Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012

Similar documents
2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

12 Evaluation of Alternatives

Service Development. Committee of the Whole April 3, 2019 Adam Harrington, Director of Service Development 1

Southwest Corridor Plan Project Update. June 11, 2013

Gateway Corridor Transitway

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

West Broadway Transit Study. Community Advisory Committee Meeting #1 April 14, 2015

Report #8: Riverview Corridor Pre-Project Development Study

Riverview Corridor Pre-Project Development Study

What is the Transportation Policy Plan (TPP)?

Chapter 1: Overview. page 1. Figure 2-1: Road congestion is expected to continue to grow

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Transit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017

Executive Summary and Staff Recommendation

Regional Transit System Plan

Fairfax County Countywide Transit Network Study

TCWR Route Alternatives Study St. Louis Park Presentation November 29, Mark Amfahr Amfahr Consulting

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Project Summary. Project Objectives

Regional Transitway Guidelines

3. STATION SPACING AND SITING GUIDELINES

Transit Investment Direction and Plan Introduction. Transportation Advisory Board October 18, 2017

Record of Meeting. 1. Introductions

Regional Transit Framework Study

APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

Transportation and Utilities

Congestion Management Process (CMP)

DRAFT Scoping Booklet

I-26 Fixed Guideway Alternatives Analysis. Transit Talk: ULI Executive Round Table Discussion. Thursday, April 30, :30 AM 1:00 PM

TECHNICAL ADVISORY COMMITTEE. January 29, 2013

Scoping Booklet. BottineauTransitway DRAFT ENVIRONMENTAL IMPACT STATEMENT. Hennepin County Regional Railroad Authority Minnesota

Orange Line Phase One Definition and Review of Related Projects. Task 2 Deliverable

Transit Planning Game

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

3.0 REVIEW OF PREVIOUS STUDIES

SR 710 Environmental Study

Findings to Date UBC LINE RAPID TRANSIT ALTERNATIVES ANALYSIS 1. UBC Line Rapid Transit Alternatives Analysis Findings to Date

Alternatives Analysis, New Starts

SH 119 BRT Corridor Project. Public Meetings November 15-16, 2017 Longmont and Boulder

Evaluation of Alternatives

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

2018 Comprehensive Guide Plan Steering Committee. Wednesday, October 11, Minnehaha Room, Minnetonka City Hall. 6:00 8:00 p.m.

DES MOINES AREA MPO. Environment Roundtable. October 13, 2015

Chapter 4: Transportation and Land Use

Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

Chapter 14 Work Program

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A

MORE MARTA ATLANTA SUMMARY OF PUBLIC ENGAGEMENT Contents CONTENTS TABLE OF EXHIBITS APPENDIX 2 9/4/18

Executive Summary T Transportation Committee Item:

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report

Tacoma Link Stakeholder Group

South Sounder Capital Improvements Program

Building the Regional Transit Strategy

Summary of transportation-related goals and objectives from existing regional plans

1.1 Purpose of the Project

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

Operations Guidelines for Metrobus in. Bus Rapid Transit/Light Rail Transit/Streetcar Corridors. Final Report

BUS RAPID TRANSIT CORRIDOR

3 Transportation Analysis

Business Advisory Committee. June 17, 2015

Chapter 3 Stakeholder Interviews and Summary of Needs

Integrated Transportation Plan. TAC Meeting September 16, 2014

2040 Transportation Policy Plan Amendment #1

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

CENTRAL AND EAST CORRIDORS

COUNCIL AGENDA REPORT

Highest Priority Performance Measures for the TPP

Chapter 5 Transportation Draft

This document has been developed to provide context to the Board as part of the strategic planning process. Regional development and travel trends

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

Federal Transit Administration s New Starts Process. Red Line Extension Alternatives Analysis Study

KRM COMMUTER RAIL RATES HIGH WITH PUBLIC INSIDE THE KENOSHA-RACINE-MILWAUKEE COMMUTER LINK

Southern Maryland Transit Corridor Preservation Study Charles County Board of County Commissioners September 22, 2009

