STEPHEN F. AUSTIN ELEMENTARY SCHOOL

Similar documents
DISTRICT SERVICES BUILDING

BOWIE LEARNING CENTER

BILL W. WRIGHT ELEMENTARY SCHOOL

WHS NINTH GRADE CENTER

Lake Highlands North Recreation Center Summary

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Mills Elementary School Site Summary

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facility Assessment Report, Montgomery Independent School District

CARL E. SCHLUTER ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Collins Middle School

Hartsville Area Schools - Building Evaluations

Thurgood Marshall Recreation Center Summary

MADELEY RANCH ELEMENTARY SCHOOL

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Timberglen Recreation Center Summary

DAVIS ELEMENTARY SCHOOL

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

Menchaca Elementary School Site Summary

Darlington Area Schools - Building Evaluations

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

GODLEY INTERMEDIATE SCHOOL

BALLOU SENIOR HIGH SCHOOL

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

RAYMOND EDUCATION CAMPUS

Barrington Elementary School Site Summary

Darlington Area Schools - Building Evaluations

Administration Building Needs Assessment

Reilly Elementary School Site Summary

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Hartsville Area Schools - Building Evaluations

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Facility Assessment Report, Montgomery Independent School District

Facility Improvements

Corsicana High School

J. C. THOMPSON ELEMENTARY SCHOOL

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

JAMES M. STEELE ACCELERATED HIGH SCHOOL

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks

Darlington Area Schools - Building Evaluations

Board Work Session Feasibility Study. January 9, 2017

FACILITY COMPONENTS - MIDDLE SCHOOL

Frederic Chopin Elementary School

WILKINSON ELEMENTARY SCHOOL

Hartsville Area Schools - Building Evaluations

LASALLE - BACKUS EDUCATION CAMPUS

NYC Department of Education

ADDENDUM 2 - JULY 14, 2015

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

REHABILITATION STANDARDS CHECKLIST

POWELL ELEMENTARY SCHOOL

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

SHEPHERD ELEMENTARY SCHOOL

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

SEATON ELEMENTARY SCHOOL

Building Inspection Report

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

COOLIDGE SENIOR HIGH SCHOOL

NYC Department of Education

SAMUEL BECK ELEMENTARY SCHOOL

Appendix J - Custom Uniformat for EDU Migration

Delco Activity Center Site Summary

TABLE OF CONTENTS Public Safety Building

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

NYC Department of Education

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

BARNARD ELEMENTARY SCHOOL

Charles H Wacker Elementary School

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Facility Improvements

Property Condition Assessment

NYC Department of Education

DRAFT. Govalle Elementary School Site Summary Valley Hill Circle Austin, TX Number of Permanent Campus Facilities 2

Velma F Thomas Early Childhood Center

Architect and Engineer: Friar Associates inc.

NYC Department of Education

WATKINS ELEMENTARY SCHOOL

Alabama Home Inspections

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Walter Q Gresham Elementary School

NYC Department of Education

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

NYC Department of Education

Facility Improvements

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Harry Stone Recreation Center Summary

K.B. Polk Recreation Center Summary

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Priority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools

Transcription:

STEPHEN F. AUSTIN ELEMENTARY SCHOOL

BUS LANE CAMPUS DATA BUS LANE PORTABLES STEPHEN F. AUSTIN ELEMENTARY SCHOOL 1776 Texas Dr., Weatherford, TX 76086 Year Built 1988 No. of Buildings 1 No. of Portables 2 Approx. Total Square Footage Grades Served 61,500 K through 6th 2013-2014 PEIMS 583 Original Planning Capacity 645 Building Levels 1 NOTICE: Issues designated as non-compliant or code deficiencies may have become non-compliant or deficient as codes have been updated or changes in the site conditions have progressed into non-compliant conformance. Identification of these deficiencies does not indicate the facility was constructed out of code compliance at the time of actual construction, and declaration of certain items may not warrant immediate action. 1

MASTER PLAN COLOR LEGEND Administration Athletics Cafeteria/Kitchen Circulation Fine Arts Computer Lab Library Toilets/Support Spaces Resource 2

