Downstream Non-R2:2013 Certified Refurbisher Checklist Document #

Similar documents
R2:2013 Lessons Learned

e-waste Responsible Recycling Presented by: Scott Jones EHS Program Manager

e-waste Responsible Recycling Presented by: Austin Matthews EHS Assistant Program Manager

SERI COP Advisory 16

CHECKLIST FOR USE WITH THE R2 PRACTICES

Corporate Sustainability Office

RESPONSIBLE RECYCLING ( R2 ) PRACTICES ACCREDITED CERTIFICATION PROGRAMS ELECTRONICS RECYCLERS

e-waste Responsible Recycling Presented by: Scott Jones EHS Program Manager Perry Johnson Registrars, Inc.

Provision 3: Legal Requirements (Export) General Principle An R2 electronics recycler shall comply with all

Electronics Disposition

WEEE Reuse and Refurbishment Audit Check List

Attachment H AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT AND PREVENTION DIVISION

Oracle Electronic Recycler Standard

The R2/RIOS Program Certified Electronics Recycler

LENOVO ELECTRONICS END OF LIFE STANDARD FOR VERSION: 2.0 4/17/2017

RIOS :2016. Overview of Changes

Framework for the ESM of hazardous wastes and other wastes from industry s perspective and the implications in Asia

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

CENTURYLINK DRAFT SUPPLY CHAIN RISK MANAGEMENT (SCRM) PLAN

SERI COP Advisory 14

Section Table of Contents Page Number

Smart Strategies to Simplify Mobile Asset Disposition from the Global Leader in Electronics Reuse and Recycling

TURBO MACH A DIVISION OF VT SAA

FINAL DRAFT Sanctioned Interpretations for Version 3.0 e-stewards Standard for Responsible Recycling and Reuse of Electronics

Smart Strategies to Simplify Mobile Asset Disposition from the Global Leader in Electronics Reuse and Recycling

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

MANAGEMENT OF ELECTRONIC WASTE IN THE UNITED STATES

SANCTIONED INTERPRETATION #4

Asset Recovery Solutions: A fundamental commitment to the environment

Making IT Asset Disposition a Value Generating Activity. Neil Peters-Michaud, CHAMP CEO, Cascade Asset Management

Morris County New Jersey Solid Waste Management Plan Amendment

E-Stewards Certification

Industry Leader in Take Back Solutions

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

EVANS CAPACITOR COMPANY

CTIA GUIDELINES 1. INTRODUCTION Purpose

TÜV SÜD BABT Production Quality Certification Scheme

QUALITY CONTROL INSTRUCTION

R2:2013 and e Stewards v 2.0 Update

Consumer Basic Hardware Services

Data Security Gap Analysis for Highly Regulated Organizations

Quality Code Matrix Appendix A for 8.4.3

Procedure for Procurement and Receipt

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

Recycling Program Standard

INS QA Programme Requirements

REMANUFACTURED AND ORIGINAL EQUIPMENT MANUFACTURER S (OEM) COMPATIBLE TONER CARTRIDGES PUBLICATION

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

TEXTILE EXCHANGE. Policy and Template for issuing Transaction Certificates (TCs) Objective. Original Document. Multiple Shipments on a TC

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

Return Material Authorization (RMA) Process

Supplier Quality Manual

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

UL 110 Standard for Sustainability for Mobile Phones Verification Requirements

FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

ECIA Distributor Counterfeit Product Mitigation Internal Audit Checklist

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Government-wide: Controls Over Disposal of IT Assets

SECTION Inline ULTRASONIC FLOW METERS

Samsung Requirements for WEEE Managing

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

Trident Precision Manufacturing

THE BUSINESS MAGAZINE FOR RECYCLING PROFESSIONALS / SEPTEMBER 2015 /

Recycling Electronics: Summary of Federal Efforts. Kim Bartels EPA Region 8 Pollution Prevention Program July 2009

DESIGN - ENGINEER - BUILD: An OEM s Guide to COMPLEX Product Development & Manufacturing. Step 3 Proof of Concept (Alpha Prototype) 6

