[FWS R3 FHC 2016 N110]; [FXFR FF03F00000] Fisheries and Habitat Conservation; Draft Supplemental Environmental Impact

Similar documents
Proposed Habitat Conservation Plan for Sierra Pacific Industries Forest Practices in the

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana

Availability of the Draft Midwest Wind Energy Multi-Species Habitat Conservation

Draft Environmental Assessment and Proposed Renewal and Amendment to the Barton

Department of the Army; Corps of Engineers

[FWS R8 R 2016 N061; FXRS282108E8PD0 167 F ] South Bay Salt Pond Restoration Project, Phase 2 at the Eden Landing Ecological

Notice of Availability and Notice of Public Hearings for the Draft Environmental

[FWS R1 ES 2016 N023; FXES FF01E00000] Oregon Department of Forestry; Proposed Safe Harbor Agreement for the

Notice of Intent to Prepare a Draft Environmental Impact Statement for the

Early Scoping for Proposed Application for Incidental Take Permit and Habitat

[LLNVE0000 L GN0000 LVEMF ; ; MO# ;

[LLNVL L GN0000. LVEMF A; MO# ] Notice of Availability of the Draft Environmental Impact Statement for the

[FWS R8 ES 2014 N213; FXES F2 145 FF08ECAR00] Orange County Transportation Authority, Orange County, California; M2 Natural

[FWS R3 ES 2013 N194; FXHC FF03E00000] Notice of Availability of the Draft Damage Assessment and Restoration Plan and

[FWS R1 ES 2018 N038; FXES FF01E00000] Notice of Intent to Prepare a Draft Environmental Impact Statement for the

Proposed Low-Effect Habitat Conservation Plan for the California Tiger. Salamander and California Red-Legged Frog, Sonoma County, California

Office of Surface Mining Reclamation and Enforcement

Draft Environmental Impact Statement; Eastern Collier Multi-species Habitat. ACTION: Notice of intent; announcement of public meeting.

Habitat Conservation Plan for the Morro Shoulderband Snail; Kroll Parcel, Community of

Notice of Availability of the Draft Environmental Impact Statement for the Mount

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET

[FWS R8 ES 2017 N107; FXES FF08ECAR00] Endangered and Threatened Wildlife and Plants; Incidental Take Permit

[FWS-R1-ES-2012-N181; FXES F2-123-FF01E00000] Proposed Safe Harbor Agreement for the Northern Spotted Owl, Skamania,

Notice of Intent to Prepare an Environmental Impact Statement for the Tule River

Notice of Availability of the Final Environmental Impact Statement for the Monument

Notice of Availability of the Draft Environmental Impact Statement for the. Converse County Oil and Gas Project, Converse County, Wyoming

Plumas National Forest; California; Plumas National Forest Over-Snow Vehicle. (OSV) Use Designation Environmental Impact Statement

Dairyland Power Cooperative: CapX 2020 Hampton-Rochester-La Crosse. ACTION: Notice of Intent to Extend Public Comment Period for a Draft Environmental

Springfield Supplemental Water Supply Project Supplemental Environmental Impact Statement

[FWS R1 ES 2015 N008; FXES FF01E00000] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for

Notice of Intent to Prepare an Environmental Impact Statement for the Denver

S1D1S SS SX064A S180110; S2D2S SS SX064A00 17XS501520

Availability of Draft Environmental Impact Statement for the Dallas. Floodway Project, in the City of Dallas, Dallas County, TX

Office of Commercial Space Transportation; Notice of Intent to Prepare an

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice PUBLIC NOTICE 30 DAY PUBLIC NOTICE

Chincoteague National Wildlife Refuge and Wallops Island National Wildlife

Idaho (Boise, Caribou-Targhee, Salmon-Challis, and Sawtooth National Forests and

Billing Code DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Dam Removal and River Restoration in Watershed Planning

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter

AGENDA Tuesday, September 29, 2015

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX

[Docket No. FWS R7 ES ; FF07CAMM00 FXES ] Endangered and Threatened Wildlife and Plants; Notice of Availability of Draft Polar

(OSV) Use Designation Environmental Impact Statement. Notice of intent to prepare an environmental impact statement.

