LWR PROJECT MAP EVALUATION SUMMARY PHASE II TYPHOON HAIYAN EMERGENCY RESPONSE PROGRAM

Similar documents
EVALUATION SUMMARY COASTAL RESILIENCE PROJECTS IN HINATUAN, SURIGAO DEL SUR, PHILIPPINES

RAPID ASSESSMENT OF SELECTED AGRARIAN REFORM COMMUNITIES AFFECTED BY TYPHOON YOLANDA REGION VIII

Technical Advisor (Nutrition Sensitive Interventions) Bauchi, supervising Gombe and Taraba states

Tools for monitoring climate change adaptation. Regional training on NAPs November 5, 2014 Roland Sundstrom Climate Change Specialist

Typhoon Haiyan Reconstruction Assistance (THRA) Project. Terms of Reference for Contract to Conduct Endline Evaluation

2. Consultancy assignment to conduct baseline assessment of Building

Climate Change and Natural Disasters in Madagascar Natural Disasters

FEED FORTIFYING EQUALITY & ECONOMIC DIVERSITY

Implementing Partners The project is being implemented by the Cooperative Development Foundation of Canada (CDF) in partnership with the following:

The Flood Resilience Alliance ( )

Call for Concept notes Climate Resilient Food Security

APPENDIX 2: ELIGIBILITY AND SCREENING CRITERIA FOR PROJECT PROPOSALS

UN-Habitat, Terms of Reference, Evaluation of UN-Habitat s Country Programme in Sri Lanka, 2 November 2017 (updated: 12 January 2018)

Byblos, Lebanon. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)

Workshop II Project Management

Alliances for Action

Management response to the recommendations deriving from the evaluation of the Somalia country portfolio ( )

Coffee Sustainability Catalogue 2016

Established in 1945, Lutheran World Relief (LWR) has

Livelihoods and Women s Empowerment EVALUATION TERMS OF REFERENCE (TOR) 1. DETAILS

Quetta, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

HIGHER EDUCATION SOLUTIONS NETWORK RESILIENTAFRICA NETWORK

CREWS Operational Procedures Note N o 3. Gender-Sensitive Programming

Terms of Reference. Innovative Models of Livelihood Interventions in Diyala and KRI

World Bank Africa Gender Innovation Lab (GIL) Call for Expressions of Interest: About the World Bank Africa Region Gender Innovation Lab (GIL)

Reducing Vulnerability and Managing Risk. Pre-Consultation Briefing Note for the Europe and Others Group Consultation

Management response to the recommendations deriving from the strategic evaluation of WFP s support for enhanced resilience

Technical Specialist - Natural Resources Management (IMARA)

Climate change adaptation (CCA) and disaster risk reduction (DRR) synergies of interventions

Should Resilience be Conceptualized and Measured Differently in Asian Rural and Urban Contexts?

Jakarta, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Hydra, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Vacancy Consultant for a Cash/Voucher Assistance Feasibility & Appropriateness Study

Measuring Community Flood Resilience

Philippines Typhoon Haiyan/Yolanda Operational Update Presentation to the WFP Executive Board Kenro Oshidari, Regional Director for Asia and

Malawi CASE STUDY MALAWI FLOODS AND RAINS RECOVERY PROGRAM FLOODS AND RAINS. Disaster/conflict: Floods and rains Disaster/conflict date:

Haiti Earthquake 2010 Response and Recovery Programme Final Evaluation

WFP and Climate Change: HELPING COUNTRIES INCREASE CLIMATE RESILIENCE TO ACHIEVE ZERO HUNGER

Food and Agriculture Based Approaches to safeguarding nutrition before, during and after emergencies: The experience of FAO 1.

