To construct or alter a bore

Similar documents
To drill over an aquifer

Application For Resource Consent to Construct or Alter a Bore

Performance and Analysis of Aquifer Slug Tests and Pumping Tests Policy

APPLICATION FOR LANDUSE RESOURCE CONSENT

Part B Assessment of Environmental Effects

Environment Canterbury regional council works with the people of Canterbury to manage the region s air, water and land. We are committed to the

FORM B: ONSITE DISCHARGE OF TREATED EFFLUENT

9.1 Introduction. 9.2 Issues

To transfer the site of a surface water take or groundwater take

APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION

CON 509: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991

Aquifer Science Staff, January 2007

Application To Discharge Contaminants to Air From Abrasive Blasting

RESOURCE CONSENT CRC174931

INFORMATION REQUIREMENTS FOR RESOURCE CONSENT DISCHARGE TREATED SEWAGE EFFLUENT TO LAND

Resource Consent Application Form 16

(this cover page left intentionally blank)

E2. Water quantity, allocation and use

E7. Taking, using, damming and diversion of water and drilling

APPLICATION FOR A PERMIT TO CONSTRUCT A WATER WELL IN THE LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT

Form B Farm dairy wastewater discharge

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Resource Consent: Groundwater Take

CON 508: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991

E5. On-site and small scale wastewater treatment and disposal

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES

RIDDICK ASSOCIATES, P.C.

KINGWOOD TOWNSHIP THREE PART PUMP TEST CHECKLIST. APPLICANT: Road Name: TAX MAP Sheet/Block/Lot Date Submitted: Name of Project (If Any):

GROUNDWATER General Facts and Concepts

The aims of the Kaipara River Catchment Water Allocation Strategy are:

Taranaki Racing Club Groundwater Abstraction Monitoring Programme Report Technical Report

Application for resource consent Form B Damming and diversion of water

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES

1.0 INTRODUCTION. 28 th November Hawke s Bay Project Management Limited 1139 Maraekakaho Road RD5 Hastings, 4175.

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

S91 REQUEST FOR A FURTHER APPLICATION AND S92(1) REQUEST FOR FURTHER INFORMATION

Application For Water Permit To Take, Use Or Divert Groundwater.

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

Water Safety Plan Guide Groundwater Abstraction Bores and Wells Version 1, Ref P1.3

Dairyshed Effluent and Stream Crossing Survey 2013/2014

Guidance note completing form WRC consent to investigate a groundwater source

Panhandle Groundwater Conservation District PO Box 637, 201 W. 3 rd St. White Deer, TX

ASSOCIATED NOTES LAND USE CONSENT TO INSTALL OR ALTER A BORE

FORM B: DAMMING AND DIVERSION OF WATER

Rangitikei Catchment: Groundwater Use and Availability

Form 1: Application for resource consent

Fractured Rock and Confined Aquifers Recommendations for Sustainable Management

Consent Steps Assessing the Application and Assessment of Environmental Effects

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated.

SECTION 12.1 HERETAUNGA PLAINS UNCONFINED AQUIFER RESOURCE MANAGEMENT UNIT

temporary water connection or for building water

Summary of relief sought by Dairy Holdings Limited

Division of Drinking and Ground Waters. Division: Number: Category: Status: Issued:

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

E. Domestic Wells. Introduction. Domestic Wells and the Water Law. Nevada Division of Water Planning

Requirement for the use of chemigation valves for backflow prevention in Canterbury

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES

ORC PLAN CHANGE 6A Overview & Update. Kim Reilly, Federated Farmers Regional Policy Manager, South Island

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit

COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY APPLICATION FOR A GROUNDWATER WITHDRAWAL PERMIT (FOR USE IN GROUNDWATER MANAGEMENT AREAS)

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

dairyshed effluent Western Australia Code of Practice for DAIRY Western Funded by Dairy Australia and your dairy service levy

9 Cross Boundary Processes

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051

WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise.

