Monthly Progress Report for the month of NOVEMBER 2013

Similar documents
Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00

CIVIL WORKS Mahesh G. Nair

Scanned by CamScanner

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

PRICED BILL OF QUANTITIES

Construction of Shopping Complex at MNIT campus.

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

Estimate FOR THE SEPTIC TANK

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR

PROGRESS JAIPUR PH-II AS ON 30 NOV 18

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

PROGRESS JAIPUR PH-II AS ON 20 DEC 18

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

STATUS OF PARTIAL OCCUPANCY. Plan revalidation from MDA obtained, Application for partial OC submitted to MDA.

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

PRE-CAST HOUSE CONSTRUCTION

PROGRESS MEERUT PROJECT AS ON 22 OCT 2018 SSSEPTEMBERSEPTEMBER. in finishing internal works. Progress is being monitored closely by the Board JUNE 18

( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS.

½% % ATM 1 E.P.F. 3 UBN No.

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story.

Calculation of requirement of Labour. for construction of IAY/CMRHM

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

PROGRESS JAIPUR PH-II AS ON 20 JULY 2018

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

PRM/KA/RERA/1251/446/PR/171230/002141

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

TOWER-1A: TERRACE FLOOR SLAB

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Sl No. Sqm Sqm Sqm Cum Cum 0.73

THE DALAI LAMA INSTITUTE FOR HIGHER EDUCATION CONSTRUCTION PROGRESS REPORT (PHASE II) Brief description on the current work status of each block:

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

The International Committee of the Red Cross

Compiled by: Civil Works Department, SSA Punjab.

PROGRESS BHUBANESWAR AS ON 15 SEP 2017 AVERAGE DAILY LABOUR IN AUG-SEP: 319

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

Sub: - Construction of RPI office and M.T. building for S. P. Headquarter, Hingoli, District Hingoli

contractor has assured that these blocks would be ready for handing over to allottees as soon as the Occupancy Certificate

nominal mix cement concrete with crushed stone aggregate using concrete mixer in foundation, plinth and at ground level excluding cost of form work.

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

IIM RAIPUR. Development of Phase I Campus including building for IIM Raipur at Naya Raipur

ARCHITECTURAL DRAWINGS

KANPUR SMART CITY LIMITED

THE TREASURE TOWER PROGRESS REPORT

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

CHAPTER 16 - GANTRIES

CONCRETE BLOCK MASONRY

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

Percentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil)

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22.

FINAL DETAIL REPORT. Construction / Renovation

9.0 TECHNICAL ANALYSIS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD.

WELCOME. to the Presentation on. Guest Lecture for Course CE- 401 at Department of Civil Engineering (Seminar Room) BUET, Dhaka

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

Design and Estimation of Reinforced Building: A Case Study

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE GEM

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Study: Construction Process at Plot 22, Shivaji Nagar, Govandi, Mumbai

Saraswathi. Floor Plans

PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK

Name of work : Special Repairs to North West Mugamandapam of 1000 Pillar Mandapam of A/m. Aranganathaswamy temple, Srirangam.

PART A: JOB PROCDRE FOR PLASTERING

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT TENDER NOTIFICATION

GEE GE STRUCTURALS PRIVATE LIMITED PROJECT NAME: GEE GE PLATINA

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

PENTABLOCK Technical Information 190mm Series

BILL OF QUANTITY. Annexture-II FIN-II. Sl No/Ref GOM SOR / Item Of Works Unit Qty Rate (Rs/Unit) Amount in Rs

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

PRECAST CEMENT PRODUCTS

HIDD HEIGHTS PROGRESS REPORT


City of Rohnert Park Building Department Inspection Descriptions

SITE PLAN. K&M Archplans(T) Ltd integrity and excellence REVISIONS ACCESS ACCESS RO ROAD PRIVATE PROPERTY MAKONGORO ROAD ENTRANCE TO AIRPORT TO CB

