Stormwater Rate Financing in Canada How to Make it Work TRIECA Ray Tufgar M.Eng., P.Eng MBA - AECOM Mike Gregory, P.Eng. CHI

Similar documents
City of Thunder Bay Stormwater Financing Study

Kitchener s Stormwater Utility

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund

SURFACE WATER UTILITY FEE

Embracing Stormwater: Overcoming the Challenges to Benefit Residents, the Municipality, and an Authority s Own Operations

Successful Stormwater Utility Programs

Radnor Township Stormwater Program and Fee. December, 2013

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

Stormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100

Northampton s New Stormwater and Flood Control Utility

Stormwater Utility Feasibility Study. City of Geneva City Council Presentation: October 16, 2017

MEMORANDUM INTRODUCTION. 1 of 7. Date: July 7, 2011 To: From: cc:

CITY OF AVON Chester Road Avon, Ohio Stormwater Utility Frequently Asked Questions

Approach to Stormwater Resiliency. City of Waterloo s. Surviving the Perfect Storm Monday November 4, 2013

User Fee Funded Stormwater Utilities: Benefits and Challenges

JOHN M. BRAAM MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY

Ann Arbor Stormwater Level of Service and Rate Analysis Advisory Group Meeting #1 Summary June 27, :00 a.m. to 12:00 p.m.

Town of Agawam Stormwater System Assessment and Utility/Fee Planning Project. Citizen Advisory Task Force Meeting #4

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039

The proponent is responsible for meeting all approval requirements from relevant agencies.

Water/Wastewater Rate Structure Review

City Of Elyria Stormwater Utility Program Frequently Asked Questions

DRAFT FINAL REPORT. City of Kalispell. Stormwater Impact Fee Study

Table of Contents 2016 ANNUAL REPORT

Policy Statement. Purpose. Scope. Definitions

Workshop #2 Agenda March 30, :30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a Stormwater Program (30

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES

Agenda. Introductions & Background Project Approach & Progress Review of Gaps Development of Priorities & Strategies Funding Strategies Conclusions

How to Evaluate Stormwater Fee Options and Implement Them in Your Community Jenkintown Library, January 18, 2018

The Corporation of Delta COUNCIL REPORT Regular Meeting Utility User Rates

Stormwater Maintenance. Committee of the Whole Middleton Common Council Updated March 12, 2013

Stormwater Funding Options. Council Meeting Presentation. February 12, Robert Muir, Senior Stormwater Engineer, Asset Management Department

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

WELCOME VANCOUVER CALGARY EDMONTON SASKATOON REGINA LONDON KITCHENER- WATERLOO GUELPH TORONTO VAUGHAN MARKHAM MONTRÉAL

M A R C H 7, KC Water Cost of Service Task Force Meeting #10

Financing Municipal Services and Infrastructure in Canada

City of Salem Stormwater Utility Answers to Frequently Asked Questions

Coraopolis Water and Sewer Authority. Stormwater Utility Fee. Resident Informational Meeting

Financing Canadian Municipalities

AGENDA ENVIRONMENTAL POLICY ADVISORY COMMITTEE THURSDAY, JUNE 28, 2018

Stormwater Utility Feasibility Study

SAP Implementation Update. Presented by: Dan Chapman Alex Ahkoon Courtney Zinn Helena Foulds

Gwinnett County Stormwater FAQs

Data from the Waste Management Industry Survey and the Household Environment Survey

Newton s Evolving Stormwater Utility

Framing your Stormwater Utility for a Perfect Strike

MEMORANDUM. Date: December 23, 2011 To: From: cc:

Paying for Stormwater Management: Stormwater Service Charge Proposal OCTOBER 9, 2014

Town of Chapel Hill, NC

Stormwater Utility Manual City of Racine, Wisconsin

Agenda Standing Policy Committee on Infrastructure Renewal and Public Works February 1, 2011 REPORTS

5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM

Stormwater Advisory Committee

The Maine Drain: Stormwater Management Strategies and Solutions June 12, Portland s Approach. Michael Bobinsky, Director of Public Services

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CENTRAL DAVIS SEWER DISTRICT

Questions to consider

REPORT. Updated Surface Water Governance Study. Pinellas County, Florida. Prepared for

Water Resources Funding Advisory Committee

~ City Recorder -;;-}

Area Drainage Master Planning. Erik Nilssen, Douglas County Engineer April 12, 2017

Water, Wastewater & Stormwater Management Budgets

What is a stormwater utility fee?

