PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2556. Project Name Region Country Sector(s) Theme(s)

Similar documents
Key Dates. Global Development Objectives. Components. Overall Ratings

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

LATIN AMERICA AND CARIBBEAN. Panama

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA8595. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1015. Project Name. Region. Country. Sector(s) Urban Transport (100%) Theme(s)

Ecological Restoration in Cattle Ranching Landscapes

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4706. Project Name

Silvopastoral Approaches, PES & Ecosystem Management in cattle ranching in Colombia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development Project Stage: Appraisal

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Silvopastoral systems for climate change mitigation and poverty alleviation in Colombia s livestock sector

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Shandong Provincial Biogas CDM Program EAST ASIA AND PACIFIC Rural Development P115878

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA107328

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA549. Project Name Region Country Sector(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Nicaragua FCPF Readiness Preparation Grant Region. Latin America and the Caribbean Country

Brazil: N2O Emission Reduction Project Region. Latin America and the Caribbean Country. Trust Fund / Carbon Finance Project ID

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data

Financing (In USD Million) Financing Source

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Integrated Safeguards Data Sheet (Initial)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3758 Project Name. Senegal SLM supplemental to PSAOP2 Region

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Theme(s) Trade facilitation and market access (20%), Rural markets (40%), Rural services and infrastructure (40%)

Promoting Sustainability in Agricultural Supply Chains. ISCC Regional Stakeholder Dialogue Bogotá - March 6th.

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Integrated Safeguards Data Sheet (Initial)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5544 Sustainable and Participatory Energy Management-phase 2 (PROGEDE Project Name

Sector(s) General water, sanitation and flood protection sector (70%), General agriculture, fishing and forestry sector (30%)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Sustainable Cattle Ranching in Colombia

EUROPE AND CENTRAL ASIA. Kazakhstan

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

UG - FCPF REDD Readiness Region. REPUBLIC OF UGANDA Sector

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

Project Information Document/ Identification/Concept Stage (PID)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Title: Proyecto Ganadería Colombiana Sostenible Sustainable Cattle Ranching Project, Colombia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE EAST ASIA AND PACIFIC. Papua New Guinea. Investment Project Financing P155087

AF Rural Enterprise Development Program Region

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Report No.: ISDSA1037

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Report Number: AB5692 Project Name

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/Updated Date PID Approved/Disclosed Estimated Date of Appraisal Completion Estimated Date of Board Approval Decision PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2556 AF - CO Mainstreaming Sust. Cattle Ranching Project (P145732) LATIN AMERICA AND CARIBBEAN Colombia General agriculture, fishing and forestry sector (40%), Agricultural extension and research (30%), Animal production (30%) Environmental policies and institutions (30%), Other environment and natural resources management (30%), Climate change (20%), Biodi versity (10%), Participation and civic engagement (10%) Investment Project Financing P145732 FEDEGAN Colombian Cattle Ranching Organization-FEDEGAN B-Partial Assessment 20-Mar-2014 21-Mar-2014 28-Feb-2014 12-Mar-2014 I. Project Context Country Context Country and Sector Issues. Cattle ranching is a key economic subsector of the Colombian economy, contributing 1.6 percent of Gross Domestic Product (GDP) and 20 percent of agricultural and livestock GDP. With 950,000 direct employments, it also accounts for 7 percent of national and 28 percent of rural employment. About 34 percent of Colombia s land surface is used for cattle ranching, representing about 38.8 million hectares. Cattle ranching are carried out in areas with high poverty, unequal income distribution, illiteracy, violence, and unequal land ownership. Except for a small percentage of very large farmers, most landholdings are small and face financial and technological limitations: working capital and natural resources are inefficiently used, resulting in high production costs and marginal profitability. Average stocking rates on pastures are estimated at less than one head per hectare. This sub-sector is also seen as one of the major drivers of deforestation in tropical areas. While deforestation rates has declined drastically at the national level in recent years, from about Page 1 of 5

238,000 ha/year in 2005-10 to about 148,000 ha/year in 2011-12, it still represents a major threat in specific areas (hotspots of deforestation) where it is principally associated with: (i) the expansion of traditional cattle ranching practices, (ii) the expansion of agricultural frontier, (iii) illegal crops (coca), and (iv) illegal logging and mining. In the National Development Plan (NDP), titled Prosperity for All 2010 2014 (Prosperidad para Todos 2010 14), the Government of Colombia projects a 20 percent increase of the cattle herd accompanied by a 21 percent reduction in pasture area by 2030. In 2006, the Colombian Cattle Ranching Association, FEDEGAN (Federación Colombiana de Ganaderos), issued its own Strategic Plan (Plan Estratégico de la Ganadería Colombiana 2019) in which it sets the ambitious target of gradually releasing 10 million ha by 2019, concomitantly with an increase of the cattle herd (reaching 48 million head of cattle). Sectoral and institutional Context The original grant in the amount of US$7 million was the GEF contribution to a wider program led by FEDEGAN and supported by CIPAV, Fondo Acción, and TNC, totaling US$42 million. The original Colombia Mainstreaming Sustainable Cattle Ranching (CMSCR) Project was approved by the Board of Executive Directors on March 16, 2010, and became effective on July 2, 2010. The Project Development Objective is to promote the adoption of environment-friendly silvopastoral production systems (SPS) for cattle ranching in Colombia s Project areas, to improve natural resource management, enhance the provision of environmental services (biodiversity, land, carbon, and water), and raise the productivity in participating farms. The CMSCR project includes four components: Component 1: Improving productivity in participating cattle ranching farms in Project areas, through SPS (total cost US$30.99M; GEF financing US$1.7M); Component 2: Increasing connectivity and reducing land degradation in participating cattle ranching farms, through differentiated PES (total cost US$6.45M; GEF financing US$3.8M); Component 3: Strengthening subsector institutions and dissemination and M&E efforts contributing to the broader adoption of environment-friendly SPS in Colombian cattle ranching (total cost US$1.46M; GEF financing US$0.8M); and Component 4: Project management (total cost US$3.09M; GEF financing US$0.7M). The geographical scope of the project covered five regions, selected for their high levels of biodiversity and proximity to strategic ecosystems and protected areas: (i) the Cesar River Valley region, (ii) the Magdalena River region, (iii) the Boyacá-Santander region, (iv) the coffee-growing eco-region, and (v) the Meta region. II. Proposed Development Objectives The Project Development Objective would remain unchanged, i.e. to promote the adoption of environment-friendly Silvopastoral Production Systems (SPS) for cattle ranching in Colombia s Project areas, to improve natural resource management, enhance the provision of environmental services (biodiversity, land, carbon, and water), and raise the productivity in participating farms. III. Project Description Comp. 1: Improving productivity in participating cattle ranching farms in Project areas, through SPS Page 2 of 5

