APPENDIX B DCC Bylaw - Drainage Project List. Project Timing Range. Existing Percent Existing Cost. DCC Number Project Name/Description Location

Storage and pumping capacity analysis using hydraulic modeling

The Evolution of the City of Asheville Water System. Presented by Leslie Carreiro and Bill Hart

Overview of the Projects

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH

Table of Contents. 3.1 Source Capacity Analysis

Freitas + Freitas Engineering and Planning Consultants, Inc.

Town of Lakeshore Water & Wastewater Master Plan Update Study Public Information Centre #1

2013 ANNUAL WATER REPORT

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

Proposed Resolution No , Approving the Agreement with Wright Water Engineers, Inc. for a Non-potable Water System Planning Study

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

Development Cost Charge (DCC) Program Update

2010 UPDATE OF WATER AND WASTEWATER IMPACT FEES FOR THE CITY OF GEORGETOWN

Overview of the Projects

ALASKA DRINKING WATER FUND Funding Priority List Fiscal Year 2018

IPFS ID: 6606/6607/6654/6655/6608. Project Description: 750 mm WWM on Trafalgar Road north (Zone G6L)

Wastewater Capital Project Cost

CHAPTER 4 HYDRAULIC ANALYSIS

HDPE PIPELINE SOLUTIONS FOR MARINE SECTOR. From the VENICE Lagoon

2012 ANNUAL WATER REPORT

M A N Y A V U

His Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project

At commercial metered connections, Council owns the water meter and backflow preventer and charges for actual water used.

Section 1 - Introduction...7. Section 2 - Raw Water Supply Section 3 - Water Treatment Section 4 - Water Distribution System...

Section 7 Hydraulic Model Development and Evaluation Criteria

LADWP WATER INFRASTRUCTURE PLAN

CITY OF ROSEBURG LONG-RANGE WATER SUPPLY PLAN

Graves County FY2012 Water Rankings

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved.

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

2011 ANNUAL WATER REPORT

EXISTING SYSTEM ANALYSIS

SANITARY SEWAGE & WATER INFRASTRUCTURE IMPACTS CITY OF KINGSTON URBAN GROWTH STRATEGY

Energy is the ability to do work, cause things to happen and make changes.

National League of Cities

Saint Louis Water Supply Replacement Gratiot Area Water Authority

2006 Water Master Plan

RESIDENTIAL SUBDIVISION, LOT 991 MARYVALE ROAD,

Project Name: St. Johns River/Taylor Creek Reservoir

Work hard. Be nice. Name: Period: Date: UNIT 2: Atomic Concepts Lesson 1: Give me an element, any element

Wastewater Facility. Treatment. Collection. History. Current Status. Presented by Bruce Bender City Public Works Director

Proposed Enhance CO 2

8.4 West Central Brazos Water Distribution System

Hwy. 70 East 0 Elmwood Road Elmwood Rd. off Salisbury Hwy. Statesville, NC 28625

Kansas Department of Health and Environment Office of Planning and Prevention

Water Supply Planning Value Planning Study Council Presentation February 27, 2017

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

TABLE OF CONTENTS. 5 WATER SUPPLY 5-1 Sources of Supply TOC-1 City of Ontario Water Master Plan. R:Reports\Ontario\Water Master Plan

SPRINGBROOK 2017 Offsite Levies

BOARD CORPORATE ALLOCATION POLICY

Clark Public Utilities. 50-Year Water Supply Plan

Using conjoint analysis to validate SAGE: A tool to measure research use in health policy/program development

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018

City of Orofino, Water Treatment Upgrades

Broomes Island Flood Mitigation Plan

Center Horse Landscape Restoration Project Summary Selected Action (Draft Record of Decision (DROD))

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

Managing Losses in Water Distribution Networks

Environmental Engineering-I

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017

BARRABA WATER SUPPLY. Construction of Split Rock Dam Pipeline and Ancillary Works

Volume 1 Executive Summary

CHAPTER 5 EXISTING FACILITIES

2008 Water & Sewer Operating Budget & 2008 Capital Budget & Forecast Approved by Muskoka District Council 3(2008) - February 25, 2008

