Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting

Similar documents
NOTICE OF PREPARATION

Carpinteria Valley Water District Carpinteria Advanced Purification Project

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

Open House Overview. We Need Your Input! Location Options Environmental Issues Treatment and Water Reuse Architecture and Visual Issues

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

SECTION 6.0 Alternatives to the Proposed Project

Community Workshop October 17, 2015

Subject: Notice of Preparation of a Draft Environmental Impact Report

CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM. Cost Estimates... 3

5.0 PROJECT ALTERNATIVES

Subject: Notice of Preparation of a Draft Environmental Impact Report

VALLECITOS WATER DISTRICT

Alternatives Analysis

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Malibu. Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I. Prepared For: Prepared by:

Pacific Wind Energy Project Draft Environmental Impact Report

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

1 INTRODUCTION 1.1 PROJECT REQUIRING ENVIRONMENTAL ANALYSIS 1.2 PURPOSE AND INTENDED USES OF THIS DRAFT EIR

Amador County General Plan Final Environmental Impact Report

Section 2.0 Introduction and Purpose

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180

Purpose of the EIR. Chapter 1 Introduction

6. Cumulative Impacts

San Ramon City Center Draft Subsequent EIR

Incremental Recycled Water Program 2007 ADDENDUM TO PROGRAM ENVIRONMENTAL IMPACT REPORT

Table of Contents. City of Redlands - Redlands Crossing Center

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

NOTICE OF PREPARATION. California Office of Planning and Research, Responsible Agencies, Trustee Agencies, and Other Interested Parties

Scoping Meeting Environmental Impact Report for Civic Center Wastewater Treatment Facility

Introduction CHAPTER Project Overview

Los Cerritos Wetlands Oil Consolidation and Restoration Project

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process

NOTICE OF PREPARATION

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report

APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES

County of El Dorado Notice of Preparation Tilden Park Project

Study Session and Draft Environmental Impact Report for the Underground Flow Equalization System 2495 Delaware St. SUP, PA Planning

Findings from Updated Site Comparison Report. City Council Presentation September 26, 2017

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process

20. UTILITIES AND SERVICE SYSTEMS

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

Revisions to the Kern County Zoning Ordinance, 2015 C

Environmental Setting, Impacts, and Mitigation Measures

City of Fountain Valley. Fountain Valley Crossings Specific Plan Project: Draft EIR Public Hearing. January 25, 2017

CEQA provides the following guidelines for discussing project alternatives:

Draft Environmental Impact City of Daly City General Plan Update. Sacramento, California, May

5.0 ALTERNATIVES 5.0 ALTERNATIVES

LAX Terminals 2 and 3 Modernization Project DRAFT EIR PUBLIC MEETING. Tuesday, March 21, :00 pm to 8:00 pm

Subsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #3 City of Santa Barbara, California October 26, 2016

LEHIGH PERMANENTE QUARRY RECLAMATION PLAN AMENDMENT

SECTION 9.0 Effects Found Not To Be Significant

Scoping Meeting for Vista Del Agua Project Environmental Impact Report

CHP Truckee Area Office Replacement Project

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

Wastewater System Environmental Setting Wastewater Conveyance Facilities

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised

5. OTHER CEQA CONSIDERATIONS

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY

6. Significant Unavoidable Adverse Impacts

Leland Reservoir Replacement Project

Lower Penitencia Creek Improvements Project. Community Update & Draft Environmental Impact Report Meeting May 22, 2017

COMPARISON OF ALTERNATIVES

f. Implement a high-quality architectural design that improves the overall aesthetics of the project site and surrounding area.