Light Gauge Steel Framing Composite housing process

Contract Rates & Specifications for your Home Construction - From the Makers of India s Finest Designer Homes

General Technical Specification


Pre-Engineered Construction Analysis and Design of Portal Frame

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

# 150

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur

United Nations Development Programme

Sl No. Rate. Hct By manual means In area of light jungle

Transcription:

Name of the Cost Physical SH Construction of boundary wall for CPRI office campus and staff colony at Bangalore Rs.1,55,48,700.00 Campus works: Stone masonry wall work from EMI / EMC site to HPL gate to Ayyappa Swamy Temple to T&D Gate to Director Generals residence to Head Office gate to High Voltage gate completed Grill painting work, grill fixing work, pillar construction work, coping concrete work and coping band finishing work from EMI / EMC site to HPL gate to Ayyappa Swamy Temple to T&D Gate to Director Generals residence to Head Office gate to High Voltage gate completed Internal and external pointing work from EMI / EMC site to HPL gate to Ayyappa Swamy Temple to T&D Gate to Director Generals residence to Head Office gate to High Voltage gate completed North side of office campus boundary completed Culvert completion except roof slab Colony works Brick masonry wall and stone pillar work from Ramaiah Bus Stop to Type III Gate to Type V gate to IISc Boundary wall completed except grill fixing, coping concrete from Type III gate to Type V gate to IISc boundary wall Grill painting work, grill finishing work, pillar work, coping concrete work and coping band finishing work from Type III gate to Type V gate only 27 Nos of bay has been completed Water Proofing cement paint white painting work for wall adjoining IISc boundary wall has been completed Water Proofing cement paint (Ivory), painting work for wall adjoin IISc boundary wall is in progress Outer side wall texture paint work (double coat) from Type III Gate to Ramaiah signal has been completed Campus works: Colony works Fixing of grills between type V gate to junction of CPRI and IISc, pointing of CRS masonry pillars. Pointing of CRS masonry. Coping concrete and fixing glass pieces on pillars Remarks Rs.9675261.00 Rs. 1

Name of the SH Vertical extension of CCAR building, Guest House 1, Guest House 2, CPRI campus Bangalore Cost Physical Rs.2,18,40,313.00 CCAR Works All rooms brick masonry, lintel beam casing and brick masonry wall work above lintel has been completed. Slab casting work for rooms has been completed. Suit rooms brick masonry wall work, lintel beam casting work and brick wall above lintel beam has been completed. Suit rooms and corridors slab reinforcement fabrication work has been completed-except toilet. Plastering work in 16 rooms completed. Concrete work completed for toilet beam. Suit slab casted. Water proofing for roof slab is completed External Wall Plastering for DB rooms in second floor is in progress. Centering work for seminar hall in second floor is in progress. Bar bending work for columns & for chajja is in progress. Parapet wall brick work dismantling. Bar bending for columns. External plastering for DB room. Brickwork for parapet wall, DB room Centering and Shuttering works for beams, roof slab of seminar hall. Application of water based primer in DB rooms, suites. Plastering of electrical room- west side wall and Corridor wall plastering. Bar bending work for DB room balconies. Floor dismantling and cleaning of debris and parapet wall. Application of wall care putty to suites, corridor in front of DB room is in progress. Concreting of duct roof slab completed. - CCAR works) Plastering for duct slabs of 8 numbers. Water proofing work is in progress above terrace floor. External & internal plastering for corridor wall infront of DB Room 1 to DB Room 5. Floor dismantling and cleaning of debris. 2

GUEST HOUSE 1 & 2 WORKS Guest House 1 No work at Guest House No: 1 Guest House 2 All rooms brick wall work up to lintel level has been completed except toilet Column work up to roof level and brick work up to roof level has been completed, Concreting of slab completed Remarks Guest House 1 No work at Guest House No: 1 Guest House 2 Brick wall construction above lintel beams is in progress. Scaffolding work for plastering. Rs.46.00Lakhs Rs. Lakhs 3

