For more information, call PERGO

Similar documents
For more information, call PERGO

Life. Home. In Harmony.

Quick Step Studio Laminate Flooring Installation Instructions

PERGO TimberCraft + WetProtect Limited Warranty for Floor Installations Only

Mega Clic Laminate Floor Installation Instructions

INSTALLATION INSTRUCTIONS

Laminate Flooring Charlestowne Collection

MEDLEY XL INSTALLATION & MAINTENANCE INSTRUCTIONS LUXURY VINYL

INSTALLATION INSTRUCTIONS

Luxury Vinyl Plank (LVP) Flooring Installation Guide For Assistance call

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

Mohawk SolidTech. SolidTech Installation Guidelines. Preparation

Installation Instructions for SuperFast Hurricane

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

INSTALLATION INSTRUCTIONS

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions

IVC US Residential Installation Guide - Laminate. Leading the Way

HDWPC Flooring Installation Guidelines

Wellmade HDPC Engineered Vinyl Plank/Tile Installation Guide

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS LAMINATE

Wellmade. - Installation Guide. General Information. Pre-Installation

INSTALLATION INSTRUCTIONS

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions

Installation. Installation Instructions - Laminate Flooring with Drop lock. I. Before you start. Subfloors with radiant heat. Floating installation

PLEASE READ BEFORE INSTALLATION

Rigid Core Installation & Maintenance Instructions

INSTALLATION GUIDE. Please read all the instructions before you begin the installation. Improper installation will void warranty.

Scuba Seal Installation / Floor Care Instructions With Video Link

ATTENTION! READ BEFORE INSTALLING!

General Commercial Installation Guide LAMINATE

AttainSilence & Attain

USA USA USA PURE CLICK

Solid Click-Lock Bamboo Product Installation Instructions

WPC VINYL PLANK INSTALLATION GUIDE

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

General and Installation Instructions Laminate - 2G + 2G

5G Click Floating Floor Installation Instructions

Wellmade En VogueTM Engineered Vinyl Plank Installation Guide

DURAfusion - Installation Instructions

Home Legend Uniclic Cork Product Installation Instructions

Installation Instructions

Installation Instructions

HYBRID. Pre-Laying Checks

SELECT SURFACES LAMINATE FLOORING INSTALLATION GUIDE DRIFTWOOD

TARKETT EASIUM. Instrucciones de Instalación & Mantenimiento

premium click optimum click

Soho Series. Soho Series 12.3mm V-Groove Engineered Laminate Flooring GENERAL INSTALLATION GUIDE

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

Oak and Bamboo Flooring. Installation Guide Floating Click-Lock. (888)

DeZignCore Ultra Luxury Vinyl Planks

INSTALLATION INSTRUCTIONS - Please read before installation

Grand Mesa Plus. 27yr Residential Warranty. 5yr Lt. Commercial Warranty

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

ATTENTION! READ BEFORE INSTALLING!

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

WOODLOC 5G FLOAT-IN INSTALLATION INSTRUCTIONS

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)

Concrete 1,8 2,0 Anidrite 0,3 0,5

STANDARDS LAMINATE FLOORING (UNILIN A2A) Installation Instructions

INSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS

PARKAY XPR Installation Instructions (Architect Collection)

Higuera Hardwoods Prefinished Engineered Bamboo Flooring Installation Instructions

L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

Yanchi Bamboo Flooring Installation Guide Pre-Installation Checklist Conditioning and Acclimating Your Bamboo Floor Before Installation

INSTALLATION INSTRUCTIONS HARDWOOD FLOORING

FEATHERWEIGHT Uniclic Luxury Vinyl Installation Sheet

Verify colour and finish before installation. Once the floor is installed, it is deemed to have been inspected, approved and accepted.

Installation Guidelines: Magnolia

INSTALLATION INSTRUCTIONS FOR WICANDERS 5G-C FLOORS

WPC Vinyl Floor Installation Guide

ATTENTION! READ BEFORE INSTALLING!

