West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z185-CP Prepared For. Chao & Associates, Inc.

Similar documents

CUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN

Index. Composition and Order of Plan Set. Utility Plan... 5

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

SITE PLAN NOTES 1. MECHANICAL EQUIPMENT SHALL BE FULLY SCREENED FROM VIEW WITH HEDGE.

APPLICATION FOR RIGHT OF WAY PERMIT

PUBLIC WORKS DEPARTMENT GENERAL NOTES

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

SECTION MAINTENANCE OF EXISTING CONDITIONS

General Legend Details...100

Galesburg, Illinois 49 North Prairie Street Quincy, IL Burlington, IA Pella, IA Hannibal, MO

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

GENERAL PLAN OF SERVICING

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

SECTION UNCLASSIFIED EXCAVATION AND GRADING

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

APPLICATION FOR A SITE CONSTRUCTION PERMIT

7.00 INTRODUCTION... 1

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

SECTION CONSTRUCTION SERVICES

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION

SECTION TRENCHING

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

Stormwater Management The District exercises regulatory authority for Stormwater Management in the City of Edina.

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

Table Related Arlington County Standards, Specification and Policies

18"ST 8"W 6"FM OHE T CTV 4"G 8"S RCAP LRCP CMP RCP PVC VCP DIA M.01 W.01-W.02 CROSS SECTIONS - ACCESS ROAD PROTECTION OF VEGETATION

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

CONSTRUCTION PLAN CHECKLIST

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011


ROYAL AVENUE. Wat. San. MH. Wat. Wat San. Rim = I.E. = Existing Curb Opening. Wat. Wat. San. San. San. gas. gas. gas.

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

Case Recommendation: Approve the request for a Special Exception for property known as West 100 with the following conditions:

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

SECTION GENERAL EXCAVATION

CITY OF FORKS CLALLAM COUNTY, WASHINGTON TIB PROJECT NO. 6-W-825(008)-1 SOUTH ELDERBERRY AVENUE RECONSTRUCTION SITE MAP

1750 PLEASANT RIDGE DRIVE LEXINGTON, KY 40509

Building Permit Package

IFB B Attachment 3 Page 112-1

STATE UNIVERSITY CONSTRUCTION FUND

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Demolition Permit Application

PART II - SURVEYING AND GRADING CRITERIA

TERRADYN CONSULTANTS, LLC

to provide timely and accurate information, we make no 385 S. Goliad Street

STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE

DOCUMENT ADDENDA AND MODIFICATIONS

SOIL TRACKING PREVENTION DEVICE TYPE A

CITY OF MILTON CONSTRUCTION NOTES

USC UPSTATE BASEBALL FIELD DRAINAGE SYSTEM IMPROVEMENTS UNIVERSITY OF SOUTH CAROLINA SPARTANBURG COUNTY, SOUTH CAROLINA FOR THE

SECTION MINOR CONCRETE

Construction Specification for General Excavation

(ITEMS APPLICABLE TO THIS PROJECT MARKED WITH "X")

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF ELKO BID TABULATION FOR Sports Complex

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS

GRADING, EROSION AND SEDIMENTATION CONTROL

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

Figure Inlet protection (Source: Minnesota DOT)

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

PRELIMINARY DEVELOPMENT PLAN INFORMATION

PROCEDURES MANUAL INFRASTRUCTURE DEVELOPMENT

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

C. W. Matthews Contracting Co., Inc. (L)

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

BASE BID FORM FY 2015

SECTION PAYMENT PROCEDURES

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

SECTION MEASUREMENT AND PAYMENT

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

YES, we received Addendum No. 1

LITTLE GIANTS LEARNING ACADEMY

T a b l e o f C o n t e n t s

SECTION MEASUREMENT AND PAYMENT

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

TECHNICAL SPECIFICATION

City of Redding Construction Standards Index

Transcription:

