Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

Similar documents
GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section.

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

TURFSTONE PAVERS SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

SECTION CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795)

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

Section (02830) MODULAR CONCRETE RETAINING WALL

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

CONCRETE TILE PAVERS

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION INTERLOCKING CONCRETE PAVERS

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

SECTION INTERLOCKING CONCRETE PAVEMENT ON A CEMENT TREATED BASE

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

PAVING SLABS ON A CONCRETE BASE

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

INTERLOCKING CONCRETE PAVERS SECTION 02780

1. Concrete pavers, with ungrouted joints, over sand base. a. Large precast sections in random mix with smaller concrete pavers

GUIDE SPECIFICATION FOR CONSTRUCTION USING WILLOW CREEK CONCRETE PAVERS

SECTION INTERLOCKING CONCRETE PAVERS

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

MagnumStone Specifications Gravity

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM

SECTION UNIT PAVERS

Section ( ) MODULAR CONCRETE RETAINING WALL

SECTION EROSION CONTROLS

Section 1I-3 - Bioswales

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Flexamat Erosion Control Mat

CONCRETE SEGMENTAL FREESTANDING WALL SYSTEM

Section ( ) SPECIFICATION FOR SEGMENTAL CONCRETE UNIT RETAINING WALL

Flexamat Tied Concrete Block Mats

MODULAR CONCRETE RETAINING WALL

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SECTION POROUS PAVEMENT SYSTEM

Base Course Design and Construction

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

Construction Specification for Concrete Unit Pavers

Section ( ) KEYSTONE CONCRETE RETAINING WALL

TECH SPEC. Guide Specification for the Construction of Interlocking Concrete Pavement

Tech Spec 9. Guide Specification for the Construction of Interlocking Concrete Pavement SECTION INTERLOCKING CONCRETE PAVERS

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

SECTION MECHANICALLY STABILIZED EARTHEN SLOPES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

1.03 Submittals A. Submit the following in accordance with Section 01300:

SECTION TRENCHING

SECTION ASPHALT PAVING

BIO-AQUIFER STORM SYSTEM

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

INS T A LLA T I O N G U I D E

PERMEABLE INTERLOCKING PAVERS

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

TRUEGRID Permeable Paver Technical Specifications

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM

Narrow Modular Pavers (NMP) for Sand-Set Installations

SECTION ( ) MODULAR CONCRETE RETAINING WALL SYSTEM WEATHERED MULTI SHAPE 8 (203mm) HIGH UNITS

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

Reinforced Soil Slopes (RSS)

SECTION LANDSCAPE SUBDRAINAGE. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Installation Guidelines

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

Redi Rock Specification and Installation Manual

SECTION MECHANICALLY STABILIZED EARTH 1.01 SUMMARY

SECTION SUBDRAINAGE

SECTION UTILITY BACKFILL MATERIALS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION UTILITY MANHOLES AND STRUCTURES

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009

GABIONS AND REVET MATTRESSES

Specification Guide and Installation Overview

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF THE AQUAPAVE PERMEABLE ON-SITE STORMWATER SOURCE CONTROL SYSTEM

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

SECTION EROSION CONTROL DEVICES

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

Wmega Retaining Wall Specification

ICPI TECH SPEC NUMBER 2 Construction of Interlocking Concrete Pavements

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Construction Specification 62 Grouted Rock Riprap

Transcription:

PART 1: Section 32 12 43 (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM GENERAL 1.01 Description A. Work shall consist of furnishing all material, labor, services and related items to complete the installation of Drivable Grass a permeable, plantable and flexible concrete erosion control system in accordance with these specifications. 1.02 Related Sections A. Section 31 10 00 - Site Clearing B. Section 31 20 00 - Earth moving C. Section 32 14 00 - Unit Pavers D. Section 32 80 00 - Irrigation E. Section 32 91 13 - Soil Preparation F. Section 32 92 00 - Turf and Grass G. Section 32 92 19 - Seeding H. Section 03 30 00 - Cast in place concrete 1.03 Reference Documents A. ASTM D-422 - Particle Size Analysis B. ASTM D-698 - Laboratory Compaction Characteristics of Soil - Standard Proctor C. ASTM D-1557 - Laboratory Compaction Characteristics of Soil Modified Proctor D. ASTM C-33 - Standard Specification for Concrete Aggregates E. ASTM C 150 - Standard Specification for Portland Cement 1.04 Submittals/Certification A. Procedures: Comply with Section 01 33 00 Submittal Procedures. B. Product Data: Submit manufacturer s product data, including installation instructions. C. Samples: a. Submit 8 x 8 Drivable Grass concrete erosion control mat sample b. Submit Geotextile or Rolled Erosion Control Blanket Underlayment data c. Submit sieve analysis for grading of bedding sand and base material (if required) d. Verify source of compost material for bedding and seed cover (if required) e. Verify grass seed and/or hydro-seed/mulch mix and sources f. Submit hydraulic testing report for the product that is representative of its intended use 1.05 Quality Assurance A. Installer Qualifications: An experienced installer who has successfully completed installations of erosion control / revetment or other concrete systems on projects of similar or larger scope and magnitude. B. Prior to commencing the work of this section, verify the accuracy of layout and grading. Verify that all sub-grades and base course aggregate conditions (if required) are as specified. Notify the owner and / or engineer of any discrepancies and coordinate the correction of those discrepancies with other trades as necessary. 1.06 Delivery, Storage and Handling A. Deliver materials to site in manufacturer s original palletized configuration with labels clearly identifying product style number, color, name and manufacturer. B. Check all materials upon delivery to assure that the proper type, grade, color, and certification have been received.