Hill Country Innovations Protech Collection

VESDURA VINYL PLANKS 8MM WPC CLICK LOCK - RAINFALL COLLECTION

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

DeZign Enduracore Water Resistant Laminate Planks

INSTALLATION & MAINTENANCE GUIDELINES FOR ENGINEERED STRAND BAMBOO FLOORING

ATTENTION! READ BEFORE INSTALLING!

TECHNICAL SERVICES Pro Gen Installation Instructions

PARKAY LAMINATE FLOORING (UNILIN DROP) Installation Instructions

Installation Instruction Laminate Flooring

Click Refresh with In*Step Locking System

Installation Procedure of Floating floors

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

IMPERIAL LUXURY VINYL PLANK FLOORING

STONE PRODUCT COMPOSITE (SPC) FLOORING INSTALLATION INSTRUCTIONS

Wellmade Nouveax Engineered Vinyl Plank Warranty

premium click optimum click

STONE PRODUCT COMPOSITE (SPC) FLOORING INSTALLATION INSTRUCTIONS

ATTENTION! READ BEFORE INSTALLING!

INSTALLATION INSTRUCTIONS

P.A.C.E. Pre-Installation Checklist - Engineered Cork Flooring

Transcription:

SYSTEM SYSTEM MADE IN THE USA SPECIALLY DEVELOPED FOR LAMINATE FLOORING FL OZ (33.ml) 0 ON 0 2 0 00 Non Destructive Moisture 3 0 Concrete Encounter Plus 200 20 dlfwej dtra djflsv dlfwe vtra alskdjf vmwjc Tools Required for Installation Common Tools Other Tools and Supplies Wood Glue Carbide 0T Blade Spacers mm Spacers mm Finishing Putty PREMIUM PREMIUM COMPONENT COMPONENT Moisture Meter Laminate floor tapping block and mm ( 3 /") spacers Finishing Putty Moisture Meter 00% Silicone Sealant Felt furniture pads PE Foam Backer Rod Job Site mil (0. mm) virgin polyethelene vapor barrier ground 0' (3 m) > 8" (200 mm) > " (30 mm) Site Requirements Laminate is a durable floor covering, not intended as structural material. Laminate requires a clean, dry, secure subfloor that meets building codes. The following requirements are not intended to supersede federal, state or local building codes, but as with many other interior finish products, may require modifying existing structural components for successful installation. Owner assumes responsibility for compliance with all building codes. Laminate floor is suitable for use in climate controlled (3-% RH and 0-8 F) indoor installations only and should not be installed in rooms with floor drains or sump pumps. Laminate floor can be installed above, on or below grade. A moisture test is strongly recommended to determine if high moisture exists in the subfloor. When using a calcium chloride moisture test for concrete subfloors (ASTM F89), values must be lbs/000ft²/2-hr or <80% RH with an in-situ probe (ASTM F270). Moisture readings of wood subfloors must be 2%. Acceptable job site conditions, including relative humidity and subfloor moisture conditions, must be maintained throughout the lifetime of the flooring. Laminate flooring is installed as a floating floor and requires the use of T-moldings in doorways ft (.22m) or less and in rooms 0 feet (2.2 m) or larger in length or width. Floor movement must not be constrained by glue, nails, screws, hardware or other fixed obstructions. This product must be installed in accordance with these installation instructions. For more information, call -800-33-PERGO 209_03_OP_UNI

Site and Material Preparation A B Door Frame Wallbase Casing Cutting Line inch (2, cm) C D % 8 hours 0 8 F 29 C 3% % RH E F G > 8" (200 mm) mil (0. mm) virgin polyethelene vapor barrier subfloor Site and Material Preparation A.) Remove carpet and padding. Also remove any wood flooring installed on concrete. Do not remove products unless they are asbestos-free. B.) Undercut door frame and wallbase. Slide the flooring at least / underneath the door frame and wallbase. Also leave a concealed 3/8 minimum expansion space under each. C.) Remove bumps or peaks in subfloor and fill depressions with floor leveling compound to ensure no more than 3/ unevenness per 0-foot span. D.) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than a difference of 2 F and 20% relative humidity between the stocking/transportation environment of the flooring and the final installation environment of the flooring. E.) Clean debris from subfloor before installation. F.) For concrete subfloors, install vapor barrier with overlapped seams of 8 or more. G.) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate floors. For planks with attached underlayment, it is acceptable to install Pergo FloorMate underlayment prior to flooring installation if desired. Make sure to follow the Pergo FloorMate installation instructions, taking special care to seal all foam edges with sealing tape and repair all rips and perforations in the underlayment vapor barrier prior to flooring installation. A separate vapor barrier should not be used in conjunction with Pergo FloorMate. 209_03_OP_UNI