Surface Water Utility Implementation. What We Did, How We Did it, and Lessons Learned

Utility Fee Information Packet Increased by the CPI of 4.5% Effective October 1, 2013

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014

Saskatchewan Labour Force Statistics

UTILITIES. Industry Solutions Harness the Power of GIS for Utilities

Council Minutes November 23, Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005

Annual Report.

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

Saskatchewan Labour Force Statistics

Financial Administration

COMMISSION ADOPTED POLICY Revenue Policy

Comparison of powers and revenue sources of selected cities

Saskatchewan Labour Force Statistics

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014

RATE SETTING OVERVIEW. City of Richmond, VA Department of Public Utilities

YOUR DC WATER BILL WHAT S NEW? WHAT CHANGES CAN YOU EXPECT IN THE FUTURE? AOBA UTILITY COMMITTEE PRESENTATION APRIL 20, By:

Saskatchewan Labour Force Statistics

Saskatchewan Labour Force Statistics

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

NOVA SCOTIA PRINTED PAPER & PACKAGING SUMMIT

Outline. Local Improvement Charges for the ICI Sector + District Energy Systems

Government FISCAL PLAN CLIMATE LEADERSHIP PLAN

UTILITIES. Industry Solutions Harness the Power of GIS for Utilities

Proposed Water Rate Adjustment

Assessment Complaints and Appeals

Building the Energy Pipeline: Capturing District Energy Opportunities in our Cities and Towns

EXHIBIT C WATER AND WASTEWATER INFRASTRUCTURE REVIEW 2016

EOS ECO-ENERGY INC. Recommendations: Energy Plan for New Brunswick Balancing the Environment, Economy and Social Aspects

City of Ottawa: Pre-Budget 2013 Submission. December 12 th, 2012

Industry Solutions Harness the Power of GIS for Utilities UTILITIES

Hamilton 2019 D.C. Study: Capital Presentation. Development Charges Stakeholders Sub-committee Meeting January 28, 2019

Department of Legislative Services

Managing Growth and Development

Handout 5: Stormwater Cost of Service

REQUEST FOR COUNCIL ACTION

Virginia Stormwater Regulations Proposed Changes. Planning Commission May 5, 2009

Transcription:

Stormwater Rate Financing in Canada How to Make it Work TRIECA 2017 Ray Tufgar M.Eng., P.Eng MBA - AECOM Mike Gregory, P.Eng. CHI March 22, 2017

3 3 Introductions & Welcome 1. Background 2. Rate Financing Process 3. Hurdles and intro to Panel Session 4. Q &A Open Discussion 1 Overview

4 4 Municipal Stormwater Management Program Capital Projects Emergency Response Operations / Maintenance Stormwater Management Public Involvement Programs Administration / Enforcement Finance Engineering / Support Services 1 Overview

5 Operations and Maintenance

6 6 Typical Issues The general public typically has limited knowledge and appreciation of what the City does to manage stormwater runoff, especially: 1. How much money is spent on the stormwater management program 2. How the program is financed Issue 1: Level of Service Higher levels needed to better plan, build, maintain/operate & renew assets That is, more money needs to be spent! Issue 2: Allocation of Charges Dedicated & sustainable revenue is required to support all program needs Allocation should be fair & equitable (same charge basis for all properties) Offer incentive opportunities to reduce runoff and pollutant discharge 1 Overview Page 6

7 7 Level of Service Decisions Affect Program Affordability Ultimate Highest Cost Level of Service Range of affordable/ sustainable options Current Administration Capital Projects Operations & Maintenance Lowest Cost 1 Overview

8 Comparison to Ontario Municipalities (Recommended Service Level per Capita) $200 $180 $160 $140 $120 Municipality Population SWM Cost per Program Capita Status Quo $14,650,000 $21 Interim 713,400 $26,610,000 $37 Sustainable $39,490,000 $55 Waterloo, ON 98,800 $5,170,000 $52 Kitchener, ON 219,200 $12,030,000 $55 Hamilton, ON 519,900 $70,460,000 $136 Stratford, ON 30,900 $5,630,000 $182 $136 $182 $100 $80 $60 $55 $52 $55 $40 $37 $20 $21 8 $0 Status Quo Interim Sustainable Waterloo Kitchener Hamilton Stratford

