Government of India R F D. (Results-Framework Document) for. Ministry of Environment and Forests ( )

Similar documents
R F D. Results Framework Document for Group 3 - Department of Rural Development & Panchayati Raj ( )

Government of India R F D. (Results-Framework Document) for. Agricultural Engineering ( )

Government of India R F D. (Results-Framework Document) for. Agricultural & Processed Food Products Export Development Authority, (APEDA) ( )

Government of India R F D. (Results-Framework Document) for. Agricultural Engineering ( )

Government of India R F D. (Results-Framework Document) for. Central Council for Research in Homoeopathy(CCRH) ( )

Results-Framework Document (RFD)

Results-Framework Document (RFD) for. ICAR-Indian Agricultural Statistics Research Institute ( )

NATIONAL MISSION FOR A GREEN INDIA

Results-Framework Document (RFD) for National Academy of Agricultural Research Management ( )

National Afforestation Programme (NAP) Scheme: At A Glance

Chapter V 63. OUTCOMES / TARGETS IN THE OUTCOME BUDGET MINISTRY OF ENVIRONMENT & FORESTS Major (EAP 50.00)

R F D. (Results-Framework Document) for. National Buildings Organisation (NBO) ( )

RFD. Results-Framework Document. For. Sardar Swaran Singh National Institute of Renewable Energy, Kapurthala (Punjab)

Government of India R F D. (Results-Framework Document) for. National Institute of Fisheries Post Harvest Technology and Training (NIFPHATT)

R F D. Results Framework Document for Department of Bio-Technology ( )

Results-Framework Document (RFD) for National Academy of Agricultural Research Management ( )

Results-Framework Document (RFD) for. Indian Agricultural Statistics Research Institute ( )

4. Environmental Legislation. Mr. S. P. Deshmukh, Watumull Institute

R F D. Results-Framework Document for Government of Karnataka. (Department of Parlimentary Affairs & Legislation) ( )

OPERATIONAL GUIDELINES* FOR THE CENTRALLY SPONSORED SCHEME: INTENSIFICATION OF FOREST MANAGEMENT

In accordance with the Paragraph 6 of the United Nations Convention on Biological Diversity I declare:

Externally Aided Projects

RFD. Results Framework Document ( )

Important initiatives by Ministry of Environment, Forest and Climate Change in 2018

Sectoral and Inter-sectoral Integration of Biodiversity in Zambia

I Env. Sector a) Regulatory (i) (i) GEAC (CS-II Div.)

12 TH WORLD LAKE CONFERENCE

Subsidiary RFD. (Results Framework Document) For. MSME- Tool Room (CITD), Hyderabad. Under. Office of Development Commissioner, MSME

3. Procedure followed in the decision making process, including channels of supervision and accountability:

Forestry Research in India; Status, Issues and Opportunities

Government of Himachal R F D. Results Framework Document for Agriculture ( )

Environmental Policy Statement:

CONTENTS CHAPTER : ONE. 1-9 CHAPTER : TWO.10-16

Combined Safeguards and Sub- on ERDD-plus, Singapore, March Daw Le Le Thein, U Than Naing

2 South Africa s Strategy for Plant Conservation. biodiversity data system/network that links data Design, establish and maintain accessible

FUTURE GENERALI INDIA INSURANCE COMPANY LIMITED

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

JICA s Support to India (Forestry Sector)

Results-Framework Document (RFD)

Strategic line 1. Improve sustainable production of goods and services by Mediterranean forests EXPECTED RESULTS

R F D. (Results-Framework Document) for. Agriculture ( )

RESULTS FRAME WORK DOCUMENT (RFD)

cqrof fhcf) I { GOVERNMENT OF INDIA

RFD. Results Framework Document. for Central Institute of Fisheries Technology (Indian Council of Agricultural Research) Cochin

Results-Framework Document (RFD) for

CORPORATE SOCIAL RESPONSIBILITY POLICY

GUJARAT URJA VIKAS NIGAM LIMITED

NATIONAL ACTION PLAN FOR CLIMATE CHANGE (Progress made by Tripura)

EXECUTIVE SUMMARY. Role, Functions and Mandate

UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY

INITIATIVES OF THE MINISTRY UNDER MGNREGA FOR ADDRESSING THE DESERTIFICATION, LAND DEGRADATION & DROUGHT(DLDD) CHALLENGE

Country profile. More from less material resource efficiency in Europe overview of policies, instruments and targets in 32 countries.

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

Report of the committee set up to frame National Sustainable Habitat Standards for the Municipal Solid Waste Management

Forests render numerous goods and services and help

5.2-2 Progress Report and Future Outlook

INDIA: TAKING ON CLIMATE CHANGE

LIST OF TABLES NUMBE R CHAPTER 1- ENVIRONMENT AND ENVIRONMENT DEGRADATION

Draft National Forest Policy (NFP), 2018

CSR POLICY OF KANAN DEVAN HILLS PLANTATIONS COMPANY PRIVATE LIMITED

DECISION No. 256/2003/QD-TTg OF DECEMBER 2, 2003 APPROVING THE NATIONAL STRATEGY ON ENVIRONMENTAL PROTECTION TILL 2010 AND ORIENTATIONS TOWARDS 2020

Results-Framework Document(RFD) for. ICAR Research Complex for Eastern Region ( )

318/331/2017-GCRT Government of India Ministry of New and Renewable Energy *** NOTICE

VISION DOCUMENT FOR 12TH FIVE YEAR PLAN

Flagship Program. August Pradhan Mantri Gram Sadak Yojana (PMGSY)

Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018)

Ministry of Environment and Forests (MoEF)

CSR POLICY OF KANAN DEVAN HILLS PLANTATIONS COMPANY PRIVATE LIMITED

Guidelines for selection and management of the Biodiversity Heritage Sites

THE JAMMU AND KASHMIR FOREST (CONSERVATION&AFFORESTATION) RULES, 2000

Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT

Pan-European Guidelines for Afforestation and Reforestation

Proactivity and responsible operating methods. City of Tampere environmental policy 2020

(Yemen) (Yemen) Republic of Yemen Ministry of Water and Environment Environment Protection Authority Abdul Hakim Aulaiah

RFD. Results Framework Document For. Central Rice Research Institute ( )

