DATE. Presented by Devin Hearing, ODOT Project Manager. Source: ODOT

Similar documents
INTERSTATE CORRIDOR PLANNING

Corridor-Based Planning Transportation Education Series

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Chapter 10 Goals, Objectives + Policies

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Linking Planning to Programming

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

Central Data Repository for Traffic Data Collection in Rural Areas and Corridors Supporting Freight Mobility

GUIDING PRINCIPLES MEMORANDUM

Examining the Economic Trade-offs of Alternative Transportation Funding NC I-95 Economic Assessment

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

TEXAS FREIGHT MOBILITY PLAN 2017

Transportation Improvement Program (TIP) Relationship to 2040 Metropolitan Transportation Plan (MTP) - Goals and Performance Measures

GOALS AND PERFORMANCE MEASURES

IDOT PERFORMANCE BASED PROJECT METRICS. February 2018

Rural Intelligent Transportation Systems Toolbox. A National Highway Institute Training Program

Presented to: MAASTO 2013 Conference. Presented by: Sandra K. Beaupre, Director Planning & Economic Development. July 2013

FHWA Sustainability and Resilience

I-81 CORRIDOR IMPROVEMENT PLAN EXECUTIVE SUMMARY

The Cost Savings Potential of Sustainability Practices

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

National Governors Association

Central Oregon Area Commission on Transportation (COACT)

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting

Freight and Rail Stakeholder Webinar. January 7, 2014

Public Open House and Stakeholder Meeting Summary

MARC Congestion Management Process Policy

ODOT Transportation Systems Management & Operations Plan

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

Model Inventory of Roadway Elements (MIRE) GIS-T Annual Conference March 30, Robert Pollack FHWA

Transportation Problems and Issues Excerpts from WWW Links

TEXAS FREIGHT MOBILITY PLAN: FACILITATING TEXAS ECONOMIC GROWTH AND GLOBAL COMPETIVENESS

State Strategies to Reduce Traffic Congestion. National Conference of State Legislatures November, 2007

INTEGRATING FREIGHT IN CORRIDOR PLANNING AND PROJECT DEVELOPMENT. Steve Linhart, AICP Caroline Mays, AICP

NC State Freight Plan

Developing Resilient Freight Systems

Development of the I-70 Corridor of National Significance

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Addendum 1: Performance Measures

North Central Region Wausau Area ITS Benefit/Cost Analysis Final Report

Appendix B. OKI 2030 Regional Transportation Plan Project Scoring Process. Ohio Kentucky Indiana Regional Council of Governments

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

GNC Coalition Update. Washington Public Ports Association Trade and Transportation Committee November 18, 2015

MAP 21 Freight Provisions and Seaports

Performance Management & Goals

PLANES, TRAINS & SEMIS South Carolina s Statewide Freight Plan

Regional Transportation Performance Measures

Innovations in Freight Planning and Project Prioritization

2040 Addendum Performance-Based Planning November 2018

A Tutorial on Establishing Effective Work Zone Performance Measures

Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

Performance Measures Workshop, May 18, 2017

Transportation 2040 Toward a Sustainable Transportation System. Toward a Sustainable Transportation System. Sultan Planning Board.

Eight County Freight Plan

Long Range Transportation Plan Project Status Update

TEXAS FREIGHT MOBILITY PLAN: DRAFT KEY POLICY RECOMMENDATIONS

Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning

Status of Freight Planning in the Alamo Area MPO

Base Information. 1. Project Title SH52 Planning & Environmental Linkages (PEL) Study

Executive Summary. How to Use this Document

Transportation Performance Management Update. September / October 2018

PERFORMANCE-BASED PLANNING AND PROGRAMMING

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

9 Summary of Findings

INCIDENT MANAGEMENT TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSM&O) FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SIX

Alternatives Identification and Evaluation

TEXAS FREIGHT MOBILITY PLAN: INTEGRATING ECONOMIC ANALYSIS

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

Process to Identify High Priority Corridors for Access Management Near Large Urban Areas in Iowa

Buffalo Niagara Integrated Corridor Management Project. ENTERPRISE Webinar Keir Opie, Cambridge Systematics September 26, 2016

FTP Implementation Element Worksheet

Welcome. Greater Charlotte Regional Freight Mobility Plan Steering Committee Kick off Meeting #1