Name of the Cost Physical Setting up of Pre-qualification of Test Facilities on 400 kv XLPE cables at CPRI office campus, Bangalore. Sh : civil works Rs.2,82,84,600.00 Concreting of all columns and tie beams up to 18.49m level of Laboratory completed Concreting of Slab, construction of brickwork of parapet -Jointing tunnel coil room and Snaking tunnel coil room completed. Internal and External plastering and painting of all walls of control room, electrical panel room, auxiliary rooms, Laboratory, Jointing tunnel coil room, Snaking tunnel coil room completed. RR masonry North of Jointing tunnel coil room completed. Fabrication, Painting with primer and Enamel paint, erection and welding of Structural Trusses-1 to 6 completed. Excavation, PCC, RRM, CRM of HT panel foundation and transformer foundation completed. Laying of M20 concrete for transformer foundation near electrical room completed. Construction of cable trench in electrical room, control room, Jointing tunnel coil room, Snaking tunnel coil room completed. Flooring concrete of Jointing tunnel coil room and Snaking tunnel coil room completed. Cinder concrete in sunken slab of toilet room completed. Water proofing treatment of slab Main building and Loading coil rooms completed. Dismantle of brickwork in Toilet room completed. Construction of brickwork between columns F9 I9 completed. Earth excavation, laying of PCC of transformer bay completed Earth excavation, laying of PCC, construction of brick work for cable trench of transformer bay completed Shuttering, reinforcement works, concreting of columns A2, A3, A4, A5, I2, I3, I4, I5, above 18.49 M level completed Laying of Random Rubble Masonry in between pavers of approach road and transformer bay completed. Construction of brickwork and concreting of lintel beam along I8 to I9 wall completed. Earthwork excavation for cable trench in lab partition completed Plastering of wall F9 to I9 (both sides), ceiling plastering of demolished portion of control room completed. Leveling of earth in-front of entrance, south side of control room completed. Laying of PCC for cable trench, construction of brickwork for cable trench of laboratory completed. Laying of Random Rubble Masonry for side drains behind the coil 4

room and for fence North side of snaking coil room completed. Construction of side brickwork, laying of PCC and coping concrete for the Ramp in front of Jointing tunnel coil rom, Snaking coil room and in between the grids D6-F6 completed. Excavation of Earth, construction of side brickwork, laying of PCC and coping concrete for the Ramp in between the grids D1- F1 completed. Laying of coping concrete over the RRM works for side drain- South side of coil room completed. Laying of Flooring concrete (RMC) in Transformer Yard. Erecting, welding and bolting of purlins, bottom chord bracings, Top chord bracings, gable ends completed. Fabrication of reinforcement for flooring in Lab completed. Plastering of walls of cable trench in door portion completed. Concreting of ramp in between Hardstanding (North side) and Transformer yard completed. Fabrication, erection and painting with zinc primer of horizontal members for fence post. Placing of drain pipe in transformer yard. Construction of brickwork and plastering along grid K. Erecting of angles to other side of cable trench in transformer yard. Flooring concrete in Lab and ramp bt. Grid D1-F1. Vacuum dewatering flooring concrete in Lab and ramp bt. Grid D1-F1. Plastering of cable trench sides in Lab completed. Earthwork excavation for gutter. Earth excavation, brickwork for the retaining wall near electrical panel room. Construction of steps in front of control room, electrical panel room. Applying a coat of wall putty in control room, electrical panel room, loading coil room. Coping concrete (1:2:4) over the RR masonry. Patch repair works in Lab. Plastering of cable trench in control room. PCC for the ramp- Loading coil rooms. Leveling and ramming of earth south of jointing tunnel coil room. Painting of column of Lab with Surfacem. Making opening from control room cable trench to Lab cable trench. Cement skirting all around the Lab building. Applying 2 nd coat of wall putty in control room. Leveling of earth for side drains. Earthwork excavation for gutter. Earth excavation, brickwork for the retaining wall near electrical panel room. Construction of steps in front of control room, electrical panel room. Applying a coat of wall putty in control room, electrical panel room, loading coil room. Coping concrete (1:2:4) over the RR masonry. Plastering of cable trench in control room. PCC for the ramp- Loading coil rooms. 5

