Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 100 kw)

Similar documents
Interconnection Application

Form B GENERATION INTERCONNECTION APPLICATION (Non-Inverter Based Generation and Inverter Based Generation > 25 kw)

GARKANE ENERGY COOPERATIVE SMALL GENERATOR QUALIFIED FACILITY INTERCONNECTION APPLICATION

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

Dated: April 16, 2002

ATTACHMENT P SMALL GENERATOR INTERCONNECTION PROCEDURES (SGIP) (For Generating Facilities No Larger Than 20 MW)

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS)

REVISION NO.: 8 EFFECTIVE: 03/26/18

SMALL GENERATOR INTERCONNECTION PROCEDURES (SGIP) (For Generating Facilities No Larger Than 20 MW)

Distributed Renewable Energy Generation Interconnection Policy

LEVEL 2 Application For Interconnection And Net Metering

CUSTOMER GUIDE FOR THE INTERCONNECTION DISTRIBUTED RESOURCES TO THE PUBLIC SERVICE COMPANY OF OKLAHOMA DISTRIBUTION SYSTEM

CUSTOMER GUIDE FOR THE INTERCONNECTION DISTRIBUTED RESOURCES TO THE AMERICAN ELECTRIC POWER DISTRIBUTION SYSTEM

DISTRIBUTED RENEWABLE ENERGY GENERATION POLICY

CUSTOMER GUIDE FOR THE INTERCONNECTION DISTRIBUTED RESOURCES TO THE AMERICAN ELECTRIC POWER DISTRIBUTION SYSTEM

LEVEL 1 Application for Interconnection and Net Metering

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

atlantic cit~ elect,ic

Union Power Cooperative

CUSTOMER GUIDE FOR DISTRIBUTION SYSTEM INTERCONNECTION INVERTER-BASED DISTRIBUTED RESOURCES. < 50 kw

INTERCONNECTION APPLICATION AND AGREEMENT

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

Small Scale Solar Permit Application

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. Policy Bulletin No Appendix A SAFETY & INTERCONNECTION REQUIREMENTS FOR ALTERNATE ENERGY PRODUCTION

Address of Installation Building Permit #

NY State Unified Solar Permit

RENEWABLE ENERGY ELECTRIC GENERATING SYSTEM APPLICATION INSTRUCTIONS

NY State Unified Solar Permit

DISTRIBUTED GENERATION INTERCONNECTION PROCEDURES. June 21, 2011

City of Pasadena Water and Power Department Power Division DISTRIBUTED GENERATION FACILITIES INTERCONNECTION REQUIREMENTS REGULATION 23

NY State Unified Solar Permit

NY State Unified Solar Permit

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION

NY State Unified Solar Permit

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS

LITTLETON ELECTRIC LIGHT DEPARTMENT 39 AYER ROAD LITTLETON, MA (M) (F)

Addition to Section 4 - Special Use Regulations

CONTRACTOR S PERMIT APPLICATION for Residential PV Installation with e-inspection CA Health and Safety Code Section V p2s

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

NY State Unified Solar Permit

ENERGEX Inverter Energy Systems

Feed-in-Tariff (FIT) Connection Application Guidelines

PHOTOVOLTAIC (PV) SUBMITTAL REQUIREMENTS

effective date 1/8/01

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

Distributed Generation. Technical Requirements and Interconnection Agreements

THE POTOMAC EDISON COMPANY Electric P. S. C. Md. No. 53 Fifth Revision of Original Page No. 28 Canceling Fourth Revision of Original Page No.

Facility Interconnection Requirements

DRAFT Commercial Solar Bylaw November 8, 2011

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012

APPLICATION FOR SOLAR PERMIT

ATTACHMENT N. Small Generator. Interconnection Procedures and Agreement. (For Generating Facilities No Larger Than 20 MW)

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016

Metering Procedures for PA Renewable Energy Credits (MPREC)

Small Generator Interconnection Procedures (SGIP) (For Generating Facilities No Larger Than 20 MW)

Distributed Generation (DG) Connection Standard

GRENLEC s Renewable Standard Offer

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1

RECOMMENDATIONS FOR EXPEDITED PERMITTING FOR SMALL PV SYSTEMS

NSPI BULK POWER FACILITIES CONNECTION GUIDE Report number NSPI-TPR-002-2

Transmission Interconnection Requirements. Table of Contents

Information Document Protection System Information ID# R

Session of HOUSE BILL No By Committee on Energy, Utilities and Telecommunications 1-26

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

ELECTRIC SYSTEMS PROCEDURE: ES DISTRIBUTED ENERGY RESOURCES (DER)

4. GENERAL REQUIREMENTS

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0

Duquesne Light Company FACILITY INTERCONNECTION REQUIREMENTS (FAC 001) GENERATION FACILITIES TRANSMISSION FACILITIES END USER FACILITIES 12/30/2015

ANNUAL CRES PROVIDER REGISTRATION APPLICATION for Power Marketer Services in Ohio Power Company d/b/a AEP Ohio

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

Original Cal. P.U.C. Sheet No E San Diego Gas & Electric Company San Diego, California Canceling Cal. P.U.C. Sheet No.

