July Bill No.1: Preliminaries

Similar documents
Bill No.1: Preliminaries

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

SECTION MEASUREMENT AND PAYMENT

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION EXCAVATION AND FILL

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

DRAFT. Draft Bill of Quantities. Drainage

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAIN

PERMANENT PAVEMENT REPAIR NO SCALE

SECTION 303 CULVERTS

SECTION STORM DRAINAGE

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER UNITED NATIONS DEVELOPMENT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

Bill of Quantity (BOQ)

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

SECTION D2 MANHOLES AND CATCH BASINS GENERAL MATERIALS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

Special Provision No. 421S01 November 2006

TECHNICAL SPECIFICATION

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Bill of Quantity (BOQ)

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

Special Provision No. 421F01 April 2006

***************************************************************************************************************

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

SECTION FACILITY SANITARY SEWERS

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

Special Provisions for Pavement Open Cuts

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

Section 403. DRAINAGE STRUCTURES

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

This type of masonry shall consist of brick laid in full beds of cement mortar.

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

Description Unit Quantity Rate Kshs. Amount Kshs.

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM...

***************************************************************************************************************

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

A. BILL OF QUANTITIES FOR SANITARY SEWER

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

SANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding

ITEM 706 PIPE SLOPE DRAIN

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 6664 Level (3) Communications System

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

SPECIAL SPECIFICATION 6658 Time Warner Communications System

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

Cleaning and Rehabilitation of Storm Water and Waste Water Drainages Projects in Maachouk, Sour. Specifications

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

Construction Specification for General Excavation

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

SECTION MEASUREMENT AND PAYMENT

Estimate FOR THE SEPTIC TANK

SECTION TRENCHING & BACKFILLING

CITY OF FARGO SPECIFICATIONS REMOVALS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CITY OF FARGO SPECIFICATIONS REMOVALS

CHAPTER 6. Sanitary Sewer

Transcription:

Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier, fax machine, as described in the specifications, equipment, supplies, maintenance of traffic, temporary works, etc, which are required for the completion of the works as per the specifications. This item includes also all obligations, and liabilities conferred on the contractor by the bidding documents, and all tests required for the completion of the work. L.S 1 Unit Price Total of Bill (1) Preliminaries carried to main summary - Engineering Unit 1 of 12

Bill No.2: Supplying and Installation 2 Supplying, transporting and installing the following pipes, manholes and fittings, where no mix of pipes and fittings makes should be allowed, and all such supplies should have recent manufacturing dates: Unit Price Supplying, transporting and unloading in the specified stores of the contractor the following pipes, manholes and fittings, all to be new and not used before or renewed. 2.1 Supply, install and test DN 16" upvc ( marked with quality approved tag). Supplies have to match PWA Specifications. Each Pipe has to be 3m long plus coupler from one side with its own rubber, thickness of each pipe is not less than ( 11.5 mm) and including 120cm length nipple pipes with its coupler from one side at the beginning and end of the sewer line.(this item will be measured from the outside face of the manhole to the outside face of the other manhole).inspection by mirror and hydrostatic test have to be done for sewer lines according to the General Technical Specifications for Sewerage Systems section 4.12 and as direction of the Engineer. L.M 214 2.2 Supply, install and test DN 12" upvc ( marked with quality approved tag). Supplies have to match PWA Specifications. Each Pipe has to be 3m long plus coupler from one side with its own rubber, thickness of each pipe is not less than (9.2mm) and including 120cm length nipple pipes with its coupler from one side at the beginning and end of the sewer line.(this item will be measured from the outside face of the manhole to the outside face of the other manhole).inspection by mirror and hydrostatic test have to be done for sewer lines according to the General Technical Specifications for Sewerage Systems section 4.12 and as direction of the Engineer. L.M 2200 2.3 Supply, install and test DN 10" upvc ( marked with quality approved tag). Supplies have to match PWA Specifications. Each Pipe has to be 3m long plus coupler from one side with its own rubber, thickness of each pipe is not less than (7.3mm) and including 120cm length nipple pipes with its coupler from one side at the beginning and end of the sewer line.(this item will be measured from the outside face of the manhole to the outside face of the other manhole).inspection by mirror and hydrostatic test have to be done for sewer lines according to the General Technical Specifications for Sewerage Systems section 4.12 and direction of the Engineer. L.M 1450 Engineering Unit 2 of 12