2 3 Left Right 3 2 > in > cm 7 8 9 2 3 0 2 3 7 WOOD GLUE 209_03_OP_UNI

8 9 Molding Molding PE foam backer rod PE foam backer rod Flooring Installation. Inspect each plank. Floor should be installed blending planks from several cartons at the same time to ensure good color and shade mixture throughout the installation. 2. For the first row along straight walls, remove the tongue on all long side joints and on the short side of the st plank only. 3. For uneven walls, trace contour on tongue-side of plank and cut.. Assemble the first row tongue side toward wall. Insert the end tongue into the end groove and rotate downward to assemble. Keep the planks aligned and the joints closed.. Two spacers thick side to thick side = 3/8.. Provide a 3/8 space for expansion on all sides. First piece must be at least 8 long. Start new rows with pieces trimmed from previous row. Ensure at least a end joint offset. 7. At a slight angle, insert the tongue of plank 2 into the groove of plank until the laminate edges meet, and then rotate down until the joints lock. 8. Join the short end of the plank first. There will be a gap on the long side joints when the plank is rotated down. 9. Raise the outside edge of the plank upward approximately. Maintain this angle as you push the plank in until the laminate edges meet. Rotate downward on the plank until the joint locks. Repeat these steps to complete the installation. Installation Tip: Place a carton of planks across the end of the row being installed to keep installed planks in place during installation. 0. Alternate Tap Method: Align the tongues into the grooves of the long and short sides of the planks. Install the long side first by placing a tapping block no closer than 8 from either end and tap lightly along the long side until the joint is closed tightly. Then tap the end using the tapping block into a locked position. Note: Uneven tapping or use of excessive force may damage the joint.. Ensure there will be a 3/8 gap (after the joint is closed) to the wall for expansion. 2. For the last row, align the plank to be used on top of the 2nd to last row. Using a full width plank as a spacer, trace wall contour and cut plank. 3. For the last row, install the long side tongue into the groove with the end joint aligned. Using a pull bar and hammer, work evenly along the length of the plank and lightly tap the joint closed.. After tapping the long side joint closed, tap the short side closed, using a tapping block or a pull bar. Installation Under Doorway Frames. Slide plank under pre-cut door frame.. Tap the long side joint closed first. Then tap the end joint closed. Installation Around Fixed Objects (such as Pipes) 7. Allow 3/8 expansion space around pipes or other fixed objects. Finishing the Installation 8. Remove all spacers. 9. Create a watertight seal by applying flexible 00% silicone sealant to the entire perimeter of the installation. DO NOT use acrylic sealant. First fill all expansion spaces with 3/8 compressible PE foam backer rod and cover with silicone sealant. Prior to installing the moldings, apply silicone sealant to the portion of the molding or transition that will contact directly with the laminate flooring surface. Install moldings and immediately wipe away any excess silicone sealant. Apply silicone sealant at connections to doorframes or any other fixed objects. 209_03_OP_UNI

A B C Care and Cleaning Place felt floor protectors under legs of moveable furniture. Chair casters should be rubber not plastic or metal. Place walkoff mats at entrances. Dust mop as primary cleaning method. Occasionally wet mop with water only, using a well wrung out mop; DO NOT pour liquid directly on floor or use an excessively wet mop that will puddle or leave moisture standing on the floor. If needed, use a solution of cup of vinegar per gallon of water OR /3 cup non-sudsing ammonia per gallon of water. DO NOT use detergents, abrasive cleaners, soaps, waxes or polishes. Use correct hard surface vacuum tools. DO NOT use rotating beater bars, floor scrubbers, steamers, jet mops or similar products. Wipe up spills immediately. DO NOT allow topical moisture to remain on the floor longer than the time specified in the product warranty. 209_03_OP_UNI