For OUC Residential Customers

Applying For New or Revised Electric Service. ComEd is happy to assist you in initiating new or revised electric service to your location.

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

Member Service Electric Wiring Guidelines

Business New Construction Rebate Program Qualification Standards

TONGA POWER LIMITED REQUEST FOR PROPOSALS INDEPENDENT POWER PRODUCERS. for SOLAR PHOTOVOLTAIC GENERATION 5 APRIL, 2018 RFP - TPL SOLAR IPP

Net Metering Inter Connection agreement

Distribution Bus Protection Upgrade Considerations When Integrating Distributed Generation

DG Interconnection Procedures Collaborative. January 20, 2017

Water & Energy Consulting Lon W. House, Ph.D.

EL PASO ELECTRIC COMPANY FIRST REVISED SAMPLE FORM NO. 21 CANCEWNG ORIGINAL SAMPLE FORM NO. 21

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

SCHEDULE SS STANDBY SERVICE

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

PID275 Feasibility Study Report 9.33 MW Distribution Inter-Connection Valentine Substation

4. GENERAL REQUIREMENTS

Transcription:

An applicant (Generator Owner) makes application to to install and operate a generating facility greater than 100 kw interconnected with the utility system. Section 1, Applicant Information Directly Interconnected to the Generating System Is the following system: Leased or Member Owned Type of Application: Initial or Addition/Upgrade Name: Mailing Address: City: State: ZipCode: Email Address: Facility Location (if different from above): Telephone: Area Code Number (Cell) Area Code Number Account No.: Rate Code: Section 2, Equipment Contractor Name: Mailing Address: City: State: ZipCode: Email Address: Telephone (Daytime): Area Code Number Section 3, General Service Requirements If different from the existing service, what size service will the generation facility require? 200A 400A 600A 800A Primary Metered If this is a new account for a Solar System, what Voltage/Phase will be required? 120/240V-1Ph 120/208V-1Ph 120/208V-3Ph 277/480V-3Ph Section 4, Application Fee This application fee is applicable for all new PV applications received on or after May 20, 2016. The cost will be $50.00 per application (new and/or upgrade) for systems 25 kw DC or less. For systems over 25 kw DC the fee will be $50.00 plus $1.00 kw DC over 25 kw DC. All interconnection applications submitted to DEC shall be accompanied with the appropriate fee made out to and are non-refundable. No applications will be considered without the fee. 1

Section 5, Generator Type Is Generator powered from a Renewable Energy Source: No Type of Energy Source (if applicable): Solar Wind Other Other generator energy source: Diesel, Natural Gas Diesel, Fuel Oil Other: Will excess power be exported to? No Total Aggregated Maximum Load: kw DC/AC (Typical) Maximum Export: kw DC/AC Forecast Annual kwh: sun light hours per days) (Note: The Annual Forecast MUST be completed using 4.5 peak Section 6, Generator Technical Information Please fill out the Initial Rating information if there is currently no generating facility on-site. If adding a generating facility to an existing facility, fill out the Initial Rating Information, the Added Rating Information and the Total Rating Information Type of Generator: Synchronous Induction DC Generator or Solar with Inverter Generator (or solar collector) Manufacturer, Model Name & Number: (A copy of Generator Nameplate and Manufacturer s Specification Sheet may be substituted) Inverter Manufacturer, Model Name & Number (if used): (A copy of Inverter Nameplate and Manufacturer s Specification Sheet may be substituted) Nominal Voltage Setting (V) Max Reconnect Voltage Setting (V) Initial Rating: DC System Design Capacity: (kw) (kva) Inverter Capacity: (Maximum AC kw) AC System Design Capacity: (kw) (kva) Added Rating: DC System Design Capacity: (kw) (kva) Inverter Capacity: (Maximum AC kw) AC System Design Capacity: (kw) (kva) Total Rating (Existing and New): DC System Design Capacity: (kw) (kva) Inverter Capacity: (Maximum AC kw) AC System Design Capacity: (kw) (kva) Generator Characteristic Data (for rotating machines): (Not needed if Generator Nameplate and Manufacture s Specification Sheet is provided) Direct Axis Synchronous Reactance, X d : P.U. Negative Sequence Reactance: P.U. Direct Axis Transient Reactance, X d : P.U. Zero Sequence Reactance: P.U. Direct Axis Subtransient Reactance, X d : P.U. kva Base: 2