CHAPTER 7 ENVIRONMENTAL POLICY AND LEGISLATIONS IN INDIA

Final Steering Committee Meeting. Country presentation GEORGIA February 7-8, 2018

Summary of Sichuan Biodiversity Conservation Strategy and Action Plan

Trinidad and Tobago-Protected Areas and Wildlife Management Project

Renewal of the NCC s Environmental Strategy. Board of Directors September 12, 2017

S e c t i o n B i o d i ve r s i t y

Regional Workshop For South, Southeast and East Asia on Capacity Building For National Biodiversity Strategies and Action Plans

Areas of Expertise ABOUT EPTRI

ENVIRONMENTAL AND CLIMATECHANGE POLICY OF HUNGARY

स य /No.: भ. व. स/BSI-. दन क/Date: REQUEST FOR PROPOSAL

Brief description, overall objective and project objectives with indicators

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

VALLIAMMAI ENGINEERING COLLEGE

Sustainable Development Policy of NHDC Ltd

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

EVALUATION FORMAT FOR FIRST CONCURRENT EVALUATION OF FOREST DEVELOPMENT AGENCY PROJECTS SANCTIONED UNDER NATIONAL AFFORESTATION PROGRAMME (NAP) SCHEME

CONTENTS. Workshop on Environmental Statistics for the South-East Asian Countries 5 th ~7 th December 2011 Hanoi, Vietnam

India. 1. REDD-plus activities

Madagascar: Makira REDD+

Ex-Ante Evaluation (for Japanese ODA Loan)

RFD. Results-Framework Document. For. Sardar Swaran Singh National Institute of Renewable Energy, Kapurthala (Punjab)

MINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE NEW INITIATIVES AND EFFORTS

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON

BOTSWANA NATIONAL REPORT ON THE IMPLEMENTATION OF THE UNITED NATIONS CONVENTION TO COMBAT DESERTIFICATION

Transcription:

Government of India R F D (Results-Framework Document) for Ministry of Environment and Forests (2013-2014)

Page : 2 of 39 Results-Framework Document (RFD) for Ministry of Environment and Forests-(2013-2014) Vision Section 1: Vision, Mission, Objectives and Functions Conservation of environment and natural resources for the present and future generations in a manner consistent with the aspirations of the country for growth and development Mission To plan, promote, coordinate and oversee the implementation of environmental and forestry programmes in order to protect the environment and maintain a balance between conservation and development activities Objectives 1 Improve forest and tree cover in the country 2 To conserve and sustainably use biodiversity resources 3 To control Environmental Pollution 4 Conservation of Rivers and Lakes 5 Coordination Implementation National Action Plan on Climate Change (NAPCC) & preparation of State Action Plan on Climate Change by State Governments 6 Joint ** Responsibility for power generation 7 Better Environmental Governance 8 Survey, Identification and Documentation of Wild Faunal Diversity of the Country and identification of new species 9 Green India Mission 10 To support Research in multi-disciplinary aspects of Environment in Identified thrust areas 11 In situ and Ex-situ Conservation of Fauna 12 Survey, Identification and Documentation of Wild Plant Diversity of the Country and identification of new species 13 Better Ambient Water and Air Quality 14 (a) Coordination Implementation National Action Plan on Climate Change (NAPCC) (b) Guiding and coordinating preparation of State Action Plan on Climate Change by State Functions 1 Formulation of national policies on management of environment, forests and wildlife; 2 Implementation of provisions of related legislations on forests, environment and wildlife, control of pollution of air and water, etc.; and 06/01/2014 11.4

Page : 3 of 39 Results-Framework Document (RFD) for Ministry of Environment and Forests-(2013-2014) Section 1: Vision, Mission, Objectives and Functions 3 Survey and exploration of natural resources particularly of forests, flora, fauna, ecosystems, etc. 4 Bio-diversity conservation including that of lakes and wetlands; 5 Conservation, development, management and abatement of pollution of rivers which includes National River Conservation Directorate; 6 Environmental research and development, education, training, information and awareness; 7 Regulation of diversion of forest land for non forestry purposes; 8 Environmental Impact Assessment; 9 Wildlife conservation, preservation, protection planning, research, education, training and awareness; 10 Afforestation and eco-development; 11 Prevention of cruelty to animals; 12 Administration and Management of subordinate and autonomous institutions of the Ministry; and 13 Monitoring of implementation of central sector and centrally sponsored schemes funded by the Ministry. 06/01/2014 11.4

Page : 4 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [1] Improve forest and tree cover in the country 22.00 [1.1] Afforestation and [1.1.1] Regeneration of Degraded Forests (10%) (a) Approval of State Forest Development Agency (FDA) projects for regeneration of degraded forests [1.1.2] [1.2] (b) Mainstreaming [1.2.1] livelihood issues with afforestation programmes [1.3] Green India Mission (4%) (a) Eco restoration/ enhancing tree cover in urban and peri-urban areas/ Agro-forestry and social forestry/ restoration of wet lands including preparatory activities and advance action for plantation. [1.3.1] [1.3.2] (i) Approval of State Forest Development Agency (FDA) proposals within 45 days of receipt (% of proposals disposed off within 45 days of receipt) (ii) Extent of treatment area for which National Afforestation Programme (NAP) projects approved Employment generation in mandays (i) Approval of proposals (% of proposals disposed of within 45 days of receipt) (ii) No. of landscape covered 3.00 90 80 70 60 50 Lakh Ha 3.00 0.50 0.47 0.43 0.37 0.35 4.00 17 15 13 11 10 0.25 90 80 70 60 50 No 1.00 150 45 120 105 90

Page : 5 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [1.3.3] (iii) Extent of Area covered under GIM (a) Increase in forest Cover Lakh Ha 1.00 1.8 1.6 1.4 1.2 1.0 [1.3.4] [1.3.5] [1.4] (b) Promoting alternative [1.4.1] fuel energy [1.5] (c) Livelihood Improvement [1.5.1] activities [1.6] Protection of Forests [1.6.1] (8 %) (a) Strengthening of forest protection and management in States/ UTs by providing financial assistance [1.6.2] [1.6.3] (b) Increase in quality of forest cover (iv) Development of nurseries under GIM of household adapting Energy Saving Devices. of Households Covered under GIM (i) Percentage of proposals approved within 60 days of receipt ii) Utilisation of budget allocation (iii) Sanction for Creation and Maintenance of Firelines (With respect to BE) Lakh Ha 1.00 1.8 1.6 1.4 1.2 1.0 0.25 150 135 120 105 90 of househol ds of househol ds 0.25 0.25 75000 75000 67000 60000 52000 45000 67000 60000 52000 45000 % 1.00 90 80 70 60 50 % 2.00 91 81 71 61 60 % 0.75 91 81 71 61 60