[RR , XXXR4079V4, RX ] Notice of Intent to Prepare an Environmental Impact Statement and Notice of Public

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar. SUMMARY: This notice is provided in accordance with the Council on

PUBLIC NOTICE. Town of Beech Mountain Mr. Tim Holloman 503 Beech Mtn. Parkway Banner Elk, North Carolina 28604

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA SEP

Tongass National Forest; Alaska; Shoreline II Outfitter/Guide Environmental Impact

Tongass National Forest; Alaska; Shoreline II Outfitter/Guide Environmental. Notice of intent to prepare an environmental impact statement.

Notice of Availability of the Bog Creek Road Project Draft Environmental Impact

Notice of Availability of a Draft Environmental Impact Statement for Vineyard Wind

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016

Kīlauea Point National Wildlife Refuge, Kaua i County, HI; Comprehensive. Conservation Plan and Finding of No Significant Impact for Environmental

[LLNVW01000 L EA A; MO# ; ; TAS: Notice of Proposed Supplementary Rules on Public Land in Water Canyon,

Notice of Intent to Prepare an Environmental Impact Statement for the. Proposed Upland Pipeline in Williams, Mountrail, and Burke Counties,

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Procedures for Implementing the National Environmental Policy Act. SUMMARY: The Tennessee Valley Authority (TVA) is proposing to amend its

Agency Organization Organization Address Information. Name United States Department of Agriculture

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

5 Public Involvement. 5.1 Proposed Action Scoping and Draft EIS. Echo Trail Area Forest Management Project

Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Draft. Comprehensive Conservation Plan and Environmental Assessment

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

Office of the Assistant Secretary for Water and Science [RC0ZCUPCA0, 155R0680R1, RR ]

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Eldorado National Forest; California; Eldorado National Forest Over-Snow Vehicle. Notice of intent to prepare an environmental impact statement.

Issuing Office: CELRB-PM-EA Published: 22 FEB 2019 Notice No: SANDUSKY-19 Expires: 25 MAR 2019

PUBLIC NOTICE Application for Permit

SUMMARY: The Department of Energy (DOE) announces its intent to prepare an

The project will be conducted in partnership with the Nez Perce Tribe.

Boardman River Dams Committee (BRDC) Detailed Analysis of Alternatives

[18XD4523WT_DS _DWT _DP.64920]; OMB Control. Agency Information Collection Activities; Submission to the Office of

Publication Date: October 17, 2011 Next Publication: October 31, 2011 Submittal Deadline: October 24, 2011 Submit to

February 23-24, 2009 Robert D. Thornton, Partner

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT MONTGOMERY FIELD OFFICE 105 SOUTH TURNER BOULEVARD MONTGOMERY, ALABAMA 36114

Comment Request for Information Collection for Form ETA-232, Domestic. Agricultural In-Season Wage Report and Form ETA-232A, Wage Survey Interview

Appendix M Draft EIS Review Process and Public Hearing Summary

Preparation of an Environmental Impact Statement for High Capacity Transit

Avista Dam Relicensing Factsheet Commenting on the Draft License Application

Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

[16XL LLWY L ER0000.LVRWK09K A00; ; Notice of Availability of the Final Supplemental Environmental Impact Statement

Model Riparian Buffer Ordinance.

CLEAN WATER ACT 401 WATER QUALITY CERTIFICATION APPLICATION FORM

[LLNVL00000.L ER0000.LVRWF12F A; N-78803; ; Notice of Availability of the Final Environmental Impact Statement, Including a

Public Notice. US Army Corps of Engineers Fort Worth District. Applicant: Mill Branch Stream Mitigation Bank. Permit Application No.