Comp. 2: Increasing connectivity and reducing land degradation through differentiated PES schemes Comp. 3: Strengthening Sub-sector Institutions, Dissemination and M&E Comp. 4: Project management IV. Financing (in USD Million) Total Project Cost: 21.67 Total Bank Financing: 0.00 Financing Gap: 0.00 For Loans/Credits/Others Amount Borrower 0.00 Single Purpose Trust Fund 21.67 Total 21.67 V. Implementation Status of Implementation. CMSCR project implementation has been significantly delayed, which results in a disbursement rate of only 30 percent after three years of implementation. This delays were mainly due to the selection of participating farms took much longer than foreseen during preparation: (i) the first call for participants (Convocatoria), conducted in August 2011, fell short of the target of 2,000 participating cattle ranchers, and a second call had to be launched in August 2012, (ii) the screening procedures established in Project's Operational Manual to mitigate any potential reputational risks of working with cattle ranchers in Colombia proved to be extremely complex and time consuming, although indispensable. Mapping participating farms (necessary in order to establish the baseline) is also taking longer than anticipated. Overall Project Performance. Progress towards achievement of PDO and implementation progress has consistently been rated as moderately satisfactory or above since the project became effective. In May 2013, the rating for Progress towards achievement of the PDO was downgraded to Moderately Satisfactory, because the risk of not meeting the quantitative target of areas converted to silvopastoral systems (key outcome indicator) was considered high: although the 2,491 participants exceed the PAD s target of 2,000, it seems unlikely that the target of 50,500 ha under silvopastoral systems, including 38,500 ha under PES and 12,000 ha of intensive SPS (isps), will be achieved. There are two factors that adversely impact the likelihood of meeting area targets for SPS and isps: Page 3 of 5

(i) the much higher proportion of small-scale farms among participants than foreseen during preparation, and (ii) the higher than anticipated level of TA needed at the different steps of the process of conversion into silvopastoral systems (sensitization campaigns, selection process, baseline assessments). It is proposed to process this Additional Financing concomitantly with a Level Two restructuring of the original project, in order to (i) adjust the outcome indicators set for the original project to better align with early implementation results, and (ii) include new outcome indicators on climate change mitigation and poverty alleviation (two focus areas targeted by DECC). In addition, the restructuring will (i) reallocate the proceeds of the original project, particularly to take into account the higher needs for technical assistance and the reduced targets in terms of payments for environment services (PES),and (ii) extend the closing date from September 23, 2015 to August 23, 2017, to close on the same date as the Additional Financing. The CMSCR project targeted 2,000 farms to be enrolled and benefit from project instruments (technical assistance and/or payment for environmental services). To date, a total of 2,491 farms have already been selected in the project. While the Additional Financing would provide additional support to 1,500 farms, this support could benefit some of the already selected farms. In total, it is expected that the project will directly benefit around 2,700 farms. In addition, a group of farm control will be set up as part of the Impact Assessment. VI. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment OP/BP 4.01 Natural Habitats OP/BP 4.04 Forests OP/BP 4.36 Pest Management OP 4.09 Physical Cultural Resources OP/BP 4.11 Indigenous Peoples OP/BP 4.10 Involuntary Resettlement OP/BP 4.12 Safety of Dams OP/BP 4.37 Projects on International Waterways OP/BP 7.50 Projects in Disputed Areas OP/BP 7.60 VII. Contact point World Bank Contact: Carole Megevand Title: Sr Natural Resources Mgmt. Spec. Tel: 458-1937 Email: cmegevand@worldbank.org Borrower/Client/Recipient Name: FEDEGAN Contact: Andres Felipe Zuluaga Page 4 of 5

Title: Project Coordinator Tel: 5713142533075 Email: afzuluaga@fedegan.org.co Implementing Agencies Name: Colombian Cattle Ranching Organization-FEDEGAN Contact: Carlos Osorio Title: Subgerente Tecnico Tel: 571-5782020 Email: cosorio@fedegan.org.co VIII.For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C. 20433 Telephone: (202) 458-4500 Fax: (202) 522-1500 Web: http://www.worldbank.org/infoshop Page 5 of 5