Overview COSVR608. Operate plant, machinery, equipment or vehicles to prevent, reduce the impact of ice or snow

Similar documents
Overview COSVR777. Operate and control operations of road plant, machinery or equipment for planing or milling operations

COSVR389 SQA Unit Code HN4K 04 Operate plant or machinery to excavate

FY66 04 Operate Ancillary Equipment (Auger)

FY68 04 Operate Ancillary Equipment (Pecker/hammer)

COSVR391 SQA Unit Code HN0C 04 Operate plant or machinery to receive and transport loads

Overview COSVR776. Operate and control operations of road plant, machinery or equipment for laying high friction surfacing

FY52 04 Operate Plant or Machinery to lay and distribute (Asphalt paver)

COSVR761 SQA Unit Code HN0L 04 Operate plant or machinery to sweep, clean or clear

Overview COSVR774. Operate and control operations of road plant, machinery or equipment for laying slurry micro-surfacing

COSVR402 revised Nov 2013 Slinging and signalling the movement of suspended loads

COSVR400 Operate powered units, tools or pedestrian plant, machinery or equipment

FY4N 04 Operate Plant or Machinery to Receive and Transport Loads (Dump Truck - rigid chasis all sizes wheeled)

FY5P 04 Operate Road Rail Plant (Road Rail - rough terrain forklift truck)

COSVR71 SQA Unit Code HL77 04 Install mechanically fixed plasterboard

V COSVR??? Dynamic load and integrity testing of piles

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled)

Overview. COSVR772 Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials 1

Overview. COSVR772 Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials

Overview. COSVR772 Operate and control operations of road plant, machinery or equipment for laying flexible and semi-flexible paving materials 1

Overview COSVR773. Operate and control operations of road plant, machinery or equipment for laying rigid paving

Overview. COSVR204 - SQA Unit Code HP7M 04. Contribute to stone cladding lifting procedures

COSVR773 SQA Unit Code HM69 04 Operate and control operations of road plant, machinery or equipment for laying rigid paving

Overview COSVR678. Service and maintain or commission door, gate or shutter systems

FY36 04 Operate Plant or Machinery to Lift and Transfer Loads (Lorry loader)

COSVR166 (SQA Unit Code - FW1E 04) Cut and bend reinforcement steel to shape

FY38 04 Operate Plant or Machinery to Lift and Transfer Loads (Mobile crane blocked duties)

COSVR257 HL4M 04 Commission lightning conductor installation systems

COSVR676 SQA Unit Code HM1L 04 Install door systems

COSVR322 (SQA Unit Code - H0HR 04) Apply insulation and finishes to cylindrical and flat surfaces

FY30 04 Operate Plant or Machinery to Lift and Transfer Loads (Hoist rack and pinion goods)

COSVR402 SQA Unit Code HE3C 04 Slinging and signalling the movement of suspended loads

National Occupational Standards Development Pack for Plant Operations (Construction)

COSVR339 - SQA Unit Code F Apply coatings by the airless spray method

Overview COSVR130. Install plasterboard linings

COSVR767 SQA Unit Code HG63 04 Prepare and mix earth plasters and earth renders

COSVR358 SQA Unit Code HM34 04 Install fire resisting timber door assemblies and doorsets

Overview COSVR681. Install external blinds, screens or solar shading systems

Overview COSVR182. Erect precast concrete structural units

COSVR375 SQA Unit Code HL5P 04 Lay flexible pavement materials

Overview COSVR272. Install underlay, battens and roofing components. Install underlay, battens and roofing components

COSVR274 SQA Unit Code HM24 04 Install single-lap roof tiles to a variable gauge

COSVR188 SQA Unit Code HP85 04 Produce standard stonemasonry components

COSVR324 (SQA Unit Code - H0HT 04) Fit sheet metal insulation protection

Overview COSVR367. Lay modular pavement

COSVR143 SQA Unit Code HN48 04 Produce tiled, mosaic and stone surface finishes

COSVR221 - SQA Unit Code HM0W 04 Form drill holes or core in the structural fabric