Bill No.2: Supplying and Installation 2.4 Supply, install and test DN 8" upvc ( marked with quality approved tag). Supplies have to match PWA Specifications. Each Pipe has to be 3m long plus coupler from one side with its own rubber, thickness of each pipe is not less than (5.9mm)and including 120cm length nipple pipes with its coupler from one side at the beginning and end of the sewer line.(this item will be measured from the outside face of the manhole to the outside face of the other manhole).inspection by mirror and hydrostatic test have to be done for sewer lines according to the General Technical Specifications for Sewerage Systems section 4.12 and direction of the Engineer. L.M 11000 Unit Price 2.5 Supply and install of 100cm inside diameter precast reinforced concrete manhole: class A section, painted with two coats of Latex Bituminous Emulsion from outside and Epoxy TAR from inside, completed with fittings, heavy duty cover with capacity of 25 tons and frame, heavy duty step irons, benching, leveling concrete, concrete connection head between manhole and sewer pipe, reinforced concrete joint around manhole steel cover, rubber gaskets, accessories and including Excavation, damp proofing, backfilling (3/8" class A gravel) and reinstatement, all according to the GTS for Sewerage Systems section 3.9, Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 5 in the Planning and Design Guidelines, and all needed as shown in Drawings and satisfaction of the Engineer. This item for the following Invert Level Depth: a) invert depth d<=1.55m No. 375 b) invert depth 1.55m<d<=2.00m No. 80 c) invert depth 2.0<d<=2.5m No. 55 2.6 Supply and install of 125cm inside diameter reinforced precast concrete class A sections, painted with two coats of Latex Bituminous Emulsion from outside and epoxy TAR from inside, completed with fittings, heavy duty cover with capacity of 25 tons and frame, heavy duty step irons, benching, leveling concrete, concrete connection head between manhole and sewer pipe, reinforced concrete joint around manhole steel cover, rubber gaskets, accessories and including Excavation, damp proofing, backfilling (3/8" class A gravel) and reinstatement, all according to the GTS for Sewerage Systems section 3.9, Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 5 in the Planning and Design Guidelines, and all needed as shown in Drawings and satisfaction of the Engineer. This item for the following Invert Level Depth: a) invert depth 2.5<d<=3.5m No. 75 b) invert depth 3.5<d No. 25 Engineering Unit 3 of 12

Bill No.2: Supplying and Installation Unit Price 2.7 Supply and construct manholes cast-in-situ reinforced concrete bases, painted with two coats of Latex Bituminous Emulsion from outside and epoxy TAR from inside, completed with fittings, heavy duty cover with capacity of 25 tons and frame, heavy duty step irons, benching, leveling concrete, concrete connection head between manhole and sewer pipe, reinforced concrete joint around manhole steel cover, rubber gaskets, accessories and including Excavation, damp proofing, backfilling (3/8" class A gravel) and reinstatement, all according to the GTS for Sewerage Systems section 3.9, Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 5 in the Planning and Design Guidelines, and all needed as shown in Drawings and satisfaction of the Engineer. This item for the following Invert Level Depth:. a) invert depth 2.0m>d No. 2 b) invert depth 2.0<d<=2.5m No. 15 2.8 2.9 Supply and construct,manholes, cast-in-situ reinforced concrete bases with Precast concrete leveling ring of thickness between 50 and 150 mm, painted with two coats Latex Bituminous Emulsion from outside and epoxy TAR from inside, completed with fittings, heavy duty cover with capacity of 25 tons and frame, heavy duty step irons, benching, leveling concrete, concrete connection head between manhole and sewer pipe, reinforced concrete joint around manhole steel cover, rubber gaskets, accessories and including Excavation, damp proofing, backfilling (3/8" class A gravel) and reinstatement, all according to the GTS for Sewerage Systems section 3.9, Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 5 in the Planning and Design Guidelines, and all needed as shown in Drawings and satisfaction of the Engineer. This item for the following Invert Level Depth: a) invert depth 2.5<d<=3.0m No. 23 b) invert depth 3.0<d<=3.5m No. 17 c) invert depth 3.5<d No. 7 Supplying and installation of drop fittings, drop pipes and plain concrete B200. All according to the GTS for Sewerage Systems section 3.9(ii-I), Construction and Installation of Water Supply and Sewerage Trenches section 5.4( Drop Manholes) in the Planning and Design Guidelines, drawings and direction of the Engineer. a) 60<=d<115 No. 2 b) 115<d No. 4 Total of Bill (2) Supplying and Installation carried to main summary Engineering Unit 4 of 12

Bill No.3: Earth Works 3 EARTH WORKS: Unit 3.1 Excavation: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 16" nominal diameter pipelines (width of trench is not less than 95cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using approved common backfill material which shall not contain granite blocks, masonry rubble, asphalt pavement or any material larger than 150 mm in any dimension provided that this material is not more than 25% of the volume of backfill material. The trench must be filled and leveled in layers not exceeding 250mm wetted and compacted to 95 percent of the maximum dry density. If the excavated material is not approved by the engineer to be used as backfill material, the contractor shall remove it from the site to approved dumps and to supply the required common backfill material at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i), 2.9(ii- A), 2.9(iii), 2.9(iv),2.9(v), 2.11(i-ii) & 2.12 of the(gts Sewerage Systems) or Equivalent and dwgs and direction of the engineer.. This item for the following invert level depth: a) invert depth d<=2m L.M 50 b) invert depth 2.0<d<=2.5m L.M 158 c) invert depth 2.5<d<=3.5m L.M 344 d) invert depth 3.5<d L.M 50 Engineering Unit 5 of 12