Strengthening Resilience in Tsunami-affected Communities in Sri Lanka and India Getting Started on Monitoring and Evaluation Plans Notes for Partners

Medair use of Cash Transfer through Disaster Risk Reduction activities

Asia: Earthquake and Tsunami Operation Evaluation Framework

Analyzing stories of change Engaging beneficiaries to make sense of data. ICT4Eval International Conference 6 June 2017 Rome

MOPAN. Institutional report. World Food Programme (WFP) Multilateral Organisation Performance Assessment Network D O N O R

TERMS OF REFERENCE. Recruitment of Consultant for the Tracer Study of CARE Project s Capacity-Building Component

World Vision Somalia

Terms of Reference (TOR) Livelihood Support to Resettled Communities under the project of Support for Sustainable Resettlement in Sri Lanka (SSRS)

GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

Community-based Early Warning System: The SC UK Experience By Aden Tekle, Early Warning Technical Manager, Ethiopia

End of Project Evaluation Report. Samburu Pastoralists Livelihood Improvement Project (SAPLIP)

Implementation Plan For the Regional CDM Strategy

PAC Consulting Agriculture and Markets Team Leader Recruitment Pack

Job pack: Social Inclusion, Gender, and Research Specialist

Sahel Adaptive Social Protection Program Summary Note

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction

Mid-term Evaluation for the Gender and Generational Empowerment project in Tanzania.

Servacius B. Likwelile EXECUTIVE DIRECTOR Tanzania Social Action Fund (TASAF) Dar es Salaam, TANZANIA October 1-5, 2007

Complete participation: micro project cycles for sustainable agriculture

FAO, UNICEF, WFP A Strategy for Enhancing Resilience in SOMALIA Brief, July 2012

Call for Expression of Interest

African Union Business Plan : Catalysing the Implementation of the CAADP-Malabo Commitments for Accelerated Agricultural Transformation in Africa

ADB BRIEFS CLIMATE CHANGE IN CORAL TRIANGLE OF THE PACIFIC COUNTRIES: SUPPORTING COMMUNITIES TO ADAPT NO. 42 KEY POINTS SEPTEMBER 2015

Ex-Post Evaluation of Japanese Technical Cooperation Project

Mournag, Tunisia. Local progress report on the implementation of the Hyogo Framework for Action ( )

The FedEx Award for Innovations in Disaster Preparedness Submission Form

THE 2014 YOLANDA DISASTER-RESPONSE PROJECT

QUARTERLY PROGRESS REPORT (from 1 April to 30 June 2017)

BUDGET REVISION 6 TO PROTRACTED RELIEF AND RECOVERY OPERATION

AMERICA S ROLE IN ENDING GLOBAL HUNGRY AND MALNUTRITION THROUGH INTERNATIONAL AGRICULTRE AND FOOD ASSISTNACE

Institutional capacity assessment approach for national adaptation planning in the agriculture sectors

DISASTER RISK REDUCTION FOR RESILIENCE PROGRAMME

Hydra, Tunisia. Local progress report on the implementation of the Hyogo Framework for Action ( )

COMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA

1. Introduction and Country Overview

WCDR Hyogo Framework for Action:

MEDIUM- AND LONG-TERM ACTION AGAINST DROUGHT IN THE HORN OF AFRICA

Program Theory of change and Impact Pathway

1 st Asia Parks Congress - Sendai Nov Nguyen Thi Yen Disaster Risk Reduction and Climate Change Manager CARE International in Vietnam

ACORD (Agency for Cooperation and Research in Development) Enhancing Iddir s Engagement in Slum Upgrading in Dire Dawa, Ethiopia ( )

Guidelines on PDNA and Recovery

Supporting Markets to Recover: Tips and Tricks from the Markets in Crisis Community of Practice

Monitoring and Evaluating Social Protection Programs Efforts to Respond to Natural Disasters and Climate Change-Related Shocks

TOR Final Evaluation CBHFA and National Society Development, Côte d Ivoire Summary

Malawi Forum. October 31, 2017 Lilongwe, Malawi

NGO Group Statement to the Global Platform for Disaster Risk Reduction. Cancun, Mexico, May 2017

IFRC nutrition-sensitive interventions in the Asia-Pacific region

Module 6 Introduction to Measurement

Strengthening Orphan and Vulnerable Children Programs with Data

2015 Strategic Plan Refresh

CARE Philippines. Household Cash Transfer Assessment. Typhoon Haiyan Recovery Response. Promoting Resilient and Sustainable Livelihoods

REQUEST FOR PROPOSALS

Case Study. Youth employment fund in Serbia. SDGs addressed CHAPTERS. More info: BELGRADE

Oxfam PNG - WASH Program Final Evaluation

For: Approval. Note to Executive Board representatives. Document: EB 2018/LOT/G.14 Date: 22 November Focal points:

Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) Toll free: Fax: (819)

Building a Strong Future Together

Published by SHOUHARDO III program CARE Bangladesh February 2018

Insert a short description of any ongoing response and assessments already conducted:

The 12 January earthquake severely damaged all public infrastructure and displaced around 2.1 million people.