MASTER PLAN 3

CIVIL - SITE Introduction This report provides the results of the Civil/Site assessment of the above referenced school performed by Pacheco Koch Consulting Engineers, Inc. (PKCE) The Civil /Site assessment consisted of: 1) a site visit for a visual evaluation; and 2) a meeting between Weatherford ISD faculty members and PKCE staff, focused on the following items: 1. Paving 2. Surface Drainage 3. Accessible Route / Parking 4. Utilities (no subsurface verified during site visit) 5. Erosion Based on observed conditions, recommended improvements for each of the deficiencies identified have been accompanied with estimated quantities and an opinion of probable construction cost, to be used as a budgetary tool. Site Visit: March 17, 2014 On the above date, PKCE personnel visited Stephen F. Austin Elementary to observe the items discussed above. The table below shows each deficiency found, the photograph number, an estimated quantity, a unit cost, and a construction cost estimate, all based on available construction cost data at the time of this assessment. Items not included in this assessment are as follows: design fees, overhead contractor cost including mobilization, bonding, permitting, on-site job office cost, etc Meeting with Weatherford ISD Staff On Tuesday, April 1, 2014, PKCE personnel met with representatives of the School District s Maintenance Department to learn about any known issues that may not be discovered/visible during the site visit and to gain historical/current knowledge of the site. During the meeting, the following Civil/Site issues were brought up for Stephen F. Austin Elementary: Sidewalks around the building have settled, creating tripping hazards, specifically around southwest area of the building. Existing handrails on multiple ramps throughout the site are damaged and need replacing. Installation of perimeter fencing around playground areas is desired. A new sidewalk route from the south drop-off loop west along Washington Drive is desired. 5

CIVIL - SITE 10 4 13 4 9 4 6 4 8 4 4 4 7 4 3 4 11 4 5 4 2 4 12 4 1 4 14 4 15 4 6

CIVIL - SITE Sidewalk settlement adjacent to building Sidewalk/Specialty pavers settled at interior courtyard Sidewalk settlement adjacent to building Sidewalk settlement at concrete ramp Surface drainage issues adjacent to building Surface drainage issues in north parking lot 7

CIVIL - SITE Surface drainage issues at portable buildings Surface drainage issues adjacent to building Surface drainage issues in north parking lot Erosion Issues at concrete stairs Slope stability/erosion issues Lack of pedestrian route along Washington Drive 8

CIVIL - SITE Concrete curb damage Accessible ramp at front entrance Accessible parking space 9

CIVIL - SITE SUMMARY OF FINDINGS STEPHEN F. AUSTIN ELEMENTARY Photo # Description Level Approx. Quantity Concrete sidewalk settlement adjacent to building. 1,2,3,4 5,6,7, 8,9 10,11 12 13 Demo Recompact subgrade and install new concrete sidewalk. Demo existing courtyard on west side of building and replace with new concrete courtyard. Surface drainage issues adjacent to building and throughout site parking lots. Install/improve site drainage system. Slope stability/erosion issues Sod affected areas to eliminate further erosion around concrete structures. Lack of pedestrian route along Washington Drive. Install concrete sidewalk. Concrete curb damage. Sawcut and replace affected concrete curbs. 300 SY 300 SY 1 LS 1 LS 1,500 SF 120 SY 150 LF 14 Non-compliant accessible ramp at front entrance. Install ADA compliant curb ramp. 1 EA 15 Accessible parking space violates ADA maximum slope. (Ex. slope =2.5%) Sawcut and install new concrete pavement to achieve maximum allowable slope of 2%. 50 SY ** Playground area fence Install new fence around playground area. 300 LF * An engineer s drainage study and plan is needed to verify the extent of the site drainage system needed to eliminate existing surface drainage issues. The engineer s study will define the exact construction scope for the required improvements. 10

CIVIL - SITE ** Installation of a new fence around the playground area was an item discussed with the Weatherford ISD maintenance department at the meeting on April 1, 2014, and has thus been included in this cost estimate exhibit. 11

BUILDING CONDITION: EXTERIOR 13

BUILDING CONDITION: EXTERIOR In this view, the concrete walk has settled and the concrete walk surface is non-compliant. This photo of the wing wall indicates cracks at the exterior brick face. Here, you will notice cracks appearing in the sealant at the control joint. The typical length of control joints in this area are between 18-0 to 20-0 above the window lintel. (The control joint locations are noted on the plan.) This view reveals cracks that were found in the sealant at both sides of the aluminum window at the cafeteria. The typical window size of this window type is 9-0 long by 6-8 in height. The light pattern on this type of window is 3 wide and 3 high, with the lower left and lower right glazing being operable. This photo shows rust build up at the steel lintel beam. (See plan for all locations where this similar condition is noted.) This condition is found at various locations at the Main Entry. There are two areas located at the height of 9-0, two areas at 8-0, and two areas at 16-0. There are three areas at the Library, where this condition is shown at the height of 11-8. At the plaster soffit, we noticed damage and overflow extension is missing. 14

BUILDING CONDITION: EXTERIOR Here, you will notice cracks appearing in the sealant at the control joint. The typical length of control joints in this area are between 8-0 to 10-0 above the window lintel. (The control joint locations are noted on the plan.) The concrete walk, shown in this photo at the main entry, is damaged and the threshold is non-compliant. This photo indicates where soil erosion has occurred because of drainage toward the building. This picture shows damage at the aluminum window sills. The window size where this damage at the sills occurs is 9-0 long by 6-8 in height. The light pattern on this type of window is 3 wide and 3 high, with the lower left and lower right glazing being operable. The location of this photo is at the Library, and it shows the main window to the Library. We noticed that the mortar joints, at this location, are damaged at the brick face. Here, you will notice cracks appearing in the sealant at the control joint. The typical length of control joints in this area are 5-0 above the window lintel. (The control joint locations are noted on the plan.) 15