Bill No.3: Earth Works Unit 3.2 Excavation: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 12" nominal diameter pipelines (width of trench is not less than 85cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using approved common backfill material which shall not contain granite blocks, masonry rubble, asphalt pavement or any material larger than 150 mm in any dimension provided that this material is not more than 25% of the volume of backfill material. The trench must be filled and leveled in layers not exceeding 250mm wetted and compacted to 95 percent of the maximum dry density. If the excavated material is not approved by the engineer to be used as backfill material, the contractor shall remove it from the site to approved dumps and to supply the required common backfill material at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. On the other hand where trenches in street, it shall be done by using 200mm base course material from the last top layer, placed, wetted and compacted to not less than 95 % of the modified Proctor density for the two cases. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i), 2.9(ii-A), 2.9(iii), 2.9(iv),2.9(v), 2.11(i-ii) & 2.12 of the(gts Sewerage Systems) or Equivalent and dwgs and direction of the engineer.. This item for the following invert level depth: a) invert depth d<=2m L.M 750 b) invert depth 2.0<d<=2.5m L.M 570 c) invert depth 2.5<d<=3.5m L.M 290 d) invert depth 3.5<d L.M 50 Engineering Unit 6 of 12

Bill No.3: Earth Works Unit 3.3 Excavation: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 10" nominal diameter pipelines (width of trench is not less than 80cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,vi). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using approved common backfill material which shall not contain granite blocks, masonry rubble, asphalt pavement or any material larger than 150 mm in any dimension provided that this material is not more than 25% of the volume of backfill material. The trench must be filled and leveled in layers not exceeding 250mm wetted and compacted to 95 percent of the maximum dry density. If the excavated material is not approved by the engineer to be used as backfill material, the contractor shall remove it from the site to approved dumps and to supply the required common backfill material at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. On the other hand where trenches in street, it shall be done by using 200mm base course material from the last top layer, placed, wetted and compacted to not less than 95 % of the modified Proctor density for the two cases. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i), 2.9(ii-A), 2.9(iii), 2.9(iv),2.9(v), 2.11(i-ii) & 2.12 of the(gts Sewerage Systems) or Equivalent and dwgs and direction of the engineer.. This item for the following invert level depth: a) invert depth d<=2m L.M 620 b) invert depth 2.0<d<=2.5m L.M 80 c) invert depth 2.5<d<=3.5m L.M 240 d) invert depth 3.5<d L.M 420 Engineering Unit 7 of 12

Bill No.3: Earth Works Unit 3.4 Excavation: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 8" nominal diameter pipelines (width of trench is not less than 75cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,vi). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using approved common backfill material which shall not contain granite blocks, masonry rubble, asphalt pavement or any material larger than 150 mm in any dimension provided that this material is not more than 25% of the volume of backfill material. The trench must be filled and leveled in layers not exceeding 250mm wetted and compacted to 95 percent of the maximum dry density. If the excavated material is not approved by the engineer to be used as backfill material, the contractor shall remove it from the site to approved dumps and to supply the required common backfill material at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. On the other hand where trenches in street, it shall be done by using 200mm base course material from the last top layer, placed, wetted and compacted to not less than 95 % of the modified Proctor density for the two cases. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i), 2.9(ii-A), 2.9(iii), 2.9(iv),2.9(v), 2.11(i-ii) & 2.12 of the(gts Sewerage Systems) or Equivalent and dwgs and direction of the engineer.. This item for the following invert level depth: a) invert depth d<=2m L.M 8630 b) invert depth 2.0<d<=2.5m L.M 700 c) invert depth 2.5<d<=3.5m L.M 450 d) invert depth 3.5<d L.M 40 Engineering Unit 8 of 12

Bill No.3: Earth Works Unit 3.5 Excavation for road crossing sewer pipe lines: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 10" nominal diameter pipelines (width of trench is not less than 80cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,vi). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using backfilling (3/8" class A gravel), the contractor shall remove backfill material from the site to approved dumps at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. On the other hand where trenches in street, it shall be done by using 200mm base course material from the last top layer, placed, wetted and compacted to not less than 95 % of the modified Proctor density for the two cases. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i) and 2.9(ii-A) of the(gts Sewerage Systems) or Equivalent, dwgs and direction of the engineer. This item for the following invert level depth: a) invert depth d<=2m L.M 40 b) invert depth 2.0<d<=2.5m L.M 30 c) invert depth 2.5<d<=3.5m L.M 10 d) invert depth 3.5<d L.M 30 Engineering Unit 9 of 12

Bill No.3: Earth Works 3.6 3.7 Excavation for road crossing sewer pipe lines: Clearing, grubbing of top soil (if any) to a depth of 300 mm from the natural ground level as specified in item 2.2(ii) in the General Technical Specifications for Sewerage Systems (GTS) and unclassified trench excavations which deems to include whatever type and nature (sand, clay, mixed soil or rock) needed to bury 8" nominal diameter pipelines (width of trench is not less than 75cm) according to the GTS for Sewerage systems section 2, clauses: 2.4(i,iii,iv,v), 2.6(i,iv,vi). According to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3, clauses: 3.2.1, 3.2.2, 3.3, 3.4, 3.6 in the Planning and Design Guidelines. According to Drawings and direction of the Engineer. Back-filling sections of trenches in or Adjacent to Streets for the pipelines mentioned above in two stages: A) Soft back-filling (surrounding the pipe) by using sand placed 150 mm below the invert level up to 200 mm over the crown of the pipe and for the full width of the trench with suitable compaction, and laying of green warning tape over this stage. B)Final back-filling for the remainder of the trench by using backfilling (3/8" class A gravel), the contractor shall remove backfill material from the site to approved dumps at his own cost. The last top layer (250 mm) of the trench shall be done by using approved base course material for trenches adjacent to street. On the other hand where trenches in street, it shall be done by using 200mm base course material from the last top layer, placed, wetted and compacted to not less than 95 % of the modified Proctor density for the two cases. All related works to this item must be implemented in accordance with Section (2)- clauses 2.9(i) and 2.9(ii-A) of the(gts Sewerage Systems) or Equivalent and dwgs and direction of the engineer.. This item for the following invert level depth: a) invert depth d<=2m L.M 900 b) invert depth 2.0<d<=2.5m L.M 190 c) invert depth 2.5<d<=3.5m L.M 100 d) invert depth 3.5<d L.M 30 Such unsuitable material should be excavated and removed from the bottom of the trench to at least 150 mm below the bottom of the pipe, or to the depth required by the specifications. They should be replaced with an approved clean and stable sand or L.M 500 fine aggregate material. All according to the Construction and Installation of Pipes in Water Supply and Sewerage Trenches section 3.3(A,B) in the Planning and Design Guidelines and direction of the Engineer. Note 1 : Unit prices of all items of earth works shall include the following: Cleaning the site from all surplus back-fill materials, results of excavations, and repair all damages due to the excavations (concrete or stone walls, concrete or asphalt yards, existing pipe lines and utilities, cesspools, sidewalks, etc...), all shall be reinstalled to a condition equal to that before the work began. Note 2 : Unauthorized excavation: If the bottom of any excavation is taken out beyond the limits indicated or prescribed, the resulting void shall be backfilled and thoroughly compacted in layers of 150mm, with the following: Selected screened gravel or sand fill if the excavation was for a pipeline, or Class B-150 concrete if the excavation was for a structure or a manhole. Total of Bill(3) Earth Works carried to main summary Unit Engineering Unit 10 of 12

Bill No.4 : Miscellaneous Works 4 Miscellaneous Works Unit Price 4.1 Reinforced concrete encasement (type B250) of sewer pipeline that has less than 90cm depth (from ground level to the top of the pipe ), including reinforcing steel, formwork. As shown on drawings and to the satisfaction of the Engineer. M 3 180 4.2 Plain concrete blinding (B200) to the required levels, as shown to the drawings and to the direction of the engineer. M 3 80 4.3 100mm thickness B250 reinforced concrete including 8mm steel mesh reinforcement. All according to the direction of the Engineer. M 3 80 4.4 Plain concrete B150 with riprap (Stones) M 3 40 4.5 Reinstatement the asphalt where the pipelines pass underneath asphalted roads and in the main road crossing according to the (GTS) section 2 clauses 2.13B and 2.14G and including application of primary coat (MCO). L.M 8000 4.6 Supply and laying precast reinforced concrete pipes 800mm diameters ( single pipe culvert ) including excavation, preparation, bedding, back filling, head walls, end walls, aprons inlet and outlet protections, tar or bituminous painting to surfaces permanently in contact with back filled material and all necessary works, all according to specifications, drawings and direction of the engineer. L.M 10 Total of Bill (4) Miscellaneous Works carried to main summary Engineering Unit 11 of 12

ITEM Main Summary DESCRIPTION Total USD Bill 1 Bill 2 Bill 3 Preliminaries Supplying and Installation Works Earth Works Bill 4 Miscellaneous Works Grand Total - Excluding Value Added Tax: The sum of : Contractor: -------------------------------------------------------------- Authorized Person: -------------------------------------------------------------- Signature / stamp : --------------------------------------------------------------- Date: -------------------------------------------------------------------- Engineering Unit 12 of 12