Public Notice (33 USCS 1344, 33 CFR 325.3) for the PolyMet Mining Corp. NorthMet Project

40 CFR Parts 1500, 1501, 1502, 1503, 1504, 1505, 1506, 1507, and Update to the Regulations for Implementing the Procedural Provisions of the

Green River Diversion Rehabilitation

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT

PUBLIC NOTICE REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

APPENDIX A THE NEPA PROCESS

Appendix B Public Consultation

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries

Environmental Impact Statement for the Baltimore-Washington Superconducting Maglev (SCMAGLEV) Project, between Baltimore, Maryland and Washington, DC

Pierce County Islands and the Head of Lake Pepin

U.S. Army Corps of Engineers

Essar Steel Minnesota L.L.C. Supplement to Environmental Impact Statement (SEIS) Preparation Notice

Notice of Intent to Accept Proposals, Select Lessee(s), and Contract for Pumped-Storage

Transcription:

This document is scheduled to be published in the Federal Register on 02/26/2016 and available online at http://federalregister.gov/a/2016-04134, and on FDsys.gov DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS R3 FHC 2016 N110]; [FXFR13340300000 145 FF03F00000] Fisheries and Habitat Conservation; Draft Supplemental Environmental Impact Statement for the Ballville Dam Project on the Sandusky River, Sandusky County, Ohio AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability; announcement of meeting; request for comments. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the availability of a draft supplemental environmental impact statement (SEIS) that has been prepared to evaluate the Ballville Dam Project, in Sandusky County, Ohio, in accordance with the requirements of the National Environmental Policy Act (NEPA). We are also announcing a public meeting and requesting public comments. DATES: Submitting Comments: We will consider all comments regarding the draft SEIS received or postmarked by [INSERT DATE 45 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER] and respond to them as appropriate. 1

Public Meeting: We will conduct a public meeting in Fremont, Ohio, on March 15, 2016, from 7 to 9 p.m. The meeting will provide the public with an opportunity to present comments, ask questions, and discuss issues with Service staff and our cooperating agencies regarding the draft SEIS. ADDRESSES: Submitting Comments: You may submit comments on the draft SEIS by any one of the following methods: U.S. mail or hand-delivery: Brian Elkington, U.S. Fish and Wildlife Service, Fisheries, 5600 American Boulevard West, Suite 990, Bloomington, MN 55437-1458. Email: Ballvilledam@fws.gov. Fax: (612) 713 5289 (Attention: Brian Elkington). Viewing Comments by the Environmental Protection Agency: For how to view comments on the draft SEIS from the Environmental Protection Agency (EPA), or for information on EPA s role in the EIS process, see EPA s Role in the EIS Process under SUPPLEMENTARY INFORMATION. Public Meeting: The meeting will take place at Terra State Community College, Neeley Center, 2830 Napoleon Road, Fremont, Ohio, 43420. A hard copy of the draft SEIS and associated documents will be available for review at the Birchard Public Library, 423 Croghan Street, Fremont, Ohio 43420, as well as online at http://www.fws.gov/midwest/fisheries/ballville-dam.html. 2

FOR FURTHER INFORMATION CONTACT: Brian Elkington, (612) 713 5168. Individuals who are hearing impaired or speech impaired may call the Federal Relay Service at (800) 877 8337 for TTY assistance. SUPPLEMENTARY INFORMATION: We announce the availability of a draft supplemental environmental impact statement (SEIS) that has been prepared to evaluate the Ballville Dam Project, in Sandusky County, Ohio, in accordance with the requirements of the National Environmental Policy Act (NEPA). We are also announcing a public meeting and requesting public comments. Background Ballville Dam was built in 1913 for hydroelectric power generation. The City of Fremont purchased the dam in 1959 from the Ohio Power Company for the purpose of supplying water to the city. With the construction of a raw water reservoir, the dam is no longer required for this purpose. Moreover, in 2007, the Ohio Department of Natural Resources issued a Notice of Violation to the City, stating that the dam was being operated in violation of the law as a result of its deteriorated condition. Ballville Dam is currently a complete barrier to upstream fish passage and impedes hydrologic processes. The purpose for the issuance of Federal funds and preparation of this Draft SEIS is to remove Ballville Dam and restore natural hydrological processes over a 40-mile stretch of the Sandusky River, reopen fish passage to 22 miles of additional habitat, restore flow conditions for fish access to habitat above 3