9 Emergency Response Capital Projects Stormwater Management Operations / Maintenance Public Involvement Programs Finance Engineering / Support Services Administration / Enforcement FINANCING MECHANISMS USED IN NORTH AMERICA

10 10 Stormwater Funding Categories Taxes: mandatory levies that are not related to any specific benefit or government service (i.e., general services for the public good) Fees: payments made to offset the cost of a specific service and payable by those people who benefit from the service (i.e., a rational nexus must be demonstrated) Special levies that have specific designations and limitations for usage Other means: e.g., public-private partnerships, long-term debtfinancing strategies, federal or provincial economic stimulus grants for infrastructure investment Any combination of the above 1 Overview

11 11 Stormwater User Fees Progression of public utilities Once funded from general tax support then shifted to enterprise fund Charges derived on a fairness and equity basis Water Volume used Wastewater Volume generated Solid Waste Volume/Weight generated Stormwater Runoff contribution 1 Overview

12 12 Impervious Area Based Stormwater Rate Charge based on impervious area measurements: Rooftops Driveways Parking areas Patios Sidewalks Fair and equitable basis for user fee Based on property s contribution of runoff volume and pollutant loading Not assessed value, frontage, zoning type, lot size, number of water meters, number of parking spaces, etc 1 Overview Page 12

13 13 Stormwater User Fee Funding User-Fee Funding (e.g., Stormwater Rate based on impervious area) 1 Overview Pros Dedicated and stable funding source for all program activities (i.e., sustainable) Fair and equitable fee based on runoff contribution (assessed to all private and publicly-owned properties in the same manner) With a credit program, provides an incentive for property owners to reduce stormwater runoff and pollutant discharge Mechanism to ensure privately owned stormwater facilities are maintained Cons Additional implementation costs (rate study, database management, billing and customer service*) Possibility that a new fee may not be well received by the public *Note: Potential to administer stormwater rate through other existing billing systems (e.g., hydro, water/ sewer, etc.).

14 Emergency Response Capital Projects Stormwater Management Operations / Maintenance Public Involvement Programs Finance Engineering / Support Services Administration / Enforcement RATE FINANCING DETAILS

15 15 Stormwater Rate Calculation Charge = Units (ERU) = $Expense Units Dwelling Units = $/Month/Unit + Non Residential Impervious Area m 2 / ERU ERU = Equivalent Residential Unit 1 Overview

Level of Effort Accuracy Simplicity Fairness 16 16 Common Billing Unit Methodologies Flat Fee 0% Tiered Flat Fee Runoff Coefficient Intensity of Development Factor Residential Base Rate Equivalent Residential Unit (ERU) Single Family Unit (SFU) Tiered Residential Base Rate Level-of-Service / Geography Base Rate Annual Impervious Area Measurements (all properties) 100% 1 Overview