2. Goals and Objectives

C-11: Madison Street BRT

APPENDIX TRAVEL DEMAND MODELING OVERVIEW MAJOR FEATURES OF THE MODEL

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

SECTION 4. Citizen s Guide to DEIS

C-01c: Downtown Seattle to Ballard (Market Street vicinity) LRT, primarily elevated/tunnel options

SCS Scenario Planning

Progress Report Regional Express & Bus Rapid Transit Program

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

METRA UP-W LINE. Locally Preferred Alternative Report

S-09: Auburn Station Access Improvements

Lake Oswego to Portland Transit Project Health Impact Assessment

Travel Demand Forecasting User Guide

FUTURE BUS RAPID TRANSIT PLANS

Metro Blue Line Improvements & Project Update

Chapter 5 - Transportation

NEPA Class of Action Request

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017

Recommended Response. TAB/TAC/TAC-Planning

Section 11: Transportation Strategies Toolbox

Transcription:

Midtown Corridor Alternatives Analysis Technical Advisory Committee Meeting November 15, 2012

Today s Agenda Introductions Roles and Responsibilities Alternatives Analysis Process Overview Outreach Overview Introduction to the Midtown Corridor Relevant Key Issues Visioning Exercise 2

TAC Roles Staff representatives from partner agencies including Metropolitan Council, Metro Transit, Hennepin County, the City of Minneapolis, and MnDOT. Will provide technical input to the project and assist in the resolution of technical issues in their field. They could provide guidance to the PAC on the technical feasibility of alternatives. 3

TAC Responsibilities Attend all TAC meetings Review meeting materials prior to TAC meetings Review and provide input to all other project deliverables in a timely manner Attend at least one open house during each phase of the study Serve as a conduit for your agency, both by providing study information to them and relaying their feedback back to the PMT Keep the PMT informed on any agency projects that could affect the AA. Encourage co-workers to attend public meetings and provide input Provide input that is technically sound, objective and meets the project purpose and need 4

5 Decision Making Process

Overview of Alternatives Analysis Process 6

What is an AA? 7 The purpose of an AA is to identify and analyze the benefits, costs, and impacts associated with various transit alternatives. Modes evaluated in an AA include: Light rail transit (LRT) Dedicated busway or bus rapid transit (BRT) Enhanced bus Streetcar

What is the outcome of an AA? The AA will result in the selection of a locally preferred alternative (LPA) that best meets the identified purpose and need for the project. Although an AA is no longer a requirement of the FTA s Project Development Process as defined in MAP-21, before a project can move into Project Development, a thorough evaluation of alternatives should be completed. 8

AA Work Plan Four Stages in AA Process: 1. Project Initiation 2. Development and Screening of Alternatives 3. Evaluation of Alternatives 4. Final Assessment 9

Stage 1: Project Initiation Review and assess previously completed work Inventory physical features, utilities, land use, and travel patterns Identify universe of alternatives Identify deficiencies in study area Establish goals and objectives Define purpose and need 10

Stage 2: Development and Screen of Alternatives Define a set of reasonable alternatives for more detailed analysis For each alternative define: Mode Alignment Station locations Span of service Frequency 11

Stage 3: Evaluation of Alternatives Refinement and detailed evaluation of the most promising alternatives Details include: Ridership forecasts Capital and operations & maintenance costs Environmental resource impacts 12

Stage 4: Final Assessment Final assessment of alternatives Complete evaluation to identify the alternatives that best meet goals and objectives and purpose and need for the project Prepare AA document PAC recommendation of LPA 13

14 Project Schedule

Introduction to the Midtown Corridor 15

16 Study Area The Midtown Corridor runs about 4.4 miles between the Blue Line (Hiawatha) Lake Street/Midtown Station and the Green Line (SW) West Lake Station. Two alignments are under study: Midtown Greenway Lake Street

Study Area Dense urban corridor Several locations along the corridor are major retail centers, activity centers, and sites targeted for growth and transit-oriented development. 17