COMMITTEE ON WORLD FOOD SECURITY

Transcription:

EVALUATION SUMMARY PHASE II TYPHOON HAIYAN EMERGENCY RESPONSE PROGRAM Lutheran World Relief (LWR) commissioned TANGO International to independently evaluate the recovery phase (Phase II: August 2014 October 2016) of its Typhoon Haiyan Emergency Response Program (HERP) and provide recommendations for future LWR emergency responses. TANGO conducted its field evaluation of the second phase of HERP in September October 2016 in Cebu and Leyte. Shelter CFW NFIs/MR Q&A WASH Early Recovery/ Livelihoods LWR PROJECT MAP Capiz Samar PROJECT SUMMARY After assessing the needs of Haiyan-devastated communities, LWR planned the multiyear HERP with the goals of supporting sustainable recovery and rebuilding people s livelihoods in affected barangays (villages) in Cebu and Leyte. Phase II of HERP aimed to contribute to Haiyan-affected populations sustainable recovery through the rebuilding of livelihoods as well as through the improvement of community resilience to future disasters. Phase II interventions, implemented both directly and through local partner Philippine NGOs, included livelihood diversification, increased production and improved livelihood resilience interventions for coconut farmers and fisher folk. Funded by ACT Alliance, the Evangelical Lutheran Church of America, the Conrad N. Hilton Foundation and individual donors, LWR implemented Phase II with its local partners KAMMPIL and Tambuyog Development Center, Inc. (TDC), reaching more than 5,000 Haiyan-affected families. Northern Cebu Bantayan Island Eastern Leyte Western Leyte Cebu City

EVALUATION METHODOLOGY The TANGO evaluation team (ET) used a mixed-methods approach to collect and analyze quantitative and qualitative primary and secondary data. Primary data was collected through household surveys, key informant interviews (KIIs) and focus group discussions (FGDs) with beneficiaries, other community stakeholders and HERP staff. The main secondary data sources were internal and external program reports and year three outcome monitoring data. The ET worked to capture a broad range of stakeholders input, using appropriate purposive qualitative sampling to ensure a cross-section of diverse beneficiaries engaged in program activities. The evaluation team applied a resilience analysis lens to the assessment of program outcome results and their contributions to the program goal. Additionally, the ET included a specific assessment of underlying internal and external factors that influenced the overall program experience. Several factors influenced the design, implementation and results of the evaluation, including the following: The monitoring data and documentation from implementing partners was of varying quality and quantity; Due to the large number of program sites and staff members included in HERP, the ET along with LWR had to prioritize which areas and staff to visit; Maricel Nepangue is the hog meat team leader for the Kaongkod Fisherfolk Association (KAFA) in Barangay Kaongkod, Madridejos, Bantayan. She is the mother of 3 children. Program design was not yet finalized when the baseline study was conducted; therefore, questions were administered more broadly at the baseline than during the endline study, possibly increasing the chance of measurement error. SUMMARY OF FINDINGS APPROPRIATENESS OF PHASE II The ET considered the combination of HERP II outcomes to be appropriate and suitable to address short-term livelihood recovery while strengthening adaptive capacity over the longer term and meaningfully contribute to HERP s goal. For community capacity in livelihood resilience (Outcome 3), the combination of activities was appropriate to achieve the expected outcome, with the assumption that all activities included sufficient emphasis on livelihood resilience in addition to protecting human lives. The focus on strengthening community leadership and organization around disaster risk reduction was highly appropriate for improving community resilience. LWR HERP II did an excellent job selecting activities that expand access to highly relevant technologies and services in the target areas, i.e. the introduction of automated weather stations and climate information centers and facilitation of linkages with insurance providers.