QUALITY SYSTEM PROCEDURE PRESERVATION OF PRODUCT QSP-04-07

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

GE - Aviation, Services Supplier Quality Specification

Table of Contents. Executive Summary Introduction... 5

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

PURCHASE ORDER TERMS & CONDITIONS

Japan s Experiences and Challenges on the Export of Used EEE for Reuse Purpose

EXAMPLE OF VENDOR QUALIFICATION FOR IMMUNE EFFECTOR CELL PRODUCT MANUFACTURER

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

QUALITY CLAUSES. Real Time Logic, Inc Academy Ridge View, Colorado Springs, CO Phone: (719) Fax: (719)

Introducing. TAMP-o-matic

PURCHASE ORDER TERMS & CONDITIONS

Please understand that poor results from green procurement assessment may lead to shrinkage or termination of business with the subject suppliers.

UNIVERSAL WASTE PROCEDURES

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

Helical Products Company

SHELTON INDUSTRIAL PATTERN INC.

Purchase Order Quality Clauses

Anti-Counterfeit Control Plan Version A Dated 08/24/2018

Intro Corporation Purchase Order General Terms and Conditions

UPPLIER ANUAL. Issued: 01 Aug 13

Supplier Quality Assurance Manual

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

HP Standard Supplier Requirements for Safe and Legal Products

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

PCB IPC-A 600 PCB IPC- 6012, 6018

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Reverse Logistics. Moving forward in Reverse. Brian Mantel Sprint Tim Long Clover Wireless

Transcription:

Vendor Name: Other Business Names: Address: This checklist is designed for the evaluation of potential refurbishers under R2:2013 Provision 6(c)(3) for equipment that is non-functional or untested and in need of testing/repair. This checklist is tailored to vendors who are not R2:2013 Certified. Document the equipment sent to this refurbisher for testing and/or repair. Describe the processing techniques by the downstream vendor for each type of equipment. Remove or change equipment types specific to each downstream vendor. Equipment Processing Technique Desktops Laptops Peripherals Network Equipment Rechargeable Batteries LCD TV s/monitors Printers Cellular Devices

Requirements for non- R2:2013 certified Refurbishers These requirements are documented in R2:2013 Provision 6(c)(3). The cross-referenced provisions are extracted here for all the requirements incorporated in 6(c)(3). Downstream refurbishers are required to meet the requirements of Provision 6 in order to qualify as a downstream refurbisher under Provision 6(c)(3). Any outsourcing to a downstream refurbisher is therefore expected to meet the same requirements as imposed on the R2:2013 certified recycler. Prov. Requirement Verification 6(c)(3)(B)(ii) Verify that downstream refurbisher does not resell equipment in untested or nonfunctioning condition? 6(b)(1) Does the refurbisher label and sort each shipment downstream to track throughput? 6(b)(2) Does the refurbisher sanitize all data on reusable equipment before it is shipped downstream? 6(b)(3) Does the refurbisher handle and package shipments for reuse to prevent damage of the equipment during transit? 6(b)(3) Does the refurbisher package shipments for reuse in light of the risks posed during shipment? For example, refurbished batteries packaged according to transport regulations to prevent fires or spills. 6(c) Are shipments by the refurbisher for reuse identified prior to shipment as: (1) Tested for Full Functions, R2/Ready for Reuse; -or- (2) Tested for Key Functions, R2/Ready for Resale If downstream refurbisher produces fully functional equipment ready for reuse, verify these requirements. 6(c)(1)(A) Tested and Full Functions, R2/Ready for Reuse Are all equipment functions tested, working properly and ready for reuse as if it were new? 6(c)(1)(A) Is R2/Ready for Reuse equipment loaded with legally licensed software, drivers, and configured?