the impoundment, and improve overall conditions for native fish communities in the Sandusky River system, restoring self-sustaining fish resources. We published a final EIS in the Federal Register on August 1, 2014 (79 FR 44856), for the Ballville Dam Project that addressed the environmental, economic, cultural and historical, and safety issues associated with the proposed removal of the dam and a suite of alternatives. The final EIS analyzed four alternatives for the removal: (1) Proposed Action Incremental Dam Removal with Ice Control Structure; (2) No Federal Action; (3) Fish Elevator Structure; and (4) Dam Removal with Ice Control Structure. The final EIS considered the direct, indirect, and cumulative effects of the alternatives, including any measures under the Proposed Action alternative intended to minimize and mitigate such impacts. The final EIS also identified additional alternatives that were considered, but were eliminated from consideration as detailed in Section 2.3 of the final EIS. Draft Supplemental Environmental Impact Statement This draft SEIS provides further discussion of the potential significant impacts of the proposed action and an analysis of reasonable alternatives to the proposed action, specifically within the context of additional information made available since completion of final EIS for this project. This additional information addresses estimates of total quantity of sediment impounded by Ballville Dam, the potential impacts of the proposed alternative on harmful algal blooms (HABs) in the Sandusky River and Lake Erie due to the proposed sediment release, the potential impacts of the proposed alternative on downstream habitats due to sediment release, the accuracy of cost estimates of sediment 4

removal within the EIS, evaluation of a bypass and excavation alternative provided in comments on the FEIS, and the potential for beneficial reuse of sediments impounded by Ballville Dam. Although we concluded that these topics were sufficiently addressed in the FEIS, we provide additional review and assessment in this Draft SEIS to help further clarify the issues. To complete this aspect of the Draft SEIS, we consulted subject matter experts to help review FEIS materials and clearly articulate our understanding of them. The resulting additional information and explanation has been incorporated within this Draft SEIS. EPA s Role in the EIS Process In addition to this notice of the draft SEIS, EPA is publishing a Federal Register notice announcing the draft SEIS, as required under section 309 of the Clean Air Act (42 U.S.C. 7401 et seq.; CAA). The publication of EPA s notice is the official start of the minimum requirement for a 45-day public comment period for an EIS. The EPA is charged under the CAA to review all Federal agencies EISs and to comment on the adequacy and the acceptability of the environmental impacts of proposed actions in the EISs. EPA also serves as the repository (EIS database) for EISs prepared by Federal agencies. The EIS database provides information about EISs prepared by Federal agencies, as well as EPA s comments concerning the EISs. All EISs are filed with EPA, which publishes a notice of availability on Fridays in the Federal Register. For more information, see http://www.epa.gov/compliance/nepa/eisdata.html. You may search for EPA comments on EISs, along with EISs themselves, at https://cdxnodengn.epa.gov/cdxenepa-public/action/eis/search. 5

Public Comments Letters describing the proposed action and soliciting comments will be sent to appropriate Federal, State, and local agencies, and to private organizations and citizens who have previously expressed or are known to have interest in this proposal. To ensure that the full range of issues related to this proposed action are addressed and all significant issues identified, comments and suggestions are invited from all interested parties. We request data, comments, new information, or suggestions from the public, concerned governmental agencies, the scientific community, tribes, industry, or any other interested party on this notice. We specifically request comments regarding the additional information and analyses presented in the draft SEIS. You may submit your comments and materials considering this notice by one of the methods listed in the ADDRESSES section. Public Availability of Comments All comments and materials we receive in response to this request will be available for public inspection, by appointment, during normal business hours at the address listed in the ADDRESSES section of this notice. Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment including your personal identifying information may be made publicly available at any time. While you can ask us in your comment to withhold your personal 6

identifying information from public review, we cannot guarantee that we will be able to do so. Authority This notice is being furnished as provided for by NEPA and its implementing Regulations (40 CFR 1501.7 and 1508.22). The intent of the notice is to obtain suggestions and additional information from other agencies and the public on the draft SEIS. Comments and participation in this process are solicited. Dated: February 22, 2016 Kurt Schilling, Acting Assistant Regional Director, Fisheries, Midwest Region. [FR Doc. 2016-04134 Filed: 2/25/2016 8:45 am; Publication Date: 2/26/2016] 7