Daily Report Module for Construction Management Information System

Similar documents
USE QUESTIONNAIRE AND AHP TECHNIQUES TO DEVELOP SUBCONTRACT- OR SELECTION SYSTEM. Yan-Chyuan Shiau, Tsung-Pin Tsai, Wen-Chian Wang, Miao-Ling Huang

USE RFID TO ESTABLISH SITE BUILDING MATERIAL MANAGEMENT SYSTEM

INTEGRATED MANAGEMENT OF THE CONSTRUCTION PROJECT DURING THE BUILDING PHASE

HARBORTOUCH HOSPITALITY USER GUIDE. Harbortouch Technical Support: or

Application of BIM Based on Security in the Process of Engineering Construction

The Problems and Countermeasures of the E-commerce Enterprise Internal Audit Informationization Hu Xiaoqing, Zhang Chengqian

Discussion on the Application of BIM Technology in the Assembly Building

PRELIMINARY SEISMIC SAFETY ASSESSMENT OF SCHOOL BUILDING USING CASE-BASED REASONING TECHNIQUE

Study on BIM Family Self-create for Steel Reinforcing Bar Detail Construction Design and Information Extraction

THE QUICK GUIDE TO THE SL2014 SYSTEM. Where to start, what to do and in which order

Developing An Ontology-Based Representation Framework for Establishing Cost Analysis Knowledge Base for Construction Work Items

Title. Author(s)WENG-FONG CHEUNG; YU-CHENG LIN. Issue Date Doc URL. Type. Note. File Information

Microsoft MB6-871 Exam Questions & Answers

Oracle Talent Management Cloud. What s New in Release 9

Application of BIM on Documenting Construction Defects

The Application and Research of Property-management Information System based on JSF Technology Lin Tang

CHAPTER 1 INTRODUCTION

STUDY ON BIM-BASED STRUCTURAL WORKING DRAWING DESIGN SYSTEM

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

INTERNSHIP PROGRAM 2018/2019

LECTURE 8: Planning & Control Functions & Tools (Part II) Project Management BACA

APPROACH OF STANDARD DESIGN MODELS IN THE SAUDI MINISTRY OF INTERIOR PROJECTS

Candy Training Courses 2016

Candy Training Courses 2016

Application Research on Monitoring Cloud Platform of Bridge Construction Based on BIM ZHI Peng1, a, SHI Tianyun2, b, WANG Wanqi3, c, WANG Huilin4, d

An Integrated Methodology for Construction BIM & ERP by Using UML Tool

An Efficient Online Shopping System

Building Life Cycle and Tacit Knowledge Base of Best Practice

Version /2/2017. Offline User Guide

Computer Aided Drafting, Design and Manufacturing Volume 27, Number 1, March 2017, Page 63

Notes on Changes. in the Microsoft Dynamics AX Feature Pack and R2

Notes on Changes. in the Microsoft Dynamics AX Feature Pack and R2

S.No RFP Particulars Project Management Equipment Planning: Measurement & Payment:

The building contract a tool to minimise disputes and enhance productivity

PIMS User Guide USER GUIDE. Polaris Interview Management System. Page 1

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

IBM Sterling Gentran:Server for Windows

Quick Start Guide. Taking A Payment & Printing A Receipt

The Impact of Information Technology and Internet in the Construction Industry

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

changes and modifications are inevitable, even in the contemporary BIM approach in the building design process, and developing a collaborative BIM pla

Analysis and design on airport safety information management system

HARBORTOUCH ECHO USER GUIDE HARBORTOUCH SUPPORT LINE:

eprocurement User Guide

Title. Author(s)JUI-LIN PENG; CHUNG-MING HO; CHEN-YU CHEN; YEONG-BIN. Issue Date Doc URL. Type. Note. File Information

Contents. 1. Introduction Services Application Standards Real Estate Management ERP Solution Production Management 47

NEC3 Contracts explained

Product Documentation SAP Business ByDesign February Business Configuration

IntegraPay + Xero. Setup guide

Scope of Work Bid Package C-4 - West Polished Concrete

Existing Construction Conditions

Construction coordination

Materials Management

Delphi Supplier Profile Supplier Administrator - E-Learning How To Enter Diversity Spend Data

IDEAS Product Overview

New for 2009! Detecting and Correcting with the Client Data Review Feature

Perfect Financial & Accounting Management System

TITLE I GENERAL PROVISIONS. Article 1 Purpose

Basic Instructions on the Online Bidding

5D BIM Implementations in Hong Kong and Mainland China

Ministry of Transportation. WBCMS Manual. Item Postings & Reconciliation Guide. Contract Management and Operations Branch

A Web-based Framework of Project Performance and Control System

Evaluation index system for positive operation of water conservancy projects

A basic knowledge of ERP concepts will help you in understanding the concepts of SAP Material Management System described in this tutorial.

