REQUEST FOR PROPOSALS

Similar documents
FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT

QUALITY REQUIREMENTS

FACILITIES MANAGEMENT

Student Services & Classroom Addition

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION QUALITY REQUIREMENTS

INSPECTION REQUIREMENT ACKNOWLEDGEMENTS. Job Site Address:

Fair Oaks Water District

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

SECTION CONTRACTOR QUALITY CONTROL

Special Inspections Instructions

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

APPENDIX D CONSTRUCTION PHASE CRITERIA

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services

SECTION QUALITY CONTROL

PROCEDURE SPECIAL INSPECTIONS PROGRAM OP PURPOSE: POLICY: SCOPE: Michael Fink. Deputy Commissioner

Earthworks QA/QC Plan Sample

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)

Chapter 3 Other Stakeholders Duties

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Special Inspections Program Procedures - IBC Section 1704 Special Inspections - Index:

Facilities Planning and Construction (FP&C)

Excavation QA/QC Manual Sample

REQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM

MARYLAND STADIUM AUTHORITY

Request for Proposal for Annual Financial Audit Services

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

TDOT PROPOSED SCOPE OF WORK CEI

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES

Fire Protection Contractor QA/QC Plan Sample

The deadline for submittal of proposals is 4:00 PM, Pacific Time, January 8, 2014.

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

Construction Management Plan

SPECIAL INSPECTION & TESTING AGREEMENT CITY OF NORTON SHORES BUILDING DEPARTMENT Michigan Building Code 2015

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

150/ G Versus 150/ H Contractor Quality Control Program

301 Walnut Street Windsor, Colorado phone fax

P-196 MARINE CORPS RESERVE VEHICLE MAINTENANCE FACILITY NWS CHARLESTON, SC SECTION DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

REQUEST FOR PROPOSAL COMMISSIONING AGENT SERVICES GARRISON ELEMENTARY SCHOOL RENOVATIONS PHASE I

SECTION CONTRACTOR QUALITY CONTROL

DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO. January 2, 2018 ADDENDUM NO. 1 FOR

Scope of Work Bid Package C-8 - West Overhead Doors

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

MARYLAND STADIUM AUTHORITY

WYOMING DEPARTMENT OF TRANSPORTATION. SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE

SECTION QUALITY REQUIREMENTS

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

DATE : November 9, 2010 September 18, 2002 (Updated 01/01/08 for code references.) TITLE : Special Inspection and Structural Observation Procedures

STANTEC ARCHITECTURE ARCHITECTS PLANNERS ENGINEERS 3001 Bee Caves Road Suite 300 Austin, TX April 29, 2016

Appendix A - Technical Specifications

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

Request for Proposal W

SCDOT QUALIFIED PRODUCTS POLICY 2

Appendix 1 SCDOT Aggregate QC/QA Policy

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

TERM CONTRACT FOR PROFESSIONAL MATERIALS TESTING and INSPECTION SERVICES CHAPTER TWO PROFESSIONAL S REQUIRED SERVICES

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

Technical Services Division 1660 Mission Street San Francisco CA Office (415) FAX (415)

REGULATION REGARDING EQUIPMENT PROCUREMENT PROCESS AND APPROVAL OF MANUFACTURERS FOR NUCLEAR FACILITIES

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Multi-Institutional Academic Health Science & Research Center Evansville, IN

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

Communications Contractor QA/QC Plan Sample

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

I. Development, Submittal, and Acceptance of a Quality Management System

SPECIAL INSPECTION AND TESTING AGREEMENT

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

Review of FMMIS and DSS Assessment Project Procurement Divisions of Operations and Medicaid

Science Technology Engineering and Mathematics (STEM) Initiative

REQUEST FOR QUALIFICATIONS

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION REQUEST FOR PROPOSAL ASBESTOS AIR MONITORING SERVICES

REQUEST FOR PROPOSALS AUDIT

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

SITE-UTILITY SYSTEMS

Transcription:

REQUEST FOR PROPOSALS College of Pharmacy Building Construct Deep Foundations Special Inspections and Testing Services University of Iowa Project #0329505 Addendum #1 Issued: Thursday, October 06, 2016 Item #1: We are extending the proposal deadline. 7.0 Proposal Evaluation and Award C. Respondents proposals will be due no later than 12:00 (Noon) on Tuesday, October 11, 2016 (was October 6, 2016). End of Addendum #1

FACILITIES MANAGEMENT Design & Construction September 28, 2016 Re: Request for Proposals- Special Inspections and Testing Services 0329505 College of Pharmacy Building Construction Deep Foundations University of Iowa The University of Iowa, located in Iowa City, Iowa, seeks a qualified Company to provide Special Inspections and Testing Professional Services in accordance with Special Inspection in IBC Chapter 17 and other Owner required testing for the above project. Qualified Special Inspections and Testing Agencies (Consultant) are invited to submit a lump sum not to exceed proposal based on the scope of services described below. 1.0 Background This is a separate/early bid package to construct deep foundations and utilities for the Pharmacy Building - Construct New Facility project. Abbreviations for building names used throughout this document: CoP College of Pharmacy (after completion of project scope) PHAR Pharmacy Building (existing) UIHC University of Iowa Healthcare 2.0 Scope of Work A. Provide services to perform Special Inspections and Testing Professional Services in accordance with IBC Chapter 17 - Special Inspection and as listed in the Contract Documents. This includes, but is not limited to Specification Section(s): 03 20 01 Concrete Reinforcing for Piers 03 30 01 Cast-In-Place Concrete for Drilled Piers 31 22 13 Earthwork and Rough Grading 31 23 16.13 Trench Excavation and Backfill 31 23 16.16 Structural Excavation for Minor Structures 31 23 16.29 Overexcavation and backfill for Unsuitable Pipe Bedding Material 31 63 29 Drilled Concrete Piers B. For intent of this submittal, it is estimated that work under this project will be performed six (6) days per week, Monday through Saturday. C. Attendance at one (1) pre-installation meeting will be required for the drilled concrete piers. D. Attendance at bi-weekly progress meetings and a monthly deficiency meeting will be upon request especially during times of high frequency testing. 200 University Services Building Iowa City, IA 52242 319-335-5500 Fax 319-335-2722 http://www.facilities.uiowa.edu/

Page 2 E. Coordination of services with the General Contractor so as to not impede the construction schedule. F. Any deficiencies noted during testing and inspections shall be verbally reported to the General Contractor s appointed responsible person before the field technician leaves the site. If uncorrected after a reasonable period of time, to attention of the Owner and Design Professional. G. Parking onsite for one (1) vehicle may be allowed by the General Contractor. This is to be coordinated with the GC. All other parking is at an off-site location and is to be provided by this Consultant. H. Notify Owner of any anticipated additional services before proceeding with the work or at the time it occurs if it is not foreseeable. In order for testing professional to be compensated for additional services, work must be identified as added scope, retest or delay with proper notification and timely costs prepared. Delays, such as wait times for pours, etc. will not be compensated if technician has other activities to perform or the inspection is to be full time. I. CONFLICTING REQUIREMENTS 1. If compliance with two or more standards is specified and standards establish different of conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement; refer uncertainties and requirements that are different, but apparently equal, to Owner s Representative for a decision before proceeding. 2. Minimum quantity or quality levels: Quantity or quality level shown or specified shall be minimum provided or performed; actual installation may comply exactly with minimum quantity or quality specified or it may exceed minimum or maximum, as appropriate, for context of requirements. J. The Consultant shall use Submittal Exchange to access submittals for this project. K. The University will provide an on-line, secure project communications web site which for use by the Owner s Representative, Design Professional and Contractor as the major method of communicating and storing contract change document information. This web site will be used to communicate request for information (RFI), and instructions to contractor (ITC). L. Additional services to provided are: 1. Consultant shall determine if objects encountered during drilled concrete piers are obstructions in accordance with Specification Section 31 63 29. Obstructions to be clearly noted on report, documenting loss of production time. 2. Consultant shall verify bearing capacity at each pier. The Consultant shall determine if bearing stratum reached is acceptable or not in accordance with Specification Section 31 63 29. Consultant to document final elevation on its reports. 3. Clarification to Specification Section 31 63 29 Drilled Concrete Piers paragraph 1.6B.3 Assume 26 piers are to be rock cored. M. Work not included: 1. Drilled piers marked as future work. 2. Drilled dowels marked as future work.