The scope of HERP II activities selected to achieve Outcomes 1 and 2 was too limited. Project activities focused mainly on the provision of capital inputs and basic training to diversify household livelihood strategies and strengthen primary livelihoods. This combination is appropriate for immediate livelihood recovery but insufficient to achieve the diversified and improved livelihoods without complementary interventions such as establishing access to continuous technical support, coaching for new productivity techniques, governance initiatives to mobilize local support and foster collaboration among beneficiaries, access to sustainable finance and market assessments to inform value chain investment. PHASE II RESULTS OUTCOME 1: Disaster-affected fisher folk and small coconut farmer households increase livelihood diversification to improve resilience to shocks and stresses. The program was partially successful in establishing diversified livelihoods, with better results achieved with coconut farmers than with fisher folk. KAMMPIL has made good progress in promoting horticulture adoption. The ET found that fisher folk did not adopt program-supported livelihood diversification strategies at the same rate as coconut farmer households. Compared to coconut farmers, fisher folk indicated a less urgent need for an alternative non-fishery livelihood activity to meet household food and income needs after the disaster. While all beneficiaries interviewed indicated a strong appreciation for the support the project provided, the majority of fisher folk were able to resume some type of fishing activities within 1-2 months following Typhoon Haiyan, which essentially provides a shorter window of relevance (or, in other words, opportunity) for a demand-driven introduction of an alternative livelihood activity. 1 Table 1: Outcome 1 household survey results Point Estimate Sample Size Baseline Endline Baseline Endline OUTCOME 1: Disaster-affected small coconut farmer households increase livelihood diversification to improve resilience to shocks and stresses. Indicator 1.1: Percentage of households with diversified income sources (3 or more) Total 35.0 47.5 *** 1362 1488 KAMMPIL 33.0 74.1 *** 646 721 TDC 36.1 24.2 *** 716 767 Indicator 1.2: Percentage of households who practice project supported improved practices/techniques (intermediary outcome indicator) Total n/a 39.8 n/a n/a 1488 KAMMPIL n/a 62.0 n/a n/a 721 TDC n/a 20.3 n/a n/a 767 Difference from baseline value is statistically significant at the 10% (*), 5%(**) or 1%(***) levels Eduardo Campos is a 46 year old fisherman, who belongs to the Nakasama Fisherfolk Association in Barangary Naungan, Ormoc City, Leyte. He lost all of his fishing gear in Typhoon Haiyan, but HERP replaced his lost gear, got him fishing again quickly, and helped his association develop additional sources of income, like fish cages. 1 The project assumption is that the recovery need is the catalyst for longer term livelihood diversification.

OUTCOME 2: Disaster-affected fisher folk and small coconut farmer households increase productivity from primary livelihoods to improve resilience to shocks and stresses. The program was partially successful in strengthening the primary livelihoods of fisher folk and coconut farmers. Progress was made in strengthening productivity but value chain results were not yet evident at the time of the evaluation. In general, more than half of the coconut farmers adopted production practices promoted by the project, which indicates good potential that these farmers future production will likely increase. Adoption rates of improved productivity techniques for fisher folk were lower than for the coconut farmers. Interviews with beneficiaries indicate that the promotion of fish aggregating devices and the distribution of appropriate gears has had nominal effects on fish catch. In part, this was because most fisher folk had already recovered their equipment and were already able to maximize their catch when the project inputs were provided. However, many fisher folk stated that the input provisions combined with the orientation received from TDC on fishing zones and the negative impacts of illegal fishing practices convinced them to adopt and even promote sustainable fishing practices. The project activities to promote adoption of improved marketing techniques were not successful. Interviews with beneficiaries, project staff and stakeholder indicate this is a Table 2: Outcome 2 household survey results Point Estimate Sample Size Baseline Endline Baseline Endline OUTCOME 2: Disaster-affected small coconut farmer households increased productivity from primary livelihoods to improve resilience to shocks and stresses. Indicator 2.1a: Percentage of households adopted improved productivity techniques promoted by the project Total n/a 34.2 n/a 1548 KAMMPIL n/a 55.1 n/a 769 TDC n/a 14.8 n/a 779 Indicator 2.1b: Percentage of households have adopted improved marketing techniques promoted by the project Total n/a 9.0 n/a 1360 KAMMPIL n/a 7.6 n/a 695 TDC n/a 10.3 n/a 665 Difference from baseline value is statistically significant at the 10% (*), 5%(**) or 1%(***) levels direct result of insufficient program resource and time allocation to this project intervention. Program business interventions were started too late and did not yet have sufficient supply and market linkages developed to demonstrate potential for success at the time of program completion. SUSWEFAS is a fisher folk association with 20 members, 14 of which are women. LWR built their fish drying facility and the necessary fish drying equipment, which is solar powered. They now sell the dried fish in several markets, and they are coming up with new plans to expand their business