BUILDING CONDITION: EXTERIOR This ramp is located near the entry. We have two major issues at this location. The issues are as follows: Cracks in the concrete, and the ramp slope is non-compliant. At the porch light fixture, we noticed that birds are nesting above the fixture. We also noticed that the fixture is showing wear and discolored stains. At this location, it is noted that the decorative steel railings are showing wear with chipped paint in certain spots. This photo is located at the courtyard. The exterior wall joint, at the walk, indicates damage in the sealant. The concrete walk at this location is settled and is non-compliant. This location shows cracks in the sealant around the perimeter of the aluminum door and windows. The dimensions of this door window unit are as follows: 9-3 height by 6-0 length by -6-0 height by 3-0 length by -3-0 height. 16

BUILDING CONDITION: EXTERIOR This location shows cracks in the sealant around the perimeter of the aluminum window. The dimensions of this window unit are as follows: 6-8 height by 6-0 length. This location shows cracks in the sealant around the perimeter of the aluminum window. The dimensions of this window unit are as follows: 6-8 height by 3-4 length. This location shows cracks in the sealant around the perimeter of the aluminum door with transom unit. The dimensions of this door with transom unit are as follows: 9-2 height by 3-4 length. At the porch stoop edge, we noticed that the sealant at the concrete walk indicated damage and exposed rebar in some areas. At this location, it is noted that the decorative steel railings are showing wear with chipped paint and rust in certain spots. We also noticed that the decorative gate is misaligned. This photo shows soil erosion due to water drainage issues and cracks in brick face at the corner. 17

BUILDING CONDITION: EXTERIOR Here, you will notice cracks appearing in the sealant at the control joint. The typical length of control joints in this area are between 18-0 to 20-0 above the window lintel. (The control joint locations are noted on the plan.) The brick face at this corner shows major damage, discoloration of bricks, and soil erosion. The brick face at this corner shows cracks in it. The mow strip, in this photo, is settled along the perimeter. (Mow strips are typically 4 below grade) In this photo, you will observe that the leaves and debris covers the area drains for the water drainage. This photo was taken in the Courtyard area. This location shows cracks in the sealant around the perimeter of the aluminum door with transom unit. At both locations in the courtyard, the lintel length is at 12-0. 18

BUILDING CONDITION: EXTERIOR This location shows cracks in the sealant around the perimeter of the aluminum door with transom unit. At both locations in the courtyard, the lintel length is at 3-0. This photo indicates cracks near the corner of the exposed grade beam, along with soil erosion. In this view, we noticed that the sealant at the expansion joint is showing major damage in it. (The control joint locations are noted on the plan.) (This is typical at the west elevation.) We noticed that the sealants at each of the control joints are showing major damage. (The control joint locations are noted on the plan.) Here, you will notice cracks and damage appearing in the sealant at the control joint at the Gym wall. The typical length of control joints in this area are between 24-8 +/- long. (The control joint locations are noted on the plan.) This view is the Kitchen exit door. The concrete at the threshold of this exit door is cracked, broken, and chipped. 19

BUILDING CONDITION: EXTERIOR Here, you will notice cracks and damage appearing in the sealant at the control joint at the screen wall for mechanical units. (The control joint locations are noted on the plan.) 20

BUILDING CONDITION: INTERIOR 21

BUILDING CONDITION: INTERIOR Damaged plastic laminate and floor base in high traffic areas of Cafeteria. Damaged tile sill in Cafeteria. Damaged/missing floor base. Stained ceiling tile. Source of leaker should be identified and repaired. Stained carpet finishes in various locations. Cracking of gypsum board finish in select ceiling locations. 22

BUILDING CONDITION: INTERIOR Delaminating vinyl wall covering in restroom locations. Non-compliant egress door clearance. Wall nicks and dings in various locations. Damaged plastic laminate and floor base in high traffic areas of Cafeteria. Non-compliant electric water cooler installation Damaged/missing VCT flooring at entry door transitions select locations. 23

BUILDING CONDITION: INTERIOR Rusting HVAC grilles in high humidity locations. Damaged plastic laminate finishes. Non-compliant sink installation Damaged floor base and wall finishes in select locations. Discolored/stained tile at HVAC grilles in select locations. Mis-seated exhaust shaft in custodial area. 24

BUILDING CONDITION: INTERIOR Damaged wall tile in select locations. Non-compliant sink installation access. Non-compliant sink installation - Pipe Protection. 25