Page 3 3.0 Schedule Compliance with the Bid Documents dated August 29, 2016 prepared by OPN Architects, Inc. If there any discrepancies bid the most stringent and notify the Owner s Representative. To review the current documents, please send an e-mail request to: facilities-dcs@uiowa.edu The e-mail must include the subject line: 0392505 CoP Construct Deep Foundations. The project has bid and award has been made to Peterson Contractors, Inc. The General Contractor is not allowed to mobilize until October 25, 2016. The Substantial Completion date for this project is March 10, 2017. 4.0 Deliverables A. DOCUMENTATION Submit reports to the Owner, Design Professional, Building Official, and General Contractor. 1. Detailed daily field logs will be turned in within 24 hours specifically noting, in detail, the work that occurred for that day. 2. Provide electronic copy of written reports within 48 hours of inspection or test. All test reports shall be uploaded to Submittal Exchange at a minimum of once a week. 3. A deviation log will be maintained and updated weekly to allow for tracking of open deficiency items. 4. A final report of inspections will be required. B. ADDITIONAL REPORTS: 1. none 5.0 Statement of Qualifications A. It is the Owner s intent that the Consultant designated as the Special Inspections and Testing Professional, and the key staff members, exhibit the following: 1. LABORATORY - The independent testing laboratory shall: a. Meet Recommended Requirements for Independent Laboratory Qualifications, published by American Council of Independent Laboratories; b. Meet basic requirements of ASTM E329 Standards of Recommended Practices for Inspection and Testing Agencies. c. Authorized to operate in the State of Iowa. d. Testing Equipment: Calibrated in accordance with National Institute of Standards and Technology (NIST). 2. SENIOR ENGINEER - The senior engineer shall be a registered professional engineer and have at least 10 years of related experience and have the authority to commit the firm to the conditions and requirements of this project.

Page 4 3. FIELD TECHNICIAN(s)/ SPECIAL INSPECTOR(s) Experienced person who is educated and qualified in conducting, supervising, and evaluating tests and/or inspections. a. Where tests or inspections are required to be performed by a certified individual, the field technician/ special inspector shall have the required certifications. b. Where tests or inspections are required to be performed by a licensed engineer, the field technician/ special inspector shall be a licensed engineer or shall be under direct supervision of a licensed engineer experienced with type of work requiring special testing and inspection. c. Are able to read and understand project plans and specifications. d. Understand the requirements and testing standards of Special Inspections in IBC Chapter 17. e. Test or inspect Work specified for conformance with approved design Drawings, Specifications, and applicable material and workmanship provision on code. f. Limits of authority: (1) Special inspector/ field technician may not waive or alter Contract requirements or approve or accept any portion of Work unless specifically authorized by Owner or Design Professional. (2) Special inspector/ field technician may not assume any duties of the Contractor and has no authority to reject or stop work. 6.0 Proposal Requirements Include the following: 1. List the individual who will be the Senior Engineer and Project Manager. 2. Provide an organization chart indicating proposed project team. 3. Provide resumes for key staff members. 4. Briefly describe relevant experience of the proposed team in the following areas. List each person s direct involvement in: a. Similar Projects. b. Special Inspections and Testing 5. Describe proposed approach to managing the budget for this project. 6. Limit submittal to eight (8) pages. Total page count includes Letter of Proposal, resumes, and all supporting materials. After selection, the successful firm shall provide a written proposal on the University of Iowa Letter of Proposal form found on the University s Facilities Management/Consultants web site. Note that hard copies of the agreement will not be required with the RFP. http://www.facilities.uiowa.edu/pdc/consultants/agreement-form.html

Page 5 7.0 Proposal Evaluation and Award A. The Owner will consider and evaluate the following proposal components: 1. Consultant experience and qualifications. 2. Project Manager and Sr Engineer qualifications and accreditations. 3. Key support personnel experience and qualifications. 4. Project approach. 5. Consultant location. 6. Proposal quality. 7. Proposed lump sum not to exceed fee. B. The Owner reserves the right to negotiate and accept any proposal, or to reject all proposals, and to offer to accept any proposal subject to the deletion of any item or group of items of work from the scope of work C. The Consultant shall be prepared to attend an interview as part of the evaluation process. The Consultant shall bear all costs associated with preparing the RFP and subsequent interviews. Respondents' proposals are due no later than 12:00 pm (Noon) on October 6, 2016. Submit electronically to: Kirsta-scranton@uiowa.edu and facilities-dcs@uiowa.edu Should you have any questions or comments, please contact: Kirsta Scranton Construction Project Manager University of Iowa FM - Design & Construction 200 University Services Building Iowa City, Iowa 52242-1922 Kirsta-scranton@uiowa.edu