Granite for stair case completed Vitrified tile flooring in control room completed Fixing of interlocking pavers on either of snaking coil room completed Fixing of PPGI sheet for roof and wall cladding. completed Remarks Painting for transformer bay beams and columns.zinc chromate painting for gate and stiffeners Second coat painting (exterior) for snaking coil and control room Plinth protection concrete for lab Plastering for plinth protection Band finishing for stone masonry for drains Green enamel paints for gate of transformer bay Green enamel Painting for chequered plates Acid cleaning for tiles and granite in control room Coping concrete for drains near back gate Cleaning work Rs.1,89,29,872.00 Rs.46,52,230.00 Engineering Officer - 2 6

Name of the Cost Physical Remarks Setting up of Pre-Qualification Test Facilities on 400 Kv XLPE Cables - SH: Providing Roof over Transformer Bay at CPRI, Sadashivnagar, Bangalore Rs.25,36,355.00 WORK COMPLETED ON 30.09.2013 Rs.13.86 Lakhs Rs.Nil FINALISATION OF ACCOUNTS IS IN PROGRESS 7

Name of the Cost Rs. 1,01,12,472.86 Construction of a Lab Building for Setting up of Test Facility for LED Lighting System at CPRI, Bangalore. SH: Civil Works Remarks Work completed on 23.06.2013 Building inaugurated on 30.08.2013 UPTO DATE Rs. 68,14,599.00 Rs. Nil FINALISATION OF ACCOUNTS IS IN PROGRESS 8

Name of the Construction of Building for Additional Test Bay SC Testing of Transformers At SC Lab Sub Head: Civil Works At Workshop. Rs.35,36,616/- Cost Physical UPTO DATE Rs.20,04,594/- Rs.Nil Remarks The work is closed on 08.06.2013 FINALISATION OF ACCOUNTS IS IN PROGRESS 9

Name of the Cost Rs. 70,03,781/- Physical Modernization of short circuit test facilities & augmentation of Power transformer test facilities Sub Head: Construction of New Low Voltage Test Cell-Civil Works UPTO DATE Rs.7,49,000/- Rs. Nil Remarks The work is closed on 08.06.2013 FINALISATION OF ACCOUNTS IS IN PROGRESS 10

Name of the Centre for Life cycle management and condition monitoring of substation equipment s. Cost Rs. 2,16,30,528.00 Physical UPTO DATE Rs. 1,79,08,665.55 Rs. Nil Remarks is handed over on 04 September 2013. (Note : Checkered plates for cable trench in laboratory area is pending.) FINALISATION OF ACCOUNTS IS IN PROGRESS 11

Month November 2013 Name of the Construction of Building for Establishment of Comprehensive EMI/EMC Test (Radiated Immunity & Radiated Emission) facility Sub Head: Civil Works Cost Rs. 3,42,91,982.00 Physical UPTO DATE Earthwork excavation for all the footings have been completed. Laying of bed concrete PCC (1:4:8) for all the footings have been completed The works pertaining to foundation, viz. casting of RCC footings, has been completed. Total reinforcement steel required for the structure has been procured by the contractor. Additional column rods, as per the directions of the structural consultants have been provided in columns. Casting of pedestals and columns up to plinth level have been completed. Construction of Random Rubble Masonry beneath plinth beam has been completed. Filling of earth up to plinth level and consolidation with water has been completed in the portion between grids G1G8 H1H8. Casting of plinth beam including tying of reinforcement steel and centering works have been completed. CVO inspection of EMI-EMC works completed. Casting of columns three lifts up to first tie-beam level have been completed. Preparation of flooring base in the lab area where roof covering at 5 m level is there earth dressing and water consolidation. Receipt of clearance from M/s. Frankonia for chamber wall foundation (flooring) details submitted by structural consultants. Casting of PCC (1:4:8) for flooring base of lab area completed. Centering shuttering works for the tie-beam at 5m level completed. Reinforcement tying for tie-beam at 5m level completed (C portion). Concreting for tie-beam at 5m level completed (C portion). Centering shuttering works for the roof at 5m level completed. Fabrication and tying of reinforcement bars for the beams and slab at +5m level completed. Casting of lift roof columns Preparation of centering and shuttering for staircase. Concreting of staircase, tie-beam at +5m level, lift column tiebeams, and 50 % of approach slab for lift. Earth work excavation for retaining wall on North and Western side completed. PCC for retaining wall on North and Western side completed. 12