17 17 Stormwater User Fees in Canada Municipality Fee Type Start Details (as of October 2014) Nova Scotia Halifax Variable Rate 2013 Stormwater Rate, Res'l $2.78/mo, Non-Res'l charge $0.0124/mo per m2 of impervious area measured through satellite imagery (replaced combined water/sewer rate). Ontario London Tiered Flat Fee 1996 Storm Drainage Charge, if land area <=0.4 ha: Res l $13.78/mo, Comm'l Ind'l $14.78/mo, Inst'l $13.66/mo, if land area >0.4 ha: Ind'l $112.68/mo/ha, Res'l Inst'l Comm'l $75.12/mo/ha. Aurora Tiered Flat Fee 1998 Storm Sewer Charge, Res l $4.78/mo, Comm l/ind l $62.96/mo per water meter. St. Thomas Tiered Flat Fee 2000 Storm Drainage Rate, Res l $7.39/mo, Comm l/ind l $7.39/mo or $102.06/ha/mo if land area >0.18 ha. Stormwater Utility, Average Single-Family Detached Home $10.17/mo (see rate schedule for Kitchener Variable Rate 2011 other property types). www.kitchener.ca/en/livinginkitchener/stormwater_utility.asp Stormwater Rate, Average Single-Family Detached Home $5.39/mo (see rate schedule for Waterloo Variable Rate 2011 other property types). www.waterloo.ca/en/living/utilityprogram.asp Richmond Hill Tiered Flat Fee 2013 Stormwater Management Rate, Res'l $3.97/mo, Non-Res'l & Multi-Res'l or building with water meter $11.53/mo. Regina Tiered Flat Fee 2001 Saskatchewan Based on property size in 2,000 m2 increments, typical Res'l $13.20/mo. Saskatoon Variable Rate 2012 Storm Water Utility, Res'l $4.40/mo, non-residential = $4.40/mo per 265m2 of impervious area with 2014 rate cap = $176/mo (replaced Flat Fee that had been implemented in 2002). Calgary Flat Fee 1994 Alberta Storm Drainage Service Charge, $9.20/mo (per water meter) to fund selected capital projects. Edmonton Variable Rate 2003 Land Drainage Utility based on intensity of development factor. Typical Res l = $7.00/mo. St. Albert Tiered Flat Fee 2003 Stormwater Rate, Res l $15.72/mo, Condo $10.86/mo, Non-Res'l $42.24/mo. Strathcona County Flat Fee (two communities) 2007 Storm Sewer Operations charge, Res l $2.00/mo and $9.65/mo in two communities. British Columbia Pitt Meadows Tiered Flat Fee 2009 Drainage levy (combined with tax funding), Res'l $6.50/mo. Richmond Tiered Flat Fee n/a Flood Control & Drainage Charge, typical Res'l = $10.80/mo. West Vancouver Tiered Flat Fee n/a Drainage levy, Res'l $12.82/mo. Surrey Tiered Flat Fee/ Parcel n/a Implemented as a parcel tax and used for flood control measures, Res'l $16.75/mo, Non- Res'l $18.67/mo (note tax levy in the Surrey Dyking District in 1913 was $0.91 per acre). White Rock Tiered Flat Fee/ Parcel n/a Implemented as a parcel tax with formula based on intensity of development factor, typical Res'l $19.00/mo. Langley Parcel Tax n/a Implemented as a parcel tax, applied as mill rate.

18 18 Stormwater Rate Billing System Property Appraiser New Parcels Changes to Boundaries Ownership Changes Building Permits New Construction Affecting Impervious Area Alterations to Existing Structures Affecting Impervious Area Geomatics Planimetric Changes to Boundaries Verification of Nonresidential Parcels Rate Administration Overall Stormwater Rate Administration Maintain Customer Data for Non-Residential Customers File Maintenance Data Entry File Maintenance Provide Customer Data Prior To Billing Stormwater Rate Customer Database for Non-Residential Customers Accounts Receivable Stormwater Revenue Existing Utility System Customer Service New Accounts Changes to Existing Accounts Residential Dwelling Units Billing System Utility Customer Database Water Accounts Sewer Accounts Stormwater Accounts Bills Utilities Electric $100.00 Water $40.00 Sewer $40.00 Storm $ 5.00 Total $185.00 1 Overview

19 19 Stormwater Financing Study Process Financial Components Collect and Evaluate Data Identify Stormwater Needs Appoint Advisory Committee Define Billing Methodology Determine Billing Units Technical Components Select Funding Methods/Rate Structure Refine 5-yr Capital / O&M Forecasts Public Acceptance Committee Reviews Needs Committee Reviews Rate Structure Establish Administrative Procedures Develop Rate Policies Committee Reviews Rate /Policies I M P L E M E N T A T I O N 1 Overview Page 19

20 20 It s Only a Few Dollars per Month, How Hard Can it Be? Kitchener Record, editorial cartoon (7-Apr-2006)

21 21 How to Make it Work Hurdles, Perils and Pitfalls Need two Champions staff and council. Look to the future during feasibility. How will the bills get out? Need cooperation between departments. Need an effective SWAC. Who handles the press? Who will handle the calls? You will have policy decisions (by-law).

22 22 Do you charge school boards or churches for their runoff contributions? Any other exemptions? Do you award credits for stormwater facilities that were required at the time of development? How do you handle permeable pavement (i.e., do you remove the impervious area from the base charge calculation and/or give the property owner a credit)? How do you handle gravel parking lots?

Thank You! March 22, 2017

24 Facilitators: Ray Tufgar AECOM Panel Discussion STORMWATER RATE IMPLEMENTATION Panelists: Michael Gregory Computational Hydraulics Int. Dr. Victoria Kramkowski City of Mississauga Arun Hinupar City of Guelph Todd Chapman City of Waterloo Robert Muir City of Markham Matt Wilson City of Kitchener