COSVR221 (SQA Unit Code - H1P5 04) Form drill holes or core in the structural fabric

COSVR157 - SQA Unit Code H1P0 04 Demolish/dismantle timber-framed structures

COSVR660 - SQA Unit Code H4HL 04 Service plant or machinery

COSVR130 Install plasterboard linings

COSVR141 Prepare backgrounds for tiling

COSVR670 - SQA Unit Code H4HC 04 Determine and complete service to maintain plant or machinery

COSVR374 - SQA Unit Code DY9N 04 Reinstate excavation and highway surfaces

COSVR289 Erect timber walls and floors

COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR618 - SQA Unit Code FW1L 04 Finish dry lining walls or ceilings

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

COSVR248 HL4T 04 Erect and dismantle mobile and static scaffold towers

COSVR329 - SQA Unit Code H0XR 04 Produce decorative metal roofing and weathering details

COSVR09 Install first fixing components

COSVR448 - SQA Unit Code H1RK 04 Install external wall insulation

COSVR67 - SQA Unit Code DY92 04 Produce external solid render finishes

COSVR639 SQA Unit HL87 04 Install drainage

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR296 Install supplementary steel frame finishings

COSVR785 Install metal decking and edge trims

COSVR242 (SQA Unit Code - H1PF 04) Install insulated cladding walls

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes

COSVR133 - SQA Unit Code DY1W 04 Install raised access flooring systems

COSVR278 SQA Unit Code HN36 04 Install natural roof slate to mitred and vertical roof details

COSVR277 Install double-lap artificial roof slates

National Occupational Standards for Piling Operations

SKSVR249 [Erect and Dismantle Basic Cantilever Scaffolds]

COSVR509 - SQA Unit Code FW18 04 Fabricate and maintain timber and proprietary formwork systems

COSVR557 SQA Unit Code HG61 04 Conserve, restore or repair solid plaster or render surfaces

COSVR272 - SQA Unit Code DY1C 04 Install roofing backgrounds and components

Controlling, directing and guiding the operation of plant or machinery in the workplace L/615/2120

COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates

COSVR256 HL53 04 Install lightning conductor systems

COSVR254 - SQA Unit Code DY0A 04 Erect and remove specialist access equipment

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems

COSVRGS Draft Install products, equipment or machinery in or for new or refurbished buildings.

COSVR628 SQA Unit Code HM3J 04 Set up and use transportable cutting and shaping machines

COSVR284 - SQA Unit Code DY0E 04 Install double-lap concrete roof slates

COSVR10 - SQA Unit Code F Install second fixing components

COSVR280 - SQA Unit Code F Strip and reclaim pitched roof coverings

SKSVR254 [Erect and remove specialist access equipment]

COSVR252 HL56 04 Utilise provision of fall protection systems

COSVR96 - SQA Unit Code DY2G 04 Install roof sheeting and cladding rainwater goods

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance

COSVR276 Install regular sized natural roof slate to standard roof details

COSVR546 SQA Unit Code HG66 04 Working on conservation and restoration projects

COSVR95 - SQA Unit Code DY2K 04 Install roof sheeting and cladding systems

Contributing to the piling operation in the workplace

COSVR654(SQA Unit Code-H4X9 04) Fabricate joints in thermal insulation protection using sheet metal

Preparing Areas for Concrete Flooring in the Workplace Unit Level 2. CITB Unit 316 v2

Transcription:

Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible working practices, selecting and using materials, components and equipment, setting up, operating and shutting down plant, machinery, equipment or vehicles for preventing, clearing or reducing the impact of ice or snow This standard is for people working independently or as part of a team to operate plant, machinery, equipment or vehicles that reasonably prevents, clears or reduces the impact of ice or snow, it can be used by operatives, supervisors and managers clear or 1