West Clayton NCP Stage 1

CLASS TEST GRADE 11. PHYSICAL SCIENCES: CHEMISTRY Test 7: Chemical systems

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017

p-cat Pipeline Condition Assessment Technique for Water and Sewer Mains Inverse Transient Analysis Pipeline Condition Assessment

BUSHFIRE ATTACK LEVEL

8.3 Somervell County Water Supply Project

- PAW PAW RT. 19 PUBLIC SERVICE DISTRICT 1

Where do we start? ocreate the Universe oform the Earth and elements omove the elements into their correct positions obuild the atmosphere and oceans

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION

5.2.2 Lower Mgeni System

PLM and SLM Joined Digitally for the Connected World

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP)

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE. Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017

Water Distribution System Facility Plan

Salem Food Policy. Kerry Murphy Healthy Lifestyles Coordinator

Atlases of Water Rights by Type and by Use

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION

WATER SUPPLY PLANS WESTMORELAND. Draft Westmoreland WS PPLan Octobwe

Byllesby Reservoir Phosphorus TMDL Public Meeting & Open House May 13, 2013 Phillippo Scout Reservation

Culinary Water Impact Fee Facilities Plan

1. Background of the study

Zone. Zone. Zone Zone. Zone. Zone. MSWD Northeast Area Master Plan Update. Figure 1 Pressure Zone Boundaries and Land Use

EIP RAW MATERIALS ANNUAL CONFERENCE Janez Potočnik Co-Chair International Resource Panel - UNEP Brussels, January 13 th, 2015

Metropolitan Tunnel Redundancy Program Update

Families on the Periodic Table

Facts and Figures. Greater Victoria Water Supply Area. May 2015

FOR SALE. FOR SALE /- Acres of Prime Almonds in LTRID and Saucelito Irrigation District. Morgan Houchin Tech Ag Financial Group, Inc.

Chemistry*120* * Name:! Rio*Hondo*College* * * EXAMPLE*EXAM*1*!

CITY OF MISSOULA Water System Master Plan

Project Report DRAFT. SPC-PENNDOT Environmental Unit Environmental Screening Project Information. Water Resources. Farmland

Rice and water. Crop and Environmental Sciences Division International Rice Research Institute Los Baños, Philippines

Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project. August 24, 2016

ENGINEERING BUDGET OVERVIEW

Transcription:

APPENDIX F 2017 DCC Bylaw - Supply Project List Allocated to Growth Allocated to Existing Residents Project Timing Range Total Project Cost Growth Percent Growth Cost Existing Percent Existing Cost # Project Name/Description Location 2020/2027-1 DCC WSD1 Jump Creek II Dam Jump Creek 2030 $ 88,000,000 100% $ 88,000,000 0% $ - 3 DCC WS3 Extension Reservoir 9 Extension Reservoir 9 2027 $ 3,300,000 100% $ 3,300,000 0% $ - DCC WS 30 Labieux Road Pump Station Upgrade - 30 install 2 additional pumps Labieux Road Pump Station 2020 $ 200,000 100% $ 200,000 0% $ - DCC WS36 Vanderneuk Road Reservoir - new 36 reservoir Vanderneuk Road Reservoir 2029 $ 5,100,000 100% $ 5,100,000 0% $ - 37 38 39 40 41 NEW 42 Uplands Drive Supply Main DCC WS 37 Uplands Drive Supply Main - new supply main for Vanderneuk Reservoir (Rock City Rd to Vanderneuk Reservoir) 2028 $ 8,900,000 100% $ 8,900,000 0% $ - DCC WS 38 Treatment Plant - incremental cost from last DCC Review can be recovered in the current DCC Review. 2017-2041 $ 12,000,000 30% $ 3,600,000 70% $ 8,400,000 DCC WS39 Boundary Ave/Island Hwy - increase Boundary Ave/Island Hwy current supply main capacity Supply Main 2026 $ 7,300,000 75% $ 5,475,000 25% $ 1,825,000 DCC WS 40 Nanaimo Lakes Road Supply Main - Nanaimo Lakes Road Supply supply main replacement Main 2025 $ 1,700,000 25% $ 425,000 75% $ 1,275,000 DCC WS 41 #1 Reservoir to College Park Supply Main College Park Supply Main - new main adjacent to current main Duplication 2017 $ 4,803,260 100% $ 4,803,260 0% $ - DCC WS 42 Towers Reservoir - increase existing tank or construct 2nd tank Towers Reservoir 2019 $ 1,800,000 50% $ 900,000 50% $ 900,000 $ 133,103,260 $ 120,703,260 $ 12,400,000

METRAL HAMMO ND B HAMMOND B AY AY WS36 SH AC K ISLA ND S RD PIPE RS LA GOON CLAR KE ROC K HU DSO N ROC KS DR ROCK WS37 HO RSWELL ROC K PARTURE B AY DE STEPH EN SON POINT D D JES SE ISLAN D BRA NDO N IS LA ND R S RD G BIG Y RD R NORWELL CIT WS30 DE PA RT U RE BA Y NA RES POIN T TYN E LABIEUX RD WS39 McK AY AN GLE SH AFT PO INT PIMB URY MID DEN KAN AK A NEWCASTLE ISLAND PA RK NORTHFIELD RD W BO BRECH IN EN BATC HELO R MARK I SL AN BLU ND ERBUS S PIRATE'S CAUS EWAY D JIM HA W KINS BEAC H BILLY BON ES PA SS A GE RD BATE GO OD PROTECTION ISLAND CO RSAIR Mc WAY PARK KA STU AR T Y LO NG JO HN SILVER CH AN NE L MILTON ST TH IRD ST PINE ST Name NICOL ST FOURTH ST DCC WS3 Extension Reservoir 9 WS30 DCC WS 30 Labieux Road Pump Station Upgrade WS36 DCC WS36 Vanderneuk Road Reservoir WS37 DCC WS 37 Uplands Drive Supply Main WS38 DCC WS 38 Treatment Plant WS39 DCC WS39 Boundary Ave/Island Hwy WS40 DCC WS 40 Nanaimo Lakes Road Supply Main WS41 DCC WS 41 #1 Reservoir to College Park Supply Main WS42 DCC WS 42 Towers Reservoir BRUCE AVE WS3 WS40 WS41 NANA IM O H ARBO UR PARK AVE FIFTH ST DCC WSD1 Jump Creek II Dam (Not Located on Map) D MINES R D WSD1 IN AL GA LLOW S WS42 Project DCC# M SIT E BROWNIE LE O AIM JINGLE POT R D R TE NAN TOW N A ST WC VE NE AR T A N ST E W AVE RD ES D U FE F R I N CR OO NANAIMO RIVER ESTU ARY EW TENTH ST R HA WS3 CE RD WTP DA R RD EX T EN SIO N WS38 WSD1 JUMP CREEK II DAM City of Nanaimo 2017 Supply DCC Project Map Published: May 11, 2017 Legend 0 Supply DCC Project 625 1,250 2,500 Meters 1:65,000 DISCLAIMER This map is intended for general information only. The City of Nanaimo makes no representation or warranty regarding the accuracy or completeness of the information presented and assumes no responsibility for any damage, loss or injury resulting from the use of this product. Document Path: V:\Source Data\Departmental Data\EngPubWks\GIS\Projects\DCC\Maps\2017 DCC Supply Projects.mxd

DCC WSD-1 (100% Growth) Jump Creek II Dam - New Storage 2030 Funding 2361 DCC WSD-1 (100% Growth) Jump Creek II Dam - New Storage DCC s 88,000,000 0 88,000,000 0 0 0 88,000,000 0 88,000,000 0 0 0 Development and construction of new water supply reservoir/dam, Jump Creek II Dam. New - Not existing before Increase capacity to existing dam and reservoir at Jump Creek Dam. Provides for future growth and climate change adaptation.