Fisher folk harvest fish from one of their association s fish cages. OUTCOME 3: Communities have improved absorptive and adaptive capacities in livelihood resilience. The project met its output targets, but the combined outputs did not fully achieve the expected outcome. The Barangay Disaster Risk Reduction and Management Committees (BDRRMC) were active at the time of the evaluation, mainly due to the intense work of the project to complete the delayed Outcome 3 activities before the end of the project. However, beneficiary interviews show that the BDRRMCs had not yet reached community households with the capacity and information instilled by the project. The program observed an increase from 34.8% to 69.1% in the proportion of households aware of the contents of disaster management plan and households which cite they are fully prepared if another typhoon were to happen in the near future. However, interviews with beneficiaries indicate this refers mainly to early warning and evacuation routes to save the lives of their family members, which was a priority for them after the devastating impact of Haiyan. Beneficiaries indicated that the project had done little to improve their capacity to reduce the risk of disaster impact on their livelihoods. Table 3: Outcome 3 household survey results Point Estimate Sample Size Baseline Endline Baseline Endline OUTCOME 3: Communities have improved absorptive and adaptive capacities in livelihood resilience. Indicator 3.1: Number of barangays with active BDRRMCs (per project documents) Total n/a 45 n/a n/a 45 KAMMPIL n/a 30 n/a n/a 30 TDC n/a 15 n/a n/a 30 Indicator 3.2: Percentage of households that report social coherency at community level 2 Total 17.0 5.6 *** 1362 1488 KAMMPIL 13.1 3.8 *** 646 721 TDC 19.3 7.2 *** 716 767 Difference from baseline value is statistically significant at the 10% (*), 5%(**) or 1%(***) level 2 A household is counted if they cite a positive trust response to each of the three community trust questions.

The main purpose of the project activities with communitybased organizations (CBOs) was to promote community groups as a way to strengthen social cohesion, which current research shows is a key determinant of absorptive and adaptive capacity. Interviews with beneficiaries and project staff show that the group work has strengthened the level of communication and coordination among households involved in project activities. The CBOs are now an effective transfer modality for relief and recovery assistance, and the foundation for a community social safety net is in place. Despite this, the communities displayed a decrease in social trust due to, in varying degrees, the following: people had to rely more heavily on others immediately after the typhoon (when the baseline data was measured); some thought others in the community could not be relied upon as consistent support providers; many prioritized self-sufficiency over relying on the goodwill of others. Over the course of Phase II, the percentage of households that recovered to the same level (or higher) than prior to Typhoon Haiyan increased from 29.7% to 51.8%, and the three combined project outcomes made an important contribution to this recovery. Coconut farmers participating in HERP s livelihood activities establish a coconut tree seedling nursery.

CONCLUSION Over the course of Phase II, the percentage of households that recovered to the same level (or higher) than prior to Typhoon Haiyan increased from 29.7% to 51.8%, and the three combined project outcomes made an important contribution to this recovery. Interviews with non-beneficiaries in neighboring communities confirmed that the benefits provided through project activities allowed project beneficiaries to recover their livelihoods to a greater degree and more quickly, when compared to households who did not receive those benefits. Interviews with beneficiaries and project staff indicate that the greatest contribution towards recovery made by the project was through its input provision. Many beneficiaries used these inputs in line with the improved practices and livelihood purpose promoted by the project, while others converted the inputs into cash to assist household recovery in other areas like education or to help households meet day-to-day expenditure needs while livelihoods were recovering. In all cases, qualitative findings show that project support helped the recovery process. The project interventions were highly relevant to the needs of the beneficiaries. The program has achieved its activity and output results but has only partially achieved the expected outcomes. The combination of activities and outputs incorporated in the design, in the context of the time and resource limitations to the project, was not sufficient to achieve the stated outcomes. Nonetheless, the project resource investments made a meaningful contribution to the project recovery goal. The key success factors for this contribution were the commitment of project staff and the participatory accompaniment model that project partners used to engage with beneficiaries. HERP s livelihood recovery strategy showed sufficient consideration of beneficiary vulnerabilities, needs and resilience capacities, but this did not translate into an effective and realistic design. The project interventions made some contributions to household absorptive and adaptive capacities but did not achieve the expected sustainable and resilient livelihoods. The main reason for this is insufficient emphasis on resilience-building in the activity and output design, which mainly focused on recovery activities. Activities were too lighttouch to expect sustainable and widespread results around promoted practices. For fisher folk, the most effective resiliencebuilding activity was the promotion of sustainable fishery practices. For the coconut farmers, the most effective resilience activity was the promotion of intercropping. At community level, the establishment of organized CBOs with active and engaged members improved community cohesion for the duration of the project. The BDRRMCs had insufficient focus on livelihood resilience building incorporated in their planning. The sustainability of both is uncertain. As part of HERP s livelihood activities, LWR trained women to sew curtains, pillow cases, and rugs and provided them with sewing machines and capital to get started. They are paid 20 pesos per curtain and can do 8 curtains a day = 160 pesos. Their association provides them with the fabric.