Page 2 C. Store materials in clean, dry area in accordance with manufacturer s instructions. D. Protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials shall not be incorporated into the work. 1.07 Project Conditions A. Review installation procedures and coordinate Drivable Grass concrete erosion control system installation with other work around installation area. B. All adjacent perimeter edging, or other hardscape/paving surfaces, required by construction documents shall be completed prior to the installation of the Drivable Grass concrete erosion control system. C. Gradients for Drivable Grass concrete erosion control mats can vary from flat to 50%. For steeper conditions, consult with manufacturer. D. Protect partially completed areas against damage from unintended construction traffic when work is in progress. Protect the perimeter of the installation area from erosions until vegetation establishment or final grades are finished. E. Areas adjacent to Drivable Grass concrete erosion control system installation should be protected during construction. PART 2: PRODUCTS 2.01 Acceptable Manufacturer A. Soil Retention Products, Inc., Corporate Office: 2501 State Street, Carlsbad, CA 92008. Phone: 760-966-6090 and 800-346-7995, Fax: 760-966-6099, Website: www.soilretention.com, E-mail: sales@soilretention.com. B. No substitutions permitted. For approved equal status, equivalent field test data for a concrete product with similar characteristics shall be submitted. Compressive strength results shall not be based on sand/gravel infilled lab tests. 2.02 Permeable, Flexible and Plantable Concrete Erosion Control System A. Permeable, Flexible and Plantable Concrete Erosion Control System: Drivable Grass a. Nominal Dimensions (inches [l x w x h]) 24 x 24 x 1.5 b. Gross Area of Each Mat (square feet) 4 c. Weight of Each Mat (lbs) 48-49 d. Plantable Area (percent) 60 e. Mats per pallet (each) 60 f. Area Covered per Pallet (square feet) 240 g. Color** Buff/Tan, Grey h. Product Flexibility - Minimum radius of curvature (inches) 12 i. Concrete Compressive Strength @ 28 days in psi 8,000 j. Proprietary Grid Reinforcement Engineered Plastic **Other colors available for special order B. Underlayment Fabric Geotextile or Rolled Erosion Control Blanket used directly below the Drivable Grass concrete erosion control mats. a. Rolled Erosion Control Blanket A protective blanket of coconut fiber, straw, or other plant residue. b. Miramesh TR - High-tenacity polypropylene yarns that are woven together to produce an open mesh geotextile.

Page 3 c. Filter fabric (Mirafi 140N) A needle-punched, non-woven geotextile composed of polypropylene fibers. C. Bedding Course Defined as the initial material directly below the underlayment fabric and Drivable Grass concrete erosion control mats. For typical hydro-seeded, mulched and nonplanted applications, a ½ nominal sand or native soil shall be used as determined appropriate by the design engineer. A uniform thickness and smooth finish surface of bedding between the subgrade and/or base layer, Underlayment Fabric and Drivable Grass concrete erosion control mat is required. For grass seed planting applications, a minimum thickness of 2 inches of a thorough mix of 75% sand and 25% fine ground compost shall be used. a. Sand shall be clean, non-plastic, and free from deleterious or foreign matter. The sand shall be sharp and manufactured from crushed rock. Do not use limestone screenings stone dust. The particles shall conform to the grading requirements shown below: ASTM C33 CSA A23.1-M94 Sieve Size Percent Passing 3/8 in. (9.5 mm) 100 No. 4 (4.75 mm) 95 to 100 No. 8 (2.36 mm) 85 to 100 No. 16 (1.18 mm) 50 to 85 No. 30 (0.600 mm) 25 to 60 No. 50 (0.300mm) 5 to 30 No. 100 (0.15mm) 2 to 10 b. Compost material is defined as finely ground, well screened composted products such as composted manures, mushroom compost or green-waste compost. Material should be able to mix well with sand, able to hold moisture, and provide nutrient. D. Spikes (if required) Used when Hydraulic Velocity and Shear greater than values supported in test documentation or as required by the design engineer. Stakes, when necessary, shall consist of 8-inch galvanized ring shanks (1/4 gauge, 9/16 head). E. Grass - Use approved seed or hydroseed mix appropriate for the site-specific application or as indicated by project specifications. F. Seed Cover (if required) Use approved seed cover to retain moisture during germination of seed. G. Base Aggregate* (If Required) - Defined as a structural base section to be used below the system for drivable applications. Local, state or provincial standards for aggregate base materials for roads should be used for the gradation and quality of dense-graded aggregate base materials. If no standards exist, follow ASTM D 2940, Standard Specification for Graded Aggregate Material for Bases or Subbases for Highways or Airports. The gradation for base material from this standard is given in Table 1 below. This material should be compacted to a minimum of 95% standard Proctor density per ASTM D 698. For planted applications, verify aggregate does not include harmful materials that could prevent healthy root growth.