Construction Cost Consultants and Quantity Surveyors Manitoba Hydro Capital Expenditure Review. January 2018

Job Enhanced Billing

HOW INTEGRATION WORKS...3

NetSuite Quick Reference Guide

Epicor ERP Project Billing - Fixed Fee Course

Unit 3: Traditional Project Delivery Using IT Applications

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

A STUDY ON THE PRACTICAL MODEL OF PLANNED EFFECTIVE RAINFALL FOR PADDY FIELDS IN TAIWAN

Bisan Enterprise. Governmental Edition. A New Dimension in Financial Management Applications

Job Costing (JC) General Features: Interface with other Systems: System Setup and Maintenance:

it s project management integrated. intuitive. intelligent

BillQuick QuickBooks Integration

Course List 2008 Civil Engineering Commercial Training

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:

IT Utilization in Construction Field of Taiwan

A Framework of BIM-Based Bridge Health Monitoring System

CONSTRUCTION STANDARD DOCUMENT

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

INDEX. O Organic mode 1

"Computer Application in Project Management" may simply be described as five-step process as follows (Rosenau, 1992)

Research on the Multidimensional Constraint Stability of Bridge Structure Modeling Based on Optimization Model

Mercy Baggot Street Canopy Intranet

INPEX CONTRACT MANAGEMENT SYSTEM

SQL ACCOUNT ADVANCE MODULE USER GUIDE

Dam Safety Instrumentation Data Acquisition, Monitoring, and Data Visualization Improvements at the Rocky Mountain Hydroelectric Plant

City Contract Management System (CCMS) Prime and Subcontractor Training

BUSINESS FLOW INTEGRATION FOR E-COMMERCE AND ERP SYSTEM

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract

Standardized Design of the Surface Engineering in Xinjiang Oilfield

JOB210: Job Profitability Reports

LOSS OF CONTROL FROM PROJECT CONTROLS

SunYoung Choi, Masters Degree Candidate, Hanyang University JaeJun Kim, Professor, Hanyang University

REPUBLIC OF KENYA THE NATIONAL TREASURY

Key benefits: Generate complete audit trails. Online integration means that: Figures are continually updated. Make reports using historical data

Design on Logistics Information Management System for Large Sports Events

Material available on web at

Transcription:

Daily Report Module for Construction Management Information System Yan-Chyuan Shiau, Wen-Chian Wang Chung-Hua University, Department of Construction Engineering 30 Tung-Shiang, Hsin-Chu, Taiwan, 300, R.O.C. ycshiau@ms22.hinet.net ABSTRACT: The profit of Construction Industry has been tremendously reduced for recent years in Taiwan. In order to survive in this difficult environment, Management becomes the key issue to achieve company s target. We need a powerful tool that can help us to handle complicate process such as estimation, bidding, purchasing and site-management in the life-circle of a construction project. In this research, we develop a Daily Report Module for Construction Management Information System. In this module, we use Object Oriented concept to mimic project schema by dividing each item into building-floor-room hierarchy. In this system, all constructed items will be calculated and converged into money request data. This will heavily save the key-in time and prevent human mistakes from multiple-input. Through the help of this tool, we can effectively calculate the cash flow for a construction project and accurately control the amount that we can claim from owner and pay to subcontractors. It can also provide warning message to prevent overcharge or overpayment in construction operation. Through the help this system, we can integrate construction data and transport site information to the head quarter through world-wide-web immediately. This can help us to improve administrating capabilities, increase competition and make profit for construction companies. KEYWORDS: Cash Flow, Construction Management, Daily Report, Object Oriented, and Site-Management 1. INTRODUCTION The poor atmosphere of the construction business in recent years is putting a lot of local contractors into severe competition; improvement of management so as to uplift competitiveness is necessary for survival. While on the construction site side, there are indeed a lot of improvements that can be reached by refining the managing layers and cutting down costs; such as, via computer, a lot of manpower and man-hours can be saved. In welcoming the information-prompt age of networks, the construction industry must be able to follow the pace so as to compile a great amount of information into useful information in a short time, and so that competitiveness can be created. Therefore it is a necessary trend that the construction industry be informationized. 2. OBJECTIVE In [1], we have constructed the Basic Database, Budget Module, Procurement Module, Price Calculation Module, and Settlement Management Module for CMIS-I. In this research, we use Object Oriented concept, Visual Modeling techniques with Delphi and ER/Studio environment to develop following modules for CMIS-II. This study is mainly aimed for developing the Daily Report Module, Estimation And Pricing System, Design Modification Control System and Project Accounting System so as to compile the daily site management information into the current engineering value estimation, for the solution of problems of inaccurate input of site logs, repetitive works, high human errors in typing, over estimates or under estimates of engineering value etc. It is also for recording work items and quantities resulting from the design modification activated by the client or designer, as well as the finalizing quantity and amount of each project, so as to control the actual costs of projects. 3. FUNCTION REQUIREMENTS The System Structure of CMIS consists the following items (Fig. 1): 1. Basic data structure for building up the system: database used is categorized into large, medium and small items. 2. To develop a Budget System program, to be able to generate project budget automatically. 603

3. To develop a Purchasing And Contracting System program, to be able to screen subcontractors and execute contracting. 4. To develop a Fund Auditing System program, to be able to place alarm for items exceeding the budget. (Above items have been completed in 2001.) 5. To develop a program of Daily Report System, to be able to record daily site work items, quantities and use of manpower and materials. 6. To develop a Estimation And Pricing System program, to be able to compile, from site daily log, quantities of the current finished items. 7. To develop a Design Modification Control System program, to be able to record items and quantities of every design change. 8. To develop a Project Accounting System program, to be able to control the finished items, costs and income, and expenditure for each project. (Items 5-8 are for the study of the present year.) Relationship) Model; by defining the relationship between the databases, the substantial database is then built up and becomes the actual relationship database (Fig. 2) Figure 2. Database Structure Diagram After establishing ER/Model, the user can, with the tools provided by the program, translate the database structure into a Script File which can be retrieved by the general database systems (Fig. 3) so that Database Console loads the data list of the system, fields of the data list and the attributes of each field, as well as the relationship between the Primary Key and Foreign Key needed for the system database. Figure 1. System Structure Diagram of CMIS 4. DATABASE STRUCTURE 4.1 Analysis of Database Structure The structure of the database is the core of the whole system, should the structure be wrong, or the database be insufficient to meet the need, the whole data flow will cause error and result in outputting unexpected data, therefore it is extremely important to build up a suitable database structure. Accompanying advances of information technology, the database system has developed from the conventional Relational Database to the Object-Oriented Database (OODB), which is now the mainstream of the development of database control systems [2]. This study uses ER/Studio tools to establish an ER Diagram, then, in the same mode, according to user need, makes the data flow chart and establishes the E-R (Entity- Figure 3. Script File of the Database Generated by ER/Studio 4.2 Construction Site Daily Log Flowchart Site Daily Report, the record of daily work done and events occurred on the site, is the center of site managing. Information gathered through daily events, by proper compiling and analyzing, can deliver reports on the cost, progress and quality of the construction [3]. 604