Chapter 7 - Monitoring Groundwater Resources

STATEMENT OF REBUTTAL EVIDENCE OF Michael James THORLEY

(No. of pages excluding this page = 10)

14 Discharges to Land and Water

Procedure to Obtain a Sewage System Building Permit

California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA

subdivision INFILL SUBDIVISION ASSESSMENT CRITERIA RULES

SOUTH COASTAL CANTERBURY AREA SUB-REGIONAL SECTION 15

Hydrogeological Studies & Best Management Practices for Groundwater Protection Guidelines. Regional Official Plan Guidelines

Groundwater Protection and Licensing Update

SATEM 2002: Software for Aquifer Test Evaluation

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

Identification. Module 4 Water Well Drilling Agreements

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

The discharge shall include stormwater generated during the construction phase of the subdivision.

5 Contaminated Sites

Building or renovating your home?

Design Checklist for EWB-USA Chapters Working on Drilled Well

Pumping tests for construction dewatering in chalk

ACCORD TWO YEARS ON... SUMMARY. What have we achieved? What do we need to keep working on? SUSTAINABLE DAIRYING WATER

COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

THE DAVIS BASIN DO NOT DELAY IN GETTING STARTED RIGHT AWAY!

INSTRUCTIONS FOR FILING A WATER ALLOCATION PERMIT APPLICATION

THE TUKITUKI PLAN. What you need to know about water quantity and water quality

Catchment Water Quality Protection

Region-wide Water Quantity - Proposed Plan Change 9 to the Bay of Plenty Regional Natural Resources Plan (Clean Copy Version from Operative Plan)

Groundwater Monitoring Requirements of the CCR Rule What s Next?

STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS

Farm Dairy Effluent Application for

PRODUCER STATEMENT SYSTEMS (T.P.58) DESIGN: ON-SITE EFFLUENT DISPOSAL

Building in the Otatara Zone PROPOSED. Invercargill City DISTRICT PLAN Building in the Otatara Zone 1

Manningham Works Code of Practice

5. Contaminated Sites

Transcription:

Resource Consent Application Form 9A To construct or alter a bore For office use only Consent o Job o Important notes for the applicant You must complete this application form 9A and Resource Consent Application Form 1 in full. It is crucial that you provide as much relevant information as possible with your application and in an understandable way. This will help ORC staff process it efficiently, and at the minimum cost. If all the necessary information is not supplied in or with the application then it will be returned with a request for further information, or it will be publicly notified. This will lead to delays in processing and may increase processing costs. Depending on the location, quantity and intended use of the groundwater to be taken from the bore, you may require a separate Water Permit to take and use water from the Otago Regional Council. If you need a water permit please refer to the aquifer testing requirements attached to this form. When siting your bore you should consider the location in terms of compliance with the rules permitting abstraction in the Regional Plan: Water for Otago. You should also consider any effects on water levels in neighbouring bores, allocation availability within the aquifier, and potential stream depletion effects. Such effects may influence the likelihood of obtaining a resource consent to take groundwater at the volume you request. If you have any questions contact the duty resource officer on 0800 474 082. This application form, when properly completed, should provide an adequate Assessment of Effects on the Environment (AEE) as required by the Resource Management Act. However, this can only be determined on application. Disclaimer It is the applicant s responsibility to ensure that: the bore is suitable for the purpose required; the bore will penetrate water-bearing material; the consent holder will have physical access to any water in the bore; the consent holder will be legally able to take water; and any future taking of water will not have adverse effects on other users or the environment. The granting of a resource consent - to make, alter or install a bore does not guarantee or imply any of the above-mentioned points. Part A Property owner s contact details A.1 This form is for (tick which applies) a new bore; or to alter an existing bore? A.2 Property owner s name and address for where the bore will be constructed/altered (if different from applicant details in Form 1) Property owner s contact numbers for property on which bore is to be constructed/altered Home phone Email Work phone Mobile Preferred method of contact (please circle) Home Work Email Mobile 1

Part A Property occupier s contact details (continued) A.3 Property occupier s name and address for land on which bore is to be constructed/altered (if different from applicant and owner details) Property occupier s contact numbers for the land on which bore is to be constructed/altered Home phone Work phone Email Mobile Preferred method of contact (please circle) Home Work Email Mobile A.4 ame and address of driller or person carrying out the works Contact numbers for driller or person carrying out the works Home phone Work phone Email Mobile Preferred method of contact (please circle) Home Work Email Mobile Part B Location of the proposed bore construction or alteration B.1 Full legal description of site upon which the bore construction or alteration is to occur (available from the rates notice) B.2 Please provide a Certificate of Title no older than three months at the time of lodging the application. If this is not supplied with your application the council will obtain one at your expense. B.3 Map location reference Please provide a grid reference or GPS location in ZTM (ew Zealand Transverse Mercator projection) 2000 format. Conversions from other reference systems such as ZMS 260 can be found on www.liz.govt.nz E E E E E OTE This should be two seven digit numbers for example E1304417, 5015351 and can be obtained from your driller or a GPS. B.4 Distance to property boundaries What is the minimum distance from the bore site to the property boundary We recommend you consult with your neighbour if the proposed bore site is near your property boundary. If the bore is to be located within 50 metres of your property boundary explain the reasons for this. 2