Performance criteria You must be able to: P1 interpret the given operating information relating to the use of plant or machinery, equipment or vehicle and confirm its relevance P2 organise with others the sequence in which the work is to be carried out P3 comply with the relevant, current legislation, special legal status documents, official guidance and organisational procedures to maintain safe and healthy work practices P4 request resources to sustain plant or machinery, equipment or vehicle operations to complete the programme of work P5 select plant, machinery, equipment or vehicle resources for the methods of work and operations to be carried out P6 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P7 comply with the given contract information to carry out the work efficiently to the required specification P8 complete the work within the allocated time, in accordance with the programme of work clear or 2

Knowledge and understanding You need to know and understand: Performance Criteria 1 Interpretation of information K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented K2 the types of information, their source and how they are interpreted K3 the organisational procedures to solve problems with the information and why it is important they are followed Performance Criteria 2 Organise with others K4 communication of ideas between team members K5 organisation of resources in conjunction with the progress of work K6 the skills required to carry out the work Performance Criteria 3 Safe work practices K7 the level of understanding operatives must have of information for relevant, current legislation, Approved Codes of Practice and official guidance and how it is applied K8 how emergencies should be responded to and who should respond K9 the organisational security procedures for plant, machinery, equipment and vehicles, tools and personal belongings K10 what the accident reporting procedures are and who is responsible for making the report K11 why, when and how health and safety control equipment should be used K12 how to comply with environmentally responsible working practices to meet the requirements of current legislation and official guidance clear or 3

Performance Criteria 4 Request resources K13 the organisational procedures for requisitioning consumables and other resources Performance Criteria 5 Selection of resources K14 the characteristics, quality, uses, sustainability, limitations and defects associated with plant, machinery, equipment and vehicle resources and how defects should be rectified K15 how the resources should be used and how any problems associated with the resources are reported K16 the organisational procedures to select resources, why they have been developed and how they are used K17 the hazards associated with the resources and methods of work and how they are overcome Performance Criteria 6 Minimise the risk of damage K18 how to protect work from damage and the purpose of protection K19 why disposal of waste should be carried out safely and how it is achieved Performance Criteria 7 Meet the contract specification K20 how methods of work, to meet the specification, are carried out and problems reported K21 how maintenance of plant, machinery, towed equipment, vehicles, tools and equipment is carried out clear or 4

Performance Criteria 8 Allocated time K22 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept clear or 5

Scope/range Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments, weather forecasts, maps, navigation aids and manufacturers' information related to the plant, machinery, towed equipment, equipment or vehicle operations and the work to be carried out Performance Criteria 2 2 organisation of own work 3 communication with team members and other associated occupations about the plant, machinery, towed equipment, equipment or vehicle operation and the work to be carried out Performance Criteria 3 4 avoidance of risk by complying with the given safety information relating to at least six of the following 4.1 methods of work 4.2 safe use of health and safety control equipment 4.3 current training, competence and authority 4.4 safe use and storage of plant, machinery, towed equipment or vehicles 4.5 safe use and storage of tools and equipment 4.6 safe use of access equipment 4.7 dealing with customers (pedestrians and road users) 4.8 specific risks to health Performance Criteria 4 5 follow organisational procedures for the requisition of consumables, materials and other resources clear or 6

Performance Criteria 5 6 selection of resources associated with own work 6.1 tools and ancillary equipment Performance Criteria 6 7 protection of the work and its surrounding area from damage 8 maintain a clean work space 9 disposal of waste in accordance with current legislation Performance Criteria 7 10 demonstration of work skills to measure, check, align, adjust, set, clear, and record 11 use and maintain hand tools and ancillary equipment 12 operate pedestrian controlled equipment plus at least one of the following winter service plant, machinery, equipment or vehicles to reasonably prevent, clear or to given working instructions 12.1 up to 3500kg 12.2 from 3500kg to 7500kg (medium LGV) 12.3 over 7500kg (HGV) 12.4 snowplough up to 3500kg 12.5 snowplough up to 7500kg 12.6 snowplough over 7500kg 12.7 snowblower dedicated 12.8 snowblower demountable 12.9 pedestrian controlled mechanised equipment 12.10 towed equipment 12.11 specialist equipment (ice breaker, melter) 13 reasonably prevent, clear or for at least one of the following 13.1 dual carriageway roads 13.2 single carriageway roads 13.3 cycle ways clear or 7

