Contracts and Communication

Similar documents
PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

PJM InSchedule User Guide

Energy Markets - The Basics

Two Settlement PJM /06/2016

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

Overview of GATS Load Data for NJ Electricity Suppliers

CUSTOMER GUIDE TO PJM BILLING

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Benefits from Generation and Storage on the Distribution System

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

PJM. erpm Users Guide. May 20, Version PJM Interconnection

Scheduling Operations

Market Settlements - Advanced

Recent Development in Reliable Energy Market in the US and Singapore

Dispatch Signal & Locational Marginal Pricing (LMP)

PJM. erpm Users Guide. December 4, Version PJM Interconnection

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

Price Responsive Demand education. DRS May 11 th, 2017

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

ATTACHMENT M-1 (FirstEnergy Zones) FirstEnergy Procedure for Determining a Load Serving Entity s Hourly Energy Obligations

Financial Transmission Rights

Storage Charging Energy

PJM Manual 29: Billing. Revision: 26 Effective Date: 11/20/2014. Prepared by Market Settlements Department

PJM Strawman Proposal

Generation Transfer Request User Guide. Revision: 02

Schedule 9 and 10 PJM /23/2017

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012

Congestion and Marginal Losses

STANDARD CONTRACT RIDERS - (Continued) RIDER NO. 9 DAY-AHEAD HOURLY PRICE SERVICE

Reliability Pricing Model (RPM) DRAFT Business Rules

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department

Billing Line Items PJM /23/2017

IMM Marginal Loss Allocation Methodology Recommendation

PJM ARR and FTR Market

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview

PJM Fixed Transmission Rights (FTRs)

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

PJM ARR and FTR Market

Current Language Proposed Revisions Rationale

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

5-Minute Settlements Roadmap

Whitepaper on PJM Forward Energy Reserve. A Centralized Call Option Market Proposal

Market Settlements - Advanced

Energy & Reserve Pricing Solution Overview PJM 2014

Xcel Energy s Comments on CAISO Draft Final Straw Proposal

Congestion and Marginal Losses

CRR Educational Material Overview

Congestion and Marginal Losses

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis January 22, PJM 2018

RPM 301 Performance in Reliability Pricing Model

Alternatives for Addressing the Interface Pricing Flaw

Markets Report. Jennifer Warner-Freeman Senior Economist, Market Analysis March 19, PJM 2018

PJM Load Response Programs. Virtual Training Joe Polidoro August 19, 2003

PJM Economic Demand Resource in Energy Market. PJM State & Member Training Dept.

Congestion and Marginal Losses

5-Minute Settlements. As of September PJM 2017

Energy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144

3.2 Market Buyers Spot Market Energy Charges.

Status Update Assessment of ICT/RTO Options and Issues

Market Settlements - Advanced

Energy & Ancillary Services Market Operations Scheduling Operations. PJM Manual 11: Revision: Effective Date: June 23, 2010January 01, 2010

UTC Activity Pre and Post 162 FERC 61,139: January 1, 2017 through March 8, 2018

ISO Net Surplus Collection & Allocation in Wholesale Power Markets under LMP

Style Definition: PJM_Normal. PJM Manual 29: Billing. Revision: 267 Effective Date: 11/20/2014. Prepared by Market Settlements Department PJM 20162

Energy Uplift (Operating Reserves)

Energy Uplift (Operating Reserves)

Control Center Requirements

I. DESCRIPTION OF SUPPLY TO BE PROCURED IN THE PA DEFAULT SERVICE PROGRAM SOLICITATIONS

Revision: 67. Prepared by

Power Markets and Renewables Deployment in Developing Countries

APS Stakeholder Meeting. September 9 th 2016

PJM Reserve Market. PJM State & Member Training Dept. PJM /27/2015

3.2 Market Settlements.

PJM ExSchedule User Guide

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

NEW YORK INDEPENDENT SYSTEM OPERATOR

Locational Based Marginal Pricing

Relevant changes will be made to corresponding sections of OA and RAA.

ERCOT ISO: Current Market and Trends in Future Market Design

Capacity Shortages RE Module. Interconnection Training Program PJM State & Member Training Dept.