B.5 Detailed site plan A detailed site plan is required. Use the space on this form to complete a site plan showing the location of your proposed bore in relation to nearby houses, driveways, streets, intersections, springs, waterways, and property boundaries. If possible also show other bores, septic tanks, and waste disposal sites. Two examples of acceptable drawings are shown below to guide people submitting their own hand drawn plan. Example of residential type Example of farm type Smith s Creek East Street 300 metres South Street 100 metres Garage 50 metres Proposed bore House Joe Bloggs bore Fence line 700 metres Proposed bore Dairy shed 400 metres Farm road access Fence line Site plan for proposed bore 3

Part C Details of proposed activity C.1 umber of bores associated with this proposed drilling? C.2 What is the bore to be used for? o Domestic (1 house only) o Domestic - more than 1 house o Stock o Irrigation o Industrial / Commercial o Exploratory o Other, provide details How many houses C.3 What quantity of water do you propose to take, and what rate will water be taken? Maximum rate of take Maximum daily volume litres per second cubic metres per day C.4. If more than one hole is being drilled to construct one or more bores, provide the following details for the additional bores on a separate sheet. Bore 1 Bore 2 Bore diameter (mm) Estimated bore depth (m) Estimated casing depth (m) Casing material (if PVC, state grade) Aquifer Method of drilling Method of construction Bore diameter (mm) Estimated bore depth (m) Estimated casing depth (m) Casing material (if PVC, state grade) Aquifer Method of drilling Method of construction Existing bore Altered bore information Existing bore consent number Bore diameter (mm) Estimated bore depth (m) Estimated casing depth (m) Casing material (if PVC, state grade) Aquifer Method of drilling Method of construction Bore diameter (mm) Estimated bore depth (m) Estimated casing depth (m) Casing material (if PVC, state grade) Aquifer Method of drilling Method of construction 4

Part D Affected parties and written approvals If you are not the owner of the land upon which the bore is to be constructed (altered), written approval is required from all parties who own the land as shown on the Certificate of Title. If written approval is required, use the written approval forms contained within Form 1. Supply these at the time of lodging your application to reduce delays in consent processing and to keep costs to a minimum. Part E Assessment of actual and potential effects Tick appropriate boxes. Ask your driller if you are unsure. E.1 Is the proposed activity within 50 metres of a known contaminated site? Yes o E.2 Is the proposed activity within 100 metres of any existing bores on neighbouring properties? E.3 Is the activity within 50 metres of any existing septic tank/outfall or long drop toilet? Yes o E.4 Are there any surface water bodies within 100 metres of the proposed bore? Yes o E.5 Is the proposed bore likely to penetrate either the Papakaio or Lower Taieri Aquifers? Yes o E.6 Is the proposed activity located in an historical place, recorded archaeological site, or in an area of cultural or spiritual significance to Tangata Whenua? E.7 Provide details of neighbouring bores or wells identified in E.2 above Owner s name Bore number Distance (m) Depth of bore (m) Yes Yes o o E.8 Provide details of septic tank/outfall or long drop toilets identified in E.3 above Owner s name Distance (m) E.9 Distance to surface water bodies within 100 metres of the proposed bore identified in E.4 above Surface Water Body Distance (m) E.10 Distance to the coast if less than 50 metres PART F Deposit A deposit is required upon lodgement of your application. Refer to the fees list on Form 1. This deposit is not the final or total cost of your application. Further charges are incurred in accordance with council s scale of fees and charges (for more information www.orc.govt.nz). Deposit enclosed Yes o $ 5