6 ALTERNATIVES 6.1 INTRODUCTION

Butano Creek Channel Reconnection and Resilience Project CEQA Process. Lead Agency: San Mateo Resource Conservation District June 27, 2018

Los Cerritos Wetlands Oil Consolidation and Restoration Project

2035 General Plan Update, Belmont Village Specific Plan, and Climate Action Plan

GRAPEVINE SPECIFIC & COMMUNITY PLAN. KERN COUNTY PLANNING & NATURAL RESOURCES DEPARTMENT June 28, 2016

David Brockbank, Senior Planner Contra Costa County Department of Conservation and Development 30 Muir Road Martinez, CA, 94553

5.0 LONG-TERM CEQA CONSIDERATIONS

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

California State University Stanislaus Physical Master Plan Update. Program Environmental Impact Report

Water Supply and Demand

3.0 COMMENTS AND RESPONSES

ATTACHMENT B. Findings for Approval and Statement of Overriding Considerations Eastern Goleta Valley Community Plan

CHAPTER 1 INTRODUCTION

RESOLUTION NO

Planning Commission Hearing

A10. Cost and Benefits Summary

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

7.0 GROWTH-INDUCING AND CUMULATIVE IMPACTS

SECTION 4.0 ALTERNATIVES

NOTICE OF PREPARATION

City and County of San Francisco San Francisco Planning Department. Summary Presentation on

NAPA SANITATION DISTRICT SOLAR PROJECT

Impact Report for IRWD s Biosolids & Energy Recovery Project. June 27, 2012

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

An Overview of the California Environmental Quality Act

County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by:

Facebook Campus Project. City Council Study Session January 31, 2012

CHAPTER 8 Wastewater and Recycled Water

San Benito County Water District

Recycled Water Feasibility Study

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

Draft Environmental Impact Report for The Farm at Alamo Creek Specific Plan Project

Transcription:

Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting May 1, 2018 3:00 PM

Meeting Agenda Purpose of Meeting California Environmental Quality Act (CEQA) Overview and Process Project Overview and Description Review of Impacts Public Comment Period

Purpose of Meeting City of Morro Bay acting as the Lead Agency prepared a Draft Environmental Impact Report (DEIR) for the proposed Morro Bay Water Reclamation Facility (WRF). The purpose of the public meeting is to provide stakeholders, agencies and the public with an opportunity to provide comments on the DEIR.

California Environmental Quality Act (CEQA)

CEQA Process for an EIR We are here

Proposed Project Overview Currently, the WWTP provides a blend of primary and secondary treatment for wastewater produced in the City of Morro Bay and community of Cayucos. To meet the requirements of the State Water Resources Control Board, the Proposed Project would provide tertiary wastewater treatment services for the City and potentially additional surrounding communities or customers. The existing WWTP would be decommissioned and be replaced by the Proposed Project and a separate new treatment facility planned by Cayucos Sanitary District (CSD).

California Coastal Zone Boundary and Project Location

Project Objectives Refined and adopted by City Council, October 24, 2017: All aspects of the WRF shall be completed ensuring economic value with a special emphasis on minimizing rate payer and City expense. Communicated WRF project progress including general project status, milestones, and budget/cost information to community regularly Produce tertiary, disinfected wastewater in accordance with the California Code of Regulations (CCR) Title 22 requirements for unrestricted urban irrigation Produce reclaimed wastewater to augment the City s water supply, by direct or indirect means Design to minimize the impacts from contaminants of emerging concern in the future Design to treat contaminants of emerging concern in the future Ensure compatibility with neighboring land uses

Project Components TREATMENT: Proposed new WRF COLLECTION: New lift station and conveyance pipeline for raw/treated wastewater flows to/from the WRF DISTRIBUTION: New recycled water pipeline from WRF to new groundwater injection wells (two alternative areas) INDIRECT POTABLE REUSE: Recharge advanced-treated recycled water to Morro Valley Groundwater Basin; extract groundwater from existing City production wells DECOMMISSION: Decommissioning of existing WWTP

Proposed Project

Contents of Draft EIR Analysis of Direct, Indirect and Cumulative impacts to resources required by CEQA: Aesthetics Air Quality Agriculture & Forestry Biological Resources Cultural Resources Geology, Soils & Seismicity GHG Emissions & Energy Hazards & Hazardous Materials Hydrology & Water Quality Land Use & Planning Noise Environmental Justice Public Services Traffic & Transportation Tribal Cultural Resources Utilities & Service Systems Growth Inducement Alternatives Analysis

