TRUCK DELIVERY PROCEDURES

Similar documents
GM MOTORSPORTS RECEIVING INSTRUCTION

Finance and Administrative Services. Implementation Date: 11/01/02 Revised: 10/24/03 I. INTRODUCTION

Specialty Systems, Inc. Standard Operating Procedure

Logistics, Materials & Supply Chain Management CIP Task Grid

In order to improve carrier service and reduce freight costs, BOSTONtec implemented a new freight program January 1, 2016.

THE HIGH COST OF POOR SERVICE

FINANCIAL MANAGEMENT FOR GEORGIA LOCAL UNITS OF ADMINISTRATION

Eclipse Standard Operating Procedures - Release 8 Warehousing

C-TPAT Best Practices. Wayne Kornmann Director, Long Beach C-TPAT Field Office

highlandbeeffarms.com

Domestic Shipping Guide

Diversified CPC International, Incorporated. Gauge the Contents of a Railcar West Durkee Road Channahon, IL

RF Receiving Process Refresher Training

SpecSys, Inc. Standard Operating Procedure

LOGISTICS DEDUCTION DISPUTE INSTRUCTIONS

The factory must establish in writing the persons who are authorized to complete and/or sign shipping documents.

Reception of Product 3. 1 Important 3. 3 Steps to follow if concealed damage is found 4. 4 Steps to follow at carrier s inspection 4

PREPARING YOUR CORE RETURNS

CORPORATE QUALITY SYSTEM PROCEDURE

Cargo Loss and Damage Claims

Inland Building Systems Field Policy

Training Guide. Warehousing Staff

Cargo Loss and Damage Claims

627 FERN VALLEY RD, WACO Tx (254) TxDMV C Household Goods Moving Service Contract

Bellacor Business Process Requirements

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures IVL Authority: Effective Date: Page 1 of Donald / Adams 9/01/04 20

MODEL GEK E3 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E3 for Can Tumbler Model E3

MODEL GEK E1 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E1 for Can Tumbler Model E1

Please see the section or sections of this packet that pertain to your shipment. Dear Customer:

TERMS & CONDITIONS PARTS SALES

BEST PRACTICES. Danfreight Systems Inc

Online Personal Design Packet

Bellacor Business Process Requirements

Material Handling/Drayage Information

IOWA STATE UNIVERSITY MOVING INFORMATION PACKET. (last updated March 26, 2018)

Shaw's Supermarkets, Inc. Vendor Supply Chain Guide: Original Date: Effective February 19, rd Update : Effective March 6, 2011

Returnable Crate Program User Guide

WAREHOUSE SUPERVISOR

Global Supplier Manual Appendix B Supplier Delivery Standards. December 20, 2017

Logistics Insight Corporation Romulus ODC Version 2.9 Procedure Manual Subject: MATERIAL FLOW July 31, 2014

YOUR TRANSPORTATION CO.

Orchard Supplier Operation Guidelines Domestic Shipping & Transportation Requirements

Chapter 6 A: Domestic Transportation

International Freight Forwarding 101

Accounts Payable-Vendor Partnership

Invoice and Credit Memo Issuance v

UPS WORLDSHIP SHIPPING SYSTEM INSTRUCTION

Bill of Lading Overview

NOTICE OF PROPOSED CLASSIFICATION ACTIONS BY THE HUMAN RESOURCES DIRECTOR

Bellacor Business Process Requirements

ATC Drive Train /GENCO ATC Transportation System User Guide

Carrier Preparation for delivering to Australian Amazon Fulfillment Centres

OWNER S MANUAL DIRECT-IT PRODUCTS. October 2006

6.0 Transportation Routing Requirements

Property of WilloWare Incorporated. 1. DS0067 Bill of Lading Report

Your freight. Delivered and show-ready.

Limited Storage Capacity

ELPAC English Language Proficiency Assessments for California

This publication is available digitally on the AFDPO WWW site at:

POLICY AND PROCEDURE MANUAL

Instruction Manual HK285. Note: The Owner/Operator must read carefully and understand all the information presented here before operation.

MATERIAL HANDLING & RATES

Export Standard Operating Procedures

Is there visible DAMAGE? Contents should be checked, if possible and damage noted on the delivery receipt.

Shipment Creation Workflow

Reverse Logistics Tool. User Guide - v1.2

NBS ORDER FULFILLMENT PROCESS

International Freight Forwarding 101

1-300 SERIES Endover Rotator Operator s Manual for Morse End-Over-End Drum Rotators Series

Fixture Installation Scope of Work

GFS RECEIVING REQUIREMENTS. Doc. Number: SOP0500 Revision No: 23 Page 1 of 5 Created: Reviewed: Revised: Effective:

SUNSET PACIFIC TRANSPORTATION, INC ICC MC

Material Handling/Drayage Information

Logistics & Warehousing

ONLINE CONCIERGE DESIGN PACK

RUSH! RUSH! RUSH! RUSH! EXHIBITION FREIGHT EXHIBITION FREIGHT EXHIBITION FREIGHT EXHIBITION FREIGHT WAREHOUSE SHIPMENT FROM: FROM:

Helpful Hints. Find more on Bredeallied.com. Shipping to the Show. How to Store Empty Containers. Shipping Out Procedures at the Close of the Show

MCC Online Parts Portal User Guide. For your comfort

Solar Eclipse Standard Operating Procedures Shipping

UNC School of the Arts Central Receiving and Storage Manual

Operator s Manual for Morse Heavy-Duty Kontrol-Karrier with 3-Piece Drum Holder

Master Sales Agreement and Policy Statement

GIVS. Training Guide. IT Training 1/9/2013

Dear Valued Vendor, Thank you for your cooperation.