13.4 footways and/or footpaths 13.5 off highway areas (car parks, vehicle yards, airports, platforms, stadiums, loading bays or quaysides) 14 operate plant, machinery, towed equipment, vehicles or equipment to reasonably prevent, clear or to given working instructions by at least one of the following methods 14.1 spreading 14.2 spraying 14.3 ploughing 14.4 blowing 14.5 clearing 15 record and report activities and progress 16 shut down and secure plant, machinery, towed equipment, vehicles or equipment Performance Criteria 8 17 completion of own work within the estimated, allocated time to meet the needs of other occupations and client clear or 8

Scope/range related to knowledge and understanding Communication 1 discussions, sketches, electronic data and briefings Disposal of waste 2 environmental responsibilities, organisational procedures, manufacturers' information, statutory regulations and official guidance Emergencies 3 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 3.1 fires, spillages, injuries 3.2 emergencies relating to occupational activities 3.3 hypothermia and cold weather related injuries (causes, symptoms and treatment) Hazards 4 those identified by method of work, risk and COSHH assessments, manufacturers' technical information, statutory regulations and official guidance Health and safety control equipment 5 identified by the principles of prevention for occupational use, types and purpose of each type, work situations and general work environment 5.1 collective protective measures 5.2 local exhaust ventilation (LEV) 5.3 personal protective equipment (PPE) clear or 9

Information 6 drawings, specifications, schedules, method statements, risk assessments, weather forecasts, maps, navigation aids, manufacturers' information and current regulations governing the operation of plant, machinery, equipment and vehicles Legislation, Approved Codes of Practice and official guidance 7 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment, working alone and mobile work whilst working in the workplace, in confined spaces, at height, with tools and equipment, with materials and substances, with movement and storage of materials, by manual handling and mechanical lifting Maintenance 8 operative care of plant, machinery, towed equipment or vehicles, hand tools, ancillary equipment and accessories Methods of work 9 application of knowledge for safe and healthy work practices, procedures and skills relating to the method and area of work and materials used to 9.1 identify the characteristics of the winter service plant, machinery, equipment and vehicles and attachments for preventing, clearing and reducing the impact of ice and snow 9.2 complete pre-start, running and post stop checks 9.3 identify valid certification for maintenance and inspection 9.4 prepare, set up and adjust for operational requirements, safety and security 9.5 carry out function checks for spreading, spraying, ploughing, blowing and clearing 9.6 confirm routes and locations requiring priority treatment 9.7 identify the suitability of de-icing and anti-icing materials clear or 10

9.8 recognise the criteria for storing de-icing and anti-icing materials 9.9 recognise the eutectic point and its effect on treatment materials 9.10 identify the environmental impact that can be caused by winter service operations, salt and de-icing and anti-icing materials 9.11 check calibration of de-icing and anti-icing equipment, sprayers and spreaders 9.12 identify spread rates for treatment, spraying and clearing patterns 9.13 clear and treat dual carriageway roads, single carriageway roads, cycle ways, footways and footpaths (including tunnels and portals), off highway areas (e.g. car parks, vehicle yards, airports, platforms, stadiums, loading bays and quaysides), tramways, level crossings, segregated areas, running surfaces, drainage channels, culverts, gullies and offlets 9.14 avoid damage to structures, infrastructure (e.g. highway features, railway crossings and temporary works), utilities service apparatus, vehicles, cycles, people and animals 9.15 adjust operations for varying weather conditions, surfaces, local requirements and constraints 9.16 work in public areas 9.17 load and replenish spread materials and return unused materials 9.18 recognise and determine when specialist skills and knowledge are required and report accordingly 9.19 record and report activities, progress and achievements 9.20 clean, clear and lubricate equipment after operations 9.21 monitor wear and tear on equipment 9.22 deal with blockages 9.23 deal with plant, machinery, equipment and vehicle breakdowns 9.24 deal with communication equipment failures 9.25 use access equipment (including; gantries, platforms and vehicle ladders) 9.26 shut down and secure plant, machinery, equipment and vehicles 9.27 use hand tools, ancillary equipment and accessories 10 team work and communication 11 needs of other occupations associated with operating plant, machinery, equipment and vehicles used to prevent, clear and reasonably clear or 11