Remarks Name of the Cost Rs. 3,42,91,982.00 Physical UPTO DATE RR Masonry for retaining wall on West side completed. Completion of RR Masonry wall on Northern side. Concreting of Plinth course on Retaining wall on Northern and Western side including tying of reinforcement and shuttering. Plastering of the plinth course on retaining wall on Northern and Western side Completion of RMC concreting of roof slab at +5m level at Laboratory portion. Completion of deshuttering of the roof portion at + 5m level at laboratory Area. Brick masonry works for parapet of lab portion Brick masonry up to lintel level in the lab portion Ceiling plastering two bays of lab portion. Centering, Shuttering, and DMC concreting for lintel and chajja in lab portion of the building. Brick masonry above lintel level in the lab portion Construction of brick masonry up to first tie-level at main chamber area completed. Ceiling, including beam plastering at lab area. Column plastering in lab area completed. External plastering of walls in lab area in progress. Wall plastering at lab area (Internal). Parapet plastering at lab area. Casting of RCC lintel and chajja at main chamber area. Wall plastering at Main chamber area (internal and external) initiated. Contract terminated on 17.10.2013 Performance Guarantee invoked and encashed on 19.10.2013 Honble High Court of Karnataka issued a stay on the termination order dated 29.10.2013 (Hand received) Processing of extension of time case including compensation initiated Contractor has submitted 3 rd RAB for an amount of Rs. 18.0 lakh. Preparation of Statement of Objections for further filing in the Hon ble High Court for vacation of stay order. Consultation with Legal cell for filing objection statement with the arbitrator in response to the claims of the contractor. No Physical progress at site. Preparation of Statement of Objections for further filing in the Hon ble High Court for vacation of stay order. Consultation with Legal cell for filing objection statement with the arbitrator in response to the claims of the contractor. UPTO DATE Rs. 7549718.77/- Nil Contract Terminated Construction of Building for Establishment of Comprehensive EMI/EMC Test (Radiated Immunity & Radiated Emission) facility Sub Head: Civil Works 13

Earthwork excavation for all the footings have been completed. Laying of bed concrete PCC (1:4:8) for all the footings have been completed The works pertaining to foundation, viz. casting of RCC footings, has been completed. Total reinforcement steel required for the structure has been procured by the contractor. Additional column rods, as per the directions of the structural consultants have been provided in columns. Casting of pedestals and columns up to plinth level have been completed. Construction of Random Rubble Masonry beneath plinth beam has been completed. Filling of earth up to plinth level and consolidation with water has been completed in the portion between grids G1G8 H1H8. Casting of plinth beam including tying of reinforcement steel and centering works have been completed. CVO inspection of EMI-EMC works completed. Casting of columns three lifts up to first tie-beam level have been completed. Preparation of flooring base in the lab area where roof covering at 5 m level is there earth dressing and water consolidation. Receipt of clearance from M/s. Frankonia for chamber wall foundation (flooring) details submitted by structural consultants. Casting of PCC (1:4:8) for flooring base of lab area completed. Centering shuttering works for the tie-beam at 5m level completed. Reinforcement tying for tie-beam at 5m level completed (C portion). Concreting for tie-beam at 5m level completed (C portion). Centering shuttering works for the roof at 5m level completed. Fabrication and tying of reinforcement bars for the beams and slab at +5m level completed. Casting of lift roof columns Preparation of centering and shuttering for staircase. Concreting of staircase, tie-beam at +5m level, lift column tiebeams, and 50 % of approach slab for lift. Earth work excavation for retaining wall on North and Western side completed. PCC for retaining wall on North and Western side completed. RR Masonry for retaining wall on West side completed. Completion of RR Masonry wall on Northern side. Concreting of Plinth course on Retaining wall on Northern and Western side including tying of reinforcement and shuttering. Plastering of the plinth course on retaining wall on Northern and Western side Completion of RMC concreting of roof slab at +5m level at Laboratory portion. Completion of deshuttering of the roof portion at + 5m level at laboratory Area. Brick masonry works for parapet of lab portion Brick masonry up to lintel level in the lab portion Ceiling plastering two bays of lab portion. Centering, Shuttering, and DMC concreting for lintel and chajja in 14

