Technical Advisory Committee Meeting #1. December 13, 2011 MARTA Headquarters

Similar documents
Public Meeting. January 26, 2012 Fulton County North Service Center

.Related Plans and Efforts

Project Steering Committee April 14, 2015

South Fulton Parkway Transit Feasibility Study Stakeholder Committee Meeting #2

GEORGIA 400 CORRIDOR ALTERNATIVES ANALYSIS. Early Scoping Report

3.0 REVIEW OF PREVIOUS STUDIES

Alternatives Analysis

DRAFT Scoping Booklet

12 Evaluation of Alternatives

Clifton Corridor Transit Initiative Project Development and NEPA. New Starts Assessment

I-20 East Transit Initiative

Preparation of this Tier 1 DEIS is in accord with the National Environmental Policy Act (NEPA), as amended and implemented by:

I-20 East Transit Initiative

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A

GDOT-Office of Planning Update

FOCUS40 MassDOT Board Presentation March 13, 2017

Fairfax County Countywide Transit Network Study

Appendix A Detailed Environmental and Cultural Analysis

FINAL. Technical Memorandum #2: Alternative Scenarios Performance Report

ATTACHMENT A NORTHERN FULTON COUNTY COMPREHENSIVE TRANSPORTATION PLAN UPDATE SCOPE OF SERVICES

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting

4.0 Coordination and Consultation 4.0 Coordination and Consultation

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report

North Fulton Wastewater Capacity Analysis and Economic Assessment

Chapter 3 Plan Development Framework

Riverview Corridor Pre-Project Development Study

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Regional Thoroughfare Network Identification and Classification Report DRAFT Prepared by:

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

, you would be well-served by calling our office for a free, no obligation consultation with one of our

Cobb County Comprehensive Transportation Plan Update THE Summary

Gateway Corridor Transitway

Gainesville- Haymarket Extension (GHX) VRE Operations Board Work Session July 15, 2016

Q9N. Likelihood of using Xpress if it meant you were better informed about how to use the bus system

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Transportation and Utilities

Regional Transportation Studies Management Committee

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018

I-26 Fixed Guideway Alternatives Analysis. Transit Talk: ULI Executive Round Table Discussion. Thursday, April 30, :30 AM 1:00 PM

CIRCULATOR STATUS UPDATE PRESENTATION JUNE 22, 2015

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

Freight Cluster Plans Update

2040 Transportation Policy Plan Amendment #1

A Practical Guide for Fulfilling the Transportation Element for Cities and Counties in the Atlanta Region

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014

Project Application. General Information ODOT PID. Primary County (3 char abrv) HAM/CLE HAM/CLE HAM ODOT. District. Project Manager (Contact Person)

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION May 18, :30 P.M. 1. APPROVAL OF AGENDA 1 min.

VelociRFTA BRT. Roaring Fork Transportation Authority. Webinar: Transit Planning with a Land Use Lens. August 23, 2011

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Report #8: Riverview Corridor Pre-Project Development Study

Scope and Fee Proposal, Decatur Community Transportation Plan Update

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016

Understanding The ATL and HB 930

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

Integrated Transportation Plan. TAC Meeting September 16, 2014

South Florida East Coast Corridor (SFECC) Study

Citywide Conversation

BUS RAPID TRANSIT CORRIDOR

- FACT SHEET - THE GUIDING PRINCIPLES

ARC Freight Advisory Task Force Meeting. SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

CHAPTER HIGHLIGHTS GOALS AND GUIDING POLICIES 60 SEEKING PUBLIC INPUT TO REFINE SCENARIOS FOR OUR FUTURE 61

S O U T H F U LTO N PA R K W AY T R A N S I T F E A S I B I L I T Y S T U DY

PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE

MORE MARTA ATLANTA SUMMARY OF PUBLIC ENGAGEMENT Contents CONTENTS TABLE OF EXHIBITS APPENDIX 2 9/4/18

REGIONAL WATER RESOURCES PLANS

Caltrain Business Plan

Caltrain Business Plan

41 st & Fox Station Area Property Owner Meeting August 16, 2018

Open House No. 1. On-Line Presentation

CHAPTER 4 HIGHLIGHTS GOALS AND GUIDING POLICIES 64 SEEKING PUBLIC INPUT TO REFINE SCENARIOS FOR OUR FUTURE 66

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Metro Amherst-Buffalo Corridor Alternatives Analysis

Metro Board Action: Motion 22.1

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

Appendix F 2008 Travel Demand Modeling

2004 FEASIBILITY STUDY UPDATE

Alternatives Analysis Executive Summary

MPO/RPO Briefings. MPO/RPO Briefing. Briefing Topics Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans

Restoration of Historic Streetcar Service in Downtown Los Angeles

Attachment 1. Task Order Services, Schedule and Deliverables

6.0 Indirect Effects and Cumulative Impacts

ATLANTA BELTLINE S c o p i n g B o o k l e t

Downtown Estes Loop Project Frequently Asked Questions

Regional Transit System Plan

Light Rail Operations and Maintenance Facilities

Regional Transportation Studies Regional Council

Transcription:

Technical Advisory Committee Meeting #1 December 13, 2011 MARTA Headquarters

Meeting Agenda Project Purpose Project Schedule TAC s Roles and Responsibilities Study Area Previous Studies Big Themes from Existing Conditions Question and Answer / Breakout Session Next Steps

Project Background

Project Purpose Purpose of the AA: o Identify alternative transit concepts o Select an LPA that can be examined through the NEPA process Initial activities include: o Develop Public Involvement Plan o Data collection (Existing Conditions) o Problem statement development o Identify goals o Develop the purpose and need o Review and refine travel demand model