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Stephen F. Austin Elementary was built in 1988. This facility does not include a fire sprinkler system. The air conditioning systems consists of single zone and multizone air handling units served by two air-cooled water chilling units and two cast iron hot water boilers. In addition, the building also has rooftop a/c equipment as well as splitsystems a/c equipment. The chillers were replaced in 2002. The systems and equipment all seem to be in good working order, but after 25 years of service with most of the equipment, some upgrades are necessary in order to provide continued reliable service. Our recommendations for these upgrades are listed below. Building electrical service is 277/480 volt, 3 phase, 4 wire, 2000 amp main PBS switch, served from power company pad-mounted transformer. The building interior lighting system was retrofitted with T8 lamps in the majority of the building, with the exception being the office and main corridor, and cafeteria addition. These areas utilize T12 type lamps. Light levels in the cafeteria are very low, with the lit space appearing to be too dark. Gym lighting is HID type. The building fire alarm system is equipped with an addressable type manufactured by Notifier. It appears to be in good operating condition. MECHANICAL: Provide new fire sprinkler system throughout building in order to improve life safety. In the gymnasium, replace the existing split system a/c units and gas-fired unit heaters with new rooftop a/c units with gas heat. Thoroughly clean and overhaul all existing air handling units throughout the building. This would include (but not be limited to) cleaning the cooling and heating coils to improve heat transfer and replacing inefficient motors and/or drives. Replace existing chilled and heating water circulating pumps with new. To avoid rusting and premature failure, paint all exposed gas piping on the roof. To avoid shutting down large systems of water or gas service during routine maintenance procedures, install service and isolation valves throughout the building. In 6 to 10 years, replace existing kitchen area rooftop a/c unit with a new, more efficient unit. 10 Year Plan: Replace the existing air-cooled condensing unit sections of the Administration split system a/c units with new, more efficient equipment. 10 Year Plan: As the chillers, boilers and circulating pumps reach the end of their useful lives, replace all such equipment with new, more efficient equipment. ELECTRICAL: Replace remaining T12 type fixtures with T8 type. Replace Cafeteria lighting with new energy saving type to improve lighting output. Provide occupancy sensors in classrooms and offices for automatic lighting shut-off as required by the International Energy Conservation Code (IECC) for effective energy savings. Replace HID lighting in Gym with T5HO fluorescent or LED type for energy savings and east ON-OFF switching. Replace all fire alarm devices throughout building and add horn/strobe lights to all classrooms for code compliance. Provide stage and front of stage lights with all controls. Provide surge protection device (SPD) at main panel. Provide additional parking lot lighting. Replace existing site and wall pack light fixtures with LED type. 27

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING 28

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING 1 2 Replace existing light fixtures with more efficient type and provide additional light fixtures. Replace with T8 lamps. 3 4 Replace existing HID light fixtures with T5HO fluorescent or LED type fixtures. Replace all fire alarm devices throughout building. 5 6 Existing chillers installed in 2002. Gas piping on roof in need of cleaning/painting. 29

ENGINEERING REPORT - STRUCTURAL Further Study is recommended of the corrosion of the floor joists and beams in the crawlspace where standing water, a very humid environment, and corrosion was observed. Based on extent of corroded floor framing members, we recommend that corroded elements be sand-blasted, re-painted, and reinforced with carbon strips. Further study is recommended to determine if the unreinforced masonry will have any net axial tension or excessive flexural tension under code required design wind forces, which is not permitted by the code. Retrofitting new structural components may be recommended. Further Study is recommended to determine if the structural unreinforced masonry has cracked behind wall finishes such as interior coverings and exterior veneers due to foundation movement. Repair of such cracks or retrofitting new structural components may be recommended. Repairing all known cracks in all structural unreinforced masonry due to foundation movement is recommended. If any modification to the Unreinforced Masonry is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Further study is recommended to determine the design and condition of the connectors between wythes. Installing new connectors may be recommended after study. Further Study is recommended to determine if there is sufficient lateral anchorage at the top of all exterior unreinforced masonry walls that are parallel to roof joists. Installing lateral restraints may be recommended after further study. Further Study is recommended to determine if installation of new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is required. Installing new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is recommended when an opportunity presents itself such as a building remodel. 31

ENGINEERING REPORT - STRUCTURAL 32

ENGINEERING REPORT - STRUCTURAL Rusted crawl space beam 33

FOOD SERVICE 35

FOOD SERVICE Cold Storage Assembly Poor condition. Cold Storage Assembly Poor condition. Compartment sink present. Convection Oven in poor condition. Steamer Kettle in poor condition. Serving Counters in poor condition. 36

FOOD SERVICE Mobile Milk Coolers in poor condition. 37

SECURITY NOTICE: For the safety and welfare of the faculty, students, and staff, the security portion of the assessment report has been removed from this report. 39