Problems 12 those arising from information, resources and methods of work 12.1 own authority to rectify 12.2 organisational reporting procedures Programme 13 types of progress, timetables and estimated times 14 organisational procedures for reporting circumstances which will affect the work programme Protect work 15 protect work against damage from general workplace activities, other occupations and adverse weather conditions Resources 16 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and specialist 16.1 consumables 16.2 de-icing and anti-icing materials 16.3 attachments, ancillaries and aids for spreading, spraying, ploughing, blowing and clearing 16.4 route planning and navigation aids 16.5 monitoring, measuring and recording equipment 16.6 hand tools, ancillary equipment and accessories 17 identify weight, bearing, pressure, quantity, volume, length and area associated with the method and procedure to operate plant, machinery, equipment and vehicles used to prevent, clear or reduce the impact of ice or snow Security procedures 18 site, workplace, company and operative clear or 12

Skills 19 own occupation and occupations related to the work clear or 13

Glossary Abrasive, grit Natural or artificial materials (e.g. gravel, cinders or sand) used to increase the adhesion of a slippery surface. Anti-caking agent Component added to spreading material to prevent coagulation. Barn Structure built to cover the stored de-icing salt to protect from the effects of the weather. Bin Receptacle for the storage of small quantities of spreading material, on steep inclines. Brine Aqueous chloride solution, usually sodium, but can be calcium, magnesium or potassium. Brine production facility System for the production of water based de-icing solutions. BS3247 The British Standard for De-icing salt. De-icing, anti-icing agent Granular material or solution used to lower the freezing point in order to remove ice or prevent it from forming. Depression of freezing point temperature The lowering of the freezing point of a liquid by the addition of a solute. This is a fixed property of a given combination of liquid and solid and is the mode of action of de-icing agents. Eutectic point Temperature below which salt will not melt ice (-21 C). Grit Natural mineral spreading medium consisting of particles of stone. Gritter Vehicle with conveyor or auger conveyor for spreading salt onto the road surface. Gritting/Spreading agent Agent used to increase adhesion between tyres and the road surface, so preventing skidding. Marine salt, sea salt Sodium chloride from solar evaporation of sea water. It contains associated impurities such as calcium sulphate and magnesium chloride. Mechanical shovel bucket loader Wheel loader for loading a spreader with spreading materials (Loading Shovel). Open stockpile Open storage on a thick base for groundwater protection. Precautionary treatment Treating road surfaces with salt, prior to an expected snow or ice event. Pre-wetted salt Salt which is wetted prior to spreading, usually using sodium chloride or calcium chloride brine solution. This improves adherence to the road, and may encourage rapid thawing action, especially in dry air conditions. clear or 14

Residual salt Salt on the road surface. Rock salt, halite Sodium chloride mined from natural salt beds. May contain impurities such as calcium sulphate and silicates. Salt saturator Specially designed vessel for continuous production of saturated sodium chloride brine. Sand Natural mineral spreading medium (also 'crushed' sand). Silo Raised storage vessel which allows direct filling of spreading vehicles. Spreading material Material spread in order to counter slippery conditions (sand, salt, grit, granulates, brine). Tank storage Reservoir for the storage of liquid de-icers. Thaw time The time taken for the ice or snow to melt after treatment. Thawing component Portion of spreading medium responsible for thawing. Vacuum salt Pure sodium chloride prepared by the evaporation of brine under vacuum conditions. The brine is usually extracted by controlled solution mining of rock salt beds, but may be naturally occurring clear or 15

Developed by Construction Skills Version Number 2 Date Approved April 2015 Indicative Review Date Validity Status Originating Organisation Original URN Relevant Occupations Suite Keywords April 2020 Current Original ConstructionSkills Road Construction Operatives Winter Service Winter maintenance; Winter service operations; Snow clearance; Snow ploughing; Gritting; Salting clear or 16