Prov. Requirement Verification 6(c)(1)(B) Is the refurbisher currently certified to RIOS or ISO 9001 for refurbishment activities? 6(c)(1)(B) If not certified to RIOS or ISO Policy? 6(c)(1)(B) If not certified to RIOS or ISO Plan? 6(c)(1)(B) Does the Quality Assurance Plan include steps to verify the accuracy of test methods (monitoring) and test equipment (calibration)? 6(c)(1)(B) Does the Quality Assurance Plan include procedures to maintain records of verification and results of testing? 6(c)(1)(C) Does the refurbisher have a written Product Return Policy which includes specific policies for R2/Ready for Reuse equipment? 6(c)(1)(C) Does the refurbisher have a written Product Return Plan that includes plans for R2/Ready for Reuse equipment sold? 6(c)(1)(C) Is the Product Return Policy and Plan appropriate for the final destination of R2 Ready for Reuse equipment 6(c)(1)(C) Is the Product Return Policy and Plan appropriate for the type of equipment sold to an end user as R2 Ready for Reuse? 6(c)(1)(C) Has the Product Return Policy and Plan been communicated to buyers and sales persons as one step in the implementation? 6(c)(1)(D) Is the refurbishers R2/Ready for Reuse equipment and components clean and free of major cosmetic defects? 6(c)(1)(E) Does the refurbisher ensure that R2/Ready for Reuse equipment or components meet the requirements of the recipient?

If downstream refurbisher produces equipment tested for key functions and ready for resale, verify these requirements. 6(c)(2)(A) Tested for Key Functions, R2/Ready for Resale Does the refurbisher use effective test methods and testing equipment to confirm that the Key Functions of the equipment or components are working properly? For example, are key functions defined for each type of equipment and processes written to specify expected results for working? 6(c)(2)(B) Is the refurbisher currently certified to RIOS or ISO 9001 for refurbishment activities? 6(c)(2)(B) If not certified to RIOS or ISO Policy? 6(c)(2)(B) If not certified to RIOS or ISO Plan? 6(c)(2)(B) Does the Quality Assurance Plan include steps to verify the accuracy of test methods (monitoring) and test equipment (calibration)? 6(c)(2)(B) Does the Quality Assurance Plan include procedures to maintain records of verification and results of testing? 6(c)(2)(D) Does the refurbisher have a written Product Return Policy which includes specific policies for R2/Ready for Resale equipment? 6(c)(2)(D) Does the refurbisher have a written Product Return Plan that includes plans for R2/Ready for Resale equipment sold? 6(c)(2)(D) Is the Product Return Policy and Plan appropriate for the final destination of R2 Ready for Resale equipment? 6(c)(2)(D) Is the Product Return Policy and Plan appropriate for the type of equipment sold? 6(c)(2)(D) Has the Product Return Policy and Plan been communicated to buyers and sales persons as one step in the implementation?

6(c)(2)(C) 6(c)(2)(C) 6(c)(2)(E) Does the refurbisher disclose to buyers in writing any functions that are not working properly with R2/Ready for Resale shipments? Does the refurbisher provide a description of cosmetic defects and missing components in writing with R2/Ready for Resale shipments? Does the refurbisher ensure that the equipment or components meet the specifications of the recipient vendor or the end user? Data Destruction Requirements If equipment is not sanitized of data prior to shipment from the R2:2013 recycler, then the downstream refurbisher must meet the requirements of Provision 8 for Data Destruction. Use the Downstream Data Destruction Vendor Checklist to qualify the refurbisher for Data Destruction requirements under R2:2013 Provision 6(b)(2). 5-Downstream Data Destruction Vendor Checklist.docx Recycling of Residual equipment containing FMs Downstream refurbishers who are not certified to R2:2013 must also meet the downstream requirements for recycling residual components containing Focus Materials from the refurbishment process. This includes any components removed during repair that contain FMs. It also includes any equipment that could not be resold or could not be repaired to a working status and therefore must be recycled. Use the Downstream Non- R2:2013 Certified Recycler Checklist to qualify the refurbisher to the Provision 3 and Provision 5 requirements for recycling of these residuals. Downstream Non-R2:2013 Certified Recycler Checklist.docx The above information applies to the minimum requirements of R2:2013 Provision 6 for downstream due diligence of refurbishers not certified to R2:2013. Additional evaluation is recommended. Onsite audits are encouraged.

Evaluator: Year 1 Attached Evidence: Comments: Status: Approved Suspended Date Completed: Evaluator: Year 2 Attached Evidence: Comments: Status: Approved Suspended Date Completed: Evaluator: Year 3 Attached Evidence: Comments: Status: Approved Suspended Date Completed: