PERMITS, ADDRESSES, AND INSPECTIONS

Similar documents
RESIDENTIAL BUILDING PERMIT INFORMATION

The following materials and documents are required in order for you to obtain a Building Permit:

RESIDENTIAL BUILDING PERMIT INFORMATION

City of Centerville Building, Zoning & Code Enforcement Department

RESIDENTIAL BUILDING PERMIT INFORMATION

TOWN OF GREENVILLE APPLICATION FOR PERMIT

RESIDENTIAL BUILDING PERMIT INFORMATION

Residential Building Permit & Inspection Procedures

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

INSTRUCTIONS. Address: Sec/Block/Lot:

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

Residential Building Permit & Inspection Procedures

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

Village of Merrimac 100 Cook St. Merrimac, WI APPLICATIONS GUIDE. For. Building Permits. Driveway/Access Permits. Updated: February 20, 2012

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

The following information is required when submitting a building permit application:

HOW TO OBTAIN A BUILDING PERMIT

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

PERMITS PERMIT FEES, PLAN RE- VIEWS, AND INSPECTIONS

CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT S.

Inspection Procedure Handout

Citizens Guide to Residential Building Permits

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

CLAY TOWNSHIP BUILDING DEPARTMENT

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

THIS INFORMATION MUST BE TURNED IN TO THIS OFFICE BEFORE A BUILDING PERMIT IS ISSUED.

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Commercial Submittal Packet

PROCEDURE FOR REQUESTING A BUILDING PERMIT

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

PIKES PEAK REGIONAL BUILDING DEPARTMENT

BUILDING PERMIT GUIDE SHEET

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

PERMITS REQUIRED BEFORE OBTAINING A PERMIT

Residential Building Permit Application Note: Storm Water Permit may be required.

BUILDING PERMIT SUBMISSION REQUIREMENTS

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

Single Family Residential Building Permit. Application Guidelines. August 2000

A homeowners/applicants guide to understanding and making application for a building permit.

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

Building Permit Checklist

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Town of Kingsville. Building Department

Building Permit Application

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Permit: *Inspection Scheduling: * Monday thru Friday Receipt #: Between And Property Code#

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

BUILDING DEPARTMEN T

City of Roanoke. Commercial Permit Submittal Guidelines

HONEY BROOK TOWNSHIP

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

COMMERCIAL SUBMITTAL PACKET

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

Construction Application for Permit (CAP) Instructions

COMMUNITY DEVELOPMENT

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

THIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application

A. -Application Form Ensure following is filled out on your building permit application:

Application for Commercial Plan Review and Building Permit. Address:

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

HOME OWNERS GUIDE PERMIT & INSPECTIONS FOR OWNER OCCUPIED SINGLE FAMILY DWELLINGS

Single Family Residential Building Permit Questions & Answers

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

BASEMENT FINISH CONSTRUCTION

Town of Bethlehem BUILDING PERMIT APPLICATION

Osceola County Growth Management Division 1 Courthouse Square, Suite 1400 Kissimmee, FL

*Secondary suites must be provided with independent heating and ventilation system, separate from the main dwelling unit.

Fill out all sections or mark with N/A (not applicable)

City of Beverly Hills Building & Safety Division General Notes

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Commercial Construction Reference Guide

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

229 Rehoboth Avenue Telephone P.O. Box 1163 Fax

BUILDING PERMIT INFORMATION PLEASE READ CAREFULLY AS IT MAY AFFECT APPROVAL OF YOUR BUILDING PERMIT

RESIDENTIAL PROJECT INFORMATION

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

CONSTRUCTION PERMITS AND CERTIFICATES A Helpful Guide

Last Updated March 15, 2016

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

Residential Building Permit Checklist

GUIDE TO BUILDING PERMITS FOR AGRICULTURAL BUILDINGS

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

A.C.C. RULES & REGULATIONS INDIAN ROCKS P.O.A. OF LEDGEDALE, INC. 2018

Building Department Permit Application. Part I: General Information

HOW TO OBTAIN A BUILDING PERMIT

Transcription:

PERMITS, ADDRESSES, AND INSPECTIONS SANILAC COUNTY CONSTRUCTION CODE DEPARTMENT 60 WEST Sanilac County COURTHOUSE ANNEX 210 SANDUSKY, MICHIGAN 48471 This information has been produced by the Construction Code Department as a way of letting the public know what information is required, and the procedures that must be followed when making application for a permit (building, electrical, plumbing, mechanical). It also outlines the procedures, requirements and the times during construction or installation when inspections are required and necessary. To the best of our knowledge and belief all information contained is accurate and correct at the time of publication. It is your responsibility as the holder of a permit (building, electrical, plumbing, mechanical) to have the knowledge of all the appropriate building and other related codes for the project you plan to undertake. The Construction Code Department s responsibility is to inspect your work and verify its compliance with the code. Inspectors cannot tell you how to do the work or solve problems with the construction, electrical wiring, plumbing or mechanical systems. Inspectors will answer any specific code questions or tell you if what you have done or propose to do will meet the appropriate code. It is not the inspector s responsibility to inform you of all the applicable building, electrical, plumbing or mechanical codes for your project. YOU MUST BE KNOWLEDGEABLE OF THE CODES AND IT IS YOUR RESPONSIBILITY TO MEET THOSE REQUIREMENTS. If you do not know the codes or are not capable of completing the project in a timely manner it may be beneficial for you to hire a licensed contractor to perform the work. This may prevent expensive mistakes or loss of time. Please note that when signing A PERMIT APPLICATION you are signing a statement indicating that you know the code requirements and laws relating to the project you propose to undertake. All building permits are required to have periodic inspections. If the project is not started and you do not have an inspection within six (6) months (this does not include the site inspection) your permit may be cancelled. If, after your project is started, it is stopped for any reason for more than six (6) months your permit maybe cancelled. All plumbing and mechanical permits are required to have periodic inspections. If the project is not started and you do not have an inspection within six (6) months your permit may be cancelled. All equipment for which a permit has been issued must be inspected and approved. Any portion of equipment that is intended to be concealed by any permanent portion of the structure shall not be concealed until it has been inspected and approved. Equipment shall not be put into normal operation until it has had a final inspection and been approved. The only

exception is replacement equipment. Replacement equipment may be installed before a permit has been issued, but an application for a permit and a request for an inspection must be made within two (2) days after the equipment has been installed or before it is to be concealed. All electrical permits are required to have periodic inspections. If the project is not started and you do not have an inspection within six (6) months your permit maybe cancelled. All equipment for which a permit has been issued must be inspected and approved. Any portion of equipment that is intended to be concealed by any permanent portion of the structure shall not be concealed until it has been inspected and approved. Equipment shall not be put into normal operation until it has had a final inspection and been approved. The only exception is replacement equipment. Replacement equipment may be installed before a permit has been issued, but an application for a permit and a request for an inspection must be made with in two (2) days after the equipment has been installed or before it is to be concealed. The information requested by this office at the time of application for a permit is required by law under the Michigan Construction Act (M.C.L.A. 125.1523). We are also required by law to keep this information, and all other pertinent documents (including all inspection information) in the County s possession for as long as the building or structure stands. An application for a permit may be made Monday through Friday (except legal holidays) at the Construction Code Department Office in the Sanilac County Courthouse at 60 West Sanilac, Courthouse Annex-Room 210, Sandusky, Michigan 48471 between the hours of 8:00 A.M. and 4:30 P.M. The Construction Code Department requires all inspections to be scheduled by the PERMIT HOLDER (in the case of replacement equipment, the owner of the property) and the request must include the permit number, whether it is a building, electrical, plumbing or mechanical permit, the permit holder s name, and the address of the construction site. It must also include the city, village or township and a telephone number where the contact person may be reached during inspection hours. After inspection is completed, the inspector will leave an INSPECTION NOTICE and/or STICKER at the job site indicating the status of the inspection and whether or not any corrections are needed. The Michigan Construction Code requires that this department keep a copy of all inspection records with the permit file. If an inspection is conducted and the inspector determines that corrections will need to be made or additional work needs to be performed, the permit holder will be responsible for all corrections or additional work and for scheduling a reinspection. If an inspection cannot be completed and approved and a re-inspection must be scheduled, a re-inspection fee may be charged to the permit holder. If a re-inspection has been charged, the re-inspection fee must be paid before or at the time of re-inspection (see reinspections in the REQUIRED INSPECTIONS section). Re-inspection requests will be scheduled like any other inspection request. THE FOLLOWING INFORMATION IS REQUIRED IN WRITING AT THE TIME AN APPLICATION FOR A BUILDING PERMIT IS MADE 1. Code A properly and completely filled out application, provided by this department. 2. Zoning approval is required from your City, Village or Township Zoning Administrator.