DCC WS3 : (100% Growth) Extension Reservoir 9A 2027 Funding 610 DCC WS3 : (100% Growth) Extension Reservoir 9A DCC s 4,300,000 0 4,300,000 0 0 0 4,300,000 0 4,300,000 0 0 0 Construction of new 4900m3 concrete reservoir with TWL 198m Includes piping from control building to new reservoir (increase of $1M) *NEW Upgrades - Increased service capacity This is required for capacity - for balancing storage and to provide fire flow

DCC WS-30 (100% Growth) Labieux Booster PS Upgrades 2020 Funding 2126 DCC WS-30 (100% Growth) Labieux Booster PS Upgrades DCC s 200,000 0 200,000 0 0 0 200,000 0 200,000 0 0 0 DCC Supply System -Upgrade Labieux booster pump station to meet increasing water demands. Labieux Booster PS Upgrades Growth - Add two new pumps to support continued growth

DCC WS36 : (100% Growth) Vanderneuk Reservoir 2029 Funding 815 DCC WS36 : Vanderneuk Reservoir DCC s 5,100,000 0 5,100,000 0 0 0 5,100,000 0 5,100,000 0 0 0 Construction of a new 2 million gallon (9230 m3) closed concrete or steel reservoir with a TWL of 170m New reservoir Allows continued growth in north end, augments Lost Lake Reservoir No 2; supports fire flow.

DCC WS37 : (100% Growth) Uplands Drive Supply Main 2028 Funding 816 DCC WS37: (100% Growth) Uplands Drive Supply Main DCC's 8,900,000 0 8,900,000 0 0 0 8,900,000 0 8,900,000 0 0 0 Uplands Drive Supply Main - Departure Bay Road to Vanderneuk Road to Turner New - Not existing before Allows continued growth in north end, supplies Vanderneuk Reservoir; supports fire flow.

DCC WS38 (30% Growth): Treatment Plant 2014 Funding 619 South Fork Treatment Plant 817 DCC WS38 : Treatment Plant 510,000 0 DCC s 0 510,000 61,000,000 0 9,863,873 933,757 0 50,202,370 61,510,000 0 9,863,873 1,443,757 0 50,202,370 0 0 Portion of Treatment Plant attributable to development (80,000-130,000) New - Not existing before Regulatory requirement; protects drinking water quality for generations.

DCC WS39 : (75% Growth) Boundary Ave / Island Hwy Supply Main 2026 Funding 818 DCC WS39 : Boundary Ave / Island Hwy Supply Main DCC s 7,300,000 0 5,475,000 1,825,000 0 0 7,300,000 0 5,475,000 1,825,000 0 0 Boundary Ave/Island Hwy Supply Main ( Construction over 2 years 2025/2026) Upgrades - Increased service capacity Augment capacity and provide duplication of Bowen Rd Supply main to provide for continued growth and fire flow.

DCC WS40 : (25% Growth) Nanaimo Lakes Road Supply Main Funding 819 DCC WS40 : (25% Growth) Nanaimo Lakes Road Supply Main DCC's Other Sources 1,700,000 0 425,000 1,275,000 0 0 1,700,000 0 425,000 1,275,000 0 0 Nanaimo Lakes Road Supply Main Growth Identified as a DCC Project Provides capacity for growth and fire protection in lower pressure zone

DCC WS41: (100% Growth) #1 RES to College Pk Dup Supply WM & PRV 2017 Funding 625 DCC WS41 (100% Growth): #1 RES to College Pk Dup Supply WM New DCC's 4,360,000 0 4,360,000 0 0 0 4,360,000 0 4,360,000 0 0 0 Construction of a new water supply main, 1.6 km-750mm diameter steel, from Nanaimo Lakes Road to College Park Reservoirs. The pipeline will increase the supply capacity and water system reliability to the City. New Not existing before This is required for capacity - to feed North end for growth. This also improves fire storage in existing reservoirs.

DCC WS 42 (50% Growth) Towers Reservoir 2019 Funding DCC WS42 (50% Growth): Towers Reservoir DCC's 1,800,000 0 900,000 900,000 0 0 1,800,000 0 900,000 900,000 0 0 DCC WS42 (50% Growth): Towers Reservoir - Replacement Replacement, Capacity Upgrade This is required for capacity to feed West Nanaimo for balancing storage and to provide fire flow. Existing reservoir was undersized.