Benefit-Cost Analysis Documentation

Performance Measures for Transportation Planning Part 1

Eight County Freight Plan

Recommended Roadway Plan Section 3 Existing Facilities & System Performance

Smarter Work Zones Paul Pisano FHWA Work Zone Management Team

I-880 ICM Systems Engineering Management Plan TAC Meeting

Highest Priority Performance Measures for the TPP

ODOT Transportation Systems Management & Operations Plan. Goals and Objectives Brief FINAL DRAFT. Prepared for: Prepared by:

Sunrise Project South I-205 Corridor Improvement Project

6 CHARTING PERFORMANCE

Table of Contents PERMIAN BASIN MPO TIP 2

Appendix B. Benefit-Cost Technical Memorandum

Adaptation of HERS-ST Models for the South Carolina Interactive Interstate Management System

Mobility and System Reliability Goal

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division

Advancing Transportation Systems Management and Operations (TSMO) in Rural Areas

Comprehensive Regional Goods Movement Plan and Implementation Strategy Study Introduction and Overview

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment North-South Corridor

Joint House and Senate Transportation Committee Update to the Ten Year Plan

Florida Department of Transportation. Lane Elimination

CENTRAL LANE SCENARIO PLANNING

HB2 Implementation Policy Guide

Transportation Systems Management & Operations (TSMO) 2017 ACEC-IA/IDOT/FHWA Transportation Conference August 24, 2017

Transcription:

DATE Presented by Devin Hearing, ODOT Project Manager Source: ODOT

Project Overview Phase 1 study (existing conditions) completed 2017 Phase 2 study kicked off 2018 Stakeholder outreach Mobility and safety analysis Identification of freight projects Investment strategy Study breaks new ground with focus & budget Few directly comparable freight corridor plans in US Source: ODOT

Study Corridor

Central Oregon ACT

Source: ODOT

Key Metrics Safety Current fatality rate involving trucks Current injury rate involving trucks Mobility Truck Delay (hr/mi-yr) Truck Travel Time Reliability (travel time index) Resiliency metrics such as additional VMT and VHT from segment closure Average Roadway Closure Duration Number of incidents per year Economic Competitiveness Current Tonnage Current Value Future Tonnage Future Value Source: ODOT

Scoring Criteria Metrics Possible Points Safety Mobility and Accessibility Economic Competitiveness Serious truck involved crashes Reliability Delay Resiliency Incidents Roadway Closure Duration Current and future tonnage and value 400 300 200

Study Corridor Need Rank Map

Corridor performance Among top 5 highways by percent truck traffic Combination truck type dominates corridor

Existing Conditions Safety Crash data was analyzed to identify locations with disproportionately high number of truck-involved crashes Mobility Evaluated along three criteria: delay, reliability, resiliency, and incident closures Economic Competitiveness Tonnage and value of commodities through the corridor

Future Conditions Traffic volumes expected to increase approx. 20% Estimated number of truck involved crashes is projected to increase by approximately 5%- 30% for most segments

Main Findings of Existing and Future Conditions Safety is critical along US 97 Biggs Junction North of Klamath Falls North of California border Reliability and delays exist primarily in and around urban areas Bend, Redmond and Madras Highest tonnage and values south of Bend and OR 58 Source: ODOT

Overview of Survey Feedback was collected using a month-long online survey and in-person tabling at truck stops along US 97 79 total responses Survey questions The type of respondent How they typically use US 97 to haul freight Perceptions of US 97 Types and locations of problems Suggestions for future outreach

Survey Results Most used the facility frequently Over 60% every day or a few times a week 88% regional or national trips Highest concentration in Bend Most access via I-84 and OR 58 Issues throughout the corridor Only 39% rated it good or very good for freight 43% rated it poor or very poor for freight

Survey Results Biggest issues Traffic volume Lack of pullouts and climbing lanes Winter weather Safety Delay in and around urban areas Bend Redmond Madras Klamath Falls La Pine

Source: ODOT

Planned Projects Many problems along the US 97 corridor have been previously identified and addressed Planned projects range in their level of completion From conceptual to under construction Source: ODOT

Suggested Solutions Planned projects compared against needs If a planned project addresses the need, no further solution was proposed. Toolbox approach to resolve most types of problems that were identified Tailored solutions in some high ranked need locations Source: ODOT

Prioritization of Projects Need Quantitative analysis Benefits Qualitative analysis Costs Did not vary substantially between solutions Need Score ODOT and TAC concurred with prioritizing projects based primarily on need and benefit rather than cost Benefits Costs

Central Oregon ACT Solutions Map

Source: ODOT

Corridor Prioritization

Source: ODOT