Section 7, Interconnecting Equipment Technical Data Will an interposing transformer be used between the generator and the point of interconnection? No Transformer Data (if applicable, for Customer Owned Transformer): (A copy of transformer Nameplate and Manufacturer s Test Report may be substituted) Size: KVA. Transformer Primary : Volts Delta Wye Wye Grounded Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Impedance: % on KVA Base Transformer Fuse Data (if applicable, for Customer Owned Fuse): (Attach copy of fuse manufacturer s Minimum Melt & Total Clearing Time-Current Curves) Manufacturer: Type: Size: Speed: Interconnecting Circuit Breaker (if applicable): (A copy of breaker s Nameplate and Specification Sheet may be substituted) Manufacturer: Type: Load Rating: Interrupting Rating: Trip Speed: (Amps) (Amps) (Cycles) Circuit Breaker Protective Relays (if applicable): (Enclose copy of any proposed Time-Overcurrent Coordination Curves) Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Manufacturer: Type: Style/Catalog No.: Proposed Setting: Current Transformer Data (if applicable): (Enclose copy of Manufacturer s Excitation & Ratio Correction Curves) Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: /5 Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: /5 Generator Disconnect Switch: A lockable disconnect device shall be installed within 3 feet of the DEC meter and accessible at all times by DEC personnel, by and at the cost of the owner. Manufacturer: Type: Catalog No.: Rated Volts: Rated Amps: Single or 3 Phase: Mounting Location: 3

Section 8, General Technical Information Enclose copy of site One-Line Diagram showing configuration and interconnection of all equipment, current and potential circuits and protection and control schemes. Is One-Line Diagram Enclosed?: Enclose copy of any site documentation that describes and details the operation of the protection and control schemes. Is Any Available Documentation Enclosed?: Enclose copies of schematic drawings for all protection and control circuits, relay current circuits, relay potential circuits, and alarm/monitoring circuits. Are Schematic Drawings Enclosed?: Section 9, Aggregated Meter Information (If Applicable) The following aggregated accounts shall be ranked according to the order in which credits shall be applied (We don t apply the credit; however, DEC may elect to make payment to the account serving the Generating System) Additionally, the following accounts must be active accounts and will be used to determine the total 2-year Annual Average kwh to ensure the new system is in compliance with DEC tariff. 1 - DEC Member Name Rate Code: DEC Account No.: Capacity (DEC): 2 Yr Annual Average kwh: 2 - DEC Member Name Rate Code: DEC Account No.: Capacity (DEC): 2 Yr Annual Average kwh: 3 - DEC Member Name Rate Code: DEC Account No.: Capacity (DEC): 2 Yr Annual Average kwh: 4 - DEC Member Name Rate Code: DEC Account No.: Capacity (DEC): 2 Yr Annual Average kwh: Any additional meters associated with this aggregated system must be supplied on a separate sheet in the same format. 4

Section 10, PJM Interconnection Queue The Generator Owner must submit a Generation Interconnection Request directly to PJM if: any Generation is designated in whole or in part as a Capacity Resource to PJM or, if generator intends to sell output to another entity at another electrical location. Generation which is operating behind the meter in isolation from the PJM bulk power transmission system and which does not intend to participate in the PJM wholesale energy market may not need to apply to the PJM interconnection queue. PJM has sole discretion on interconnection queue requirements. Prior to installation send the completed Pages 1-3 to, Attn: Troy Dickerson, Manager of Engineering: Phone: (302) 349-3125 Email: tdickerson@decoop.com or mail to P.O. Box 600 Greenwood, DE 19950 Section 11, Preliminary Approval to Proceed with Interconnection : Has Approved Has Not Approved this Preliminary Application. Name : Date: Signature: Reason of Not Approving: Section 12, Installation Details Generating System will be installed by: Owner State Licensed Electrician Installing Electrician: Firm: License No.: Mailing Address: City: State: Zip Code: Telephone with Area Code: Installation Date: Interconnection Date: Supply certification that the generating system has been installed and inspected in compliance with the local Building/Electrical code of the municipality of Signed (Inspector): Date: (In lieu of signature of Inspector, a copy of the final inspection certificate may be attached) Section 13, Generator/Equipment Certification Generating systems that utilize inverter technology must be compliant with IEEE 1547 and Underwriters Lab. UL 1741. Generating systems must be compliant with s Technical Requirements for Parallel Operation of Member Owned Generation document. The Applicant must certify that the installed generating equipment meets the appropriate preceding requirement(s) and can supply documentation that confirms compliance. Generation cannot be turned on until a representative has performed a site visit, installed a warning label near the service meter, and has authorized the system for interconnection. 5

Section 14, Applicant Signature I hereby certify that, to the best of my knowledge, all the information provided in the Interconnection Application is true and correct. Name of Applicant (Printed): Date: Signature of Applicant: Section 15, Approval or Non-Approval : Has Approved Has Not Approved this Interconnection Application. Name : Date: Signature: Reason of Not Approving: Approval to connect to the Company system indicates only that the minimum requirements for a safe proper interconnection have been satisfied. Such approval does not imply that the Generator Owner s facility meets all federal, state and local standards or regulations. Section 15, Internal Checks and Notifications DEC has performed a site visit and approved the system: DEC has installed a Warning Label on or near the service meter: Notify Billing Dept. of Interconnected Generation: Notify Mapping Dept. of Interconnected Generation: Notify Metering Dept. of Interconnected Generation: Notify System Protection of Interconnected Generation: At completion send Pages 5-6 to, Attn: Troy Dickerson, Manager of Engineering: Phone: (302) 349-3125 Email: tdickerson@decoop.com or mail to P.O. Box 600 Greenwood, DE 19950 6