Site Daily Report, the record of daily site events, records a variety of occurrences around the site; this study categorizes the event information into engineering info, engineer info, manpower, equipment, material, quantity accomplished, location of work, test item, site event, and form filling etc. The site daily report is not only a daily report sheet; it shall be used together with other forms such as climate record, engineer progress schedule, daily work-hour, equipment use record, steel bar use quantity, concrete poring quantity, quantity of form, earthwork quantity etc., and most importantly, the engineering progress schedule and the work flowchart. 4.3 Process of Daily Report This system constructs data structure of the daily report [4] as shown in Fig. 4. The system retrieves items from the basic database and translates them into Project Work Items ; by combining with the daily activities logged in the report system and other related data -such as manpower and material analysis database and contractor basics -, information for project work items are compiled; in a building-floor-room format, the work items are entered according to their work site locations and are compiled and output as the site daily report. This log can be further compiled for set period of dates as the monthly log that provides information for pricing the estimation system. on work items; therefore the item in the pricing system derives directly from the work items compiled into the pricing list. Yet in reality, some projects are subdivided into several subcontracts and are separately carried out by different subcontractors in different scheduling. If this is done in terms of work items, the quantity in the log will not be able to combine with the item, and this can cause disputes when the subcontractor applies for payment. This is the reason that in this study we add the building-floor-room structure, so that subcontracting is done according to work item and work location, and the work accomplished can combine with the work item input and can be translated into pricing and estimation. 4.5 The Building-Floor-Room Structure The study incorporated the Building-Floor-Room Structure [5], as described above and that is shown in Fig. 5, and combined with items in the project database. Items in the system contain work locations, in case of different subcontractors with different prices, this system is able to simulate the actual fulfillment by the said structure, which makes the information control more appropriate for work items. Formulas 1 to 3 are the relationships between building-floor-room and the work item; room works are compiled into floor work, and floors into building. Final summation is indicated as the accomplished quantity of the work item. Figure 5. Room-Floor-Room Structure Diagram Figure 4. Daily Report Data Structure 4.4 Process of Pricing Estimation Pricing Estimation is closely related to procurement and tender process as well as the daily log. The study finds that items of the procurement programs in popular software on the market are base V floor = V building = 2) n1 i= 1 n2 i= 1 V room --------------------------------- (Formula 1) V V Sum of work item = floor ------------------------------------- (Formula n3 i= 1 V building---------------------(formula 3) V room : Quantity of work of each room, n1: number of rooms on the floor. V floor : Quantity of work of each floor, n2: number of floors in the building. V building : Quantity of work of each building, n3: number of buildings in the project. 605

V sum of work item : Quantity of the work item in the project 5. SYSTEM STRUCTURE AND CONTENT OF WORK Following completion of the Basic Database, Budget System, Procurement and Subcontracting System, and Cost Accounting System of the Object Oriented Visualization-Simulated Structure of Constructional Information Compiling System (I), this study continues to develop the following subsystems: Daily Report System consists of 3 modules- Project Info (Fig.6), Work Item Info (Fig. 7), and Daily Report Input module (Fig. 8) to record site events and work items accomplished; it also provides input of work location info. Besides, through company intranet via Client/Server structure, input can also be made by way of the browser input to upload daily log info to the main system at the headquarters. System developed in the study provides 2 input methods: Direct Input (Intranet, shown as Fig. 8) and input through browser (Internet, as in Fig. 9) A. Daily Report System B. Estimation And Pricing System C. Design Modification Control System D. Project Accounting System 5.1 Daily Report System Figure 8. Daily Report Input Screen (Client/Server Version). Figure 6. Daily Report System Dialog Figure 9. Daily Report Input Screen (Browser Version) 5.2 Estimation and Pricing System Figure 7. Daily Report Input -- Building-Floor- Room Screen Estimation and Pricing System compiles info collected in the Daily Report, sums up to be used as the info and amount for pricing and estimation. By setting up the building-floor-room structure, the study handles work item quantity by summing up room work quantities in the floor and floor work quantities in the building, so as to get the compiled quantity of the work item. 606

time, quantity, and price and its payment term or every change in complete details, so that a better control of design change can be achieved. This system added a Version field to the Project Info as one of the Primary Keys. When there is a need of design change being brought up by the client or architect in an Engineering Meeting, a new project version will be added (as in Fig. 12) to alter and record the changed item and quantity of each version. Figure 10. Dialog of Project Estimation And Pricing System After selecting Project and range of pricing and estimation date, the system compiles daily report info and translates into the Estimation and Pricing Database (as in Fig. 10, Screen Of Project Pricing And Estimation System, and Fig. 11, Project Pricing And Estimation System add in and change the period of pricing and estimation); after entering the period of pricing and estimation, press the OK button and the system will translate the info into and for the use of the Estimation and Pricing System. Figure 12. Design Modification Control System 5.4 Project Accounting System Generally, by the end of the project, the contractor has difficulties in effectively handling the essentials of the project operation, which are the actually accomplished quantities, contract items and contract prices; only rough estimations can be worked out to approximate tentative profit or loss; in this environment that is more and more difficult to make a profit, it is truly needed to have complete control of the operation. Figure 11. Project Pricing And Estimation System -- add in and change the period of pricing and estimation 5.3 Project Modification Control System There is always a need to change in every project. Whether due to functional requirements of the client or stipulations of the architectural regulations, because of the need of construction interface or purely due to design requirements, changes on plane setup, height, material, size and equipment etc. are needed. The Project Modification Control Module is meant to record and trace the item, The system in this study can, coping with the Design Modification Control Module, control and trace the contracted quantity, subcontracted quantity and the finalized quantity etc., so that the operator can effectively control the relevant info and make necessary adjustments at all stages, as well as present the relative data at the end of the project to be used for project review and as references (as shown in Fig. 13, 14) to future project tenders, in the expectation of improving company managing ability and operating strength. 607