Remarks lab portion of the building. Brick masonry above lintel level in the lab portion Construction of brick masonry up to first tie-level at main chamber area completed. Ceiling, including beam plastering at lab area. Column plastering in lab area completed. External plastering of walls in lab area in progress. Wall plastering at lab area (Internal). Parapet plastering at lab area. Casting of RCC lintel and chajja at main chamber area. Wall plastering at Main chamber area (internal and external) initiated. Contract terminated on 17.10.2013 Performance Guarantee invoked and encashed on 19.10.2013 Honble High Court of Karnataka issued a stay on the termination order dated 29.10.2013 (Hand received) Processing of extension of time case including compensation initiated Contractor has submitted 3 rd RAB for an amount of Rs. 18.0 lakh. Wall plastering at main chamber area(internal and external) initiated Contract terminated on 17.10.2013 Performance Guarantee invoked and encashed on 19.10.2013 Honble High Court of Karnataka issued a stay on the termination order dated 29.10.2013 (Hand received) Processing of extension of time case including compensation initiated Contractor has submitted 3rd RAB for an amount of Rs. 18.0 lakh. Rs. 75,49,718.77/- Rs.Nil Contract Terminated 15

Name of the Capital project for development of Wake Simulation Laboratory Facility at CPRI, Sadashivanagar, Bangalore - SH: Construction of Machine / Special Foundations Cost Rs. 58,95,719.00 Physical Handing over of the site to the contractor on 04.02.2013 Earthwork excavation for all the footings has been completed. Cement block pillars erected for all the footings Center line markings of all the footings completed. Reinforcement steel, sand and stone aggregate required for the structure has been procured by the contractor. PCC 1:4:8 for footings completed RCC footing size markings on PCC laid is completed Tying of reinforcement for CTF1 and CTF2 complete RMC laid for 1m depth of CTF1 and CTF2, curing complete Tying of reinforcement for North block and South block and 5 ton winch west side complete Laying of PCC 1:4:8 for the extra excavated portion of south block, shaker system, 10 ton winch and 5 ton winch east side complete Structural steel assembly of ISMB and ISMC for south block and North block brought to site and erected in position as per the required drawing details. Templates for CTF1 and CTF2 brought to site and placed in position RMC laid for 1m depth of North block, south block and 5 ton winch west side curing complete Rock cutting for bolt anchor foundation and portal footing west side up to the required level complete Tying of reinforcement for shaker system (bottom) complete. RMC laid for 0.45m depth of shaker system curing complete Templates and bolts for all the footings received at site Templates and bolts for shaker system, north block, south block placed in position PCC laid for projection portion of CTF1 Tying of top reinforcement for CTF1, CTF2 and shaker system complete Tying of bottom reinforcement for 10 ton winch, 5 ton winch east side complete Laying of RMC for 10 ton winch (0.45 m depth), 5 ton winch west side (1 m depth), 5 ton winch east side (0.45m depth), CTF1(1 m depth) and CTF2 (1 m depth) Templates and bolts for 10 ton winch, 5 ton winch east side, 5 ton winch west side and pin portion of CTF1 placed in position Excavation and stacking of the rock for the bolt anchor block footing and portal footing west side complete 16