Impact Analysis Methodology 1. Baseline environmental conditions established 2. Impacts due to project construction and operation are evaluated 3. Regulatory requirements and mitigation measures are considered 4. Significance determinations are made for each project impact: Class I. Significant and Unavoidable: An impact that cannot be reduced to below the threshold level given reasonably available and feasible mitigation measures. Class II. Significant but Mitigable: Can be reduced to below the threshold given mitigation measures. Class III. Not Significant: Impact may be adverse but does not exceed threshold level and does not require mitigation. Class IV. Beneficial: An effect that would reduce existing environmental problems or hazards. No Impact

Class I. Significant and Unavoidable Cultural Resources PROJECT COMPONENT: Ground disturbance during construction of pipelines and wells, and general operational maintenance POTENTIAL RESOURCE IMPACT Historical, archaeological, paleontological resources and human remains MITIGATION MEASURES (CUL-1 through CUL-14) Avoidance of resources through project re-design Recovery and Treatment Plans Monitoring and Mitigation Plans Monitoring for resources during construction Inadvertent discovery procedures

Class II. Significant but Mitigable Aesthetics Air Quality Agriculture & Forestry Biological Resources Cultural Resources Geology, Soils & Seismicity GHG Emissions & Energy Hazards & Hazardous Materials Hydrology & Water Quality Land Use & Planning Noise Environmental Justice Public Services Traffic & Transportation Tribal Cultural Resources Utilities & Service Systems

Alternatives Analysis for CEQA Purpose: an EIR must describe a reasonable range of alternatives to a project that could feasibly attain most of the basic project objectives, and would avoid or substantially lessen the project s significant environmental effects. (Draft EIR, page 6-1) Considerations in selecting alternatives: Ability to meet project objectives Ability to lessen significant environmental effects Feasibility Feasible means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors. (Draft EIR, page 6-1)

Alternatives Considered During Project Development (before CEQA) WRF Location Alternatives 17 sites considered Joint Venture between CSD and Morro Bay Joint Venture with Los Osos

Alternatives Considered During Project Development (before CEQA) Corporation Yard Alternative Not included at WRF site Lift Station Location Alternative 8 locations considered Recycled Water Reuse Alternatives Urban Irrigation Agricultural Irrigation Commercial Uses

Project Alternatives Alternative 1: No Project Alternative Required by CEQA to allow decision makers to compare the impacts of approving the proposed project with the impacts of not approving the proposed project. (Draft EIR, page 6-11) Continued operation of the existing WWTP Requires upgrades to meet State standards for wastewater treatment and water quality Requires elevation of facilities for flood-proofing Requires a Coastal Development Permit from CCC

Project Alternatives Alternative 2: Pipeline Alignment Alternative Considered another pipeline alignment to see if impacts to cultural resources could be lessened. May affect fewer cultural sites but still significant impacts. Greater impacts to air quality and traffic due to a longer pipeline through areas with more development Alternative 2

Project Alternatives Alternative 3: WRF Design Alternative Remove advanced treatment facilities to reduce WRF size, footprint, and energy consumption. No guarantee footprint would be reduced. No significant effects would be measurably reduced. All mitigation measures for the project would still apply. Key objectives for providing recycled water and augmenting water supply would not be met.

Project Alternatives Environmentally Superior Alternative The environmentally superior alternative is the alternative identified as meeting most of the basic project objectives and resulting in the fewest or least severe combination of significant environmental impacts. (Draft EIR, page 6-15) When compared to the feasible alternatives, the proposed project meets all project objectives, reduce costs to City related to construction, and has less severe impacts to resources. The proposed project is environmentally superior.

Next steps in CEQA Process

Public Comment Period The Draft EIR public comment period closes on Friday May 18, 2018. The Draft EIR and other project information can be downloaded from http://morrobaywrf.com/ Submit comments tonight or send comments to: Rob Livick, P.E. Public Works Director City of Morro Bay 955 Shasta Avenue, Morro Bay, CA 93442 rlivick@morrobayca.gov