PART G Checklist To minimise consent processing costs check that you have completed all the sections below before you lodge your application with the Otago Regional Council. Completed Form 1 Sign and date Form 1 Completed all parts of this form Written approvals completed or attached Include a site plan Include the deposit or Attached Certificate of Title less than three months old Instruct council to obtain a Certificate of Title at your expense PART H Statutory considerations The relevant policies of the Otago Regional Policy Statement, and the Regional Plan Water for Otago for the construction and alteration of bores within the region are listed below. The Otago Regional Council must assess the application against these policies. Regional Policy Statement Policy 5.5.5 To minimise the adverse effects of landuse activities on the quality and quantity of Otago s water resource through promoting and encouraging and (a). Creation, retention and where practicable enhancement of riparian margins; and (b). Maintaining and where practicable enhancing, vegetation cover, upland bogs and wetlands to safeguard land and water values; and (c). Avoiding, remedying or mitigating the degradation of groundwater and surface water resources caused by the introduction of contaminants in the form of chemicals, nutrients and sediments resulting from landuse activities. Policy 6.4.2 To maintain and enhance the quality of Otago s water resources in order to meet the present and reasonably foreseeable needs of Otago s communities. H.1 Is the proposed activity consistent with part Policy 5.5.5 and Policy 6.4.2? o Yes o o Explanation if no 6

Regional Plan Water for Otago Policy 9.4.14 To require appropriate siting, construction and operation of new groundwater bores, to prevent (a) Contaminants from entering an aquifer; and (b) The contamination of groundwater in any aquifer from the groundwater in another aquifer; and to promote such management for existing bores. Policy 6.4.10C To require appropriate siting, construction and operation of new groundwater bores, to maintain artesian pressure in confined conditions and to promote such management for existing bores. Policy 6.4.10D To require that new bores in the Papakaio and Lower Taieri Aquifers are constructed of materials suitable to resist corrosion and in a manner that enables their complete shutdown. Policy 6.4.10E Unless provision has been made to permanently decommission and seal the bore, to require the structural condition and control mechanisms of all existing bores in the Papakaio and Lower Taieri Aquifers to be certified as being secure against uncontrolled artesian discharge at no more than five yearly intervals. In situations where more than one hole is drilled but only one bore is constructed, this policy also applies Policy 9.4.17 To require new drill holes to be appropriately sealed to prevent contaminants entering any aquifer. H.2 Is the proposed activity consistent with Policies 9.4.14, 6.4.10C, 6.4.10D, 6.4.10E and where relevant 9.4.17? o Yes o o Explanation if no 7

Otago Regional Council minimum aquifer test requirements 1. Why do I have to do an aquifer test? Aquifer tests are required by the Otago Regional Council as part of the information requirements for a resource consent application to take and use groundwater. This information sheet outlines the Otago Regional Council s minimum aquifer test requirements to support resource consent applications. Aquifer tests are required for two reasons. First to demonstrate that you can actually take the amount of water you are seeking and second for information on aquifer parameters which are used to assess the potential effects of the proposed take. 2. What is an aquifer test? Aquifer tests consist of pumping a bore at a certain rate and recording drawdown in the pumped bore and nearby observations bores at specific times. There are two main types of pump tests; step-drawdown tests and constant-rate tests. A step-drawdown test occurs when a bore is pumped at successively greater discharge rates for relatively short periods of time. These tests are used to describe bore performance which is a function of the construction of the bore and aquifer characteristics. A constant-rate test occurs when a bore is pumped for a significant length of time at one rate and often includes monitoring of groundwater level recovery once pumping has ceased (a recovery test). These tests are used to provide information on aquifer parameters such as transmissivity, storativity and leakage. 3. Doing an aquifer test The aquifer test must be of sufficient quality to demonstrate to the Council you are able to take the amount of water you are seeking and to provide a reliable assessment of aquifer properties to support an assessment of environmental effects. If the pump test is not of sufficient quality your application may not be accepted. It is recommended that you discuss your aquifer test with a groundwater scientist and or the Otago Regional Council Resource Science Unit before proceeding. The aquifer test data should be designed and analysed by a suitably qualified and/or experienced groundwater scientist. It is recommended that they are contacted before undertaking a pump test so that they can advise you on aquifer test design. If for some reason you are unable to meet the recommended minimum aquifer test requirements, then it is advisable to contact either the Otago Regional Council or your consultant to discuss appropriate alternatives to ensure that your application will be accepted. 4. Do I need resource consent? Under our Regional Water Plan, aquifer tests are a permitted activity the pumping rate does not exceed 2,000,000 litres per day (23.15 litres per second) and they do not exceed three consecutive days duration. If you are planning an aquifer test that does not meet these requirements you will need to obtain resource consent. However, you can apply for a water permit for the aquifer test at the same time you are applying for your bore permits. 5. Further information For more information please contact either a suitably qualified and/or experienced person in hydrogeology or Otago Regional Council. 6. References Aitchison-Earl, P. and Smith, M. 2008. Aquifer test guidelines (2 nd Edition). Environment Canterbury Technical Report R08/25, Environment Canterbury, ew Zealand. Kruseman, G. P. and de Ridder,. A. 1994. Analysis and evaluation of pumping test data (2 nd Edition). Publication 47: International Institute for Land Reclamation and Improvement, Wageningen, the etherlands. 7. Acknowledgements This document is based on the Aquifer Pump Tests Information Sheet from Environment Southland (ES). ORC would like to thank ES for the sharing of information and ideas. 8