Alignments Lake Street Midtown Greenway 18

Existing Conditions 19 Lake Street Busy arterial road with 2 travel lanes per direction and on-street parking Bus routes on Lake Street: Route Ridership 21 Weekday 13,850 53 Weekday 750 21 Saturday 11,250 21 Sunday 7,650 Midtown Greenway Former railroad corridor Currently being used as a bicycling and walking trail Up to 3,000 daily bicyclists Grade separated from street grid

20 Existing Transit Boardings

Existing Transit Travel Times On the Route 21, buses are moving only 25% of the time It takes 39 minutes to travel from the Uptown Transit Center to Lake Street/Midtown LRT Station 21

22 Existing Demographics

23 Existing Demographics

24 Existing Demographics

What is the Desired Outcome of a Midtown Corridor Transitway? Increase ridership through high quality, frequent and reliable transit service Enhance connections with the region s system of transitways and regular route bus service Improve mobility by offering more attractive choices on the corridor Catalyze transit-oriented development along a key commercial corridor. 25

26 Outreach Overview

Outreach Goals Manage expectations Build understanding Involve under-represented populations Increase understanding of Midtown Corridor s role in regional transit system Build relationships and trust Build support for the project and consensus on a locally preferred alternative (LPA) 27

Outreach Process 28 Provide timely, clear and comprehensive information Early and continuous participation of stakeholders Actively recruit stakeholders Ensure all interested stakeholders have opportunity to participate Reasonable availability of technical and other project information Open access to the decision-making process Proactive efforts to engage the public in the process, particularly under-represented groups

Stakeholders Residents and neighborhoods General public Non-profit organizations and institutions Businesses and business associations Federal, state, regional and local agencies 29

Communication Strategies Project website Social media Email updates Project updates and factsheets Posters, display boards and maps 30

Public Open Houses Four rounds of open houses: Purpose and Need - January 2013 Develop Alternatives - April 2013 Evaluate and Screen Alternatives - August 2013 Present Recommendations - December 2013 31

Outreach to Under-Represented Populations 32 Meeting notices and project information translated to non-english languages News releases to non-english language media outlets (print, radio, television) Interpreters or bi-lingual staff at public meetings Attend meetings of established organizations Attend local events and festivals Work with community leaders, designated ambassadors, and/or ethnic organizations to help improve access to, and communication with, specific ethnic communities Accessible meeting locations

33 Key Issues for Evaluation in AA

Key Issues 1. Purpose and need 2. Modes 3. Alignments 4. Historic and cultural resources 5. Land use & development 34

Key Issue 1: Purpose and Need 35 The most important document for the project! The purpose and need should: Identify markets - Commuters? - Intra-corridor travel - Link to regional system Identify deficiencies or problems in corridor - Existing transit service issues - Projected demand Identify needs - Serve existing and future markets - Encourage development/redevelopment

Key Issue 2: Modes LRT Streetcar BRT Connection to Hiawatha and SW LRT Operational considerations for interlining corridors Operations & maintenance facility locations Space considerations for double track alignment Overhead catenary system clearances Connection to Hiawatha and SW LRT Operational considerations for interlining corridors Operations & maintenance facility locations Space considerations for double track alignment Overhead catenary system clearances Vehicle type Exclusive or mixed-lane guideway Alignment consideration Street impacts Operations & maintenance facility location 36

Key Issue 3: Alignments Lake Street Parking considerations Traffic issues Signalized intersections Right of way constraints Midtown Greenway Access considerations (vertical circulation) Right of way constraints Vertical clearance constraints due to bridges Historic corridor 37

Key Issue 4: Historic and Cultural Resources What types of modifications can be made to resources within the historic corridor? Will require extra coordination with SHPO to help identify potential issues that could delay the project implementation 38

Key Issue 5: Land Use and Development Adopted land use plans will be used for this AA Are adopted land use plans transit supportive? 39

40 Visioning Exercise

Influencing Factors and Potential Tradeoffs Travel Markets Regional connections Commuters Inter-corridor users Casual users Historic Resources Limitations or opportunities Avoid or embrace Physical Design Trail integration Roadway integration Turn lanes and parking Service Design Capacity Travel times Replace local bus or compliment Development Focused or dispersed Type Timing 41

42 Questions?