3. If sanitary facilities (bathroom/s) are being included or bedrooms are being added in the construction project, a review of your existing facilities or a septic and/or well permit are to be reviewed by the Sanilac County Health Department. (810-648-2150 Ext.#124) 4. If you are changing the use or installing a new driveway, you will need a driveway permit from the city, village, county or state authority having jurisdiction over the road right of way. If you are building on an approved PRIVATE ROAD please ask for a copy of Article 14.28 of the Sanilac County Land Development Code (you must comply with all requirements in this article). The Sanilac County Construction Code staff or the Sanilac County Community Development staff can help you with any questions you may have. 5. A SCALED site plan (needed for Community Development Department also) showing property lines (with dimensions). Show the exact location and dimensions of all building(s) (existing and proposed) and their distance from each property line and each other. The plan shall give the distance from one of the property corners to the nearest section or quarter section line (IN FEET). The plan shall also specify the scale of the drawing (any acceptable engineering scale) and NORTH will always be shown as the top of the sheet. 6. Two copies of the building plans. The plans shall give proper dimensions and be drawn to SCALE (1/8 or ¼ per foot ONLY). The plans shall include giving room sizes and uses, rear, all sides and front elevations and at least one(1) foundation-wall-roof cross section. Drawings for Commercial and Industrial Buildings are required by law to be sealed by either a Professional Engineer or Architect registered in the State of Michigan. Commercial and Industrial Buildings may require more detailed drawings. 7. All persons making application for a Building Permit for a Commercial or Industrial Building that may require SPECIAL INSPECTIONS under Section 1705 of the Michigan Construction must also submit the following: A. A list of all materials and/or duties that may require special inspections. B. A summary of all inspections to be performed. C. The names of all agencies and individuals that will be performing the special inspections. You must also supply a resume describing the agencies and special inspector s credentials. 8. A copy of the legal description of the parcel and a property code number. If the property is a recent split, you will also need to provide a copy of a certified recorded boundary line survey and a recorded deed or land contract showing proof of ownership. The survey must show the original parcel and all new splits. All splits must be approved IN ADVANCE by the Sanilac County Equalization Department. 9. A letter from the deed holder giving consent to start construction if the applicant is not the deed holder of the property on which the construction will take place. 10. A copy of a signed contract between the applicant and a licensed contractor if the contractor is making application for the permit or if the owner makes application and designates a contractor. 11. If the building permit is for a Manufactured Home with a basement we will need two sets of

detailed drawings for the basement (unless the manufactured house has a unified floor system) provided by a Professional Architect or Engineer registered in the State of Michigan. 12. If the building permit is for a Manufactured Home on a frost free foundation we will need two copies of the manufacturer s tie down specifications and drawings. TIME AN APPLICATION FOR A MECHANICAL PERMIT IS MADE Under state law, the only person that shall make application for a mechanical permit is the B. A Mechanical Contractor licensed by the State of Michigan. TIME AN APPLICATION FOR A PLUMBING PERMITS IS MADE Under state law, the only person that shall make application for a plumbing permits is the B. A Plumbing Contractor licensed by the State of Michigan. TIME AN APPLICATION FOR AN ELECTRICAL PERMIT IS MADE Under state law, the only person that shall make application for an electrical permit is the B. An Electrical Contractor licensed with the State of Michigan. ADDITIONAL INFORMATION At the time an application is made or before the building permit has been issued, the Construction Code Department may inform the permit applicant that additional permits or information will be required from other governmental agencies. THE FOLLOWING MUST BE COMPLETED PRIOR TO CALLING FOR A SITE INSPECTION AND ISSUANCE OF THE BUILDING PERMIT 1. On all construction sites a sign must be placed near the main entrance to the property (at the

end of the driveway) near the road-right-of-way with the permit holder s name and permit number. The sign shall be a minimum of 4 (four) square feet and at least 3 (three) feet above the ground. 2. Identify the location of the building(s) and/or addition(s) on the property by inserting stakes at the proposed building corners. The construction stakes must be at least 2 (two) feet above the ground and marked with survey tape, paint or other suitable material, and be labeled for identification. A lot boundary location shall be established by a Licensed Surveyor for all new lots established after April 23, 1996. The stakes used to establish the lot boundary shall be 3 (three) feet above the ground and marked with survey tape, paint or other suitable material, and be labeled for identification. ASSIGNMENT OF ADDRESSES All addresses for Sanilac County are issued by the utility companies: Detroit Edison Company : 1-989-872-6107 Thumb Electric Company: 1-800-327-0166 THE FOLLOWING PROCEDURES MUST BE USED WHEN CALLING FOR AN INSPECTION 1. Inspections may be scheduled by calling the Construction Code Department at (810)648-4664 Monday through Friday, between the hours or 8:00 A.M. and 4:30 P.M. 2. The Construction Code Department requires all inspections to be scheduled by the PERMIT HOLDER ( in the case of replacement equipment the owner of the property) and the request must include the permit number, whether it is a building, electrical, plumbing or mechanical permit, permit holder s name, and the address of the construction site. It must also include the city, village or township, section and a telephone number where the contact person may be reached during inspection hours. 3. If you wish to schedule an inspection through our fax line, you must provide the following information: the permit number, the name of the permit holder, the address of the construction site, whether it is a building, electrical, plumbing or mechanical inspection and the type of inspection you are requesting, such as footing, frame, rough, etc., and a telephone number where the permit holder may be reached during inspection hours. (If you do not provide all of the required information, the inspection request will not be honored.) These inspections will be placed in the next available slot. It is also important that you designate one person to call for all inspections this will help avoid missed or duplicate inspections. 4. Most inspections will be completed within three (3) business days after the request is received. During abnormally busy times of the year the inspection time could be up to five (5) business days. 5. If access roads and/or driveways are not passable because of the weather or other conditions, please let our office know at the time of the inspection is requested.