General requirements The pumping rate should be kept constant within +/- 5% and measured to within +/- 5% accuracy. It is recommended that a data logging electronic flow meter be used to achieve these requirements. After step and constant rate aquifer tests, recovery should be measured to within 10% of the initial static water level. After the start of pumping and during recovery, at a minimum, water levels in the pumping and observation wells should be measured at 30 second intervals during the first 5 minutes, 1 minute intervals between 5 and 15 minutes, 5 minute intervals between 15 and 60 minutes and 15 minute intervals thereafter. It is recommended that data logging pressure transducers be used to achieve these requirements. Pumped water should be discharged at a location where it won t cause recharge of the aquifer and influence the aquifer test. Aquifer pumping tests should be conducted during stable weather conditions. Significant rainfall, barometric pressure changes, high or variable river flows and other factors may influence the results of your test. Be prepared to delay the test if required. Specific requirements Takes less than 250 m3/d Takes between 250 to 750 m3/d Takes greater than 750 m3/d 2 hour pumping at the maximum proposed rate. Water level monitoring should include drawdown and recovery in the pumping well. 1. Static water level to be monitored for at least 24 hours prior to start of test in the pumping and observation wells 2. A step-drawdown aquifer test comprising a minimum of 4, 1 hour pumping steps followed by measurement of recovery. The maximum pumping rate should be equal to the maximum proposed rate. 3. A 24-hour constant-rate aquifer test undertaken at the maximum proposed rate. Water level monitoring should include drawdown and recovery in the pumping bore and in at least one observation bore within the area of localized drawdown. Confined or leaky aquifers 1. Static water level to be monitored for at least 24 hours prior to start of test. 2. A step-drawdown aquifer test comprising a minimum of 4, 1 hour pumping steps followed by measurement of recovery. Maximum pumping rate should be equal to the maximum proposed rate. 3. A 72-hour constant-rate aquifer test undertaken at the maximum proposed rate. Water level monitoring should include drawdown and recovery in the pumped bore and at least two observation bores in the source aquifer and one observation well in the overlying aquifer within the area of localized drawdown. Unconfined aquifers 1. Static water level to be monitored for at least 24 hours prior to start of test. 2. A step-drawdown aquifer test comprising a minimum of 4, 1 hour pumping steps followed by measurement of recovery. Maximum pumping rate should be equal to the maximum proposed rate. 3. A 48-hour constant-rate aquifer test undertaken at the maximum proposed rate. Water level monitoring should include drawdown and recovery in the pumped bore and at least two observation bores within the area of localized drawdown. 9

Information requirements to be included with the aquifer test results The following information should be provided with the aquifer test results: A map of the site with key features including the pumping and observation bores, surface water features and pumped water discharge location identified Coordinates for pumping and observation bores used in the aquifer test Surveyed elevations for pumping and observation bores used in the aquifer test and for nearby surface water level Bore logs and construction information, including depth and diameter for the pumping and observation bores Information on the location of pumped discharge, the method used to measure discharge and the discharge monitoring records in electronic format (Excel). Records of measured groundwater levels in the pumping and observation bores in electronic format (Excel) Records of measured or observed of rainfall, barometric pressure and river flows Analysis of aquifer test results to provide estimates of relevant aquifer parameters to support the effects assessment. This should include details of any data corrections used, analysis methods, plotted data, calculations used and discussion of data and analysis reliability 10