Page 4 Table 1 ASTM D 2940 Gradation for Dense-Graded, Crushed Stone Base Sieve Size Percent Passing 2 in. (50 mm) 100 1 1/2 in. (37.5 mm) 95 to 100 3/4 in. (19.0 mm) 70 to 92 3/8 in. (19.0 mm) 50 to 70 No. 4 (4.75 mm) 35 to 55 No. 30 (0.600 mm) 12 to 25 No. 200 (0.075 mm) 0 to 8 *For California installations, Caltrans Class II Base is recommended. PART 3: EXECUTION 3.01 Subgrade Preparation A. Vertical depth to accommodate design section for Drivable Grass concrete erosion control mat thickness, Underlayment Fabric thickness, Bedding Course thickness (if any), and Base Aggregate layer (if any). B. Excavate to the lines and grades shown on the construction drawings. C. Install any edging as specified. D. Proof roll subgrade area as directed by engineer to determine if remedial work is required. E. Over-excavation and replacement of unsuitable subgrade soils with approved compacted fill as directed by engineer. F. Owner's representative shall inspect the subgrade and approve prior to placement of Drivable Grass concrete erosion control system components. G. Install irrigation system (if required) to the specified depth and location as required by the contract drawings. 3.02 Installation of Aggregate Base and Bedding Layer (if required) A. Install and compact aggregate base as required by the contract drawings. The recommended base surface should be +/- 3/8 over a 10 ft. straight edge. B. Install, level to a uniform thickness, and compact bedding course upon which Underlayment Fabric will be placed. 3.03 Install Underlayment Fabric A. Install underlayment fabric in accordance with the manufacturer s guidelines. 3.04 Install Drivable Grass Concrete Erosion Control Mats A. Install permeable, flexible, and plantable Drivable Grass concrete erosion control mat in accordance with the manufacturer s guidelines directly atop the Underlayment Fabric. B. Install mats to the line, grades and locations required by the contract documents. C. Install mats in one axial direction. Butt concrete mats against each other leaving no significant gaps. Adjust mats as required to maintain good grid pattern alignment. The vertical tolerance from mat to mat should be relatively flush with excessive lipage limited (maximum ⅛ difference in height from mat to mat). D. Install four stakes (if required) per mat as required per manufacture s guidelines.

Page 5 3.05 Fill Drivable Grass Concrete Erosion Control System with Infill Material (if required) A. Infill for planted applications is to be comprised of the same material as the bedding course. B. Spread infill uniformly across the mats with a push broom. Leave the infill about ¼ below the concrete pad surface. 3.06 Vegetate Drivable Grass Concrete Erosion Control System A. Install planting materials as specified in the construction drawings. Seeding, hydroseeding, stolonizing, and plugging, may be acceptable provided that planting is conducted in accordance with the project documents. 3.06 Field Quality Control A. The Owner shall engage inspection and testing services to provide quality assurance during construction. This does not relieve the Contractor from securing the necessary control testing during construction when required by the contract documents. B. Qualified and experienced technicians and engineers shall perform testing and inspection services. C. As a minimum, quality assurance testing should include subgrade soil inspection; aggregate base (if any) and bedding (if any) type, quality, thickness, compaction; Underlayment Fabric placement; Drivable Grass Concrete Erosion Control Mat placement and staking (if required); and observation of construction for general compliance with design drawings and specifications. a. The final surface tolerance of the concrete mats shall not deviate more than +/- ⅜ over a 10-ft straightedge. b. The surface elevation of the concrete mats shall be ⅛ to ¼ above adjacent drainage inlets, concrete collars or inlets. c. Lippage: No greater than ⅛ difference in height between concrete mats. 3.07 Protection A. Avoid significant run-on during plant establishment and stay off planted areas until established. The contractor shall be responsible for protecting work from damage due to subsequent construction activity on the site.