Page : 6 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [1.6.4] [1.6.5] [1.6.6] [1.7] (b) Technology based [1.7.1] Monitoring of Forest Cover [2] To conserve and sustainably use 22.00 [2.1] In situ Conservation of [2.1.1] biodiversity resources Fauna (6%) (a).in situ Conservation: Strengthening of infrastructure in protected areas including tiger reserves and elephant reserves [2.2] Ex-situ Conservation of Rare Endangered, Threatened (RET) and Endemic Plants and their multiplication (5%) [2.2.1] (iv) Sanction for engagement of Fire Watchers (With respect to BE) (v) Sanction for construction of Forest Boundary pillars (With respect to BE) (vi) Sanction for construction of field Officer/ Residence Buildings (With respect to BE) Publication of Report India State of Forest Report 2013 by the end of 2013-14 of protected areas including tiger reserves and elephant reserves provided financial assistance To provide Financial assistance to 14 existing botanical gardens % 0.75 91 81 71 61 60 % 0.75 91 81 71 61 60 % 0.75 91 81 71 61 60 Date 2.00 31/03/2014 6.00 402 375 360 350 340 2.50 14 12 10 8 6

Page : 7 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% (a) To provide financial assistance to 14 existing botanical gardens [2.3] (b) To ensure ex-situ [2.3.1] conservation of at least 100 RET and endemic species Ex-situ conservation of RET and endemic species 2.50 100 80 60 50 40 [2.4] Survey, Identification and Documentation of Wild Plant Diversity of the Country and identification of new species (3%) [2.4.1] Extent of coverage of region/state/district/ ecosystem/protected areas of field surveys conducte 2.70 60 54 48 42 36 (a) Survey of forest ecosystems, protected areas and fragile ecosystems [2.5] (b) Digitization of herbarium [2.5.1] specimens Digital Images and Metadata of Specime ns digitized 0.30 5783 4200 5000 5000 5000 [2.6] Survey Identification and Documentation of Wild Faunal Diversity of the Country and identification of new species (3%) [2.6.1] Extent of coverage of region/state/district/ ecosystem/protected areas of field surveys conducte 2.70 100 90 80 70 60 (a) Survey of forest ecosystems, protected areas and fragile

Page : 8 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator ecosystems Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [2.7] (b) Digitization of national [2.7.1] zoological collections Digital Images and Metadata of Specime ns digitized 0.30 10000 9000 8000 7000 6000 [2.8] To support Research in multi-disciplinary aspects of Environment in Identified thrust areas (4%) [2.8.1] Support of research proposals in identified thrust areas during year 2013-2014 To provide financial assistance to 25 new research proposals 4.00 25 22 20 17 15 [2.9] Desertification Status [2.9.1] Mapping (DSM) of India (1%) (a) Desertification Status Mapping on 1:0.5 million scale Preparation of Desertification Status Map for entire country on 1:0.5 million scale [2.10] (b) Detailed mapping [2.10.1] Desertification (1:50,000 scale)* Status Mapping on 1:50,000 12 district of States of Districts 0.50 0.50 35 12 25 23 20 15 10 9 7 5 [3] To control Environmental Pollution 24.00 [3.1] To Increase Awareness among the People about Environmental Issues for their Participation in the Protection of Environment (5%) (a) [3.1.1] of eco-clubs functional in NGC schools financially assisted 2.00 100000 90000 80000 70000 60000

Page : 9 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Support to eco-clubs in schools under the National Green Corps Programme Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [3.2] (b) Support to NGOs, educational and other institution under the National Environment Awareness Campaign [3.2.1] [3.3] (c) Advertising & Publicity [3.3.1] for awareness generation through Science Express [3.4] Better Ambient Water and air Quality (6%) (a) Enhancement of common effluent treatment capacity [3.4.1] [3.5] (b) Notification of standards [3.5.1] for additional categories of industries [3.6] To Improve Management of [3.6.1] Hazardous Substances (8%) (a) Setting up of one Treatment, Storage and Disposal Facilities (TSDFs) for Hazardous Wastes/ Bio- Medical Wastes Treatment and of local level NGOs, educational and other institutions financially assisted of visitors to the Science Express: Biodiversity Special Additional effluent treatment capacity to be created (MLD) Industrial processes categories to be covered (i) Inviting proposals from states/uts 1.50 10000 9000 8000 7000 6000 1.50 1500000 1400000 1300000 1200000 1100000 MLD 3.00 24 21 19 16 14 3.00 4 3 2 1 0 Date 1.00 31/07/2013 31/08/2013 30/09/2013 31/10/2013 30/11/2013

Page : 10 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% Disposal Facilities (CBMWTDFs)/ Integrated E-Waste Recycling, Treatment and Disposal Facilities [3.6.2] (ii) Receipt of proposal by the Ministry and evaluation of proposals and field visit by independent empanelled agency Date 1.00 31/12/2013 15/01/2014 31/01/2014 15/02/2014 28/02/2014 [3.6.3] (iii) Release of financial assistance Date 1.00 05/03/2014 10/03/2014 15/03/2014 20/03/2014 25/03/2014 [3.7] (b) Implementation of GIS based inventorisation system for hazardous wastes [3.7.1] [3.8] (c) Physical Monitoring of [3.8.1] hazard analysis and off-site emergency plans To have GPS for 5000 industries in different States Review of draft reports 1.00 5000 4000 3000 2000 1000 1.00 10 8 6 4 2 [3.9] (d) Creating public [3.9.1] awareness Organizing workshops/seminars on chemical accidents management and wastes management 1.00 10 9 8 7 6 [3.10] (e) Continuing the [3.10.1] (i)finalisation of bid implementation of the ongoing documents, Capacity selection of Date 0.50 28/02/2014 31/03/2014 --