BACKGROUNDER on the first fully functioning regional transmission organization in the United States: PJM Interconnection

Measurement and Verification for Residential DR Training

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

Key Issues and Consideration in Market Design, Operational and Oversight

ATTACHMENT M-2 (ComEd)

ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Transmission Congestion and Loss Only Virtual Product. Overview

Market Settlements - Advanced

The Evolution of the PJM Market in the United States: Looking Back to Look Forward

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Markets Report. Paul M. Sotkiewicz, Ph.D Chief Economist, Markets MC Webinar March 23, 2015 PJM 2015

Transcription:

Contracts and Communication PJM State & Member Training Dept.

Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not supersede the PJM Operating Agreement or the PJM Tariff both of which can be found by accessing: http://www.pjm.com/documents/agreements/pjm-agreements.aspx For additional detailed information on any of the topics discussed, please refer to the appropriate PJM manual which can be found by accessing: http://www.pjm.com/documents/manuals.aspx 2

Contracts 3

Contracts Contract Information Pricing Day-ahead automatically carries over to Real-time Real-time Contract Name Start/Stop date Seller, Buyer Both must be PJM Members Source, Sink Pricing Points Seller looks like load priced at Source (Charge) Buyer looks like generation priced at Sink (Credit) Buyer pays LMP difference between Source and Sink (congestion and losses) Source/Sink for RLR, WLR and GEN types should be the same See next slides 4

Contracts Contract Information Service Types RLR Retail Load Responsibility Surrogate for Metered Interchange Seller is Retail Load Aggregator, Buyer is EDC Typically entered by EDC (other arrangements) Applied to Balancing Market Typically priced at zonal LMP or Aggregate Source and Sink are the same EDC Zone Used to calculate loads and Load Ratio Shares ( carves out LSE load from zone) If nothing else done (i.e. IBT, Day ahead, import, generation), LSE charged Energy MW * Source RT LMP 5

PJM Retail Access Energy Model Transmission PJM Load Up to Day After 2 or 3 Months After Generation State Commissions EDCs Agree to Method and Standards of Determining Hourly Retail Load Responsibility Agree to Method and Standards of Determining Hourly Reconciliation Amount LOAD AGGREGATORS 6

Contracts Contract Information Service Types WLR Wholesale Load Responsibility Surrogate for Metered Interchange Seller is Muni, Co-op (Wholesale customer); Buyer is EDC Generally entered by EDC Applied to Balancing Market Typically priced at Aggregate (must be fully in zone) Source and Sink are the same Used to calculate load and Load Ratio Shares for wholesale entities not fully metered to PJM EDC Zone If nothing else done (i.e. IBT, Day ahead, import, generation), Seller charged Energy MW * Source RT LMP Must coordinate with PJM Market Settlements 7

Gen Contracts in Power Meter Contract Information Service Types GEN Merchant Generation Entered in Power Meter Surrogate for metered interchange Seller is EDC, Buyer is Generator Generally entered by EDC Applied to Balancing Market Priced at Generator bus Source and Sink are the same EDC Zone Designate merchant generation supply schedules for generators billed directly by PJM 8

Contracts Contract Information Service Types IBT Internal Bilateral Transaction Used for all internal bilateral energy transactions including supply for parties serving retail load Financial change of MW ownership Does not affect scheduling May be specified as Day-ahead or Balancing Day-ahead automatically copies to Balancing as well Entered by either of the parties Source and Sink can be the same or different Must be agreed to by both parties Adjusts a participants spot market interchange for PJM Prices for energy settled outside PJM Market Settlements Buyer gets paid sink LMP for energy Buyer pays (sink-source) LMP explicit congestion and losses Seller is charged source LMP PJM RTO 9

Contracts Contract Information Schedule Confirmation Type Unilateral Buyer Seller automatically confirmed Unilateral Seller Buyer automatically confirmed Bilateral Both Buyer and Seller must confirm Comments For party-party communications only, PJM does not review 10

esuite: Login for InSchedule 11

InSchedule Your Company s PJM Accounting Acronym is at the top of each screen 12

Contracts Search for Contracts Click to Create a New Contract 13 Click to edit a Contract

Contracts To create new contract or modify, enter required information and click Save 14

Schedules Find a Schedule associated with a contract or create new Schedule Click to edit a Schedule 15

Schedules Adjust Schedule MWh amount and click Confirm when done 16

File Upload Click to Upload a File 17

File Upload Select the file and click Open and the file will begin uploading immediately 18

Communication 19

Interacting with PJM Markets erpm Power Meter eftr efuel InSchedule edata edart Oasis egads emkt CAM elrs ExSchedule MSRS

PJM Tools Demonstration 21

Questions?