Prepared by Golder Associates Ltd. Yellowknife, NWT, Canada. De Beers (De Beers Canada Inc.). 2002. Snap Lake Diamond Project Environmental Assessment Report. Prepared for De Beers Canada Mining Inc. by Golder Associates Ltd. Yellowknife, NWT, Canada. De Beers. 2011. Snap Lake Mine: Wildlife Effects Monitoring Program 2010 Annual Report. Prepared for De Beers Canada Inc. by Golder Associates Ltd. Yellowknife, NWT, Canada. Lutsel K e Dene Elders. 2001. Traditional Knowledge in the Na Yaghe Kue Region: An Assessment of the Snap Lake Project. Lutsel K e, NWT. Weledeh Yellowknives Dene. 1997. Weledeh Yellowknives Dene: A Traditional Knowledge Study of Ek ati. Yellowknives Dene First Nation Council, Yellowknife, NWT, Canada.