Remarks Tying of top reinforcement for north block and south block RMC laid for shaker system (final stage), south block, CTF1 and CTF2 Tying of reinforcement for retaining wall of shaker system and 5 ton winch west side RMC laid for 10 ton winch(final stage), 5 ton winch east side (final stage), North block (2 nd stage), 5 ton winch west side (2 nd stage) RMC laid for 5 ton winch west side (final stage), retaining wall of shaker system, north block (final stage) Curing for the RMC laid Nil Rs. 40,73,864/- Rs. Nil 17

Name of the Cost Rs. 1,47,36,225/- Capital project for development of Wake simulation laboratory facility at CPRI Sadashivanagar, Bangalore SH: Civil works of lab building (South block) UPTO DATE Handing over of the site to the contractor on 15.04.2013 Earthwork excavation for 27 footings has been completed. Sand, 40mm aggregate, reinforcement procured by the contractor Cement block pillars erected for all the footings excavated Center line marking for the footings complete Laying of PCC (1:4:8) completed for all the footings excavated Column markings on the PCC laid complete Tying of reinforcement for the footings and columns in grid 3 and 5 complete RMC (M25) laid for footings along grid 3 and 5 DMC (M25) laid for pedestals of columns along grid 3 and 5 Earthwork excavation, laying of PCC 1: 4: 8 and RRM masonry for plinth beams RRM masonry for plinth beam in grid 3 and 5 complete. Rock cutting of rock encountered in seven footings completed. Plinth beam reinforcement tying in grid 3 and 5 complete Earthwork excavation of 11 footings in grid 8 complete PCC 1:4:8 for footings excavated in grid 8 completed Earthwork excavation for 3 remaining footings in grid 8 complete. PCC (1:4:8) for all the footings in grid 8 complete. Tying and placement of footing reinforcement for all the footings in grid 8 complete Tying and placement of column reinforcement for all the footings in grid 8 complete Tying and placement of column reinforcement for all staircase footings complete RMC for staircase footings complete RRM, pedestal and column starters for staircase footings complete. Earthwork excavation and PCC (1:4:8) for plinth beams in staircase region complete. DMC (M25) for plinth beam in grid Z3 to W3, grid Z5 to L5 and Cross beams between grid 3 and grid 5 laid. DMC (M25) for columns (6nos.) up to 2.55m laid. Filling of excavated earth in between grid 3and grid 5 complete. Flooring PCC (1:4:8) for three bays complete. Plinth beam concrete for staircase area complete. RMC (M25) for footings in grid 8 complete RRM, pedestal and column starters for footings in grid 8 18

complete Earthwork excavation and PCC (1:4:8) for plinth beams in grid 8 complete DMC for columns (8 nos.) up to 2.55m laid. DMC (M25) for plinth beam in grid W3 to L3 and respective cross beams complete. Centering and shuttering for beam at mezzanine floor level in progress Remarks PCC (1:4:8) for flooring in office area complete. Reinforcement bending and tying for plinth beam in grid 8 complete. DMC (M25) concrete for plinth beam in grid 8 complete. DMC (M25) concrete for columns (6no.s) in grid 8 for 2.55m level complete. RRM for block in staircase area laid. Reinforcement bending and tying for staircase first flight and mid landing complete. DMC (M25) concrete for staircase first flight and mid landing complete. Centering and shuttering for slab at 3m level complete. Tying of reinforcement for beam at mezzanine floor level in grid 3 and grid 5 from toilet to porch region complete. Tying of slab reinforcement from toilet to porch region complete. Construction of solid block wall in grid 8 up to sill level in progress. Earth filling in lab portion from z grid to porch portion complete. Earthwork excavation for cable trench in progress. UPTO DATE Rs. 19, 84, 953/- nil 19