Page : 11 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% Building on Industrial Pollution Management Project (CBIPMP) contractor, awarding of contract, procurements etc. in the case of two (2) pilot projects on remediation of hazardous waste and Municipal Solid Waste at NMK and Kdapa sites, in Andhra Pradesh [3.10.2] (ii)finalisation of remedial option in two (2) pilot projects on remediation of HW and MSW sites at Hooghly and Dhapa in West Bengal. [3.11] (f) Initiation of preparation [3.11.1] (i) Issuing Requests of Detailed Project Report for Proposals (DPRs) under National (RFPs)for short clean Energy Found listing consultants (NCEF) for remediation of 10 contaminated sites in six (6) identified States. Date 0.50 28/02/2014 31/03/2014 -- Date 0.34 31/10/2013 30/11/2013 31/12/2013 31/01/2014 28/02/2014 [3.11.2] (ii) Selection of consultants amongst shortlisted consultants based on their proposals Date 0.33 30/11/2013 31/12/2013 31/01/2014 28/02/2014 31/03/2014

Page : 12 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator submitted Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [3.11.3] (iii) Award of work to selected consultant for preparation of DPRs for selected items [3.12] Better Environmental [3.12.1] (i) Appointment of Governance (5%) Members of the NGT Operationalisation of NGT [3.12.2] (ii) Infrastructure and refurbishment of the 5 places of sitting of NGT Date 0.33 31/12/2013 31/01/2014 28/02/2014 31/03/2014 -- Date 3.00 05/08/2013 01/11/2013 15/12/2013 31/03/2014 -- Date 2.00 05/07/2013 01/10/2013 15/12/2013 31/03/2014 -- [4] Conservation of Rivers and Lakes 10.00 [4.1] Conservation of Rivers and Lakes (10%) (a) Treatment of municipal sewage falling into the rivers [4.1.1] [4.2] (b) Pollution abatement [4.2.1] works/ rejuvenation of lakes [5] Coordination Implementation National Action Plan on Climate Change (NAPCC) & preparation of State Action Plan on Climate Change by State Governments 2.00 [5.1] a) Monitoring* of the preparation and implementation of National Missions and other Initiatives under NAPCC (0.2%) [5.1.1] Creation of sewage treatment capacity of lakes where works to be completed Meeting of the Executive Committee on Climate Change mld 7.50 295 266 236 207 177 2.50 4 3 2 1 1 number 0.20 1 1 1

Page : 13 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% [5.2] b) Review and Consideration of State Action Plan by Expert Committee and National Steering Committee on Climate Change (1.8%) [5.2.1] [6] Joint ** Responsibility for power generation 5.00 [6.1] Give necessary support [6.1.1] and clearance [6.1.2] Final approval of State Action Plans on Climate Change Additional Capacity installed Total power generated number 1.80 9 8 7 6 5 MW 3.00 18500 18000 17000 16500 -- BU 2.00 1030 1000 950 920 -- * * * Efficient Functioning of the RFD System 3.00 Timely submission of Draft RFD 2014-15 for Approval Transparency/Service delivery Ministry/Department Timely submission of Results for 2012-13 3.00 Independent Audit of implementation of Citizens /Clients Charter (CCC) Independent Audit of implementation of Public Grievance Redressal System Administrative Reforms 6.00 Implement mitigating strategies for reducing potential risk of corruption * Mandatory Objective(s) Implement ISO 9001 as per the approved action plan Implement Innovation Action Plan (IAP) Identification of core and noncore activities of the Ministry/Department as per 2nd ARC recommendations On-time submission Date 2.0 05/03/2014 06/03/2014 07/03/2014 08/03/2014 11/03/2014 On-time submission Date 1.0 01/05/2013 02/05/2013 03/05/2013 06/05/2013 07/05/2013 % of implementation % 2.0 100 95 90 85 80 % of implementation % 1.0 100 95 90 85 80 % of implementation % 1.0 100 95 90 85 80 % of implementation % 2.0 100 95 90 85 80 % of milestones achieved % 2.0 100 95 90 85 80 Timely submission Date 1.0 27/01/2014 28/01/2014 29/01/2014 30/01/2014 31/01/2014

Page : 14 of 39 Section 2: Inter se Priorities among Key Objectives, Success indicators and Targets Objective Weight Action Success Indicator Weight Target / Criteria Value Excellent Very Good Good Fair Poor 100% 90% 80% 70% 60% * Improving Internal Efficiency/Responsiveness. 2.00 Update departmental strategy to align with 12th Plan priorities Timely updation of the strategy Date 2.0 10/09/2013 17/09/2013 24/09/2013 01/10/2013 08/10/2013 * Ensuring compliance to the Financial Accountability Framework 1.00 Timely submission of ATNs on Audit paras of C&AG Timely submission of ATRs to the PAC Sectt. on PAC Reports. Early disposal of pending ATNs on Audit Paras of C&AG Reports presented to Parliament before 31.3.2012. Early disposal of pending ATRs on PAC Reports presented to Parliament before 31.3.2012 Percentage of ATNs submitted within due date (4 months) from date of presentation of Report to Parliament by CAG.during the year. Percentage of ATRS submitted within due date ( 6 months) from date of presentation of Report to Parliament by PAC.during the year. Percentage of outstanding ATNs disposed off during the year. Percentage of outstanding ATRS disposed off during the year. % 0.25 100 90 80 70 60 % 0.25 100 90 80 70 60 % 0.25 100 90 80 70 60 % 0.25 100 90 80 70 60 * Mandatory Objective(s)

Page : 15 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 [1] Improve forest and tree cover in the [1.1] Afforestation and [1.1.1] country Regeneration of Degraded Forests (10%) (a) Approval of State Forest Development Agency (FDA) projects for regeneration of degraded forests (i) Approval of State Forest Development Agency (FDA) proposals within 45 days of receipt (% of proposals disposed off within 45 days of receipt) 26 27 27 27 27 [1.1.2] (ii) Extent of treatment area for which National Afforestation Programme (NAP) projects approved Lakh Ha 1.41 0.57 0.50 0.50 0.50 [1.2] (b) Mainstreaming livelihood issues with afforestation programmes [1.2.1] Employment generation in mandays 23.72 16.4 16 16 16 [1.3] Green India Mission (4%) (a) Eco restoration/ enhancing tree cover in urban and peri-urban areas/ Agro-forestry and social forestry/ restoration of wet lands including preparatory activities and advance action for plantation. [1.3.1] (i) Approval of proposals (% of proposals disposed of within 45 days of receipt) 0 0 90 90 90 [1.3.2] (ii) No. of landscape covered No 0 0 135 180 225