CONSIDERATIONS FOR IMPLEMENTATION LWR MANAGEMENT RESPONSE LWR finds that overall, the evaluation fairly represents and resonates with our implementation experience and internal monitoring of HERP Phase II. LWR also acknowledges TANGO s recommendations and will use them to inform future emergency response programming. Though we agree with most of the evaluation s findings, there are several challenges LWR faced during implementation that we feel provide important nuance and context. First, the project was unexpectedly shortened midway through its implementation due to changes in funding. Second, HERP leadership changed three times over the span of 18 months. Lastly, LWR sought full community participation in the selection of beneficiaries and types of livelihood inputs such as fishing nets, which took a long time and delayed distribution. We disagree with the evaluation s assessment that fisher folk had already recovered their equipment and were maximizing their catch by the time LWR s distribution was complete as we found most fisher folk were merely getting by with any poorly repaired or salvaged equipment they could find. The quality and quantity of the equipment they were using at the time of LWR s distribution was not the same as prior to the typhoon. EVALUATION ACTION ITEMS LWR will share and discuss the evaluation findings with our implementing partners KAMMPIL and TDC, and will especially look into the sustainability of investments in livelihood diversification initiatives like fish drying facilities with them. Moving forward with TANGO s recommendations in mind, LWR will strive to improve our project design and integration of gender and quality and accountability into emergency projects through the strengthening staff and partner capacity in using LWR s Design, Monitoring, Evaluation, and Learning (DMEL) tools. ORGANIZATIONAL LEARNING Recommendation 1: Ensure a reasonable causal design between activities and outputs, and expected outcomes. The project pathways of change need to be robust, feasible within the project timeframe and properly resourced to reasonably achieve the outcomes, or the project will not be successful. Organize a causal design and targeting workshop with shortlisted partners and ensure the presence of the right technical domain experts to inform and validate project design decisions. This is a 3-4 day event that should include a field visit to ensure a common understanding of operational context. Recommendation 2: Ensure coherency in partner expectations for project design, implementation and results, and ensure role clarity among partners. See Recommendation 1. A collaborative design process would have demonstrated the respective operational, technical and strategic strengths and weaknesses among the consortium partners, identified gaps in combined partnership capacity vis-à-vis the expected outcomes and contributed to greater role clarity. Recommendation 3: Ensure that each partners relevant sector expertise is appropriately applied and that technical support is provided to address areas of insufficient experience in the specific project activities (e.g. DRR and diversified livelihoods) and operating modalities (e.g. large-scale procurement and distribution). See Recommendations 1 and 2. A collaborative design process guided by a technical expert in the project outcome domains would have identified capacity gaps and ways to address them, e.g. by identifying additional technical partners or revising the design, as well as inherent partnership strengths that should be utilized. Recommendation 4: Ensure the geographic coverage and beneficiary distribution are feasible within project resources. See Recommendation 1. Targeting should not be an afterthought but should be incorporated into the design process. Recommendation 5: Collect the information you need and use the information you collect. Include outcome monitoring in every project even if it is light-touch. It is not useful to have to wait until the end of a project to know how you are doing, nor to simply look at activity-level output. To request the full report, contact Kat Fiske at kfiske@lwr.org. 800.597.5972 lwr.org