Figure 13. Project Accounting System D. To develop a Fund Auditing System program, to be able to place an alarm on items exceeding the budget. E. To develop a Daily Report System program, to be able to record daily site work items, quantities, and use of manpower and material. F. To develop a program of Estimation And Pricing System, to be able to compile, from site daily log, quantities of the current finished items. G. To develop a Design Modification and Control System program, to be able to record items and quantity of every design change. H. To develop a Project Accounting System program, to be able to control the finished items, cost and income, and expenditure for each project. 6.2 Contributions Through results of this study, contractors can execute the above mentioned compilation of construction information by using the Construction Management Information System and achieve the following effects: Figure 14. Project Balance Report 6. CONCLUSIONS AND SUGGESTIONS The domestic construction atmosphere is generally low at the moment and contractors are facing enormous competitive pressure. Reinforcing competitive ability is the one and only method for a construction company to survive. The Construction Management Information System developed in this study has built up a Basic Database, Budget System, Procurement And Subcontracting System, Cost Accounting System, Daily Report System, Estimation and Pricing System, Design Modification Control System and Project Accounting System in the expectation of attaining the following effects: A. To build up a basic data structure and present the system in the database categorized into large, medium and small items. B. To develop a Budget System program, to be able to generate project budget automatically. C. To develop a Purchasing And Contracting System program, to be able to screen subcontractors and execute contracting. A. By using computer software and log input interfaces, the system simplifies repetitive input tasks to simplify figure inputs. B. Provides estimation and pricing period selections, which compiles from the Daily Report System and applies payment from the client; it can also serve the subcontractor in the same manner. C. Builds up the building-floor-room structure into the database structure and solves the inconvenience of being unable to subcontract a single itemized work item. D. Project Accounting System provides control of actually accomplished items in the project; this uplifts site management efficiency. E. Reduces waste in use of equipment resources by way of resource integration, so as to lower costs and increase competitiveness. 6.3 Suggestions Subsequent study of this research can extend to combine the Progress Control Software (such as MS-Project, P3 etc.) to achieve automatic compilation of the construction progress, update the Daily Report info into the Schedule Control Software so as to achieve real-time integrated construction management. 608

7. ACKNOWLEDGEMENT I would like to take this opportunity to show my appreciation to National Science Council, Executive Yuan, for its support of the study. Project No.: NSC 91-2211-E-216-018 8. REFERENCES 1. Yan-Chyuan Shiau, Ming-Teh Wang, Tsung- Pin Tsai, Wen-Chian Wang, Developing A Construction Integrated Management System, ISARC 2002,September 23-25 Washington D.C., USA. 2. Jiang Duan-Shiang, The Control of Estimation, Construction Engr.,2001/09. 3. Yang-Wang-Jing, The Application of Object- Oriented in Project Cost Control, Master Thesis of Civil Engineering,National Taiwan University,1998. 4. Wang Wen-Chian, CMIS,The Study of Estimation System,Master Thesis of Construction Management Dept., Chung-Hua University,2003. 5. Yan-Chyuan Shiau and Wang Wen-Chian, The Study of Integration between Estimation System and Site Report System for Construction Integrated Software, Construction Engr., 2003/05. 6. Yan-Chyuan Shiau, Ming-Teh Wang, Tsung- Pin Tsai, Wen-Chian Wang,, Developing A Construction Integrated Management System,ISARC 2002,September 23-25 Washington D.C., USA. 609