Page : 16 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 [1.3.3] (iii) Extent of Area covered under GIM (a) Increase in forest Cover Lakh Ha 0 0 1.6 2.2 2.7 [1.3.4] (b) Increase in quality of forest cover Lakh Ha 0 0 1.6 2.2 2.7 [1.3.5] (iv) Development of nurseries under GIM 135 180 225 [1.4] (b) Promoting alternative [1.4.1] fuel energy of household adapting Energy Saving Devices. of household s 0 0 67000 90000 110000 [1.5] (c) Livelihood [1.5.1] Improvement activities of Households Covered under GIM of household s 0 0 67000 90000 110000 [1.6] Protection of Forests [1.6.1] (8 %) (a) Strengthening of forest protection and management in States/ UTs by providing financial assistance (i) Percentage of proposals approved within 60 days of receipt % 49 32 91 91 91 [1.6.2] ii) Utilisation of budget allocation % 98.00 84.81 91 91 91 [1.6.3] (iii) Sanction for Creation and Maintenance of Firelines (With respect to BE) % 61594 58000 91 91 91

Page : 17 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 [1.6.4] (iv) Sanction for engagement of Fire Watchers (With respect to BE) % 150935 300000 91 91 91 [1.6.5] (v) Sanction for construction of Forest Boundary pillars (With respect to BE) % 17758 42000 91 91 91 [1.6.6] (vi) Sanction for construction of field Officer/ Residence Buildings (With respect to BE) % 353 419 91 91 91 [1.7] (b) Technology based [1.7.1] Monitoring of Forest Cover Publication of Report India State of Forest Report 2013 by the end of 2013-14 Date 31/03/2014 -- 31/03/2016 [2] To conserve and sustainably use [2.1] In situ Conservation of [2.1.1] biodiversity resources Fauna (6%) (a).in situ Conservation: Strengthening of infrastructure in protected areas including tiger reserves and elephant reserves of protected areas including tiger reserves and elephant reserves provided financial assistance 400 424 402 402 402

Page : 18 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 [2.2] Ex-situ Conservation of [2.2.1] Rare Endangered, Threatened (RET) and Endemic Plants and their multiplication (5%) To provide Financial assistance to 14 existing botanical gardens 12 14 12 12 12 (a) To provide financial assistance to 14 existing botanical gardens [2.3] (b) To ensure ex-situ [2.3.1] conservation of at least 100 RET and endemic species Ex-situ conservation of RET and endemic species 110 100 120 130 150 [2.4] Survey, Identification and [2.4.1] Documentation of Wild Plant Diversity of the Country and identification of new species (3%) Extent of coverage of region/state/district/ ecosystem/protected areas of field surveys conducte 71 92 60 60 60 (a) Survey of forest ecosystems, protected areas and fragile ecosystems [2.5] (b) Digitization of [2.5.1] herbarium specimens Digital Images and Metadata of Specimen s digitized 5783 53000 5000 5000 5000 [2.6] Survey Identification and [2.6.1] Documentation of Wild Faunal Diversity Extent of coverage of region/state/district/ of field surveys 103 148 100 100 100

Page : 19 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 of the Country and identification of new species (3%) ecosystem/protected areas conducte (a) Survey of forest ecosystems, protected areas and fragile ecosystems [2.7] (b) Digitization of national [2.7.1] zoological collections Digital Images and Metadata of Specimen s digitized 9200 101000 10000 10000 10000 [2.8] To support Research in [2.8.1] multi-disciplinary aspects of Environment in Identified thrust areas (4%) To provide financial assistance to 25 new research proposals 25 25 25 Support of research proposals in identified thrust areas during year 2013-2014 [2.9] Desertification Status [2.9.1] Mapping (DSM) of India (1%) (a) Desertification Status Mapping on 1:0.5 million scale Preparation of Desertification Status Map for entire country on 1:0.5 million scale of States 35 [2.10](b) Detailed mapping [2.10.1] (1:50,000 scale)* Desertification Status Mapping on 1:50,000 12 district of Districts 12 48 --

Page : 20 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 [3] To control Environmental Pollution [3.1] To Increase Awareness among the People about Environmental Issues for their Participation in the Protection of Environment (5%) (a) Support to eco-clubs in schools under the National Green Corps Programme [3.1.1] of eco-clubs functional in NGC schools financially assisted 90000 95350 100000 120000 120000 [3.2] (b) Support to NGOs, educational and other institution under the National Environment Awareness Campaign [3.2.1] of local level NGOs, educational and other institutions financially assisted 9000 13107 10000 11000 12000 [3.3] (c) Advertising & Publicity [3.3.1] for awareness generation through Science Express of visitors to the Science Express: Biodiversity Special -- 2402951 1500000 [3.4] Better Ambient Water [3.4.1] and air Quality (6%) (a) Enhancement of common effluent treatment capacity Additional effluent treatment capacity to be created (MLD) MLD 12 43 24 30 -- [3.5] (b) Notification of [3.5.1] standards for additional categories of industries Industrial processes categories to be covered 6 0 5 5 6 [3.6] To Improve Management [3.6.1] of Hazardous Substances (8%) (i) Inviting proposals from states/uts Date 31/08/2013

Page : 21 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 (a) Setting up of one Treatment, Storage and Disposal Facilities (TSDFs) for Hazardous Wastes/ Bio- Medical Wastes Treatment and Disposal Facilities (CBMWTDFs)/ Integrated E-Waste Recycling, Treatment and Disposal Facilities [3.6.2] (ii) Receipt of proposal by the Ministry and evaluation of proposals and field visit by independent empanelled agency Date 15/01/2014 [3.6.3] (iii) Release of financial assistance Date 10/03/2014 [3.7] (b) Implementation of [3.7.1] GIS based inventorisation system for hazardous wastes To have GPS for 5000 industries in different States 5000 4000 4000 [3.8] (c) Physical Monitoring of [3.8.1] hazard analysis and offsite emergency plans Review of draft reports 10 8 9 9 9 [3.9] (d) Creating public [3.9.1] awareness Organizing workshops/seminars on chemical 10 10 10 10 10

Page : 22 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 accidents management and wastes management [3.10](e) Continuing the [3.10.1] implementation of the ongoing Capacity Building on Industrial Pollution Management Project (CBIPMP) (i)finalisation of bid documents, selection of contractor, awarding of contract, procurements etc. in the case of two (2) pilot projects on remediation of hazardous waste and Municipal Solid Waste at NMK and Kdapa sites, in Andhra Pradesh Date 31/03/2014 [3.10.2] (ii)finalisation of remedial option in two (2) pilot projects on remediation of HW and MSW sites at Hooghly and Dhapa in West Bengal. Date 31/03/2014 [3.11](f) Initiation of [3.11.1] preparation of Detailed Project Report (DPRs) under National clean Energy Found (NCEF) for remediation of 10 contaminated sites in (i) Issuing Requests for Proposals (RFPs)for short listing consultants Date 30/11/2014

Page : 23 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 six (6) identified States. [3.11.2] (ii) Selection of consultants amongst shortlisted consultants based on their proposals submitted Date 31/12/2013 [3.11.3] (iii) Award of work to selected consultant for preparation of DPRs for selected items Date 31/01/2014 [3.12] Better Environmental [3.12.1] Governance (5%) (i) Appointment of Members of the NGT Date -- 31/12/2012 01/11/2013 Operationalisation of NGT [3.12.2] (ii) Infrastructure and refurbishment of the 5 places of sitting of NGT Date 01/10/2013 [4] Conservation of Rivers and Lakes [4.1] Conservation of Rivers and Lakes (10%) (a) Treatment of municipal sewage falling into the rivers [4.1.1] Creation of sewage treatment capacity mld 241 119 266 200 200 [4.2] (b) Pollution abatement [4.2.1] works/ rejuvenation of lakes of lakes where works to be completed 4 1 3 4 4 [5] Coordination Implementation [5.1] a) Monitoring* of the [5.1.1] National preparation and Meeting of the Executive number 2 2 1 1 1

Page : 24 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 Action Plan on Climate Change (NAPCC) & preparation of State Action Plan on Climate Change by State Governments implementation of National Missions and other Initiatives under NAPCC (0.2%) Committee on Climate Change [5.2] b) Review and [5.2.1] Consideration of State Action Plan by Expert Committee and National Steering Committee on Climate Change (1.8%) Final approval of State Action Plans on Climate Change number -- 9 8 7 6 [6] Joint ** Responsibility for power [6.1] Give necessary support [6.1.1] generation and clearance [6.1.2] Additional Capacity installed MW 18000 Total power generated BU 1000 * Efficient Functioning of the RFD System Timely submission of Draft RFD 2014-15 for Approval On-time submission Date 06/03/2014 Timely submission of Results for 2012-13 On-time submission Date 02/05/2013 * Transparency/Service delivery Ministry/Department Independent Audit of implementation of Citizens /Clients Charter % of implementation % 95 Independent Audit of implementation of Public Grievance Redressal System % of implementation % 95 * Administrative Reforms Implement mitigating strategies for reducing % of implementation % 95 * Mandatory Objective(s)

Page : 25 of 39 Section 3: Trend Values of the Success Indicators Objective Action Success Indicator Actual Value for FY 11/12 Actual Value Target Value Projected for for Value for FY 12/13 FY 13/14 FY 14/15 Projected Value for FY 15/16 potential risk of corruption Implement ISO 9001 as per the approved action plan % of implementation % 95 Implement Innovation Action Plan (IAP) % of milestones achieved % 95 Identification of core and noncore activities of the Ministry/Department as per 2nd ARC recommendations Timely submission Date 15/10/2013 * Ensuring compliance to the Financial Accountability Framework Timely submission of ATNs on Audit paras of C&AG Percentage of ATNs submitted within due date (4 months) from date of presentation of Report to Parliament by CAG.during the year. % 90 Timely submission of ATRs to the PAC Sectt. on PAC Reports. Percentage of ATRS submitted within due date ( 6 months) from date of presentation of Report to Parliament by PAC.during the year. % 90 Early disposal of pending ATNs on Audit Paras of C&AG Reports presented to Parliament before 31.3.2012. Percentage of outstanding ATNs disposed off during the year. % 90 Early disposal of pending ATRs on PAC Reports presented to Parliament before 31.3.2012 Percentage of outstanding ATRS disposed off during the year. % 90 * Mandatory Objective(s)

Page : 26 of 39 Section 4: Acronym SI.No Acronym Description 1 BSI Botanical Survey of India 2 FDA Forest Development Agencies 3 JFMCs Joint Forest Management Committees 4 MoEF Ministry of Environment and Forests 5 NAP National Afforestation Programme 6 NAPCC National Action Plan on Climate Change

Page : 27 of 39 Section 4: Acronym SI.No Acronym Description 7 RET Rare Endangered Threatened 8 ZSI Zoological Survey of India

Page : 28 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 1 [1.1.1] (i) Approval of State Forest Development Till 2009-2010, the Ministry has been Proposals received from Agency (FDA) proposals within 45 days of receipt inviting proposals from each of the Forest Development (% of proposals disposed off within 45 days of Forest Development Agencies {a Agencies (FDA) for release receipt) conglomeration of the Joint Forest of financial assistance Management Committees (JFMC) at Forest Division level} and processing the same for release of financial assistance as per the guidelines approved by the Ministry. From 2010-11 onwards, the MoEF revised the guidelines for constituting State FDAs by the State Governments which will analyze each of the FDA proposal and recommend to the Ministry for release of financial assistance. Hence, the Ministry would approve only one proposal for the whole state. 2 [1.1.2] (ii) Extent of treatment area for which Under the National Afforestation Forest Areas National Afforestation Programme (NAP) projects Programme, the forest areas are managed/treated by JFMCs Ha. approved managed (as per the treatment action under the National plan)/ treated by the JFMCs. A Afforestation Programme number of activities are taken up in (NAP) the area to be treated (soil and moisture conservation, raising of nursery stock and plantation, protection including fire protection, etc.)

Page : 29 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 3 [1.2.1] Employment generation in man-days The work is executed by the Employment generated by members of the JFMCs and they are execution of work by the (Man-days) benefits available from the forest paid wages, apart from sharing of NAP. members of JFMCs under area, as per the guidelines issued and the wage rates fixed by the State Government. [1.6.1] (i) Percentage of proposals approved within 4 State/UTs submit Annual Work Plan of days is calculated Measured in number of days. If 60 days of receipt Proposals under Centrally Sponsored from the date of receipt of more than one proposal is Scheme: Intensification of Forest complete proposals from received from a State/UT, Management which is placed before States/UTs and date of weighted average of the the screening committee for scrutiny sanction of Screening number of days is taken to and recommendations. Sometimes Committee. clear the proposal will be more than one proposal is received considered. from States/UTs. For timely execution it is important that funds are released to States/UTs without delay. This indicator will measure the promptness of processing the proposals received from States/UTs Complete proposals will be required from States/UTs before any action is initiated in the Ministry. Counting of days will begin for the receipt of such complete proposals. [1.6.2] ii) Utilisation of budget allocation 5 This success Indicator is percentage Percentage of net amount Measured as Percentage of of budget allotted for implementation released after adjusting amount released to Budget of Centrally Sponsored Scheme IFMS unspent balance or Estimates/ Revised Estimates released to States/UTs. Indicates revalidated amount. financial achievement by the

Page : 30 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 5 [1.6.2] ii) Utilisation of budget allocation Forest Protection Division on a gross Percentage of net amount level. released after adjusting Measured as Percentage of amount released to Budget unspent balance or Estimates/ Revised Estimates revalidated amount. [1.6.3] (iii) Sanction for Creation and Maintenance 6 Creation and maintenance of firelines New Firelines created or old % of physical quantity of Firelines (With respect to BE) is one of the important activities firelines maintained by sanctioned with respect to the through which state/ut Forest removal of vegetation or BE. Departments execute fire protection debris. works well in time before the fire season starts. It is an indicator of preparedness for fire prevention and control. [1.6.4] (iv) Sanction for engagement of Fire 7 Persons engaged for forest % of physical quantity Watchers (With respect to BE) fire activities like fire sanctioned with respect to the watchers, wireless operators, BE. fire fighting and fire prevention teams etc. [1.6.5] (v) Sanction for construction of Forest 8 Boundary pillars constructed % of physical quantity Boundary pillars (With respect to BE) as per the norms and sanctioned with respect to the guidelines of the State/UT BE. Forest Departments as approved by the concerned working plans.

Page : 31 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments [1.6.6] (vi) Sanction for construction of field Officer/ 9 Buildings constructed for the % of physical quantity Residence Buildings (With respect to BE) purpose of offices, sanctioned with respect to the residences, nakas, BE. checkposts, protection camps, labour camps, barracks, etc. as per the guidelines of the scheme. 10 [1.7.1] Publication of Report India State of Forest Forest Survey of India does biennial The report India State of Report 2013 by the end of 2013-14 survey of the forest cover of the Forest Report is the outcome Publication of the report. country and publishes India State of Forest Report. The 13th Report is due in the current year 2013-14. The last report was published in 2011. of survey and inventorisation of the forests of the country. The report also gives among other data, details of the change of forest and tree cover State/ UT wise, status of bamboo in forests and forest carbon stock in the country. 11 [2.1.1] of protected areas including tiger For in situ conservation of wildlife, the Financial assistance to the reserves and elephant reserves provided financial Ministry provides financial assistance State Governments under assistance to the State Governments under three three Centrally Sponsored Centrally Sponsored Schemes, viz., Schemes, viz., Project Tiger, Project Tiger, Project Elephant and Project Elephant and Integrated Development of Wildlife Integrated Development of Habitats. The activities are executed Wildlife Habitats (in the by the State Governments and natural habitats) progress is monitored through receipt of physical progress

Page : 32 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 11 [2.1.1] of protected areas including tiger reports as well as inspections by the Financial assistance to the reserves and elephant reserves provided financial officials. State Governments under assistance three Centrally Sponsored Schemes, viz., Project Tiger, Project Elephant and Integrated Development of Wildlife Habitats (in the natural habitats) 12 [2.2.1] To provide Financial assistance to 14 For ex situ conservation of RET Financial and technical existing botanical gardens species of plants, under the assistance for maintenance Assistance to Botanic Gardens Scheme, financial and technical assistance is provided for of the existing botanic gardens in the public and private sector. maintenance of the existing botanic gardens in the public and private sector. [2.4.1] Extent of coverage of region/state/district/ 13 The Botanical Survey of India and Field survey undertaken in of field surveys ecosystem/protected areas Zoological Survey of India undertake protected areas/ different conducted field survey visits in protected areas/ eco-systems for exploration, different eco-systems for exploration, collection, identification and documentation of flora and fauna. collection, identification and documentation of flora and fauna The achievement is assessed by the number of survey visits undertaken, specimens collected and identified, new species to the science and new records for the country discovered and

Page : 33 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments [2.4.1] Extent of coverage of region/state/district/ 13 documentation prepared. Field survey undertaken in of field surveys ecosystem/protected areas protected areas/ different conducted eco-systems for exploration, collection, identification and documentation of flora and fauna [2.5.1] Digital Images and Metadata 14 Under the e-governance Programme Digitization of the plant and of Specimens digitized of the Ministry, it has been decided to animal specimens available digitize the plant and animal with the BSI and ZSI. specimens available with the BSI and ZSI for detailed scientific studies by the scientists located in different parts of the country and putting the same on the website for use by the interested students and others. 15 [3.1.1] of eco-clubs functional in NGC Under the Environment Education Eco-clubs established in the schools financially assisted and Awareness Scheme of the schools for the children for Ministry, Eco-clubs have been established in the schools for the children for creating awareness on creating awareness on environmental/ecological issues. environmental issues. 16 [3.2.1] of local level NGOs, educational Under National Environment Assistance provided to Local and other institutions financially assisted Awareness Campaign component of NGOs, educational and other the Environmental Education and Awareness Scheme of the Ministry, financial assistance is provided to institutions for creating awareness on environmental issues among the general NGOs, educational

Page : 34 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 16 [3.2.1] of local level NGOs, educational and other institutions, and also for public. and other institutions financially assisted production of TV episodes and media spots, for creating awareness on environmental issues among the general public. 17 [3.4.1] Additional effluent treatment capacity to be For improving the quality of water, Additional effluent treatment created (MLD) assistance is provided for creation of capacity created by financial MLD effluent treatment capacity. The assistance achievement can be assessed based on the percentage of physical work completed by the implementing agencies in the state governments. 18 [3.5.1] Industrial processes categories to be Under the Environment (Protection) Standards notified for various covered Act, the Ministry notifies standards for new industrial categories various categories of industries. 19 [3.6.3] (iii) Release of financial assistance For setting up of treatment, storage Proposals received from and disposal facilities for hazardous states government for setting Date studies on hazard analysis, rapid safety audit and off-shore emergency plan, proposals are invited from the States, evaluated in the Ministry and financial assistance released. Achievement under the scheme and bio-medical wastes and awarding disposal facilities for hazardous and bio-medical wastes and awarding studies on hazard analysis, rapid safety audit and off-shore emergency plan. up of treatment, storage and depends on the interest

Page : 35 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 19 [3.6.3] (iii) Release of financial assistance taken by the implementing agencies Proposals received from in the states on this issue. states government for setting Date disposal facilities for hazardous and bio-medical wastes and awarding studies on hazard analysis, rapid safety audit and off-shore emergency plan. up of treatment, storage and 20 [3.7.1] To have GPS for 5000 industries in different The Ministry provides financial Financial assistance for States assistance for implementation of GIS implementation of GIS based Date based inventorisation of hazardous wastes. inventorisation of hazardous wastes in different states. 21 [3.9.1] Organizing workshops/seminars on For creating awareness among the Financial assistance for chemical accidents management and wastes public on chemical accidents and organising workshops/ management wastes management, the Ministry seminars for creating provides financial assistance for awareness among the public organising workshops/seminars. on chemical accidents and waste management. 22 [4.1.1] Creation of sewage treatment capacity The Ministry provides financial Treatment of municipal assistance to the State Governments sewage falling into the river MLD plants under the National River for creation of sewage treatment capacity) (creation of additional Conservation Plan.

Page : 36 of 39 Section 4: Description and Definition of Success Indicators and Proposed Measurement Methodology SI.No Success indicator Description Definition Measurement General Comments 23 [4.2.1] of lakes where works to be The Ministry provides financial Works relating to completed assistance to the State Governments conservation of Lakes such for conservation of lakes which include activities like catchment area treatment, protection, creation of capacity for sewage treatment under as catchment area treatment, protection, creation of capacity for sewage treatment. the National Lakes Conservation Plan and the achievement is assessed based on the financial assistance released and activities completed by the State Governments. 24 [5.1.1] Meeting of the Executive Committee on Prime Minister s Council on Climate Meeting of the Executive Climate Change Change has set up a Executive Committee for Committee for coordinating and review of implementation of eightnational implementation of eightnational missions on NAPCC. missions under National Action Plan on Climate Change (NAPCC).

Page : 37 of 39 Section 5 : Specific Performance Requirements from other Departments Location Type State Organisation Type Organisation Name Relevant Success Indicator What is your requirement from this organisation Justification for this requirement Please quantify your requirement from this Organisation What happens if your requirement is not met. Central Government Ministry All Organization Ministry of Earth Sciences [3.6.3] (iii) Release of financial assistance [5.1.1] Meeting of the Executive Committee on Climate Change Release of matching contribution from state/uts Proper coordination, cooperation and timely action in completing formulation of the mission documents and implementation of the activities under them by the nodal ministries identified for each mission. Proposal considered and release of grant is subject to matching contribution Without their support this programme can not be successful Release of matching contribution Implementation of activities under the nodal ministry identify the each mission get delayed Without their support this programme can not be successful Ministry of Power [5.1.1] Meeting of the Executive Committee on Climate Change Ministry of Water Resources [5.1.1] Meeting of the Executive Committee on Climate Change Ministry of New and Renewable Energy [5.1.1] Meeting of the Executive Committee on Climate Change State Government Assam Departments State Departments [3.6.1] (i) Inviting proposals from states/uts [1.6.5] (v) Sanction for construction of Proposals from State govt./uts. Information received from State govt./uts These proposals are only received from state govt. The information is provided by the State govt./ UTs of Proposals of Boundary pillars constructed The implementation of the programme get delayed Get delayed

Page : 38 of 39 Section 5 : Specific Performance Requirements from other Departments Location Type State Organisation Type Organisation Name Relevant Success Indicator What is your requirement from this organisation Justification for this requirement Please quantify your requirement from this Organisation What happens if your requirement is not met. Forest Boundary pillars (With respect to BE) Information received from State govt./uts The information is provided by the State govt./ UTs of Boundary pillars constructed Get delayed [1.6.1] (i) Percentage of proposals approved within 60 days of receipt Proposals from State govt./uts These proposals are only received from state govt. of Proposals The implementation of the programme get delayed [1.6.4] (iv) Sanction for engagement of Fire Watchers (With respect to BE) Information received from State govt./uts The information is provided by the State govt./ UTs of man-days Get delayed [1.6.6] (vi) Sanction for construction of field Officer/ Residence Buildings (With respect to BE) of field office/ residential building constructed [1.6.3] (iii) Sanction for Creation and Maintenance of Firelines (With respect to BE) Information regarding creation and maintenance of fire lines received from State govt./uts of Kilometers

Page : 39 of 39 Section 6: Outcome/Impact of Department/Ministry Outcome/Impact of Department/Ministry Jointly responsible for influencing this outcome / impact with the following department (s) / ministry(ies) Success Indicator FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 1 2 Enhancing the provision of water in major streams Increase in ground water level State Governments/UTs, Ministry of Water Resources, Central Water Commission State Governments/UTs, Ministry of Water Resources, Ministry of Drinking Water, Central Water Commission 3 4 5 Conserve and Sustainably use biodiversity resources Improved forest and tree cover in the country Improved quality of water in identified water bodies State Governments/ UTs, Ministry of Agriculture, Health & Family Welfare, Biotechnology, Rural Development, Science and Technology, Tribal Affairs etc. Ministry of Rural Development, Ministry of Tribal Affairs, State Governments, Local Bodies Ministry of Water Resources, Ministry of Agriculture and State Governments 6 Control environmental pollution State Pollution Control Boards