Johns Manville Service Guidelines Roofing Systems

Shipping & Handling Best Practices Checklist

Commport Internet EDI EDI with Costco US

Derive Systems, Inc. Pricing, Ordering and Returns Policy

WEEKEND U.S.

SUPPLIER POLICIES AND PROCEDURES

Sincerely, Events Staff. Dear Iowa State University Spring 2018 Career Fair Exhibitor:

Central Receiving & Shipping. Policies and Procedures

WL Plastics Corp WL111A Handling WL Plastics Reeled Pipe

SUPPLIER ROUTING GUIDE

Wisconsin Expo, Inc.

SHIPPING ADDRESSES & RECEIVING DATES

Supplier Expectation Manual

Chapter 2 The Basic Entry Process - Entry and Entry Summary CFR , 149 Flash Drive: Ch 2 Entry and Entry Summary. I. Entry 142.

Shipments (Advance Ship Notices)

Avanco International, Inc. TRANSPORTATION PLAN FOR THE TRANSFER OF CLASSIFIED MATERIAL

Transcription:

TRUCK DELIVERY PROCEDURES Please read these instructions carefully before verifying order shipment. TRUCK DELIVERY After the truck has been unloaded, follow these procedures. The driver is NOT responsible for unloading or assisting to unload the order. It is the dealer s responsibility to unload and count the boxes received. 1. Count the boxes. Verify box count matches the bill of lading (BOL). The box count is separated by work order numbers. Verify the box label has correct dealer name on it as multiple deliveries may be on the truck. Only open and inspect if box is damaged. 2. Record discrepancies or damage. Note any discrepancies or damage on the BOL. Call us immediately at 800.328.5924 to notify us of any discrepancies or damage. Damaged Product. Accept the damaged item if repair can be made. Reject the damaged item if repair cannot be made and it will be returned to Plato. Save all packaging! Packaging and damaged product are required for a damage claim. 3. Sign the bill of lading. Sign the BOL after box count has been verified and any notes noted. The carrier driver will return the signed BOL to Plato. 4. Keep a copy. Retain a copy of the BOL, packing slips and addendums for future reference. Page 1

BILL OF LADING (BOL) 1. The BOL packet includes the BOL, packing slips, addendums and backorder copies (if any). There is one BOL for all jobs being delivered. Each job s paperwork will be grouped together within the packet. 2. The BOL will need to be signed verifying the box count with the carrier driver. Any discrepancies or damage should be noted on the BOL. Please call us immediately at 800.328.5924 to notify us of any discrepancies or damage. 3. The carrier driver will return the signed BOL to Plato. The remainder of the BOL packet stays with the dealer. Number of boxes per work order Work Order Numbers Total number of boxes Sign here Page 2

PACKING SLIP 1. The packing slip looks like the acknowledgement but without pricing. 2. Some items (i.e.: refrigerator panels) require multiple boxes. Each box will have a label on it for that line item. The number of boxes will be handwritten on the packing slip. See example below. Line Item # Multiple Boxes Example The number of boxes will be handwritten next to the item that requires more than one box. Page 3

ADDENDUM 1. The addendum lists all of the loose items (i.e.: shelves) that belong with the product on the packing slip. The addendum typically follows the packing slip in the packet. The box number on the shipping label will start with an A followed by the handwritten number in the Box # column. A = addendum. Example: Box # 2 will have an box number of A2 on the shipping label. See Addendum Shipping Label on page 5. Examples: The shelves for line item #1 will be found in the box with the label The shelves for line item #8 will be found in the box with the label 239866.1 A2 239866.1 A6 Page 4

SHIPPING LABELS Work Order # Dealer Name Client Line Item # (if different than Plato) Line Item # (number only. refer to packing slip L#) Shipping Label Work Order # Dealer Name Item (refer to the addendum for the item description) Addendum Box # (starts with A, look for handwritten number on addendum page) Addendum Shipping Label Page 5

PRODUCT LABELS Work Order # Line Item # Dealer Name Client Line Item # Cabinet Label Part Description Part Size Work Order # Line Item # Part Label Page 6

BACKORDER ITEMS 1. The backorder will list the item(s) on backorder. The backorder list typically follows the addendum in the packet. 2. The Ordered By will receive an email from Plato to confirm where and how the backordered item(s) is to ship. The first line states which line item is affected by the backorder. Line item #2, wall cabinet The second line states the quantity and what is on backorder. 2 glass shelves In this situation, the wall cabinet will be included in the delivery and only the glass shelves are on backorder. If the wall cabinet was on backorder, line 2 would state ENTIRE UNIT. Page 7