West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z1-CP Prepared For by: CA#: 398108-16 The Owner Is: 743 Greene Street Columbia, SC 29208 Project Manager Civil and Surveying DRAWING INDEX Civil c1.0 - Existing Conditions c2.0 - Utility Plan c3.0 - Construction Details Plumbing p1.0 - COUNTY OF RICHLAND SCALE: NOT TO SCALE 3 STATE OF SOUTH CAROLINA SCALE: 1" = 30 MILES 77 Richland County 20 Plumbing Engineer Swygert & Associates Ltd 1315 State Street Cayce, SC 29033 Site 20 Site

LEGEND FIRE HYDRANT WATER VALVE WATER CONC. CURB & GUTTER YARD INLET (YI) GAS VALVE SANITARY SEWER MANHOLE CLEANOUT (CO) NATURAL GAS LINE SANITARY SEWER LINE (MATERIAL UNKNOWN) WATER LINE FENCE OVERHEAD TELEPHONE FIBER OPTIC LINE CABLE TV JUNCTION BOX (JB) DROP INLET (DI) CURB INLET (CI) STORM DRAIN PIPE CONCRETE SIDEWALK POWER POLE & GUY LIGHT POLE ELEC BOX TELEPHONE PED A/C / 2 X 2 PAD TUNNEL N/F THE UNIVERSITY OF SOUTH CAROLINA TMS#R11303-10-01 1211 WHEAT STREET WEST ENERGY FACILITY CEMENT BUILDING SITE NOT TO SCALE General Notes: 1. The information shown on these plans is a compilation of the existing conditions survey and drawings of the building's plumbing furnished by the owner and is intended to show the obstacles that will be encountered in replacing the existing sanitary sewer service. Additional underground utilities may be present within the designated work area. As is required for all excavation projects contractor shall contact SC-811 to have all utilities marked prior to start of construction. 2. Contractor shall abide by all rules and regulations pertaining to worker safety for excavations in confined spaces. 3. Excavated areas shall be restored to original elevations and surface treatment after construction. 4. This plan is not intended to dictate the contractor's methodology for sewer service replacement. The owner will entertain any replacement methods that are based on sound engineering and construction practice and meets or exceeds the minimum design requirements. MAIN STREET CITY OF COLUMBIA MAINTAINED ROAD Owner's preference: existing tree to remain WATER 18" OAK 24" OAK GRATE TOP: 104.87 INV TO FLOOR: 92.77 HANDRAIL STEPS CWP 3 CWP 2 / PANEL TRANS- FORMER FFE: 104.79 at doorway CLOSET 4" METAL SUPPORTS PUMP 18" PIPE VALVE FLOOR DRAIN Subsurface piping as indicated on plumbing plan (P2 OF 2) for West Energy Facility prepared by Reed, Flemming & Assoc., INC. plans dated July 1971, USC file No. 140-01-10-003. Contractor to verify location of sewer lateral prior to start of construction HANGING PIPE SUPPORT PANEL / SWITCHES Existing Conditions and Profile West Energy Sanitary Sewer - State Project # H27-Z1-CP 3 DAYS BEFORE DIGGING IN SOUTH CAROLINA Palmetto Utility Protection Service Notes: 1. Existing conditions survey performed by Chao and Associates. 2. Street Right-of-Way and property information taken from Richland County GIS. 3. Benchmark is based on assumed datum. DRIVEWAY Construction notes: 1. Contractor is cautioned that the location and/or elevation of existing utilities shown herein are based on records provided by the utility company and information obtained from the field. Contractor shall verify all existing field conditions and utilities prior to beginning work. 2. Contractor is required to contact Palmetto Utility Protection Service (811) three days prior to any digging or commencing construction. 3. Provide silt fence and other erosion control devices, as may be required, to control soil erosion during construction. All disturbed areas shall be cleaned, graded and stabilized with grassing immediately after completion of construction in the area. 4. Contractor shall repair any damage caused to any existing site features to remain including, but not limited to, buildings, pavement, curb and gutter, storm drains, underground utilities, fencing, etc. in their entirety. Repairs shall be at the contractor's expense. 5. Sod shall be installed in all areas disturbed by construction that are not intended to be covered by impervious material, unless otherwise indicated. 6. If necessary, slopes which exceed four vertical feet or 4:1 slopes should be stabilized with an approved turf reinforcing mat in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed daily until slope is brought to grade. 7. Contractor shall take necessary action to minimize the tracking of mud onto the paved roadway from construction areas. Contractor to daily remove mud/soil from pavement as required. 8. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized to the satisfaction of Lexington County. 9. Contractor shall abide by all provisions of the City of Columbia storm drainage and erosion control ordinances as well as the South Carolina Sediment Reduction Act. 10. All excavation is unclassified. Excess material is to be removed from the site and disposed of in a legal manner. 11. All construction staking shall be provided at the contractor's expense. HMC Checked: GAL Drawn: c1.0 File: 398108C-R2.dwg Project No.: 398108

LEGEND FIRE HYDRANT WATER VALVE WATER GAS VALVE SANITARY SEWER MANHOLE CLEANOUT (CO) NATURAL GAS LINE SANITARY SEWER LINE (MATERIAL UNKNOWN) WATER LINE FENCE OVERHEAD TELEPHONE FIBER OPTIC LINE CABLE TV CONC. CURB & GUTTER YARD INLET (YI) JUNCTION BOX (JB) DROP INLET (DI) CURB INLET (CI) STORM DRAIN PIPE CONCRETE SIDEWALK POWER POLE & GUY LIGHT POLE ELEC BOX TELEPHONE PED A/C / 2 X 2 PAD MAIN STREET CITY OF COLUMBIA MAINTAINED ROAD 6" DIP min. 1% slope Cleanout required at change in direction Tie to existing manhole 110 105 100 Road Building wall 0+00 0+83.81 Exist. SSMH WATER Curb and Gutter Sidewalk 18" OAK Concrete wall GRATE TOP: 104.87 INV TO FLOOR: 92.77 Exist. grade HANDRAIL ONCRETE WALL STEPS CWP 3 CWP 2 / PANEL TRANS- FORMER Electrical vault FFE: 104.79 at doorway TUNNEL CLOSET PUMP West Energy Facility Building WEST ENERGY FACILITY CEMENT BUILDING 4" METAL SUPPORTS N/F THE UNIVERSITY OF SOUTH CAROLINA TMS#R11303-10-01 1211 WHEAT STREET 18" PIPE VALVE FLOOR DRAIN HANGING PIPE SUPPORT 110 105 100 Subsurface piping as indicated on plumbing plan (P2 OF 2) for West Energy Facility prepared by Reed, Flemming & Assoc., INC. plans dated July 1971, USC file No. 140-01-10-003. Contractor to verify location of sewer lateral prior to start of construction PANEL / SWITCHES Refer to plumbing plan details on re-connections of existing subfloor piping. Remove and replace concrete floor slab as needed to facilitate work. SITE NOT TO SCALE Area of disturbance: 0.1 acre Utility Plan West Energy Sanitary Sewer - State Project # H27-Z1-CP 398108 90 80 Bottom of electrical vault Replace exist. sanitary sewer service 0+00 0+83.81 90 80 Basement floor elevation HMC Checked: GAL Drawn: Project No.: 398108C-R2.dwg File: Ground Level to Basement Scale: 1" = 10' horiz. 1" = 5' vert. 3 DAYS BEFORE DIGGING IN SOUTH CAROLINA Palmetto Utility Protection Service Notes: 1. Existing conditions survey performed by Chao and Associates. 2. Street Right-of-Way and property information taken from Richland County GIS. 3. Benchmark is based on assumed datum. c2.0

c3.0 Project No.: 398108 Checked: GAL File: 398108C-R2.dwg Drawn: HMC Construction Details West Energy Sanitary Sewer - State Project # H27-Z1-CP

Drawn: DEM Checked: TFS File: 16245-P1_0.dwg Project No.: 398108 Floor Plan, Notes, & Detail West Energy Sewer Service - State Project # H27-Z1-CP CONSULTING ENGINEERS & LAND SURVEYORS Swygert & Associates p1.0 6-29-16