Project Schedule 2011 o Goals and Objectives o Purpose and Need o Existing Conditions Spring 2012 o Develop alternative evaluation methodology o Definition of alternatives o Refine ridership model Summer Fall 2012 o Evaluation of alternatives o Identify LPA Winter 2013 o Develop Financial Plan o Develop Implementation Plan Spring 2013 o Final AA Report

TAC s Roles and Responsibilities To ensure technical proficiency during process Review technical data and analysis Provide input and guidance to project team

Study Area One-mile either side GA 400 I-285 to McGinnis Ferry Road Study Area Jurisdictions: o Sandy Springs o Dunwoody o Roswell o Alpharetta o Milton o Forsyth, DeKalb and Fulton Counties Adjacent jurisdictions: o Mountain Park o Johns Creek o Atlanta o Gwinnett and Cobb Counties

Previous Transportation Studies MARTA Three Corridors Study (1998) Regional Transit Action Plan (2003) MARTA North Line TOD Study (2006) Concept 3 Transit Vision (2008) Georgia Statewide Strategic Transportation Plan (2010) North Fulton Comprehensive Transportation Plan (2010) Plan 2040 Regional Transportation Plan (2011) Strategic Regional Thoroughfare Plan (2011) Draft ATL Northside Strategy (Ongoing) I-285 Alternatives Analysis/ Draft EIS (Ongoing)

LCI and other Land-use Plans Livable Sandy Springs LCI (2001 and update 2006) Perimeter Focus: Envisioning a New Atlanta Center LCI (2002) Midtown Roswell Redevelopment Plan (2003) Sandy Springs MARTA Station Area Plan (2003) McFarland Stoney Point LCI (2006) North Point Activity Center (2008) Roswell Town Square/ Atlanta Street Corridor Study (2008) Roswell Road Corridor LCI Study (2008- south of I-285) Alpharetta Downtown Master Plan (2010) Dunwoody Village Master Plan (2011) Plan 2040 Regional Development Guide (ARC 2011) Blue Print North Fulton (NFCID 2008)

Local Jurisdiction CDPs and CTPs Local CDPs: o City of Sandy Springs, Georgia 2027 Comprehensive Plan (2007) o City of Dunwoody Comprehensive Plan (2010) o Imagine Roswell 2030 Comprehensive Plan (2011) o City of Alpharetta Comprehensive Plan 2030 (2011) o City of Milton 2030 Comprehensive Plan (2011) o City of Johns Creek 2009 2030 Comprehensive Plan (2009) Local CTPs: o Sandy Springs Transportation Master Plan (2008) o City of Milton Comprehensive Transportation Plan (2009) o Johns Creek Transportation Master Plan (2010) o City of Dunwoody Comprehensive Transportation Plan (2011) o Roswell Transportation Master Plan (2011)

Key Issues

Big Themes from Existing Conditions Population Concentrated near Holcomb Bridge and Sandy Springs along GA 400 2000 to 2010 Growth o 22% increase 2010 to 2040 Forecast o 10% increase

Big Themes from Existing Conditions Employment Concentrated near Perimeter Center 2000 to 2009 Growth o 1% decrease 2010 to 2040 Forecast o 49% increase Employment growth more rapid than population o 10% population vs. 49% employment Consider how to capture projected employment increase

Big Themes from Existing Conditions Community Diversity 4% use transit to get to work 2% HH have no car o Mostly located in southern half

Big Themes from Existing Conditions Community Diversity 4% use transit to get to work 2% HH have no car o Mostly located in southern half 8% below poverty level Concentrated near Holcomb Bridge Exit

Big Themes from Existing Conditions Community Diversity 4% use transit to get to work 2% HH have no car o Mostly located in southern half 8% below poverty level Concentrated near Holcomb Bridge Exit 41% are minority o More evenly distributed

Big Themes from Existing Conditions Community Diversity 4% use transit to get to work 2% HH have no car o Mostly located in southern half 8% below poverty level o Concentrated near Holcomb Bridge Exit 41% are Minority 8% are 65 and older o More evenly distributed Efforts must be made to attract nontransit dependent riders

Big Themes from Existing Conditions Transportation Conditions Transit service o MARTA bus and rail in south o Bus and P&R only in north o Transit travel time not competitive with automobile

Big Themes from Existing Conditions Transportation Conditions Limited north-south travel corridors LOS F in 2010 on GA 400 LOS F remains in 2040, even with additional capacity

Big Themes from Existing Conditions Travel Trends 2010 o Trips to study area: 600k o Trips from study area: 314k o Internal trips: 302k o Strong suburb to suburb travel

Big Themes from Existing Conditions Travel Trends 2040 o Trips to study area: 877k o Trips from study area: 409k o Internal trips: 430K Travel growth o To: 46% o From: 30% o Forsyth trips to study area: 112% growth Potential for reverse commute, plus east and west trends indicate potential connections to stations.

Big Themes from Existing Conditions Land Use and Development Top Uses: o 42% Residential o 26% Commercial o 16% Open space

Big Themes from Existing Conditions Land Use and Development DRIs located in south and north Future land use plans add mixed-use and higher density at key locations Similar to North Line TOD Clusters Potential station considerations: existing DRIs, development potential, land use policies

Big Themes from Existing Conditions Environmental Features Large preserved areas for parks o Mostly along natural areas and water resources Community support for parks in local plans Desire for physical continuity and community access Alignment crossing of Chattahoochee River and floodplains are main environmental concerns

Moving Forward

Question and Answer Session

Breakout Groups

Next Steps Stakeholder interviews December & January 2012 SAC meetings January 2012 Public meetings January 2012 TAC meetings January 2012 o Existing Conditions Report o Purpose and Need